Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies Directorate of Economics and Statistics Planning Department, Government of Maharashtra Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM Tender Notification No. EVL/1117/RKVY/502 Refer to RFP No. 1. OAP/1116/EVL/277 dated 09 th May 2016 2. OAP/1116/EVL/679 dated 23 rd December 2016 Issued By The Director Directorate of Economics & Statistics Administrative Bldg., 8 th floor, Govt. Colony, Bandra (E), Mumbai 400 051 Ph. No. 022-26400053 / 26400178 Fax No. 022-26559492 E-Mail: [email protected] Issued by Directorate of Economics & Statistics, Mumbai, GoM Page 1 of 104

Upload: others

Post on 04-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Directorate of Economics and Statistics

Planning Department, Government of Maharashtra

Limited tender for conducting evaluation study of

Rashtriya Krishi Vikas Yojna implemented by Agriculture Department,

GoM

Tender Notification No. EVL/1117/RKVY/502

Refer to RFP No. 1. OAP/1116/EVL/277 dated 09th May 2016

2. OAP/1116/EVL/679 dated 23rd December 2016

Issued By

The Director

Directorate of Economics & Statistics

Administrative Bldg., 8th floor, Govt. Colony,

Bandra (E), Mumbai 400 051

Ph. No. 022-26400053 / 26400178

Fax No. 022-26559492

E-Mail: [email protected]

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 1 of 104

Page 2: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Table of Contents

PART I

Part I ........................................................................................................................................................................................ 4

Glossary ................................................................................................................................................................................... 4

Invitation for Proposal ............................................................................................................................................................. 5

Important Information ............................................................................................................................................................. 6

Scope of work .......................................................................................................................................................................... 7

Expected broad procedure to be followed by successful bidder and expected deliverables .................................................... 9

1. Purpose of Bid Document .................................................................................................................................................................. 11

2. Cost of Bid Document .................................................................................................................................................................. 11

3. Completeness of Bid Document ................................................................................................................................................... 11

4. Proposal Preparation Cost ............................................................................................................................................................ 11

5. Period of Validity of Bids ............................................................................................................................................................. 11

6. Pre-Bid Meeting ........................................................................................................................................................................... 11

7. Amendments to Bid Document .................................................................................................................................................... 12

8. Rights to Terminate the Process ................................................................................................................................................... 12

9. Site Visit/Field visit ...................................................................................................................................................................... 12

10. Language of Bid ........................................................................................................................................................................... 13

11. Bid Submission Format ................................................................................................................................................................ 13

12. Documents Comprising of Bid ..................................................................................................................................................... 13

13. Earnest Money Deposit (EMD) and refund for Group I – Category A1 ....................................................................................... 14

14. Submissions of Bid ....................................................................................................................................................................... 14

15. Opening of Bid ............................................................................................................................................................................. 15

16. Opening of Commercial Bid ......................................................................................................................................................... 15

17. Evaluation Process ....................................................................................................................................................................... 15

18. Award Criteria .............................................................................................................................................................................. 18

19. Clarification of Bid ....................................................................................................................................................................... 20

20. Non-Material Non-Conformities .................................................................................................................................................. 20

21. Stamp Duty ................................................................................................................................................................................... 20

22. Signing of Contract ...................................................................................................................................................................... 20

Terms and Conditions of contract ......................................................................................................................................... 20

1. Eligibility ........................................................................................................................................................................................... 20

2. Terms and Conditions ........................................................................................................................................................................ 21

3. Performance Bank Guarantee ............................................................................................................................................................. 21

4. Payment Terms .................................................................................................................................................................................. 21

5. Penalty (Please see Expected broad procedure (ii))............................................................................................................................ 22

6. Indemnity ........................................................................................................................................................................................... 22

7. Force Majeure .................................................................................................................................................................................... 22

8. Termination of contract ...................................................................................................................................................................... 22

9. Rights to Accept/Reject any or all proposals ...................................................................................................................................... 23

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 2 of 104

Page 3: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

10. Fraud and Corruption ....................................................................................................................................................................... 23

Part II – Annexures ................................................................................................................................................................ 25

Annexure A: Bid Cover Letter ............................................................................................................................................................... 25

Annexure B: Format to share Bidder’s particulars and contact person’s details .................................................................................... 27

Annexure C: Authorisation letter for attending pre-bid meeting ............................................................................................................ 28

Annexure D: Format for CV of 3 key staff members proposed ............................................................................................................. 29

Annexure E: Draft Format for activity wise work plan .......................................................................................................................... 30

Annexure F: Brief understanding of Rashtriya Krishi Vikas Yojna ....................................................................................................... 31

Annexure G: Proposed methodology for evaluation study of Rashtriya Krishi Vikas Yojna ................................................................. 31

Annexure H: Format for Price Schedule ................................................................................................................................................ 32

Annexure I: Performance Bank Guarantee ............................................................................................................................................. 33

Annexure J: A. Draft Contract Form (CF) with Group I Category A1 empanelled agencies on Stamp Paper of `100 .......................... 36

Annexure K: Check-list for the documents to be included ..................................................................................................................... 42

Annexure L: Organisation Structure, Government Resolution ............................................................................................................... 43

Annexure M: Scheme Related Information ............................................................................................................................................ 52

Annexure N: Projects/schemes details ................................................................................................................................................... 54

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 3 of 104

Page 4: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Part I

Glossary

Term Meaning

BG Bank Guarantee

EDP Electronic Data Processing

EMD Earnest Money Deposit

GoM Government of Maharashtra

LoI Letter of Intent

NDA Non-Disclosure Agreement

PBG Performance Bank Guarantee

RFP Request for Proposal

ISO International Organization for Standardization

PQ Pre-Qualification

Government Government of India or GoM

GoI Government of India

DES Directorate of Economics and Statistics, Planning Department, GoM

Bidder Entity which will respond to this limited bid

Government

Agencies

Government entities which will assign actual work to empanelled

vendors

Empanelled

Vendors

Agency/organisation which has been empanelled in the respective

categories mentioned in the Government resolution of Planning Dept.,

GoM, dated 22/07/2016 and 26thSeptember, 2017.

Raw data Raw data is a primary data collected from survey and data entered in

electronic format for all field

Final data

Final data (in electronic format) is a primary data collected from

survey, which is scrutinised, validated and cleaned by removing

outliers, data entry errors, etc. and ready to use for further data

processing & tabulation

Contract

Value

Price payable to the successful bidder under the contract for the full

and satisfactory performance of the contractual obligation

Committee Tender Evaluation Committee

RKVY Rashtriya Krishi Vikas Yojna

Approach

Note

A brief note about

i. Scheme: Introduction, Objectives, Nature, Criteria, Scope,

Implementing agencies and targets & achievements (physical

& financial) of the scheme.

ii. Evaluation of scheme: Objectives of evaluation of the scheme,

sample size, methodology & for whom schedules are to be

designed.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 4 of 104

Page 5: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Invitation for Proposal

Limited Tender Notice

LIMITED TENDER NOTICE

Directorate of Economics & Statistics

Planning Department

Government of Maharashtra, Mumbai

The Directorate of Economics & Statistics, Planning Department, GoM invites Limited tender for

conducting evaluation study of Rashtriya Krishi Vikas Yojna implemented by Agriculture

Department, GoM through e-tender from Group I-category A1 & Group II-category A2

organisations/institutions empanelled vide Planning Department’s, Government Resolution, dated 22nd

July, 2016,26th September, 2017 and 27th September, 2017. The e-tender document is available from 9th

July , 2018 on website https://mahatenders.gov.in. (Tender reference No. EVL/1117/RKVY/502 ). Last

date of online submission of this tender is 23rd July, 2018 up to 16.30 Hrs..

