Chelsea Moore First-year SAID Spring 2013

Page 2: 2013 Spring Semester Portfolio

CM

Page 3: 2013 Spring Semester Portfolio

Contents 2 Site Analysis 8 Unit Wall 12 Living Wall

CM

Page 4: 2013 Spring Semester Portfolio

Site Analysis For this project we were placed into groups of three and then assigned abuilding on campus. We were to sketch,diagram, draft, and photograph thebuilding in relation to three words: threshold, promenade, and arrival. The building assigned to my group was Blegen (Classics Library). Group Members: Caleb Lang,Kevin Goldstein

CM2

Page 5: 2013 Spring Semester Portfolio

6” by 6” Ink on BristolC

M 3

Diagrams

Page 6: 2013 Spring Semester Portfolio

ArrivalThreshold Promenade

6” by 6”Graphite on Bristol

CM4

Sketches

Page 7: 2013 Spring Semester Portfolio

1/2” = 1’ Hand Drafted

Ink on Mylar CM 5

Drawings

Page 8: 2013 Spring Semester Portfolio

CM6

Based on the site, I created an axonometric drawing on mylar that abstracted the space. From this drawing, I crafted a 12” x 12”construction out of basswood.

Axon Construction

Page 9: 2013 Spring Semester Portfolio

From the basswood construction we were to create an item out of

a material of our choosing that became something other and

saidsomething more about the

building. Made of a two tone bain board. C

M 7

Insert

Page 10: 2013 Spring Semester Portfolio

Unit WallThis was a large group project in which we were to create a screen wall made of the same unit and that unit only. The screen was to have at least three differentorientations and each orientation was to be fifty percent solid and fifty percent void. The units could be made of any material of the group’s choosing. Group Members: Michael Ferguson, Lexi Schmidt, Kevin Goldstein, Ali Chidester, Ben Blake, Yicong Wang, Ashlyn Farwell,Savanah Lee, Daham Marapane

CM8

Page 11: 2013 Spring Semester Portfolio

CM 9

6” by 6” Bristol, Chipboard

Proposals

Page 12: 2013 Spring Semester Portfolio

CM10

After one unit was chosen, the design was further developed and material studies were executed todetermine what would be most effective.

Iterations

Page 13: 2013 Spring Semester Portfolio

CM 11

Unit Wall Final

3/4” MDF1/2” Plywood

Page 14: 2013 Spring Semester Portfolio

Living WallEach section of the studio was to create an eight foot by eight foot construction made of only two by fours and half inch thick MDF. Each section had to work with their neighbors to coordinate possible connections and to create unity. Within these constructions, we were to focus on promenade, view, and rest.

CM12

Page 15: 2013 Spring Semester Portfolio

CM 13

The studio section was broken down into various design groups to propose ideas that focused on the program.

6” by 6” 12” by 12” Basswood, Chipboard

Sketch Models

Page 16: 2013 Spring Semester Portfolio

CM14

1 1/2” = 1’drawings of floor plan, elevations, and section

cuts.

Ink on newsprint

Drawings

Page 17: 2013 Spring Semester Portfolio

Final Construction

CM 15