Transcript

**************************************************************************USACE / NAVFAC / AFCEC / NASA UFGS- 01 45 35 ( Febr uar y 2015) - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 01 45 35 ( August 2008)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2018**************************************************************************

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 45 35

SPECI AL I NSPECTI ONS

02/15

PART 1 GENERAL

1. 1 REFERENCES 1. 2 GENERAL REQUI REMENTS 1. 3 DEFI NI TI ONS 1. 3. 1 Cont i nuous Speci al I nspect i ons 1. 3. 2 Per i odi c Speci al I nspect i ons 1. 3. 3 Per f or m 1. 3. 4 Obser ve 1. 3. 5 Speci al I nspect or ( SI ) 1. 3. 6 Associ at e Speci al I nspect or ( ASI ) 1. 3. 7 Thi r d Par t y 1. 3. 8 Speci al I nspect or of Recor d ( SI OR) 1. 3. 9 Cont r act i ng Of f i cer 1. 3. 10 Cont r act or ' s Qual i t y Cont r ol ( QC) Manager 1. 3. 11 Desi gner of Recor d ( DOR) 1. 3. 12 St at ement of Speci al I nspect i ons ( SSI ) 1. 3. 13 Schedul e of Speci al I nspect i ons 1. 3. 14 Desi gnat ed Sei smi c Syst em 1. 4 SUBMI TTALS 1. 5 SPECI AL I NSPECTOR QUALI FI CATI ONS 1. 5. 1 St eel Const r uct i on and Hi gh St r engt h Bol t i ng 1. 5. 1. 1 Speci al I nspect or 1. 5. 1. 2 Associ at e Speci al I nspect or 1. 5. 2 Wel di ng St r uct ur al St eel 1. 5. 2. 1 Speci al I nspect or 1. 5. 2. 2 Associ at e Speci al I nspect or 1. 5. 3 Nondest r uct i ve Test i ng of Wel ds 1. 5. 3. 1 Speci al I nspect or 1. 5. 3. 2 Associ at e Speci al I nspect or 1. 5. 4 Col d For med St eel Fr ami ng 1. 5. 4. 1 Speci al I nspect or 1. 5. 4. 2 Associ at e Speci al I nspect or 1. 5. 5 Concr et e Const r uct i on 1. 5. 5. 1 Speci al I nspect or 1. 5. 5. 2 Associ at e Speci al I nspect or

SECTI ON 01 45 35 Page 1

1. 5. 6 Pr est r essed Concr et e Const r uct i on 1. 5. 6. 1 Speci al I nspect or 1. 5. 6. 2 Associ at e Speci al I nspect or 1. 5. 7 Post - t ensi oned Concr et e Const r uct i on 1. 5. 7. 1 Speci al I nspect or 1. 5. 7. 2 Associ at e Speci al I nspect or 1. 5. 8 Masonr y Const r uct i on 1. 5. 8. 1 Speci al I nspect or 1. 5. 8. 2 Associ at e Speci al I nspect or 1. 5. 9 Wood 1. 5. 9. 1 Speci al I nspect or 1. 5. 9. 2 Associ at e Speci al I nspect or 1. 5. 10 Ver i f i cat i on of Si t e Soi l Condi t i on, Fi l l Pl acement and

Load- Bear i ng Requi r ement s 1. 5. 10. 1 Speci al I nspect or 1. 5. 10. 2 Associ at e Speci al I nspect or 1. 5. 11 Deep Foundat i ons 1. 5. 11. 1 Speci al I nspect or 1. 5. 11. 2 Associ at e Speci al I nspect or 1. 5. 12 Spr ayed Fi r e Resi st ant Mat er i al 1. 5. 12. 1 Speci al I nspect or 1. 5. 12. 2 Associ at e Speci al I nspect or 1. 5. 13 Mast i c and I nt umescent Fi r e Resi st ant Coat i ngs 1. 5. 13. 1 Speci al I nspect or 1. 5. 13. 2 Associ at e Speci al I nspect or 1. 5. 14 Ext er i or I nsul at i on and Fi ni sh Syst em ( EI FS) 1. 5. 14. 1 Speci al I nspect or 1. 5. 14. 2 Associ at e Speci al I nspect or 1. 5. 15 Fi r e- Resi st ant Penet r at i ons and Joi nt s 1. 5. 15. 1 Speci al I nspect or 1. 5. 15. 2 Associ at e Speci al I nspect or 1. 5. 16 Smoke Cont r ol 1. 5. 16. 1 Speci al I nspect or 1. 5. 16. 2 Associ at e Speci al I nspect or 1. 5. 17 Speci al I nspect or of Recor d ( SI OR)

PART 2 PRODUCTS

2. 1 FABRI CATOR SPECI AL I NSPECTI ONS

PART 3 EXECUTI ON

3. 1 RESPONSI BI LI TI ES 3. 1. 1 Speci al I nspect or of Recor d 3. 1. 2 Qual i t y Cont r ol Manager 3. 1. 3 Speci al I nspect or s 3. 2 DEFECTI VE WORK

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 45 35 Page 2

**************************************************************************USACE / NAVFAC / AFCEC / NASA UFGS- 01 45 35 ( Febr uar y 2015) - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 01 45 35 ( August 2008)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2018**************************************************************************

SECTI ON 01 45 35

SPECI AL I NSPECTI ONS02/15

**************************************************************************NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or speci al i nspect i ons when r equi r ed by UFC 3- 301- 01. Thi s speci f i cat i on wi l l appl y onl y t o bui l di ngs.

Adher e t o UFC 1- 300- 02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.

Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Cr i t er i a Change Request ( CCR) .

**************************************************************************

PART 1 GENERAL

**************************************************************************NOTE: Thi s gui de speci f i cat i on wi l l be appl i cabl e t o bot h new bui l di ngs and exi st i ng bui l di ng r ehabi l i t at i ons desi gned accor di ng t o UFC 3- 301- 01 STRUCTURAL ENGI NEERI NG.