-Sd-

Dated : 5th July, 2018 Director

Directorate of Economics & Statistics,

Govt. of Maharashtra, Mumbai

Bidders are advised to study this limited tender document carefully before submitting their proposals

in response to the Limited Tender Notice. Submission of a proposal in response to this notice shall be

deemed to have been done after careful study and examination of this document (and clarification/

corrigendum issued subsequently, if any) with full understanding of its terms, conditions and

implications.

This Tender document is not transferable.

RFP reference No. OAP/1116/EVL/277 for empanelment dated 9th May, 2016 and RFP reference No.

OAP/1116/EVL/679 for empanelment dated 23rd December, 2016 is the base document for this tender

process including all terms, conditions and guidelines set forth.

Bidders are advised to go through the Planning Department-

1. Government Resolution No.वियोम-ू1998/प्र.क्र.6/का-1413, dated30th September, 1998

2. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 22nd July, 2016

3. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 21stNovember, 2016

4. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 26th September, 2017

5. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 27th September, 2017

6. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 4th April,2018

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 5 of 104

Page 6: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Important Information

# Information Details

1. Project Name To conduct evaluation study of Rashtriya Krishi Vikas

Yojna implemented by Agriculture Department, GoM

2. Limited Tender document reference No EVL/1117/RKVY/502

Date : 5th July, 2018

3. Limited Tender Fee (Non-refundable)

INR 1,000/- (Rupees One Thousand only)

To be submitted online at https://mahatenders.gov.in

(Bidders from Group II Category A2 are exempted for submitting Tender fee and EMD)

4. Earnest Money Deposit (Refundable)

INR 10,000/- (Rupees Ten Thousand only)

To be submitted online at https://mahatenders.gov.in

(Bidders from Group II Category A2 are exempted for submitting Tender fee and EMD)

5. Bid Validity Period 180 Days

6. Performance Bank Guarantee 10 % of the Contract Value

7. Performance Security Validity Period 6 months after expiration of all the Contractual Obligations

8. Availability of Tender Document 9th July, 2018 from 11.00 Hrs

9. Last date for submission of queries for

clarifications via email Up to 13th July, 2018 till 13.00 Hrs

10. Date, Time & Place of pre-bid meeting

Date- 16th July, 2018

Time - 14.00 Hrs

Place - Directorate of Economics and Statistics, 4th floor, EDP

Centre, New Admin bldg, Opposite Mantralaya, Madam kama

road, Mumbai-400032, Maharashtra

11. Last date (deadline) for uploading the bid

on e-Tendering website

Up to 23rd July, 2018 till 16.30 Hrs

at https://mahatenders.gov.in

12.

Date of online opening of Technical

Proposals received in response to the

Limited Tender Notice

On 25th July, 2018 at 14.00 Hrs.

13.

Place, Time and Date of opening of

Commercial proposals received in

response to the Limited Tender Notice

To be informed later to the shortlisted bidders

14. Contact person for queries

Mr. Vijay Aher

Additional Director (Evaluation)

Ph.: 022 22797006/09/00, 22021614

15. Email ID, Phone No: Email Id: [email protected]

Ph.: 022 22797006/09/00, 22021614

16. Submission Type e-tendering system

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 6 of 104

Page 7: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Scope of work

The Directorate of Economics and Statistics (DES) desires to conduct an evaluation study of

“Rashtriya Krishi Vikas Yojna” implemented by Agriculture Department, GoM. The limited tenders

are called from Group I-category A1 & Group II-category A2 as specified in Planning Department,

GoM Government Resolution No. मुमाअ/1016/प्र.क्र. 78/का-1417, dated 22ndJuly, 2016, 26th September,

2017, 27th September, 2017 and 4th April, 2018.

At least one project per year (from 2012-13 to 2016-17) from infrastructure & Production

growth of each department/ Implementing agency as applicable is to be selected which should not be

repeated for another year with adequate number of beneficiaries. Summary of Department / Year wise

project under RKVY is attached herewith in Annexure M which will help in selection of projects for

evaluation.

The beneficiary sample should be representative and balanced. Block, district level and State

level concerned functionaries should also be contacted/interviewed.

Overview of the Scheme:-

Rashtriya Krishi Vikas Yojna is a special Additional Central Assistance Scheme which was

launched in August, 2007 to orient agricultural development strategies, to reaffirm its commitment to

achieve 4 per cent annual growth in the agricultural sector during the 11th plan. The scheme was

launched to incentivize the States to provide additional resources in their State Plans over and above

their baseline expenditure to bridge critical gaps.

The RKVY covers all sectors such as Crop Cultivation, Horticulture, Animal Husbandry and

Fisheries, Dairy Development, Agricultural Research and Education, Plantation and Agricultural

Marketing, Food Storage and Warehousing, Soil and Water Conservation, other Agricultural

Programmes and Cooperation.

The scheme requires the States to prepare District and State Agriculture Plans. States will be

eligible for receiving RKVY funds only if the baseline share of expenditure of the Agriculture and

allied sectors in its total State Plan (excluding RKVY fund) is at least maintained and the District

Agriculture Plan and State Agriculture Plan have been formulated by the State Government.

Objectives of RKVY

The main objectives of the RKVY Scheme are as follows.

To incentivize the states so as to increase public investment in agriculture and allied

sectors.

To provide flexibility and autonomy to states in the process of planning and executing

agriculture and allied sector schemes.

To ensure the preparation of agriculture plans for the districts and the states based on agro

climatic conditions, availability of technology and natural resources.

To ensure that the local needs/crops/priorities are better reflected in the agricultural plans

of the states.

To achieve the goal of reducing the yield gaps in important crops, through focused

interventions.

To maximize returns to the farmers in agriculture and allied sectors.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 7 of 104

Page 8: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

To bring about quantifiable changes in the production and productivity of various

components of agriculture and allied sectors by addressing them in a holistic manner.

Area of focus under RKVY

Production Growth

a. Integrated development of major food crops such as wheat, paddy, coarse cereals, minor

millets, pulses, oilseeds

b. Agriculture mechanization

c. Activities related to enhancement of soil health.

d. Development of rain fed farming systems in and outside watershed areas

e. Integrated Pest Management

f. Promoting extension services

g. Activities relating to enhancement of horticultural production

h. Animal husbandry and fisheries development activities

i. Study tours of farmers

j. Organic and bio-fertilizers

k. Sericulture

Infrastructure & Assets

a. Horticulture (Nurseries, Plastic/RCC lining etc.)

b. Natural Resources Management (Soil & Water conservation activities, Reclamation of

problems Soils etc.)

c. Pest Management & Pesticide quality control (State Pesticide Testing Labs, Bio-pesticide

Testing Labs etc.)

d. Soil Nutrient Management, Fertilizers, Bio Fertilizers/Organic Farming (Setting up of new soil

testing laboratories, Setting up of new fertilizer Quality Control laboratories, Bio fertilizer

production units etc.)

e. Animal Husbandry, Dairy, Fisheries (Breeding farms, Strengthening /expansion of cold storage

facility for milk and milk product, cold storage& Ice Plants etc.)

f. Marketing and Post-Harvest (Fruits & Vegetable Markets/Distribution Centres, packing etc.)

g. Seeds (Seed Testing Labs, Storage Godowns etc.)

h. Agriculture Mechanization (Agriculture Machines Testing Centers)

i. Agricultural Extension (Kissan Call Centres, Knowledge /Technology Resources Centres etc.)

j. Agriculture Research (Research Infrastructure)

k. Minor/Micro Irrigation (Shallow Well & Dug Wells, Farm Ponds etc.)

