Download - # PSM Psm-checklist
-
8/13/2019 # PSM Psm-checklist
1/14
Occupational Safety & Health Program
Page 1of 14
September 2011www.oshainfo.gatech.edu
PSM Program Review ChecklistUse this checklist to help determine employer compliance with theProcess Safety Management Standard issued by theOccupational Safety and Health Administration. Please note that the checklist does not include all of the standards
requirements and does not reflect all OSHAletters of interpretation or compliance directives in particular
situations.
There are 3 elements to a review of a PSM program:1. Documentationreviewexamination of the documentation of the programs required by the standard.2. Field Inspection & Verificationexamination of the physical covered process; its equipment, piping,
instrumentation, procedures, and operation.3. Interviewsdiscussions with employees and contractors to determine if the implemented program matches the
program outlined in the documentation.
In order to gather the information needed to audit a PSM program the following questions need to be asked for each PSMprogram element
Who What When Where Why How WhoWho is responsible for developing and implementing each of the program elements? WhatWhat are the requirements and contents of each program element? WhenWhen are the required actions for each element completed and when were they required to be
completed?
WhereWhere have actions been implemented or changed? WhyWhy have the implementation decisions and priorities been made as recorded in the documentation? HowHow is the program implemented and how is the programs effectiveness evaluated and improved?
An essential part of verifying program implementation is to audit the flow of information and activities among theelements. When information in one element is changed or when action takes place in one element that affects otherelements, an auditor/reviewer should examine a sample of the related elements to see if the appropriate changes andfollowup actions have taken place.
The following example demonstrates the interrelationship among the elements:During a routine inspection of equipment (Mechanical Integrity), the maintenance worker discovers a valve that nolonger meets the applicable code and must be changed. Because the type of valve is no longer made, a different type of
valve must be selected and installed (Management of Change). The type of valve selected may mandate different stepsfor the operators (Operating Procedures)who will require training and verification in the new procedures (Training).The rationale for selecting the type of valve must be made available for review by employees and their representatives(Employee Participation).
When the new valve is installed by the supplier (Contractors), a qualified and safe contractor must be selected to performthe work(Contractor Management). The workwill involve shutting down part of the process (Pre-startup SafetyReview) as well as brazing some of the lines (Safe Work Practices - Hot Work Permit). The employer must review the
response plan (Emergency Planning) to ensure that procedures are adequate for the installation hazards. AlthoughManagement of Changeprovisions cover interim changes, after the new valve is in place the Process Safety
Informationwill have to be updated before the (Process Hazard Analysis) is updated or revalidated, to account forpotential hazards associated with the new equipment. Also, inspection and maintenance procedures and training will needto be updated (Mechanical Integrity).
In summary, 12PSM elements can be affected by changing one valve. A reviewer/inspector/auditor/compliance officerwould check a representative number of these 11 elements to confirm that the required follow-up activities have beenimplemented for the new valve.
-
8/13/2019 # PSM Psm-checklist
2/14
Occupational Safety & Health Program
PSM Program Review Checklist
Page 2of 14
September 2011www.oshainfo.gatech.edu
Application of PSM Standard to Facility - 1910.119(a)
Does the workplace have any of the following:A process which involves a chemical at or above the specified threshold quantities listed in Appendix A of
the PSM Standard (attached to checklist); or
A process which involves a flammable liquid or gas [as defined in 1910.1200(c)] on site in one location, in aquantity of 10,000 pounds (4535.9 kg) or more.
Exemptions: A threshold quantity of flammable liquids if it is stored in atmospheric tanks or transferred without the
benefit of chilling or refrigeration
Hydrocarbon fuels used solely for workplace consumption as a fuel (e.g., propane used for comfortheating or gasoline for vehicle refueling.) These fuels cannot be part of a process containing other
highly hazardous chemicals covered by the PSM standard.
Retail facilities. Oil or gas well drilling or servicing operations. Normally unoccupied remote facilities. Note: for determining coverage by the PSM standard, the quantity of flammable liquids stored in
atmospheric tanks may be excluded from the quantity in the covered process pursuant to the Meer
Decision.