I n addi t i on t o t he Speci al I nspect i on and t est i ng speci f i ed r equi r ement s, a r egi st er ed desi gn pr of essi onal must per f or m " st r uct ur al obser vat i ons" dur i ng const r uct i on when r equi r ed by UFC 3- 301- 01. Al l obser ved def i c i enci es wi l l be i mmedi at el y r epor t ed t o t he Cont r act i ng Of f i cer . The r egi st er ed desi gn pr of essi onal per f or mi ng t hese obser vat i ons wi l l be a r epr esent at i ve of t he Desi gner of Recor d ( DOR) f or t he bui l di ng bei ng const r uct ed.

SECTI ON 01 45 35 Page 3

St r uct ur al obser vat i ons ar e r equi r ed f or t he f ol l owi ng pr oj ect condi t i ons per I BC Chapt er 17:

1) Sei smi c Desi gn Cat egor y D, E or F; and assi gned t o Ri sk Cat I I I , I V or V.2) Sei smi c Desi gn Cat egor y D, E or F; and wi t h a hei ght gr eat er t han 22860 mm 75 f t .3) Sei smi c Desi gn Cat egor y E, assi gned t o Ri sk Cat egor y I or I I and t he bui l di ng i s gr eat er t han t wo st or i es above gr ade pl ane.4) Nomi nal desi gn wi nd speed i n excess of 49 m/ sec 110 mph; and assi gned t o Ri sk Cat I I I , I V or V.5) Nomi nal dei sgn wi nd speed i n excess of 49 m/ sec 110 mph; and wi t h a hei ght gr eat er t han 23 m 75 f t .

Coor di nat e wi t h t he Cont r act i ng Of f i cer how St r uct ur al Obser vat i ons wi l l be cover ed f or Desi gn- Bi d- Bui l d pr oj ect s as t hi s ser vi ce wi l l not be cover ed by t he Cont r act or .

Speci al I nspect i ons ar e mi ni mum Qual i t y Assur ance r equi r ement s t hat ar e i n addi t i on t o t he Qual i t y Cont r ol r equi r ement s t hat ar e def i ned i n Sect i ons 01 45 00. 00 10 QUALI TY CONTROL and 01 45 00. 00 20 QUALI TY CONTROL.

The r equi r ement s f or Speci al I nspect i ons, t he speci al i nspect or , and r el at ed t est i ng wi l l be used wher e r equi r ed by UFC 3- 301- 01 and UFC 4- 023- 03.

**************************************************************************

1. 1 REFERENCES

**************************************************************************NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out s i de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

**************************************************************************

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

SECTI ON 01 45 35 Page 4

AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)

ASCE 7 ( 2017) Mi ni mum Desi gn Loads f or Bui l di ngs and Ot her St r uct ur es

I NTERNATI ONAL CODE COUNCI L ( I CC)

I CC I BC ( 2018) I nt er nat i onal Bui l di ng Code

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 310- 04 ( 2013; wi t h Change 1) Sei smi c Desi gn f or Buildings

1. 2 GENERAL REQUI REMENTS

Per f or m Speci al I nspect i ons i n accor dance wi t h t he St at ement of Speci al I nspect i ons, Schedul e of Speci al I nspect i ons and Chapt er 17 of I CC I BC. The St at ement of Speci al I nspect i ons and Schedul e of Speci al I nspect i ons ar e i ncl uded as an at t achment t o t hi s speci f i cat i on. Speci al I nspect i ons ar e t o be per f or med by an i ndependent t hi r d par t y and ar e i nt ended t o ensur e t hat t he wor k of t he pr i me cont r act or i s i n accor dance wi t h t he Cont r act Document s and appl i cabl e bui l di ng codes. Speci al i nspect i ons do not t ake t he pl ace of t he t hr ee phases of cont r ol i nspect i ons per f or med by t he Cont r act or ' s QC Manager or any t est i ng and i nspect i ons r equi r ed by ot her sect i ons of t he speci f i cat i ons. [

St r uct ur al obser vat i ons wi l l be per f or med by t he Gover nment . The cont r act or must pr ovi de not i f i cat i on t o t he Cont r act i ng Of f i cer 14 days pr i or t o t he f ol l owi ng poi nt s of const r uct i on:

**************************************************************************NOTE: Def i ne t he poi nt s i n const r uct i on t hat st r uct ur al obser vat i ons need t o occur .

**************************************************************************

a. [ _____]b. [ _____]c. [ _____] ]

1. 3 DEFINITIONS

1. 3. 1 Cont i nuous Speci al I nspect i ons

Cont i nuous Speci al I nspect i ons i s t he const ant moni t or i ng of speci f i c t asks by a speci al i nspect or . These i nspect i ons must be car r i ed out cont i nuousl y over t he dur at i on of t he par t i cul ar t asks.

1. 3. 2 Per i odi c Speci al I nspect i ons

**************************************************************************NOTE: Consi der r evi s i ng t he def i ni t i on of per i odi c i f t her e i s a speci f i c t i me i nt er val t hat i s r equi r ed bet ween per i odi c i nspect i ons. For a speci f i c t i me i nt er val on a speci f i c Speci al I nspect i ons, i ndi cat e t he t i me i nt er val i n t he Schedul e of Speci al I nspect i ons f or t hat t ask.

**************************************************************************

SECTI ON 01 45 35 Page 5

Per i odi c Speci al I nspect i ons i s Speci al I nspect i ons by t he speci al i nspect or who i s i nt er mi t t ent l y pr esent wher e t he wor k t o be i nspect ed has been or i s bei ng per f or med.

1. 3. 3 Perform

Per f or m t hese Speci al I nspect i ons t asks f or each wel ded j oi nt or member .

1. 3. 4 Observe

Obser ve t hese Speci al I nspect i ons i t ems on a r andom dai l y basi s. Oper at i ons need not be del ayed pendi ng t hese i nspect i ons.

1. 3. 5 Speci al I nspect or ( SI )

A qual i f i ed per son r et ai ned by t he cont r act or and appr oved by t he Cont r act i ng Of f i cer as havi ng t he compet ence necessar y t o i nspect a par t i cul ar t ype of const r uct i on r equi r i ng Speci al I nspect i ons. The SI must be an i ndependent t hi r d par t y hi r ed di r ect l y by t he Pr i me Cont r act or .