Objectives of evaluation Study

It is essential to evaluate and measure the extent to which the programme and approach has

stood up to the expectations. The study enlightens the policy makers to incorporate necessary

corrections to make the programme more effective and successful. The study intends to achieve the

following specific evaluation objectives listed below:

1. To study the socio-economic profile of farmers participated/benefited in RKVY.

2. Analysis of direct and indirect impact on project beneficiaries and on increasing Production

and Productivity.

3. To assess the impact of RKVY on input use, production, income and employment among the

beneficiary including farmers in Maharashtra.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 8 of 104

Page 9: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

4. To identify factors influencing the adoption of major interventions/ initiative under RKVY.

5. To identify the constraints hindering the performance of this scheme in Maharashtra.

6. To study scheme designs for consistency, feasibility, effectiveness and adequacy with respect

to the goals and objectives.

7. To evaluate physical and financial progress of the scheme since last five years.

8. To evaluate whether works carried under various developmental schemes are according to

Government policy and also to evaluate whether various items/equipments, implements,

medicines and seeds/various livestock provided under personal benefit schemes are according

to projects.

9. To find out the problems and difficulties in implementing the scheme.

10. To evaluate periodically monitoring & review of the scheme at all concerned offices from

Mantralaya to root level.

11. To find out whether scheme is implemented in accordance with guidelines of RKVY.

12. To find out whether any reforms/measures/initiatives for better implementation and fulfilment

of the purpose of scheme for which it has been initiated are being taken from time to time by

respective department for similar projects.

13. To study whether any policy which has been adopted by the department after successful

implementation of any project.

14. Contribution of private partner in financial and personal terms.

15. To study whether the project is continued after completion.

These are minimum objectives of this evaluation study to be accomplished. The successful

bidder may extend the scope beyond these objectives which will be appreciated by DES.

The results of the study will provide useful insights on the impacts of the RKVY on farming

communities and can suggest policy recommendations for improving the efficacy of the program. It is

also expected that this study will provide valuable insights into various factors influencing the decision

of the farmers on adoption of recommended package of good agricultural practices for increasing

production and productivity of selected crops. This may help the policy planning authorities to

consider making suitable changes in the development and implementation of policy on promotion of

agriculture sector in general and the identified crops in particular, in the Maharashtra.

Expected broad procedure to be followed by successful bidder and expected deliverables

The successful bidder would be required to carry out the evaluation study of Rashtriya Krishi

Vikas Yojna in the State, covering following components: -

(i) To formulate evaluation study implementation procedure

(ii) Whenever secondary data is required issue a letter to concerned authorities/officer’s to acquire the

required information/data, by giving specified time period (maximum one month) for this evaluation

study. In case of non-response for getting required information/data of the scheme after one week of

the specified time/period, this fact should be communicated to the officers of the higher authorities

and DES as well at each stage. Or else, ‘Penalty’ clause of this tender document will be applicable.

(iii) To design schedules for conducting evaluation study

(iv) To determine coverage in terms of geography, population frame, etc. for canvassing schedules and

sampling procedure

*(Component (i) to (iii) should be submitted to DES for approval)

(v) To conduct pilot study for schedule testing

(vi) Rectification of schedules on the basis of pilot survey

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 9 of 104

Page 10: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

(vii) To prepare Instruction Manual for conducting field work

(viii) To impart training for conducting field work & schedules briefing which may be attended by DES

representatives. Venue &time schedule of training should be informed well in advance to DES.

(ix) To conduct field work, venue &time schedule of fieldwork should be informed well in advance to

DES so that DES representatives can inspect the same.

(x) To monitor field work & take corrective measures

(xi) To capture data (collection, validation, data entry & compilation in electronic format)

(xii) To validate captured data

(xiii) To tabulate validated data

(xiv) To analyse tabulated data (tabulation plan to be mutually decided by DES with successful bidder)

(xv) To submit questionnaire and final evaluation report (soft copy and 10 Hard copies each) covering

results & recommendations in Marathi language. However, summary & recommendations will have

to be submitted in both Marathi and English language.

(xvi) To submit raw data, final data (in electronic format) and schedules to DES. The schedules which

would be canvassed by successful bidder should be submitted to DES, if canvassed physically.

(xvii) Secondary data needs to be analysed for all Districts. (Secondary data generated through

MIS/Administrative operative system).

(xviii) Fortnight report indicating the progress of evaluation survey should be submitted regularly to DES.

All rights regarding this evaluation survey are reserved to DES.

Kindly refer to the ‘4.4 Scope of work’ for empanelled agencies mentioned in the tender document

OAP/EVL/1116/277, dated 09th May, 2016 and OAP/EVL/1116/679, dated 23rd December, 2016. The

successful bidder will have to adhere to the standard prescribed by United Nations Group of

Evaluation. (Please refer the site http://www.uneval.org/document/detail/22). Further Corrigendum-1

issued to the above mentioned tender document dated 09th May, 2016, wherein it has been made

binding on the empanelled agencies to adhere to the guidelines issued by erstwhile Planning

Commission. These guidelines are available at

http://planningcommission.nic.in/reports/peoreport/peo/guide_consult1902.pdf(pages 1-7). The bidders are

advised to refer to these standards for conducting evaluation studies of various evaluation schemes

conducted by DES available at http://mahades.maharashtra.gov.in/surveyreports.do?repCatId=ES

Expected important activities

The successful bidder will have to ensure that all data is collected, validated and tabulated as per the

specified time schedule. Following are the expected important activities

a. A summary of interaction with various stakeholders like health officials, local bodies,

beneficiaries, etc.

b. Fortnight/Mid progress report to be submitted.

c. Reports on documentation of experiences at the end of the study.

d. Presentations and participations in the discussions, meetings and minutes of meeting.

e. As per the planning department, Government Resolution dated 30th September, 1998 Para

No.9.9.1,& 10, it will be mandatory for successful bidder to present the finalized evaluation

study report/Presentation in front of committee in separate two meetings whenever called one

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 10 of 104

Page 11: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

under the chairman ship of Hon Additional Chief Secretary (planning) and another headed by

Hon Chief Secretary, GoM.

Instructions to Bidder

1. Purpose of Bid Document

This document provides information to enable the bidders to understand the broad requirements to

submit their "Bids".

2. Cost of Bid Document

The Cost of tender document is INR 1,000/- (Rupees One Thousand only) inclusive of GST which shall be

paid online. Bidders from Group II Category A2 are exempted for submitting Tender fee and EMD.

3. Completeness of Bid Document

Bidders are advised to study all instructions, forms, terms, requirements and other information in the Bid

Documents carefully. Submission of bid shall be deemed to have been done after careful study and examination

of the Bid Document with full understanding of its implications. The response to this Bid Document should be

full and complete in all respects. Failure to furnish all information required, submission of a proposal not

substantially responsive in every respect will be at the bidder's risk and may result in rejection of the bid.