Important interpretation: June 11, 2007OSHA defines on-site in one location for PSM to mean that the
standard applies when a threshold quantity of highly hazardous chemical (HHC) exists within an area underthe control of an employer or group of affiliated employers. It also applies to any group of vessels that are
interconnected, or in separate vessels that are close enough in proximity that the HHC could be involved in a
potential catastrophic release.
* * I F TH E WORKPLACE HAS ANY OF THESE OPERATIONS OR PROCESSES, I T MUST COMPLY
WITH THE PSM STANDARD. **
Examples of industries that may have highly hazardous chemicals and processes covered by the PSM standard:
Industrial production of organics and inorganicmaterials
Paints Pharmaceuticals Adhesives
Sealants and Fibers Petrochemical facilities Paper Mills Food Processing with Anhydrous Ammonia over
the TQ
Conversion Example
Gallons to lbs conversion = gal lons x 8.33 x specif ic gravity of the liquid = lbs of li quidExample: Weight of 10,000 gall ons of gasoli ne = 10,000 x 8.33 x 0.739 = 61,559 lbs
-
8/13/2019 # PSM Psm-checklist
3/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 3of 14September 2011www.oshainfo.gatech.edu
YES NO Employee Participation1910.119(c)(1)
Has the employer developed a written plan of action for implementation of employeeparticipation?
YES NO Employee Participation1910.119(c)(2)Has the employer consulted with employees and their representatives on the conduct and
development of process hazard analyses and on the development of all other elements of the
PSM standard?
YES NO Employee Participation1910.119(c)(3)Do employees and their representatives have access to process hazard analyses and all other
information required by the PSM standard?
YES NO Hazard Information Collection1910.119(d)(1)
Has the employer collected information pertaining to the hazards of the process?
Toxicity PELs Physical data Reactivity
Corrosivity Thermal & chemical stability Hazards of mixing chemicals MSDSs
YES NO Technology of the Process Information Collection1910.119(d)(2)(i)(A)Does the employer have block diagrams or simplified process flow diagrams for each
covered process?
YES NO Technology of the Process Information Collection1910.119(d)(2)(i)(B-D)Does the employer have information on the technology of the covered process for the
following:
Process chemistry1910.119(d)(2)(i)(B). Maximum intended inventory1910.119(d)(2)(i)(C). Safe upper and lower limits for: temperature, pressures, flows, levels, compositions
or other pertinent metrics for the process1910.119(d)(2)(i)(D).
YES NO Technology of the Process Information Collection1910.119(d)(2)(i)(E)Has the employer performed and documented an evaluation of the consequences ofdeviations in the covered process, including those affecting the health and safety of
employees?
YES NO Equipment of the Process Information Collection1910.119(d)(3)(i)(A-H)Does the employer have information on the equipment of the covered process for thefollowing:
Materials of construction1910.119(d)(3)(i)(A). Piping and instrument diagrams (P&IDs)1910.119(d)(3)(i)(B). Electrical classification1910.119(d)(3)(i)(C). Relief system design and design basis1910.119(d)(3)(i)(D). Ventilation system design1910.119(d)(3)(i)(E). Design codes or standards used1910.119(d)(3)(i)(F). Material and energy balances for processes1910.119(d)(3)(i)(G). Safety systems1910.119(d)(3)(i)(H).
-
8/13/2019 # PSM Psm-checklist
4/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 4of 14September 2011www.oshainfo.gatech.edu
YES NO Equipment of the Process Information Collection1910.119(d)(3)(i)(A-H)
Has the PSM documentation including all elements above been field verified and comparedto the actual equipment and components in the covered process?
YES NO Process Hazard Analysis 1910.119(e)(1)Has the employer performed an initial process hazard analysis on the covered processes?
YES NO Process Hazard Analysis
1910.119(e)(2)(i-vii)Has the employer used one or more of the following methodologies to perform the processhazard analysis (PHA)?
What if1910.119(e)(2)(i). Checklist1910.119(e)(2)(ii). What if/Checklist1910.119(e)(2)(iii). Hazard and Operability Study (HAZOP)1910.119(e)(2)(iv). Failure mode and effects analysis (FEMA)1910.119(e)(2)(v). Fault tree analysis1910.119(e)(2)(vi). An appropriate equivalent methodology1910.119(e)(2)(vii).