1. 3. 6 Associ at e Speci al I nspect or ( ASI )

A qual i f i ed per son who assi st s t he SI i n per f or mi ng Speci al I nspect i ons but must per f or m i nspect i on under t he di r ect super vi s i on of t he SI and cannot per f or m i nspect i ons wi t hout t he SI on s i t e.

1. 3. 7 Thi r d Par t y

A t hi r d par t y i nspect or must not be company empl oyee of t he Cont r act or or any Sub- Cont r act or per f or mi ng t he wor k t o be i nspect ed.

[ 1. 3. 8 Speci al I nspect or of Recor d ( SI OR)

**************************************************************************NOTE: The Speci al I nspect or of Recor d i s r equi r ed f or t he f ol l owi ng pr oj ect condi t i ons per UFC 3-301-01:

1) Sei smi c Desi gn Cat egor y D, E or F; and assi gned t o Ri sk Cat I I I , I V or V.2) Sei smi c Desi gn Cat egor y D, E or F; and wi t h a hei ght gr eat er t han 22860 mm 75 f t .3) Sei smi c Desi gn Cat egor y E, assi gned t o Ri sk Cat egor y I or I I and t he bui l di ng i s gr eat er t han t wo st or i es above gr ade pl ane.4) Nomi nal desi gn wi nd speed i n excess of 49 m/ sec 110 mph; and assi gned t o Ri sk Cat I I I , I V or V.5) Nomi nal dei sgn wi nd speed i n excess of 49 m/ sec 110 mph; and wi t h a hei ght gr eat er t han 23 m 75 f t .

I n addi t i onal t o t hese condi t i ons, t he DOR i s encour aged t o consi der usi ng an SI OR on l ar ge magni t ude or cr i t i cal pr oj ect s wher e t hi s addi t i onal l evel of qual i t y cont r ol i s af f or dabl e.

**************************************************************************

A l i censed engi neer i n r esponsi bl e char ge of super vi s i on al l speci al i nspect or s f or t he pr oj ect and appr oved by t he Cont r act i ng of f i cer . The

SECTI ON 01 45 35 Page 6

SI OR must be an i ndependent t hi r d par t y hi r ed di r ect l y by t he Pr i me Contractor.

] 1. 3. 9 Cont r act i ng Of f i cer

The Gover nment of f i c i al havi ng over al l aut hor i t y f or admi ni st r at i ve cont r act i ng act i ons. Cer t ai n cont r act i ng act i ons may be del egat ed t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) .

1. 3. 10 Cont r act or ' s Qual i t y Cont r ol ( QC) Manager

An i ndi v i dual r et ai ned by t he pr i me cont r act or and qual i f i ed i n accor dance wi t h t he Sect i on [ 01 45 00. 00 20 QUALI TY CONTROL] [ DESI GN- BUI LD Sect i on 01 45 00. 05 20 DESI GN AND CONSTRUCTI ON QUALI TY CONTROL] havi ng t he over al l r esponsi bi l i t y f or t he cont r act or ' s QC or gani zat i on.

1. 3. 11 Desi gner of Recor d ( DOR)

A r egi st er ed desi gn pr of essi onal [ empl oyed by t he Gover nment ] [ cont r act ed by t he Gover nment as an A/ E] r esponsi bl e f or t he over al l desi gn and r evi ew of submi t t al document s pr epar ed by ot her s. The DOR i s r egi st er ed or l i censed t o pr act i ce t hei r r espect i ve desi gn pr of essi on as def i ned by t he st at ut or y r equi r ement s of t he pr of essi onal r egi st r at i on l aws i n st at e i n whi ch t he desi gn pr of essi onal wor ks. The DOR i s al so r ef er r ed t o as t he Engi neer of Recor d ( EOR) i n desi gn code document s.

1. 3. 12 St at ement of Speci al I nspect i ons ( SSI )

**************************************************************************NOTE: The St at ement of Speci al I nspect i ons wi l l be devel oped by t he DOR and must cover t he f ol l owi ng items:1) Li st of t he Ar chi t ect ur al Desi gnat ed Sei smi c Syst ems. a. These component s ar e i n or at t ached t o a Ri sk Cat egor y I V or V st r uct ur e and ar e needed f or cont i nued oper at i on of t he f aci l i t y or t hei r f ai l ur e coul d i mpai r t he cont i nued oper at i on of t he f aci l i t y .2) Li st of t he Mechani cal Desi gnat ed Sei smi c Syst ems. a. For Sei smi c Desi gn Cat egor y C or Ri sk Cat egor y V l i s t t he f ol l owi ng: i . Heat i ng, vent i l at i on and ai r - condi t i oni ng ( HVAC) duct wor k cont ai ni ng hazar dous mat er i al s and anchor age of such duct wor k. i i . Pi pi ng syst ems and mechani cal uni t s cont ai ni ng f l ammabl e, combust i bl e or hi ghl y t oxi c mat er i al s. b. For Sei smi c Desi gn Cat egor y D, E or F or Ri sk Cat egor y V l i s t mechani cal syst em t hat meet one of t he f ol l owi ng: i . Li f e saf et y component r equi r ed t o f unct i on af t er an ear t hquake i i . Component t hat cont ai ns hazar dous cont ent i i i . Al l component s i n an essent i al f aci l i t y needed f or cont i nued oper at i on af t er an ear t hquake3) Li st of t he El ect r i cal Desi gnat ed Sei smi c

SECTI ON 01 45 35 Page 7

Syst ems. a. For Sei smi c Desi gn Cat egor y C or Ri sk Cat egor y V l i s t t he f ol l owi ng: i . Anchor age of el ect r i cal equi pment used f or emer gency or st andby power syst ems. b. For Sei smi c Desi gn Cat egor y D, E or F l i s t el ect r i cal syst em t hat meet one of t he f ol l owi ng: i . Li f e saf et y component r equi r ed t o f unct i on af t er an ear t hquake i i . Component t hat cont ai ns hazar dous cont ent i i i . Al l component s i n an essent i al f aci l i t y needed f or cont i nued oper at i on af t er an ear t hquake4) Def i ne t he per i odi c wal k- down i nspect i ons r equi r ed by UFC 3- 301- 01.5) Li st of el ement s t hat ar e par t of t he pr ogr essi ve col l apse r esi st ance syst em. a. Pr ovi de a descr i pt i on of t he f ol l owi ng as t hey appl y: i . El ement s of t he t i e f or ce syst em consi st i ng of i nt er nal l ongi t udi nal and t r ansver se, ver t i cal , and per i pher al t i es. i i . El ement s of t he al t er nat e pat h syst em. i i i . El ement s havi ng enhanced l ocal r esi st ance.