4. Proposal Preparation Cost

The bidder shall be responsible for all costs incurred in connection with participation in this process, including,

but not limited to, costs incurred in conduct of informative and other diligence activities, participation in

meetings/discussions/presentations, preparation of proposal, in providing any additional information required

by DES to facilitate the evaluation process, and in negotiating a definitive Contract or all such activities related

to the bid process. The DES will in no case be responsible or liable for such costs, regardless of the conduct or

outcome of the bidding process.

This Bid Document does not commit DES to award a contract or to engage in negotiations. Further, no

reimbursable cost may be incurred in anticipation of award. All materials submitted by the Bidder shall become

the property of the DES and may be returned at the sole discretion of DES.

5. Period of Validity of Bids

Bids shall remain valid for the period of 180 days after the bid submission deadline date prescribed by DES. A

bid valid for a shorter period shall be rejected by DES as non-responsive.

In exceptional circumstances, prior to the expiration of the bid validity period, the DES may request Bidders to

extend the period of validity of their Bids. The request and the responses shall be made in writing. In this case,

the EMD shall also be extended for Thirty days (30) beyond the deadline of the extended validity period. No

interest will be paid by DES on amount of EMD.

6. Pre-Bid Meeting

DES will host a Pre-Bid Meeting for queries (if any) raised by the prospective bidders. The date, time and place

of the meeting are given in this document. The representatives of the bidders may attend the pre-bid meeting at

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 11 of 104

Page 12: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

their own cost. The purpose of the pre-bid meeting is to provide a forum to the bidders to clarify their doubts /

seek clarification or additional information, necessary for them to submit their bid.

All enquiries from the bidders relating to this Bid Document must be submitted to Deputy Director (Evaluation)

by 16th July, 2018 till 14.00 Hrs. These queries should also be emailed to [email protected]. The

queries should necessarily be submitted in the following format as a Word Document:

Format for raising queries in the bidding:

# Bid Document reference (Section

No., Page No.)

Content of the Bid Document

requiring clarification

Clarification sought

/ queries

1

2

3

Authorisation letter in the name of the person attending pre-bid meeting needs to be submitted on the letterhead

of the Bidder during the pre-bid meeting in the format specified in Annexure C.

Queries submitted post the deadline mentioned or which do not adhere to the above mentioned format may not

be responded to. All the responses to the queries (clarifications/corrigendum) shall be made available at DES

Head office & will be informed to respective vendor accordingly.

7. Amendments to Bid Document

At any time before the deadline for submission of bids, the Directorate, may, for any reason, whether at its own

initiative or in response to a clarification requested by a prospective Bidder, modify the Tender Document by an

amendment. All the amendments made in the document would be issued as a corrigendum to the Tender

Document and shall be made available at http://mahatenders.gov.in.The bidders are advised to visit the website

http://mahatenders.gov.in on regular basis for checking necessary updates. DES also reserves the rights to

amend the dates mentioned in this Tender Document for bid process.

In order to afford prospective Bidders reasonable time in which to take the amendment into account in

preparing their bids, DES may, at its discretion, extend the last date for the receipt of Bids.

8. Rights to Terminate the Process

DES may terminate the Bid Document process at any time and without assigning any reason. DES makes no

commitments, express or implied, that this process will result in a business transaction with anyone.

This Bid Document does not constitute an offer by DES. The bidder's participation in this process may result in

DES selecting the bidder to engage in further discussions and negotiations toward selection. The

commencement of such negotiations does not, however, signify a commitment by DES to execute a contract or

to continue negotiations. DES may terminate negotiations at any time without assigning any reason.

9. Site Visit/Field visit

The Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, Mantralaya, GoM through

Agriculture Commissionerate, Pune in the State. If intending bidder desires to visit field offices, it is requested

that prior appointments of concerned officers be taken (for which accommodation/Transportation charges will

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 12 of 104

Page 13: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

be incurred by successful bidder only). The letter for extending co-operation to the intending bidder shall be

issued by DES to the offices of Agriculture Commissionerate, if demanded. Man-days for field work and

expected duration of field work must be shared with DES. Also convey the visit schedule of survey well in

advance along with name and contact details of surveyor to the respective Deputy Commissioner or District

Statistical officer so that DES representative may visit the same randomly which will also help the agency to

collect information from Government Official if they refuse to do so. Successful bidder must send written

communication to Administrative Department (Agriculture Department) and concerned office for necessary

primary / secondary data for the said evaluation survey within one month of issuing of work order. If concerned

office fails to provide necessary information regarding the scheme within one month of awarding the tender,

successful bidder should communicate to DES, Evaluation Branch with all follow up letters &list of required

information for the study for further necessary action.

10. Language of Bid

The Bids prepared by the Bidder and all correspondence and documents relating to the bids exchanged by the

Bidder and DES, shall be written in English language, provided that any printed literature furnished by the

Bidder in another language shall be accompanied by an English translation in which case, for purposes of

interpretation of the bid, the English translation shall govern.

If any supporting documents submitted are in any language other than English, translation of the same in

English language is to be duly attested by the bidder.

11. Bid Submission Format

The entire proposal shall be strictly as per the format specified in this Bid document. Details of the format are

given in Part-II Annexures of this tender document. Bidder shall ensure that the bid documents are submitted in

the respective folder online.

12. Documents Comprising of Bid

The following table is provided as a guideline for submitting various important documents along with the bid.

# Type of Envelope Documents to be submitted

01 Technical

Proposal Folder

(Envelope A)

Annexure A: Bid Cover Letter

Online payment receipt of EMD of Rs. 10,000/- & Online payment receipt

of Limited Tender Fee of Rs. 1,000/-

Annexure B: Format to share Bidder’s Particulars and contact person’s

details

Annexure C: Authorisation letter for attending pre-bid meeting (To be

provided on the letter head of Bidder)

Annexure D: Format for CV of 3 key staff members proposed for this study

Annexure E: Draft Format for activity wise work plan with subject title

Annexure F: Brief understanding of Rashtriya Krishi Vikas Yojna

Annexure G: Proposed methodology for evaluation study of Rashtriya Krishi

Vikas Yojna

(Complete tender documents with signature & stamp of authorized signatory on each

page with proper subject title)

02 Commercial

Proposal Folder

(Envelope B)

Annexure H: Format for Price schedule

Commercial Bid (in the BoQ format)

(Complete tender documents with signature & stamp of authorized signatory on each

page with proper subject title)

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 13 of 104

Page 14: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Condition: It may be noted that, the activities which can be sub-contracted should be strictly as per the RFP

document OAP/1116/EVL/277 for empanelment dated 9th May, 2016&OAP/1116/EVL/679 dated 23rd

December, 2016.

Tender to be submitted in two separate parts containing Technical and Commercial proposals (online).

Commercial offer must be given in separate envelope. Price Bid should not contradict in Technical proposal in

any manner. Bidder should submit their prices only in price schedule (Annexure H) given in the tender, prices

quoted other than in the bid form shall be liable to be rejected. The bid form must be filled completely, without

any errors, erasures or alterations.

The bidder offer shall contain no interlineations, erasures or overwriting excepts as necessary to correct errors

made by the bidder, in which case such corrections shall be initiated by the person or persons signing offer.