YES NO Process Hazard Analysis
1910.119(e)(3)(i-vii)Does the PHA(s) address the following?
Hazards of the process1910.119(e)(3)(i). Equipment in the process1910.119(e)(3)(i). Identification of previous incidents1910.119(e)(3)(ii). Engineering and administrative controls1910.119(e)(3)(iii). Consequences of failure for engineering or administrative controls; including
consequences of deviation and steps required to correct or avoid deviation
1910.119(e)(3)(iv). Facility siting1910.119(e)(3)(v). Human factors1910.119(e)(3)(vi). A qualitative evaluation of safety and health effects of failure on employees in the
workplace1910.119(e)(3)(vii).
YES NO Process Hazard Analysis 1910.119(e)(4)Was the PHA(s) performed by a team that had the following? Expertise in engineering and process operations. At least one employee with experience and knowledge specific to the covered
process. With one member of the team knowledgeable in the specific evaluation
methodology used to perform the PHA.
YES NO Process Hazard Analysis
1910.119(e)(5)Does the employer have a system to promptly address PHA findings and recommendations? Does the system address findings and recommendations in a timely manner? Are the resolutions documented? Document actions taken? Is there a written schedule for completion of recommended actions? Has the actions taken or scheduled for resolution of recommendations been
communicated to employees, contractors or other persons possible impacted by the
recommendations or actions?
-
8/13/2019 # PSM Psm-checklist
5/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 5of 14September 2011www.oshainfo.gatech.edu
YES NO Process Hazard Analysis 1910.119(e)(6)Have PHAs been updated and revalidated at least every five years?
YES NO Process Hazard Analysis 1910.119(e)(7)Has the employer retained all documentation for PHAs, updates, revalidations,
recommendations, and resolutions of recommendations?
YES NO Operating Procedures1910.119(f)(1)
Has the employer developed and implemented written safe operating procedures for eachcovered process; addressing the steps for each operating phase, the operational limits, safetyand health considerations, and safety systems and their function?
Steps for each operating phase: Initial startup1910.119(f)(1)(i)(A).Normal operations1910.119(f)(1)(i)(B). Temporary operations1910.119(f)(1)(i)(C). Emergency shutdown including the conditions under which emergency shutdown is
required, and assignment of responsibility to qualified operators to ensure timely andsafe shutdown1910.119(f)(1)(i)(D).
Emergency operations1910.119(f)(1)(i)(E).Normal shutdown1910.119(f)(1)(i)(F).
Startup after turnaround or emergency shutdown1910.119(f)(1)(i)(G).Operating limits: Consequences of deviation1910.119(f)(1)(ii)(A). Steps required to avoid or correct deviation1910.119(f)(1)(ii)(B).
Safety and health considerations: Properties and hazards of chemicals present in the covered process
1910.119(f)(1)(iii)(A). Precautions required to prevent exposure; including engineering and administrative
controls, and PPE1910.119(f)(1)(iii)(B).
Control measure to be taken if physical or airborne exposure occurs 1910.119(f)(1)(iii)(C).
Quality control of raw materials and control of hazardous chemical inventory1910.119(f)(1)(iii)(D).
Any special or unique hazards (like forklifts hitting ammonia refrigeration pipes)1910.119(f)(1)(iii)(E).
Safety systems and their proper operation1910.119(f)(1)(iv).
-
8/13/2019 # PSM Psm-checklist
6/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 6of 14September 2011www.oshainfo.gatech.edu
YES NO Employee Training1910.119(g)(1)Has the employer trained each employee involved in operating a covered process before theemployee is involved in operating the process?
PSM training programs MUST be developed for: Affected employeesThose not directly involved in the process operation but with
jobs at the facility with a covered process.
Authorized employeesThose directly involved in the process operation. Contractors who may perform work on a covered process.
Vendors/Visitors who may visit the facility and may potentially be exposed to thecovered processPrimarily in emergency evacuation procedures and PPE
requirements (if necessary).