The St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons wi l l be i ncl uded as an at t achment t o t hi s speci f i cat i on.

**************************************************************************

A document devel oped by t he DOR i dent i f y i ng t he mat er i al , syst ems, component s and wor k r equi r ed t o have Speci al I nspect i ons.

1. 3. 13 Schedul e of Speci al I nspect i ons

**************************************************************************NOTE: A t empl at e f or t he Schedul e of Speci al I nspect i ons can be f ound on t he Whol e Bui l di ng Desi gn Gui de websi t e at https://www.wbdg.org/FFC/NAVGRAPH/graphtoc.pdf .

**************************************************************************

A schedul e whi ch l i s t s each of t he r equi r ed Speci al I nspect i ons, t he ext ent t o whi ch each Speci al I nspect i ons i s t o be per f or med, and t he r equi r ed f r equency f or each i n accor dance wi t h I CC I BC Chapt er 17.

[ 1. 3. 14 Desi gnat ed Sei smi c Syst em

**************************************************************************NOTE: I ncl ude t hi s par agr aph when Desi gnat ed Sei smi c Syst ems ar e r equi r ed i n accor dance wi t h UFC 3-310-04.

**************************************************************************

Those nonst r uct ur al component s t hat r equi r e desi gn i n accor dance wi t h ASCE 7 Chapt er 13 and f or whi ch t he component i mpor t ance f act or , I p, i s gr eat er t han 1. 0. Thi s desi gnat i on appl i es t o syst ems t hat ar e r equi r ed t o be oper at i onal f ol l owi ng t he Desi gn Ear t hquake f or RC I - I V st r uct ur es and

SECTI ON 01 45 35 Page 8

f ol l owi ng t he MCER f or RC V st r uct ur es. Al l syst ems i n RC V f aci l i t i es desi gnat ed as MC- 1 i n accor dance wi t h UFC 3- 310- 04 ar e consi der ed par t of t he Desi gnat ed Sei smi c Syst ems. [ Desi gnat ed Sei smi c Syst ems wi l l be i dent i f i ed by Owner and wi l l have an I mpor t ance Fact or I p = 1. 5] .

] 1. 4 SUBMITTALS

**************************************************************************NOTE: Revi ew submi t t al descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect .

The Gui de Speci f i cat i on t echni cal edi t or s have desi gnat ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y , wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a “ G” t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .

For submi t t al s r equi r i ng Gover nment appr oval on Ar my pr oj ect s, a code of up t o t hr ee char act er s wi t hi n t he submi t t al t ags may be used f ol l owi ng t he " G" desi gnat i on t o i ndi cat e t he appr ovi ng aut hor i t y. Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i c t Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i c t Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.

Use t he " S" c l assi f i cat i on onl y i n SD- 11 Cl oseout Submi t t al s. The " S" f ol l owi ng a submi t t al i t em i ndi cat es t hat t he submi t t al i s r equi r ed f or t he Sust ai nabi l i t y eNot ebook t o f ul f i l l f eder al l y mandat ed sust ai nabl e r equi r ement s i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

**************************************************************************

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on; submi t t al s not havi ng a " G" desi gnat i on ar e f or [ Cont r act or Qual i t y Cont r ol appr oval . ] [ i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . ] Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

SI OR Let t er of Accept ance; G[ , [ _____] ]

SECTI ON 01 45 35 Page 9

Speci al I nspect i ons Pr oj ect Manual ; G[ , [ _____] ]Speci al I nspect i ons Agency' s Wr i t t en Pr act i cesNDT Pr ocedur es and Equi pment Cal i br at i on Recor ds

SD- 06 Test Repor t s

Speci al I nspect i ons Dai l y Repor t sSpeci al I nspect i ons Bi weekl y Repor t s

SD- 07 Cer t i f i cat es

Fabr i cat i on Pl antSt eel Tr uss Pl antWood Tr uss Pl antAC472 Accr edi t at i onSt eel Joi st I nst i t ut e Member shi pPr ecast Concr et e I nst i t ut e ( PCI ) Cer t i f i ed Pl antCer t i f i cat e of Compl i anceSpeci al I nspect or of Recor d Qual i f i cat i ons; G[ , [ _____] ]Speci al I nspect or Qual i f i cat i ons; G[ , [ _____] ]Qual i f i cat i on Recor ds f or NDT t echni c i ans

SD- 11 Cl oseout Submi t t al s

**************************************************************************NOTE: I ncl ude t hi s submi t t al f or l ar ge compl ex projects.

**************************************************************************

I nt er i m Fi nal Repor t of Speci al I nspect i onsCompr ehensi ve Fi nal Repor t of Speci al I nspect i ons; G[ , [ _____] ]

1. 5 SPECI AL I NSPECTOR QUALI FI CATI ONS

Submi t qual i f i cat i ons f or each speci al i nspect or [ and t he speci al i nspect or of r ecor d] .

Cer t i f y i ng Associ at i ons

AABC Associ at ed Ai r Bal ance Counci l

ACI Amer i can Concr et e I nst i t ut e

AWCI Associ at i on of t he Wal l and Cei l i ng I ndust r y

AWS Amer i can Wel di ng Soci et y

FM Fact or y Mut ual

ICC I nt er nat i onal Code Counci l

NDT Nondest r uct i ve Test i ng

NICET Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es

SECTI ON 01 45 35 Page 10

Cer t i f y i ng Associ at i ons

PCI Pr ecast / Pr est r essed Concr et e I nst i t ut e

PTI Post - Tensi oni ng I nst i t ut e

UL Under wr i t er s Labor at or i es

1. 5. 1 St eel Const r uct i on and Hi gh St r engt h Bol t i ng

1. 5. 1. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ b” .