Offers containing erasures or alterations will not be considered. There should be no hand- written material,

corrections or alterations in the offer. Technical details must becompletely filled up. Filling up of the technical

details Form using terms such as “OK”, “accepted”, “noted”, “as given in the brochure/manual” is not

acceptable. The DES may treat offers not adhering to these guidelines as unacceptable.

13. Earnest Money Deposit (EMD) and refund for Group I – Category A1

Bidders are required to submit EMD of Rs.10,000/- (Rupees Ten Thousand only) online on the

https://mahatenders.gov.in portal.

Unsuccessful Bidder’s bid security (EMD) will be discharged/ returned after the expiration of the period of

tender offer validity prescribed by the DES.

The successful Bidder’s bid security (EMD) will be discharged upon the bidder executing the Contract and

furnishing the Security deposit/performance security in the form of performance bank guarantee. The bid

security may be forfeited if a Bidder withdraws its bid during the period of bid validity or in case of a successful

Bidder, if the Bidder fails:

i) To sign the contract in accordance with the terms and conditions

ii) To furnish performance bank guarantee as specified in the terms and conditions

14. Submissions of Bid

Complete bidding process will be online (e-tendering) in two envelope system. All the notifications&

detailed terms and conditions regarding this tender notice hereafter will be published online on web site

https://mahatenders.gov.in.

Bidding documents can be seen, downloaded and submitted in electronic format on the website. The

deadline for submission of bid is specified in this document.

The bidders are required to submit EMD online on web site https://mahatenders.gov.in

Technical Proposal bids will be opened online on website https://mahatenders.gov.in on 25th July,2018

Bidder should submit information & scanned copies in only PDF format in Technical Proposal

Envelope as mentioned in the Bid Document.

Uploaded documents of successful bidder may be verified with the original before signing the

agreement. The successful bidder has to provide the originals to the concerned authority.

No physical documents of Technical Proposaland Commercial Bid envelopes shall be accepted. Only

the soft copies need to be uploaded on e-tendering website.

Time and date of opening of Commercial bids will be informed by email to technically qualified bidder.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 14 of 104

Page 15: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

The guidelines to download the tender documents and online submission of bids and procedure of

tender opening can be downloaded from website http://mahatenders.gov.in.

All documents are mandatory, however, DES reserves right to waive minor infirmity / non-conformity

or call for clarifications / additional documents. The bidder will have to submit additional document /

clarification within 3 working dates from the date of issue of the letter / mail seeking clarification /

additional document. The Director, Directorate of Economics & Statistics, Mumbai, GoM reserves the right to accept or

reject any or all the tenders without assigning any reason.

15. Opening of Bid

Bids shall be opened through e-tender process (online). All the Bids received within the deadline shall be

opened at the date, place and time mentioned in “Important Information” of this tender document.

The technical bids of all bidders will be opened.

The Bidders’ representatives who are present shall be requested to sign the attendance sheet. Authorisation

letter in the name of the person attending bid opening meeting needs to be submitted on the letterhead of the

Bidder during bid opening in the format specified in Annexure C.

Once the bids are opened each bid will be checked for technical criteria.

16. Opening of Commercial Bid

Bids shall be opened through e-tender process (online). The commercial bids of only technically successful

bidders will be opened. DES shall notify the technically qualified bidders about the date of opening the

Commercial Bids.

The commercial bids will be opened and assessed by DES for completeness and accuracy. Arithmetical errors

will be rectified on the following basis -

If there is an error in a total corresponding to the addition or subtraction of subtotals, the subtotals shall

prevail and the total shall be corrected.

If there is a discrepancy between words and figures, the amount in words will prevail unless the amount

expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail

subject to the points above.

The amount stated in the proposal form, adjusted in accordance with the above mentioned procedure,

shall be considered as binding, unless it causes the overall proposal price to rise, in which case the

proposal price shall govern.

If the bidder does not accept the correction of errors, its bid will be rejected and the bid security may be

forfeited.

17. Evaluation Process

DES shall appoint an Evaluation Committee (EC) to scrutinize and evaluate the technical and commercial bids

received. The EC will examine the Bids to determine whether they are complete, responsive and whether the

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 15 of 104

Page 16: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Bid format confirms to the Bid Document requirements. DES may waive any informality or nonconformity in a

Bid which does not constitute a material deviation according to DES.

The evaluation process of the Bid Document proposed to be adopted by DES is indicated under this

clause. The purpose of this clause is only to provide the Bidder an idea of the evaluation process that

DES may adopt. However, the Director, DES reserves the right to modify the evaluation process at

any time during the Tender process, without assigning any reason, whatsoever, and without any

requirement of intimating the Bidder of any such change.

The committee constituted by DES shall evaluate the response to the tender process and all supporting

documents. Criteria for Technical Evaluation of the bids which shall be followed under this procedure are as

follows:

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 16 of 104

Page 17: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

# Technical Bid Criteria Points

1 Understanding of scheme Rashtriya Krishi Vikas Yojna implemented by Agriculture

Department, GoM in detail 25

2 Proposed methodology for Evaluation Study of Rashtriya Krishi Vikas Yojna implemented by

Agriculture Department, GoM (Sampling method, Sample size, etc.) 25

3 Proposed team composition (3 key members)

a. Criteria for assigning marks

i. Total experience of all 3 key members in evaluation/ sample survey.

ii. Experience in conducting evaluation/ sample survey in development sector

especially on Agriculture and allied sector part.

iii. Qualification :- Post Graduate in Economics/ Statistics or Post Graduate Degree

in Agriculture/ Dairy/Civil Engineer/MBA in Agriculture Marketing

iv. Team should be retained throughout the project. If member changes, it should be

done with one month prior notice. In case of substitute replaced candidate

should have similar qualification as mentioned in the bid.

b. Conditions and methodology of assigning marks :

i. None of the key member should be greater than 65 years of age

ii. 3 Mandatory key members should be

a) One key member should be post graduate in Statistics

b) One key member should be post graduate in Economics

c) One key member should be Post Graduate in Agriculture

Project wise optional key members :

d) One key member should be Post Graduate in Veterinary Science

e) One key member should be Civil Engineer (structural)

f) One key member should be Post Graduate in Horticulture

g) One key member should be MBA in Marketing

h) One key member should be Post Graduate in Dairy

with 3 years of experience each

iii. Total experience of all 3 key members in the field of evaluation studies / sample

surveys shall be calculated. The bidder with highest experience will get the

highest marks. The total experience of each other bidder will be compared with

the bidder having highest experience and proportionate marks shall be given to

each of them.

For non-compliance of b. (i) & (ii) conditions, 5 marks each shall be deducted.

30

4 Work plan:

i. Work plan should be feasible and aggressive (maximum 180 days). The

feasibility of the work plan shall be assessed activity wise by Evaluation

Committee. The most aggressive and feasible work plan (in the eyes of

Evaluation Committee) shall be given highest marks.

ii. The bidders proposing work plan for more than 180 days, the deduction of

marks would be done in the proportion of 2 marks for each additional 10 days or

part thereof.