Training subjects should include at least the following:
Lock-out/Tag-out Hot work Line & equipment opening Confined space entry (if applicable) Emergency response Operating procedures Management of Change
Other Training Subjects May be Required for Authorized Employees and Contractors
YES NO Employee Training1910.119(g)(2)Has refresher training been provided for employees involved in operating a covered processat least every three years or as needed?
YES NO Employee Training1910.119(g)(3)
Has the employer documented all training, ascertaining that employees have received andunderstood the training? Documentation should include the following:
Identity of employee. Date of training. Means used to verify employee understanding of the training (test, interview, etc.)
YES NO Contractor Management1910.119(h)(2)(i)
When selecting a contractor, has the employer obtained and evaluated information regarding
the contractors safety and health performance and programs?
YES NO Contractor Management1910.119(h)(2)(ii)
Has the employer informed contract employer of the known potential fire, explosion ortoxic release hazards related to the contractors work and process?
YES NO Contractor Management1910.119(h)(2)(iii)
Has the employer explained to contractor employer the applicable provisions of the
emergency action plan?
YES NO Contractor Management1910.119(h)(2)(iv)
-
8/13/2019 # PSM Psm-checklist
7/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 7of 14September 2011www.oshainfo.gatech.edu
Has the employer developed and implemented safe work practices to control the entrance,
presence and exiting of contractors in covered process areas?
YES NO Contractor Management1910.119(h)(2)(v)Has the employer periodically evaluated the performance of all contractors in fulfilling their
obligations in regards to training and related documentation of for contractor employees?
YES NO
Contractor Management1910.119(h)(2)(vi)Has the employer maintained an illness and injury log (OSHA form 300) for workperformed by contract employees in the covered process area?
YES NO Contractor Management1910.119(h)(3)(i-iv)Has the contractor employer done the following:
Trained each contractor employee is trained in the work practices necessary to safelyperform the job.
Instructed each contractor employee in the known potential fire, explosion or toxicrelease hazards related to the job and process.
Document that each contractor employee has received and understood the trainingrequired, and the documentation includes the identity of the employee, date oftraining, and means used to verify the contract employee understood the training.
Ensure that contractor employees follow safety rules of the facility.YES NO Contractor Management1910.119(h)(2)(v)
Has the contractor notified the employer of unique hazards presented by the contractoremployers work in the covered process area?
YES NO Pre-Startup Safety Review1910.119(i)Did the employer perform a pre-startup review for all new facilities or modified facilities
that are modified enough to require change to the process safety information?
YES NO Mechanical Integrity of Process Equipment1910.119(j)(2)Does the employer have written procedures to maintain the on-going integrity of the
following process equipment: Pressure vessels and storage tanks. Piping systems (including piping components such as valves.) Relief and vent systems and devices. Emergency shutdown systems. Controls (including monitoring devices and sensors, alarms, and interlocks.) Pumps.
YES NO
Mechanical Integrity of Process Equipment
1910.119(j)(3)Does the employer have documentation of training that each employee involved in the
maintaining of the on-going integrity of covered process equipment has been informed ofthe hazards of the process and the procedures applicable to the employees job task and how
to perform the job task in a safe manner?
YES NO Mechanical Integrity of Process Equipment1910.119(j)(4)
-
8/13/2019 # PSM Psm-checklist
8/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 8of 14September 2011www.oshainfo.gatech.edu
Does the employer have documentation that the employer has performed inspections and
tests on the covered process equipment following generally accepted engineering practicesor manufacturers recommendationson a frequency that is according to generally accepted
engineering practices, manufacturers recommendations or more frequently if determined by
prior experience? The documentation should include: date, name of person performing
inspection or test, description of inspection or test, and results of the inspection or test.
YES NO Mechanical Integrity of Process Equipment1910.119(j)(5)Has the employer corrected deficiencies in integrity before further use or in a safe and
timely manner when necessary means are taken to assure safe operation?
YES NO Mechanical Integrity of Process Equipment1910.119(j)(6)Quality assuranceHas the employer assured that fabricated equipment is suitable for the
process application (applicable codes), has been inspected and checked for properinstallation consistent with design specification and manufacturers recommendations, and
all maintenance materials and spare parts are also suitable for the process application?