**************************************************************************

a. I CC St r uct ur al St eel and Bol t i ng Speci al I nspect or cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 1. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

1. 5. 2 Wel di ng St r uct ur al St eel

1. 5. 2. 1 Speci al I nspect or

**************************************************************************NOTE: For hi ghl y compl ex st eel pr oj ect s use onl y AWS Cer t i f i ed Wel di ng I nspect or s.

**************************************************************************

a. I CC St r uct ur al Wel di ng Speci al I nspect or cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. AWS Cer t i f i ed Wel di ng I nspect or

1. 5. 2. 2 Associ at e Speci al I nspect or

AWS Cer t i f i ed Associ at e Wel di ng I nspect or

1. 5. 3 Nondest r uct i ve Test i ng of Wel ds

1. 5. 3. 1 Speci al I nspect or

NDT Level I I I Cer t i f i cat e

1. 5. 3. 2 Associ at e Speci al I nspect or

NDT Level I I Cer t i f i cat e pl us one year of r el at ed exper i ence

SECTI ON 01 45 35 Page 11

1. 5. 4 Col d For med St eel Fr ami ng

1. 5. 4. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ c and d” .

**************************************************************************

a. I CC St r uct ur al St eel and Bol t i ng Speci al I nspect or cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. I CC Commer ci al Bui l di ng I nspect or wi t h one year of exper i ence, or

c. I CC Resi dent i al Bui l di ng I nspect or wi t h one year of exper i ence, or

d. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 4. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

1. 5. 5 Concr et e Const r uct i on

1. 5. 5. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ c and d” .

**************************************************************************

a. I CC Rei nf or ced Concr et e Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. ACI Concr et e Const r uct i on Speci al I nspect or , or

c. NI CET Concr et e Techni c i an Level I I I Cer t i f i cat e i n Const r uct i on Mat er i al s Test i ng, or

d. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 5. 2 Associ at e Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ b” .

**************************************************************************

a. ACI Concr et e Const r uct i on Speci al I nspect or i n Tr ai ni ng, or

b. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

SECTI ON 01 45 35 Page 12

1. 5. 6 Pr est r essed Concr et e Const r uct i on

1. 5. 6. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ c” .

**************************************************************************

a. I CC Pr e- st r essed Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. PCI Qual i t y Cont r ol Techni c i an/ I nspect or Level I I Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

c. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 6. 2 Associ at e Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ b” .

**************************************************************************

a. PCI Qual i t y Cont r ol Techni c i an/ I nspect or Level I Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

1. 5. 7 Post - t ensi oned Concr et e Const r uct i on

1. 5. 7. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ b” .

**************************************************************************

a. PTI Level 2 Unbonded PT I nspect or Cer t i f i cat e, or

b. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 7. 2 Associ at e Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ b” .

**************************************************************************

a. PTI Level 1 Unbonded PT I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

SECTI ON 01 45 35 Page 13

1. 5. 8 Masonr y Const r uct i on

1. 5. 8. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ b” .

**************************************************************************

a. I CC St r uct ur al Masonr y Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 8. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

1. 5. 9 Wood

1. 5. 9. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ b” .

**************************************************************************

a. I CC Commer ci al Bui l di ng I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. I CC Resi dent i al Bui l di ng I nspect or wi t h on year of exper i ence, or

c. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 9. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

1. 5. 10 Ver i f i cat i on of Si t e Soi l Condi t i on, Fi l l Pl acement and Load- Bear i ng Requirements

1. 5. 10. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ d and e” .

**************************************************************************

a. I CC Soi l s Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. NI CET Soi l s Techni c i an Level I I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng, or

c. NI CET Geot echni cal Engi neer i ng Techni c i an Level I I Const r uct i on or Gener al i st Cer t i f i cat e, or

SECTI ON 01 45 35 Page 14

d. Geol ogi st - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence, or

e. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 10. 2 Associ at e Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ c” .

**************************************************************************

a. NI CET Soi l s Techni c i an Level I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng wi t h one year of r el at ed exper i ence, or

b. NI CET Geot echni cal Engi neer i ng Techni c i an Level I Const r uct i on or Gener al i st Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

c. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

1. 5. 11 Deep Foundat i ons

1. 5. 11. 1 Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ c and d” .

**************************************************************************

a. NI CET Soi l s Techni c i an Level I I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng, or

b. NI CET Geot echni cal Engi neer i ng Techni c i an Level I I Const r uct i on or Gener al i st Cer t i f i cat e, or

c. Geol ogi st - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence, or

d. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 11. 2 Associ at e Speci al I nspect or

**************************************************************************NOTE: For pr oj ect s wi t h Sei smi c Desi gn Cat egor y D, E or F or nomi nal desi gn wi nd speed i n excess of 49 m/ s 110 mph, consi der el i mi nat i ng “ c” .

**************************************************************************

a. NI CET Soi l s Techni c i an Level I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng wi t h one year of r el at ed exper i ence, or

b. NI CET Geot echni cal Engi neer i ng Techni c i an Level I Const r uct i on or Gener al i st Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

c. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

SECTI ON 01 45 35 Page 15

1. 5. 12 Spr ayed Fi r e Resi st ant Mat er i al

1. 5. 12. 1 Speci al I nspect or

a. I CC Spr ay- appl i ed Fi r epr oof i ng Speci al I nspect or Cer t i f i cat e, or

b. I CC Fi r e I nspect or I Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

c. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 12. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

1. 5. 13 Mast i c and I nt umescent Fi r e Resi st ant Coat i ngs

1. 5. 13. 1 Speci al I nspect or

a. I CC Spr ay- appl i ed Fi r epr oof i ng Speci al I nspect or Cer t i f i cat e, or

b. I CC Fi r e I nspect or I Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

c. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 13. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