20

Total 100

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 17 of 104

Page 18: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

The Evaluation Committee shall invite each bidder to make a power point presentation as part of the technical

evaluation. Bidder must submit soft copy of power point presentation. Bidder should carry all necessary original

documents at the time of presentation. Presentation marks will be awarded on the basis of quality of content and

the bidder who is found to show case the best quality in particular criteria defined above shall be awarded

maximum marks, other bidders awarded marks on relative basis. In order to qualify technically, Bidder must

secure a minimum of 60% of total marks in technical evaluation after summing up. Only those Bidders

who have a minimum score of 60 % of total marks in technical evaluation will be considered for opening

of their Commercial Bid. Only the Bids qualifying the technical evaluation will be considered for

commercial evaluation.

The Bidder must possess the technical know-how and the financial ability that would be required to

successfully provide the services sought by DES, GoM, Mumbai for the entire period of the contract. The

Bidder’s Bid must be complete in all respects, conform to all the requirements, terms and conditions and

specifications as stipulated in the Bid Document.

There should be no mention of bid prices in any part of the Bid other than the Commercial Bids.

Directorate of Economics and Statistics, GoM, Mumbai reserve rights to negotiate with successful bidder.

18. Award Criteria

The technically qualified bidders will further be selected on the basis of QCBS (Quality and Cost Based

Selection) method. Technical score would be assigned as per technical evaluation and Commercial Score would

be calculated as ((Minimum commercial value of all the bidders/Commercial Value of the concerned bidder) *

100) and Final Score would be calculated as (0.55 * Technical Score) + (0.45 * Commercial Score). The Final

score will be calculated as follows:

Example :

In order to qualify technically, bidders must secure minimum Technical Score of 60.

• The Final Normalized technical score of the Bidder shall be calculated as follows :

Normalized Technical Score of a Bidder = Technical Score of that Bidder X 100

Score of the Bidder with the highest technical score

Bidders Technical Score Calculation Normalized Technical Score :

Sr.No. Bidder Technical

Score

Normalized

Technical Score

Technical

score to be

considered

1 Bidder-1 88 (88/95)*100 93

2 Bidder-2 90 (90/95)*100 95

3 Bidder-3 80 (80/95)*100 85

4 Bidder-4 95 (95/95)*100 100

• Only technically qualified Proposals shall be considered for Financial bid Opening.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 18 of 104

Page 19: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Evaluation of Financial Proposal

a. The Normalized Financial score of the technically qualified bidders will be calculated, while considering

the Financial quote given by each of the Bidders in the Financial Bid as follows :

Normalized Financial Score of a Bidder = Lowest Financial Quote of BidderX 100

Financial Quote of Bidder under consideration

Bidders Financial Quote (In Calculation Normalized Financial lakhs) Score

Sr.No. Bidder Financial

Quote

(` In thousand)

Normalized

Financial Score

Financial Score to

be considered

1 Bidder-1 110 (110/110)*100 100

2 Bidder-2 140 (110/140)*100 79

3 Bidder-3 160 (110/160)*100 69

4 Bidder-4 130 (110/130)*100 85

b. The bid price will include all applicable taxes and shall be in Indian Rupees and mentioned separately.

Final score calculation through QCBS :

a. The final score will be calculated through Quality and Cost selection method based with the following

weight-age:

Technical: 55%

Financial: 45%

Final Score = (0.55*Normalized Technical Score) + (0.45* Normalized Financial Score)

Sr.

No. Bidder

Bidders

Normalized

technical

score

Weighted

Technical

score

{column

(3)*55}/100

Normalized

Financial

Final Score

Weighted

Financial

score

{column

(5)*45}/100

Final Score

column (4)+

column (6)

(1) (2) (3) (4) (5) (6) (7)

1 Bidder-1 93 51 100 45 96

2 Bidder-2 95 52 79 36 88

3 Bidder-3 85 47 69 31 78

4 Bidder-4 100 55 85 38 93

b. The bidder with the highest Final score shall be treated as the Successful bidder. In the above example,

Bidder-1 will be treated as successful bidder.

c. In the event the Final scores are ‘tied’, the bidder securing the highest technical score will be

adjudicated as the Best Value Bidder for award of the project.

The bidder with highest final score would be considered for award of contract. DES shall award the Contract to

the selected bidder by issue of Letter of Award. Prior to the expiration of the period of proposal validity, the

bidders will be notified in writing or by fax or email that their proposal has been accepted.

If the selected bidder does not sign the Contract and does not submit Performance Bank Guarantee within 15

days, the Letter of Award may be cancelled. The deadline may be extended only once on request by successful

bidder.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 19 of 104

Page 20: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

19. Clarification of Bid

To assist in the examination, evaluation, and comparison of the Bids and qualification of the Bidders, DES may,

at its discretion, ask any Bidder for a clarification of its bid. Any clarification submitted by a Bidder that is not

in response to a request by DES shall not be considered, and DES’s request for clarification and the response

shall be in writing. If the Bid includes a financial proposal, no change in the prices or substance of the bid shall

be sought, offered, or permitted, except to confirm the correction of arithmetic errors discovered by DES in the

evaluation of the Bids.

If a Bidder does not provide clarifications of its bid by the date and time set in DES’s request for clarification,

its bid shall be rejected.

20. Non-Material Non-Conformities

Provided that a bid is substantially responsive, DES may waive any non-conformity in the bid that does not

constitute a material deviation, reservation or omission.

DES may request that the Bidder submit the necessary information or documentation, within a reasonable

period of time, to rectify non-material non-conformities in the bid related to documentation requirements.

Requesting information or documentation on such non-conformities shall not be related to any aspect of the

price of the bid. Failure of the Bidder to comply with the request may result in the rejection of its bid.

DES may rectify non-material non-conformities related to the Bid Price. To this effect, the Bid Price shall be

adjusted, for comparison purposes only, to reflect the price of a missing or non-conforming item or component.

21. Stamp Duty

The stamp duty payable for the contract shall be borne by the successful bidder.

22. Signing of Contract

The successful bidder is required to refer to the draft Contract Form (CF)/MoU, attached as Annexure J in this

Bid Document, which will be considered as base document before signing the agreement between DES &

Successful Bidder. Within 15 days of receipt of the letter of intent, the successful Bidders shall sign and date the

Contract and return it to DES. One extension on bidder’s request may be given by DES at its sole discretion.

Successful bidder must sign on each page of all tender document including corrigendum.

Terms and Conditions of contract

1. Eligibility

All bidders in Group 1- category A1 & Group II-category A2, who are currently empanelled & have completed

all the necessary formalities mentioned in the Government Resolution dated 22nd July, 2016, 26th September,

2017, 27th September, 2017 and 4th April, 2018 are eligible to apply for this tender. Bidders who have not

complied all terms & conditions of RFP Ref. OAP/1116/EVL/277 dated 09th May, 2016 and

OAP/1116/EVL/679 dated 23rd December, 2016 of empanelment before closing date of this RFP are not eligible

to apply.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 20 of 104

Page 21: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

2. Terms and Conditions

All terms & conditions mentioned in the DES empanelment tender document no. OAP/1116/EVL/277 dated

09th May, 2016 and 23rd December, 2016for empanelment as well as in this contract agreement shall be valid

throughout the term of this contract agreement. In case of any friction between the terms & conditions

mentioned in the tender document and contract agreement, the terms and conditions mentioned in the tender

document shall prevail. All the commitments made by the bidder through correspondences for the completion

of the tender process as well as during the presentation shall be applicable as part of this contract.