YES NO Hot Work1910.119(k)Has the employer issued a hot work permit for hot work operations conducted on or near acovered process?
YES NO Management of Change1910.119(l)(1-2)Does the employer have written procedures to manage change in the covered process(es)?
Procedures should cover the following: Technical basis for proposed change. Impact of change on safety and health. Modification to operating procedures.Necessary time period for the change. Authorization requirements for the proposed change.
YES NO Management of Change1910.119(l)(3)Have affected employees and contractors been informed and trained on change in thecovered process prior to start-up of the process or affected portion of the process?
YES NO Management of Change1910.119(l)(4-5)Has the employer updated the following procedures, practices and/or documentation
affected by the change in the process? Process information. Operation procedures or practices. Inspection and testing procedures. PHAs. Flow charts, P&IDs, equipment #s, mechanical integrity certificates, etc.
YES NO Incident Investigation1910.119(m)(1)Has the employer investigated each incident, which resulted in, or could reasonably haveresulted in, a catastrophic release of highly hazardous chemical in the workplace?
YES NO Incident Investigation1910.119(m)(2)
-
8/13/2019 # PSM Psm-checklist
9/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 9of 14September 2011www.oshainfo.gatech.edu
Has an incident investigation been initiated as promptly as possible, but not later than 48
hours following the incident?
YES NO Incident Investigation1910.119(m)(3)Did the investigation team(s) consist of at least one person knowledgeable in the process
involved, including a contract employee if the incident involved work of the contractor, and
other persons with appropriate knowledge and experience?
YES NO Incident Investigation1910.119(m)(4)Did the investigation team issue a report at the conclusion of the investigation which
included at a minimum the following:
Date of incident. Date investigation begun. A description of the incident. The factors that contributed to the incident. Any recommendations resulting from the investigation.
YES NO Incident Investigation1910.119(m)(5)Has the employer established a system to promptly address and resolve incident findingsand recommendations, with documentation of resolutions and corrective actions?
YES NO Incident Investigation1910.119(m)(6)Has the employer reviewed all incident reports with affected personnel whose job tasks are
relevant to the incident findings, including contract employees?
YES NO Incident Investigation1910.119(m)(7)Has the employer retained all incident reports for at least 5 years?
YES NO Emergency Planning and Response1910.119(n)Has the employer developed and implemented an emergency plan for the entire plant inaccordance with the provisions of 29 CFR 1910.38?
YES NO Compliance Audit1910.119(o)(1-3)Has the employer performed an audit of the PSM program to certify they have evaluated
compliance with the provisions of the PSM standard at least every 3 years conducted by at
least one person knowledgeable in the process, and a report issued?
YES NO Compliance Audit1910.119(o)(4)Has the employer promptly determined and documented appropriate response to each of the
findings?
YES NO Compliance Audit1910.119(o)(5)Has the employer retained the two most recent compliance audit reports?
YES NO Trade Secrets1910.119(p)Has the employer made all information necessary to comply with the PSM standard
available to those persons responsible for compiling the process safety information?
YES NO Trade Secrets1910.119(p)
-
8/13/2019 # PSM Psm-checklist
10/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 10of 14September 2011www.oshainfo.gatech.edu
Have employee and their designated representatives had access to trade secret(s)
information contained within process hazard analysis and other documents required to bedeveloped by this standard?