1. 5. 14 Ext er i or I nsul at i on and Fi ni sh Syst em ( EI FS)

1. 5. 14. 1 Speci al I nspect or

a. AWCI EI FS I nspect or Cer t i f i cat e, or

b. Ext er i or Desi gn I nst i t ut e Cer t i f i cat e, or

c. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 14. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

1. 5. 15 Fi r e- Resi st ant Penet r at i ons and Joi nt s

1. 5. 15. 1 Speci al I nspect or

a. Passed t he UL Fi r est op Exam wi t h one year of r el at ed exper i ence, or

b. Passed t he FM Fi r est op Exam wi t h one year of r el at ed exper i ence, or

c. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 15. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

SECTI ON 01 45 35 Page 16

1. 5. 16 Smoke Cont r ol

1. 5. 16. 1 Speci al I nspect or

a. AABC Techni c i an Cer t i f i cat i on wi t h one year of r el at ed exper i ence, or

b. Regi st er ed Pr of essi onal Engi neer wi t h r el at ed exper i ence

1. 5. 16. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

[ 1. 5. 17 Speci al I nspect or of Recor d ( SI OR)

Regi st er ed Pr of essi onal Engi neer

] PART 2 PRODUCTS

2. 1 FABRI CATOR SPECI AL I NSPECTI ONS

Speci al I nspect i ons of f abr i cat or ' s wor k per f or med i n t he f abr i cat or ' s shop i s r equi r ed t o be i nspect ed i n accor dance wi t h t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons unl ess t he f abr i cat or i s cer t i f i ed by t he appr oved agency t o per f or m such wor k wi t hout Speci al I nspect i ons. Submi t t he f ol l owi ng cer t i f i cat i on [ cer t i f i cat i ons] t o t he Cont r act i ng Of f i cer f or i nf or mat i on t o al l ow wor k per f or med i n t he f abr i cat or ' s shop t o not be subj ect ed t o Speci al I nspect i ons.

**************************************************************************NOTE: The f ol l owi ng cer t i f i cat i ons meet t he r equi r ement s f or f abr i cat or appr oval i n accor dance wi t h par agr aph 1704. 2. 5. 2 of I BC.

**************************************************************************

[ Amer i can I nst i t ut e of St eel Const r uct i on ( AI SC) Cer t i f i ed Fabr i cat i on Pl ant , Cat egor y STD.

][ Tr uss Pl at e I nst i t ut e ( TPI ) st eel t r uss pl ant qual i t y assur ance pr ogr am certification.

][ Tr uss Pl at e I nst i t ut e ( TPI ) wood t r uss pl ant qual i t y assur ance pr ogr am certification. ]

**************************************************************************NOTE: AC472 Accr edi t at i on i s t he accr edi t at i on cr i t er i a f or i nspect i on pr ogr ams f or manuf act ur er s of met al bui l di ng syst ems.

**************************************************************************

[ I nt er nat i onal Accr edi t at i on Ser vi ce, AC472 Accr edi t at i on][ St eel Joi st I nst i t ut e Member shi p][ Pr ecast Concr et e I nst i t ut e ( PCI ) Cer t i f i ed Pl ant , Gr oup C]

At t he compl et i on of f abr i cat i on, submi t a cer t i f i cat e of compl i ance, t o be i ncl uded wi t h t he compr ehensi ve f i nal r epor t of Speci al I nspect i ons, st at i ng t hat t he mat er i al s suppl i ed and wor k per f or med by t he f abr i cat or ar e i n accor dance t he const r uct i on document s.

SECTI ON 01 45 35 Page 17

PART 3 EXECUTI ON

3. 1 RESPONSIBILITIES

[ 3. 1. 1 Speci al I nspect or of Recor d

**************************************************************************NOTE: I ncl ude t hi s par agr aph when t he SI OR i s required.

**************************************************************************

a. Super vi se al l Speci al I nspect or s r equi r ed by t he cont r act document s and t he I BC.

b. Submi t a SI OR Let t er of Accept ance t o t he Cont r act i ng Of f i cer at t est i ng t o accept ance of t he dut i es of SI OR, s i gned and seal ed by t he SI OR.

c. Ver i f y t he qual i f i cat i ons of al l of t he Speci al I nspect or s.

d. Ver i f y t he qual i f i cat i ons of f abr i cat or s.

**************************************************************************NOTE: I ncl ude t he f ol l owi ng br acket ed r equi r ement s when t he st r uct ur al desi gn i s r equi r ed t o f ol l ow AI SC 341 f or sei smi c desi gn of st eel st r uct ur es.

**************************************************************************

[ e. Submi t Speci al I nspect i ons agency' s wr i t t en pr act i ces f or t he moni t or i ng and cont r ol of t he agency' s oper at i ons t o i ncl ude t he following:

( 1) The agency' s pr ocedur es f or t he sel ect i on and admi ni st r at i on of i nspect i on per sonnel , descr i bi ng t he t r ai ni ng, exper i ence and exami nat i on r equi r ement s f or qual i f i cat i ons and cer t i f i cat i on of i nspect i on per sonnel .

( 2) The agency' s i nspect i on pr ocedur es, i ncl udi ng gener al i nspect i on, mat er i al cont r ol s, and v i sual wel di ng i nspect i on.

f . Submi t qual i f i cat i on r ecor ds f or nondest r uct i ve t est i ng ( NDT) t echni c i ans desi gnat ed f or t he pr oj ect .

g. Submi t NDT pr ocedur es and equi pment cal i br at i on r ecor ds f or NDT t o be per f or med and equi pment t o be used f or t he pr oj ect . ]

h. Pr epar e a Speci al I nspect i ons Pr oj ect Manual , whi ch wi l l cover t he following:

( 1) Rol es and r esponsi bi l i t i es of t he f ol l owi ng i ndi v i dual s dur i ng Speci al I nspect i ons: SI OR, SI , Gener al Cont r act or , Subcont r act or s, QC Manager , and DOR.

( 2) Or gani zat i onal char t and/ or communi cat i on pl an, i ndi cat i ng l i nes of communi cat i on.