3. Performance Bank Guarantee

The successful bidder shall at his own expense, deposit with DES, within 15 days from the date of issuance of

LoI the notification of award of the contract or prior to signing of the contract, whichever is earlier, an

unconditional and irrevocable Performance Bank Guarantee (PBG) from any Scheduled or Nationalised bank as

per the format given in this Bid Document, payable on demand, for the due performance and fulfilment of the

contract by the bidder.

This Performance Bank Guarantee will be for an amount equivalent to 10% of contract value and shall be valid

for 12 months. All charges whatsoever such as premium, commission, etc. with respect to the Performance

Bank Guarantee shall be borne by the bidder.

The Performance Bank Guarantee format can be found in the Annexure I section of this document.

The Performance Bank Guarantee may be discharged/ returned by DES upon being satisfied that there has been

due performance of the obligations of the Bidder under the contract. However, no interest shall be payable on

the Performance Bank Guarantee. Bidders from Group II Category A2 are exempted for submitting

Performance Bank Guarantee.

4. Payment Terms

Group I – Category A1 agencies: No advance payment will be made at any stage. TDS will be deducted as

applicable at source. Payment shall be made within 45 days from the date of submission of invoice. The

payment shall be made as follows:

Payment terms

# Stages of Payment Delivery wise payments percentage

(including taxes)

1 On submission of raw data in electronic format along with canvassed

filled in interviewed schedules- 1st instalment 10 per cent of contract value including taxes.

2 On submission of final data, tables and acceptance of the same by

DES– 2nd instalment 20 per cent of contract value including taxes.

3 On submission of draft evaluation report covering detailed analysis,

findings and recommendations - 3rd instalment 20 per cent of contract value including taxes.

4 On acceptance of final report by the committee constituted – Last

instalment 50 per cent of contract value including taxes.

For Group II – Category A2 agencies stages of payment will be decided mutually before signing of MOU.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 21 of 104

Page 22: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

5. Penalty (Please see Expected broad procedure (ii))

The successful bidder should adhere to the work plan strictly. Delay beyond 180 days shall attract penalty of `

2000/- per week or part thereof (Period of 180 days will be calculated from the date of work order. No

communication will be entertained in this regard). DES reserves the right to waive off penalty considering

prevailing circumstances and the reasons for delay for which successful bidder is not responsible. If the final

report of the study is not submitted as per the agreed condition and within the stipulated timelines, where the

delay is on account of the successful bidder then the DES will withhold the last instalment. All penalties shall

be deducted subject to a cap of 25 per cent of contract value.

6. Indemnity

The successful bidder agrees to indemnify and hold harmless DES, its officers, employees and agents (each a

“Indemnified Party”) promptly upon demand at any time and from time to time, from and against any and all

losses, claims, damages, liabilities, costs (including reasonable attorney’s fees and disbursements) and expenses

(collectively, “Losses”) to which the Indemnified Party may become subject, in so far as such losses directly

arise out of, in any way relate to, or result from any misstatement or any breach of any representation or

warranty made by the successful bidder.

7. Force Majeure

The successful bidder shall not be liable for forfeiture of its Performance Guarantee, imposition of liquidated

damages or termination for default, if and to the extent that it’s delay in performance or other failure to perform

its obligations under the contract is the result of an event of Force Majeure. For purposes of this Clause, “Force

Majeure” means an event beyond the “reasonable” control of the successful bidder, not involving the successful

bidder’s fault or negligence and not foreseeable. Such events may include Acts of God & acts of Government of

India in their sovereign capacity.

For the successful bidder to take benefit of this clause it is a condition precedent that the successful Bidder must

promptly notify DES, in writing of such conditions and the cause thereof within 5 calendar days of the Force

Majeure event arising. DES or the evaluation committee appointed by DES shall study the submission of the

successful bidder and inform whether the situation can be qualified one of Force Majeure. Unless otherwise

directed by DES in writing, the successful bidder shall continue to perform its obligations as far as it is

reasonably practical, and shall seek all reasonable alternative means for performance of services not prevented

by the existence of a Force Majeure event.

In the event of delay in performance attributable to the presence of a force majeure event, the time for

performance shall be extended by a period(s) equivalent to the duration of such delay. If the duration of delay

continues beyond a period of 15 days, DES and the successful bidder shall hold consultations with each other in

an endeavor to find a solution to the problem.

Notwithstanding anything to the contrary mentioned above, the decision of DES shall be final and binding on

the successful bidder.

8. Termination of contract

DES may, without prejudice to any other remedy under this Contract and applicable law, reserves the right to

terminate for breach of contract by providing a written notice of 15 days stating the reason for default to the

successful bidder and as it deems fit, terminate the contract either in whole or in part:

If the successful bidder fails to deliver any or all of the requirements of this evaluation study (more

particularly described elsewhere in this tender document); or

If there is more than 25 percent delay in the time frame as per activity chart proposed by bidder and

accepted by DES; or

If the successful bidder fails to perform any other obligation(s) under the contract.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 22 of 104

Page 23: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Prior to providing a notice of termination to the successful bidder, DES shall provide the successful bidder with

a written notice of 15 days instructing the successful bidder to cure any breach/ default of the Contract, if DES

is of the view that the breach may be rectified.

On failure of the successful bidder to rectify such breach within 15 days, DES may terminate the contract by

providing a written notice of 15 days to the successful bidder, provided that such termination will not prejudice

or affect any right of action or remedy which has accrued or will accrue thereafter to DES. In such an event the

successful bidder shall be liable for penalty/liquidated damages imposed by DES.

In the event of termination of this contract for any reason whatsoever, DES is entitled to impose any such

obligations and conditions and issue any clarifications as may be necessary to ensure an efficient transition and

effective continuity of the services which the successful bidder shall be obliged to comply with and take all

available steps to minimize the loss resulting from that termination/ breach, and further allow and provide all

such assistance to DES and/ or succeeding bidder, as may be required, to take over the obligations of the

successful bidder in relation to the execution/ continued execution of the requirements of this contract.

9. Rights to Accept/Reject any or all proposals

Director, DES reserves the right to accept or reject any proposal and to annul the bidding process and reject all

Bids at any time prior to award of Contract, without thereby incurring any liability to the affected Bidder or

Bidders or any obligation to inform the affected bidder or bidders of the grounds for DES's action.

10. Fraud and Corruption

DES requires that Bidder must observe the highest standards of ethics during the execution of the contract. In

pursuance of this policy, DES defines, for the purpose of this provision, the terms set forth as follows:

(i) “corrupt practice” is the offering, giving, receiving or soliciting, directly or indirectly, of anything

of value to influence improperly the actions of another party;

(ii) “fraudulent practice” is any act or omission, including a misrepresentation, that knowingly or

recklessly misleads, or attempts to mislead, a party to obtain a financial or other benefit or to avoid an

obligation;

(iii) “collusive practice” is an arrangement between two or more parties designed to achieve an improper

purpose, including to influence improperly the actions of another party;

(iv) “coercive practice” is impairing or harming, or threatening to impair or harm, directly or indirectly,

any party or the property of the party to influence improperly the actions of a party;

(v) “obstructive practice” is

i. deliberately destroying, falsifying, altering or concealing of evidence material to the

investigation or making false statements to investigators in order to materially impede a DES

investigation into allegations of a corrupt, fraudulent, coercive or collusive practice; and/or

threatening, harassing or intimidating any party to prevent it from disclosing its knowledge of

matters relevant to the investigation or from pursuing the investigation, or

ii. Acts intended to materially impede the exercise of DES’s inspection and audit rights.