-
8/13/2019 # PSM Psm-checklist
11/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 11of 14September 2011www.oshainfo.gatech.edu
Appendix A1910.119 List of Highly Hazardous Chemicals, Toxics and Reactives
CHEMICAL NAME CAS* TQ**
Acetaldehyde 75-07-0 2500
Acrolein (2-Popenal) 107-02-8 150
Acrylyl Chlorde 814-68-6 250
Allyl Chlorid 107-05-1 1000
Allylamine 107-11-9 1000Alkylaluminum Varies 5000
Ammonia, Anhydrous 7664-41-7 10000
Ammonia solutions (greater than 44% ammonia by weight) 7664-41-7 15000
Ammonium Perchlorate 7790-98-9 7500
Ammonium Permanganate 7787-36-2 7500
Arsine (also called Arsenic Hydride) 7784-42-1 100
Bis(Chloromethyl) Ether 542-88-1 100
Boron Trichloride 10294-34-5 2500
Boron Trifluoride 7637-07-2 250
Bromine 7726-95-6 1500
Bromine Chloride 13863-41-7 1500
Bromine Pentafluoride 7789-30-2 2500
Bromine Trifluoride 7787-71-5 15000
3-Bromopropyne (also called Propargyl Bromide) 106-96-7 100
Butyl Hydroperoxide (Tertiary) 75-91-2 5000
Butyl Perbenzoate (Tertiary) 614-45-9 7500
Carbonyl Chloride (see Phosgene) 75-44-5 100
Carbonyl Fluoride 353-50-4 2500
Cellulose Nitrate (concentrationgreater than 12.6% nitrogen) 9004-70-0 2500
Chlorine 7782-50-5 1500
Chlorine Dioxide 10049-04-4 1000
Chlorine Pentrafluoride 13637-63-3 1000
Chlorine Trifluoride 7790-91-2 1000
Chlorodiethylaluminum (also called DiethylaluminumChloride)
96-10-6 5000
1-Chloro-2,4-Dinitrobenzene 97-00-7 5000
Chloromethyl Methyl Ether 107-30-2 500
Chloropicrin 76-06-2 500
Chloropicrin and Methyl Bromide mixture None 1500
Chloropicrin and Methyl Chloride mixture None 1500
Cumene Hydroperoxide 80-15-9 5000
Cyanogen 460-19-5 2500
Cyanogen Chloride 506-77-4 500
Cyanuric Fluoride 675-14-9 100
Diacetyl Peroxide (concentration greater than 70%) 110-22-5 5000
Diazomethane 334-88-3 500
Dibenzoyl Peroxide 94-36-0 7500
-
8/13/2019 # PSM Psm-checklist
12/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 12of 14September 2011www.oshainfo.gatech.edu
CHEMICAL NAME CAS* TQ**
Diborane 19287-45-7 100
Dibutyl Peroxide (Tertiary) 110-05-4 5000
Dichloro Acetylene 7572-29-4 250
Dichlorosilane 4109-96-0 2500
Diethylzinc 557-20-0 10000
Diisopropyl Peroxydicarbonate 105-64-6 7500
Dilauroyl Peroxide 105-74-8 7500
Dimethyldichlorosilane 75-78-5 1000
Dimethylhydrazine, 1,1- 57-14-7 1000
Dimethylamine, Anhydrous 124-40-3 2500
2,4-Dinitroaniline 97-02-9 5000
Ethyl Methyl Ketone Peroxide (also Methyl Ethyl KetonePeroxide; concentration greater than 60%)
1338-23-4 5000
Ethyl Nitrite 109-95-5 5000
Ethylamine 75-04-7 7500
Ethylene Fluorohydrin 371-62-0 100
Ethylene Oxide 75-21-8 5000
Ethyleneimine 151-56-4 1000
Fluorine 7782-41-4 1000
Formaldehyde (Formalin) 50-00-0 1000
Furan 110-00-9 500
Hexafluoroacetone 684-16-2 5000
Hydrochloric Acid, Anhydrous 7647-01-0 5000
Hydrofluoric Acid, Anhydrous 7664-39-3 1000
Hydrogen Bromide 10035-10-6 5000
Hydrogen Chloride 7647-01-0 5000
Hydrogen Cyanide, Anhydrous 74-90-8 1000
Hydrogen Fluoride 7664-39-3 1000
Hydrogen Peroxide (52% by weight or greater) 7722-84-1 7500
Hydrogen Selenide 7783-07-5 150
Hydrogen Sulfide 7783-06-4 1500
Hydroxylamine 7803-49-8 2500
Iron, Pentacarbonyl 13463-40-6 250