( 3) Cont r act or ' s i nt er nal pl an f or schedul i ng i nspect i ons. Addr ess i t ems such as t i mel i ness of i nspect i on r equest s, who t o cont act f or i nspect i on r equest s, and avai l abi l i t y of al t er nat e i nspect or s.

SECTI ON 01 45 35 Page 18

( 4) I ndi cat e t he gover nment r epor t i ng pr ocedur es.

( 5) Pr opose f or ms or t empl at es t o be used by SI and SI OR t o document inspections.

( 6) I ndi cat e pr ocedur es f or t r acki ng nonconf or mi ng wor k and ver i f i cat i on t hat cor r ect i ve wor k i s compl et e.

( 7) I ndi cat e how t he SI OR and/ or SI wi l l par t i c i pat e i n weekl y QC meetings.

( 8) I ndi cat e how Speci al I nspect i ons of shop f abr i cat ed i t ems wi l l be handl ed when t he f abr i cat or ' s shop i s not cer t i f i ed per par agr aph FABRI CATOR SPECI AL I NSPECTI ONS.

( 9) I ncl ude a sect i on i n t he manual t hat cover s each speci f i c i t em r equi r i ng Speci al I nspect i ons t hat i s i ndi cat ed on t he Schedul e of Speci al I nspect i ons. Pr ovi de names and qual i f i cat i ons of each speci al i nspect or who wi l l be per f or mi ng t he Speci al I nspect i ons f or each speci f i c i t em. Pr ovi de det ai l on how t he Speci al I nspect i ons ar e t o be car r i ed out f or each i t em so t hat t he expect at i ons ar e c l ear f or t he Gener al Cont r act or and t he Subcont r act or per f or mi ng t he wor k.

Make a copy of t he Speci al I nspect i ons Pr oj ect Manual avai l abl e on t he j ob s i t e dur i ng const r uct i on. Submi t a copy of t he Speci al I nspect i ons Pr oj ect Manual f or appr oval .

i . At t end coor di nat i on and mut ual under st andi ng meet i ng wher e t he i nf or mat i on i n t he Speci al I nspect i ons Pr oj ect Manual wi l l be r evi ewed t o ver i f y t hat al l par t i es have a c l ear under st andi ng of t he Speci al I nspect i ons pr ovi s i ons and t he i ndi v i dual dut i es and r esponsi bi l i t i es of each par t y.

j . Mai nt ai n a 3- r i ng bi nder f or t he Speci al I nspect or ' s dai l y and bi weekl y r epor t s and t he Speci al I nspect i ons Pr oj ect Manual . Thi s f i l e must be l ocat ed i n a conspi cuous pl ace i n t he pr oj ect t r ai l er / of f i ce t o al l ow r evi ew by t he Cont r act i ng Of f i cer and t he DOR.

k. Submi t a copy of t he Speci al I nspect or ' s dai l y r epor t s t o t he QC Manager.

l . Di scr epanci es t hat ar e obser ved dur i ng Speci al I nspect i ons must be r epor t ed t o t he QC Manager f or cor r ect i on. I f di scr epanci es ar e not cor r ect ed bef or e t he speci al i nspect or l eaves t he s i t e t he obser ved di scr epanci es must be document ed i n t he dai l y r epor t .

m. Submi t a bi weekl y Speci al I nspect i ons r epor t unt i l al l wor k r equi r i ng Speci al I nspect i ons i s compl et e. A r epor t i s r equi r ed f or each bi weekl y per i od i n whi ch Speci al I nspect i ons act i v i t y occur s, and must i ncl ude t he f ol l owi ng:

( 1) A br i ef summar y of t he wor k per f or med dur i ng t he r epor t i ng t i me frame.

**************************************************************************NOTE: I ncl ude t he br acket ed por t i on of t he f ol l owi ng l i ne when t her e ar e desi gnat ed sei smi c syst ems f or mechani cal and el ect r i cal .

SECTI ON 01 45 35 Page 19

**************************************************************************

( 2) Changes and/ or di scr epanci es wi t h t he dr awi ngs, speci f i cat i ons [ and mechani cal or el ect r i cal component cer t i f i cat i on, ] t hat wer e obser ved dur i ng t he r epor t i ng per i od.

( 3) Di scr epanci es whi ch wer e r esol ved or cor r ect ed.

( 4) A l i s t of nonconf or mi ng i t ems r equi r i ng r esol ut i on.

( 5) Al l appl i cabl e t est r esul t s i ncl udi ng nondest r uct i ve t est i ng reports.

**************************************************************************NOTE: I ncl ude t hi s par agr aph on l ar ge compl ex projects.

**************************************************************************

[ n. At t he compl et i on of each Def i nabl e Feat ur e of Wor k ( DFOW) r equi r i ng Speci al I nspect i ons, submi t an i nt er i m f i nal r epor t of Speci al I nspect i ons t hat document s t he Speci al I nspect i ons compl et ed f or t hat DFOW and cor r ect i ons of al l di scr epanci es not ed i n t he dai l y r epor t s. The i nt er i m f i nal r epor t of Speci al I nspect i ons must be s i gned, dat ed and bear t he seal of t he SI OR. ]

o. At t he compl et i on of t he pr oj ect submi t a compr ehensi ve f i nal r epor t of Speci al I nspect i ons t hat document s t he Speci al I nspect i ons compl et ed f or t he pr oj ect and cor r ect i ons of al l di scr epanci es not ed i n t he dai l y r epor t s. The compr ehensi ve f i nal r epor t of Speci al I nspect i ons must be s i gned, dat ed and bear t he seal of t he SI OR.

] 3. 1. 2 Qual i t y Cont r ol Manager

**************************************************************************NOTE: I ncl ude t he br acket ed i t ems when t her e i s no SIOR.

**************************************************************************

[ a. Super vi se al l Speci al I nspect or s r equi r ed by t he cont r act document s and t he I BC.

b. Ver i f y t he qual i f i cat i ons of al l of t he Speci al I nspect or s.

c. Ver i f y t he qual i f i cat i ons of f abr i cat or s.

d. Mai nt ai n a 3- r i ng bi nder f or t he Speci al I nspect or ' s dai l y and bi weekl y r epor t s. Thi s f i l e must be l ocat ed i n a conspi cuous pl ace i n t he pr oj ect t r ai l er / of f i ce t o al l ow r evi ew by t he Cont r act i ng Of f i cer and t he DOR.