Isopropylamine 75-31-0 5000
Ketene 463-51-4 100
Methacrylaldehyde 78-85-3 1000Methacryloyl Chloride 920-46-7 150
Methacryloyloxyethyl Isocyanate 30674-80-7 100
Methyl Acrylonitrile 126-98-7 250
Methylamine, Anhydrous 74-89-5 1000
Methyl Bromide 74-83-9 2500
Methyl Chloride 74-87-3 15000
Methyl Chloroformate 79-22-1 500
-
8/13/2019 # PSM Psm-checklist
13/14Occupational Safety & Health Program
PSM Program Review Checklist
Page 13of 14September 2011www.oshainfo.gatech.edu
CHEMICAL NAME CAS* TQ**
Methyl Ethyl Ketone Peroxide (concentration greater than 60%) 1338-23-4 5000
Methyl Fluoroacetate 453-18-9 100
Methyl Fluorosulfate 421-20-5 100
Methyl Hydrazine 60-34-4 100
Methyl Iodide 74-88-4 7500
Methyl Isocyanate 624-83-9 250
Methyl Mercaptan 74-93-1 5000
Methyl Vinyl Ketone 79-84-4 100
Methyltrichlorosilane 75-79-6 500
Nickel Carbonly (Nickel Tetracarbonyl) 13463-39-3 150
Nitric Acid (94.5% by weight or greater) 7697-37-2 500
Nitric Oxide 10102-43-9 250
Nitroaniline (para Nitroaniline) 100-01-6 5000
Nitromethane 75-52-5 2500
Nitrogen Dioxide 10102-44-0 250
Nitrogen Oxides (NO; NO(2); N2O4; N2O3) 10102-44-0 250
Nitrogen Tetroxide (also called Nitrogen Peroxide) 10544-72-6 250
Nitrogen Trifluoride 7783-54-2 5000
Nitrogen Trioxide 10544-73-7 250
Oleum (65% to 80% by weight; also called Fuming SulfuricAcid)
8014-94-7 1000
Osmium Tetroxide 20816-12-0 100
Oxygen Difluoride (Fluorine Monoxide) 7783-41-7 100
Ozone 10028-15-6 100
Pentaborane 19624-22-7 100
Peracetic Acid (concentration greater 60% Acetic Acid; also
called Peroxyacetic Acid)
79-21-0 1000
Perchloric Acid (concentration greater than 60% by weight) 7601-90-3 5000
Perchloromethyl Mercaptan 594-42-3 150
Perchloryl Fluoride 7616-94-6 5000
Peroxyacetic Acid (concentration greater than 60% Acetic Acid;also called Peracetic Acid)
79-21-0 1000
Phosgene (also called Carbonyl Chloride) 75-44-5 100
Phosphine (Hydrogen Phosphide) 7803-51-2 100
Phosphorus Oxychloride (also called Phosphoryl Chloride) 10025-87-3 1000
Phosphorus Trichloride 7719-12-2 1000
Phosphoryl Chloride (also called Phosphorus Oxychloride) 10025-87-3 1000
Propargyl Bromide 106-96-7 100
Propyl Nitrate 627-3-4 2500
Sarin 107-44-8 100
Selenium Hexafluoride 7783-79-1 1000
Stibine (Antimony Hydride) 7803-52-3 500
Sulfur Dioxide (liquid) 7446-09-5 1000
Sulfur Pentafluoride 5714-22-7 250
-
8/13/2019 # PSM Psm-checklist
14/14
PSM Program Review Checklist
Page 14of 14September 2011
CHEMICAL NAME CAS* TQ**
Sulfur Tetrafluoride 7783-60-0 250
Sulfur Trioxide (also called Sulfuric Anhydride) 7446-11-9 1000
Sulfuric Anhydride (also called Sulfur Trioxide) 7446-11-9 1000
Tellurium Hexafluoride 7783-80-4 250
Tetrafluoroethylene 116-14-3 5000
Tetrafluorohydrazine 10036-47-2 5000
Tetramethyl Lead 75-74-1 1000
Thionyl Chloride 7719-09-7 250
Trichloro (chloromethyl) Silane 1558-25-4 100
Trichloro (dichlorophenyl) Silane 27137-85-5 2500
Trichlorosilane 10025-78-2 5000
Trifluorochloroethylene 79-38-9 10000
Trimethyoxysilane 2487-90-3 1500
Footnote* Chemical Abstract Service Number
Footnote** Threshold Quantity in Pounds (Amount necessary to be covered by this standard.)