] [ a. ] [ e. ] Mai nt ai n a r ewor k i t ems l i s t t hat i ncl udes di scr epanci es not ed on t he Speci al I nspect or s dai l y r epor t .

3. 1. 3 Speci al I nspect or s

a. I nspect al l el ement s of t he pr oj ect f or whi ch t he speci al i nspect or i s qual i f i ed t o i nspect and ar e i dent i f i ed i n t he Schedul e of Speci al Inspections.

SECTI ON 01 45 35 Page 20

b. At t end pr epar at or y phase meet i ngs r el at ed t o t he Def i nabl e Feat ur e of Wor k ( DFOW) f or whi ch t he speci al i nspect or i s qual i f i ed t o i nspect .

**************************************************************************NOTE: I ncl ude subpar agr aphs “ c” t hr ough “ j ” when t he SI OR i s NOT r equi r ed.

**************************************************************************

**************************************************************************NOTE: I ncl ude subpar agr aphs “ c” t hr ough “ e” r equi r ement s when t he st r uct ur al desi gn i s r equi r ed t o f ol l ow AI SC 341 f or sei smi c desi gn of st eel structures.

**************************************************************************

[ c . Submi t Speci al I nspect i ons agency' s wr i t t en pr act i ces f or t he moni t or i ng and cont r ol of t he agency' s oper at i ons t o i ncl ude t he following:

( 1) The agency' s pr ocedur es f or t he sel ect i on and admi ni st r at i on of i nspect i on per sonnel , descr i bi ng t he t r ai ni ng, exper i ence and exami nat i on r equi r ement s f or qual i f i cat i ons and cer t i f i cat i on of i nspect i on per sonnel .

( 2) The agency' s i nspect i on pr ocedur es, i ncl udi ng gener al i nspect i on, mat er i al cont r ol s, and v i sual wel di ng i nspect i on.

d. Submi t qual i f i cat i on r ecor ds f or nondest r uct i ve t est i ng ( NDT) t echni c i ans desi gnat ed f or t he pr oj ect .

e. Submi t NDT pr ocedur es and equi pment cal i br at i on r ecor ds f or NDT t o be per f or med and equi pment t o be used f or t he pr oj ect . ]

f . Submi t a copy of t he dai l y r epor t s t o t he QC Manager .

g. Di scr epanci es t hat ar e obser ved dur i ng Speci al I nspect i ons must be r epor t ed t o t he QC Manager f or cor r ect i on. I f di scr epanci es ar e not cor r ect ed bef or e t he speci al i nspect or l eaves t he s i t e t he obser ved di scr epanci es must be document ed i n t he dai l y r epor t .

h. Submi t a bi weekl y Speci al I nspect i on Repor t unt i l al l i nspect i ons ar e compl et e. A r epor t i s r equi r ed f or each bi weekl y per i od i n whi ch Speci al I nspect i ons act i v i t y occur s, and must i ncl ude t he f ol l owi ng:

( 1) A br i ef summar y of t he wor k per f or med dur i ng t he r epor t i ng t i me frame.

**************************************************************************NOTE: I ncl ude t he br acket ed por t i on when t her e ar e desi gnat ed sei smi c syst ems f or mechani cal and electrical.

**************************************************************************

( 2) Changes and/ or di scr epanci es wi t h t he dr awi ngs, speci f i cat i ons [ and mechani cal or el ect r i cal component cer t i f i cat i on, ] t hat wer e obser ved dur i ng t he r epor t i ng per i od.

( 3) Di scr epanci es whi ch wer e r esol ved or cor r ect ed.

SECTI ON 01 45 35 Page 21

( 4) A l i s t of nonconf or mi ng i t ems r equi r i ng r esol ut i on.

5) Al l appl i cabl e t est r esul t i ncl udi ng nondest r uct i ve t est i ng reports.

**************************************************************************NOTE: I ncl ude t hi s par agr aph f or l ar ge compl ex projects.

**************************************************************************

[ i . At t he compl et i on of each DFOW r equi r i ng Speci al I nspect i ons, submi t an i nt er i m f i nal r epor t of Speci al I nspect i ons t hat document s t he Speci al I nspect i ons compl et ed f or t hat DFOW. I dent i f y t he i nspect or r esponsi bl e f or each i t em i nspect ed and cor r ect i ons of al l di scr epanci es not ed i n t he dai l y r epor t s. The i nt er i m f i nal r epor t of Speci al I nspect i ons must be s i gned, dat ed and i ndi cat e t he cer t i f i cat i on of t he speci al i nspect or qual i f y i ng t hem t o conduct t he inspection. ]

j . At t he compl et i on of t he pr oj ect submi t a compr ehensi ve f i nal r epor t of Speci al I nspect i ons t hat document s t he Speci al I nspect i ons compl et ed f or t he pr oj ect and cor r ect i ons of al l di scr epanci es not ed i n t he dai l y r epor t s. The compr ehensi ve f i nal r epor t of Speci al I nspect i ons must be s i gned, dat ed and i ndi cat e t he cer t i f i cat i on of t he speci al i nspect or qual i f y i ng t hem t o conduct t he i nspect i on.

**************************************************************************NOTE: I ncl ude t he f ol l owi ng r equi r ement when t he SI OR i s r equi r ed.

**************************************************************************

[ k . Submi t dai l y r epor t s t o t he SI OR.

] 3. 2 DEFECTI VE WORK

Check wor k as i t pr ogr esses, but f ai l ur e t o det ect any def ect i ve wor k or mat er i al s must i n no way pr event l at er r ej ect i on i f def ect i ve wor k or mat er i al s ar e di scover ed, nor obl i gat e t he Cont r act i ng Of f i cer t o accept such wor k.

- - End of Sect i on - -

SECTI ON 01 45 35 Page 22


Top Related