If it is noticed that the Bidder has indulged into the Corrupt / Fraudulent / Unfair / Coercive practices,

a) It will be a sufficient ground for DES to terminate the contract and initiate black-listing of the vendor.

b) It will reject a proposal for award if it determines that the bidder recommended for award has, directly

or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive practices in

competing for the contract;

c) It will sanction a firm or individual, including declaring ineligible, either indefinitely or for a stated

period of time, to be awarded a DES-financed contract if it at any time determines that the firm has,

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 23 of 104

Page 24: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

directly or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive

practices in competing for, or in executing, a DES-financed contract; and

d) It will have the right to require that a provision be included in bidding documents and in contracts

financed by DES, a provision be included requiring bidders, suppliers and contractors to permit DES

to inspect their accounts and records and other documents relating to the bid submission and contract

performance and to have them audited by auditors appointed by DES.

In the event of the successful bidder being unable to service the contract for whatever reason, DES would evoke

the PBG. Notwithstanding and without prejudice to any rights whatsoever of DES under the Contract in the

matter, the proceeds of the PBG shall be payable to DES as compensation for any loss resulting from the

Bidder’s failure to complete its obligations under the Contract. DES shall notify the successful bidder in writing

of the exercise of its right to receive such compensation within 14 days, indicating the contractual obligation(s)

for which the Bidder is in default.

DES shall also be entitled to make recoveries from the successful bidder’s bills, performance bank guarantee, or

from any other amount due to him, the equivalent value of any payment made to him due to inadvertence, error,

collusion, misconstruction or misstatement.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 24 of 104

Page 25: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Part II – Annexures

Annexure A: Bid Cover Letter

Date: dd/mm/yyyy

To,

The Director,

Directorate of Economics & Statistics, Government of Maharashtra,

New Administrative Bldg., 7th floor, Opposite Mantralaya, Mumbai 400 032

Sub : Selection of bidder to conduct evaluation study of Rashtriya Krishi Vikas Yojna implemented

by Agriculture Department, GoM

Ref : Tender No: EVL/1117/RKVY/502, Dated 5th July, 2018.

Dear Sir,

Having examined the Bid Document (and the clarification / corrigendum issued thereafter, if any), the

receipt of which is hereby duly acknowledged, we, the undersigned, offer to conduct evaluation study

of “Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM”.

We attach hereto our responses to Technical requirements & commercial proposals as required by the

Bid Document. We confirm that the information contained in these responses or any part thereof,

including the exhibits, and other documents and instruments delivered or to be delivered to Directorate

of Economics and Statistics, is true, accurate, verifiable and complete. This response includes all

information necessary to ensure that the statements therein do not in whole or in part mislead the DES

in its short-listing process.

We fully understand and agree to comply that on verification, if any of the information provided here

is found to be misleading the selection process, we are liable to be dismissed from the selection

process or termination of the contract during the project, if selected to do so.

We agree for unconditional acceptance of all the terms and conditions set out in the Bid Document (&

subsequent clarification / corrigendum, if any) and also agree to abide by this tender response for a

period of 180 days from the date fixed for bid opening. We hereby declare that in case the contract is

awarded to us, we shall submit the Performance Bank Guarantee and sign the contract in the form

prescribed in the Bid Document.

We agree that you are not bound to accept any tender response you may receive. We also agree that

you reserve the right in absolute sense to reject all or any of the products/ services specified in the

tender response.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 25 of 104

Page 26: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

It is hereby confirmed that I/We are entitled to act on behalf of our company/ corporation/ firm/

organisation and empowered to sign this document as well as such other documents, which may be

required in this connection.

_____________________________________

Signature of Authorized Signatory (with official seal)

Name :

Designation :

Address :

Telephone & Fax :

E-mail address :

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 26 of 104

Page 27: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure B: Format to share Bidder’s particulars and contact person’s details

# Description Details (to be filled by the responder

to the Bid Document)

Organisation/Institution Details:

1. Name of the Organisation/Institution

2. Official address & contact details

3. Phone No. and Fax No.

4. Service Tax Registration No.

5. Permanent Account Number (PAN) of the agency

Authorised signatory:

1. Name

2. Title

3. Organisation/Institution address

4. Phone No.

5. Mobile No.

6. Fax

7. e-mail

Secondary contact:

1. Name

2. Title

3. Phone No.

4. Mobile No.

5. Fax

6. e-mail

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 27 of 104

Page 28: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure C: Authorisation letter for attending pre-bid meeting

(To be provided on the letter head of Bidder)

No………………………………….… Date………………….

To,

The Director,

Directorate of Economics & Statistics,

Mumbai

Sub: Bid No………….…………………………………… due date………………..

Sir,

We hereby authorize Dr./Mr./Ms.……………………………………….as our authorized

representative, to represent us on the following occasion:

i. Pre-bid Meeting to be held on……………..at……………a.m./p.m.

Kindly permit him/her to attend the same.

Yours faithfully,

Signature:

Name of signatory:

Designation:

Rubber Stamp

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 28 of 104

Page 29: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure D: Format for CV of 3 key staff members proposed

Please submit CV of 3 key staff members with supportive documents for all the details mentioned.

1 Name of the Staff

2

Current designation in

the organisation / or on

hire basis

3 Age as tender issuing

date

4 Proposed role in the

evaluation study

5

Educational

Qualification (in

chronological order with

subject)

6 Language proficiency

Language Reading Writing Speaking

English

Marathi

Hindi

7 Total no. of years of

work experience

8

Total no. of years of

relevant experience in

evaluation/sample

surveys

9

Total no. of years of

relevant experience in

Agriculture and allied

sector

Note:

1. Third key staff members may or may not be full-time employee of the bidder. However, whenever

his/her services are required, this key member should be available.

2. Supportive documents must be attached.

3. Bidder should carry all necessary original documents at the time of presentation.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 29 of 104

Page 30: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure E: Draft Format for activity wise work plan

# Activity Timelines Total

No. of

weeks <Month_1> <Month_....>

<week_1> <week_2> <week_3> <week_4> <week_..> <week_..> <week_..>

1 Schedule

Designing &

Pilot survey

along with

final

Approach

Note

2 Schedule

finalisation

3 To collect all

necessary

secondary

data

regarding

the scheme

from all

concerned

offices.

4 Instruction

set design

and training

to the field

staff

5 Actual field

work (man

days)

6 Inspection

7 Schedules

Scrutiny

8 Data entry in

electronic

form and

Validations

9 Tabulation

and data

analysis

10 Draft report

11 Final report

Note:

For an activity, please mention name of month and put tick in concern week.

Work plan (maximum up to 180 days) with timelines covering

Details of activities which shall be subcontracted (if any) and the names & address of sub contracted parties.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 30 of 104

Page 31: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure F: Brief understanding of Rashtriya Krishi Vikas Yojna

(To be submitted by Bidder)

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

__________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

__________________________________________________________________________

Annexure G: Proposed methodology for evaluation study of Rashtriya Krishi Vikas Yojna

(To be submitted by Bidder) __________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 31 of 104

Page 32: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure H: Format for Price Schedule

The Bidders have to fill the details for price schedule for conducting evaluation study of Rashtriya Krishi Vikas

Yojna implemented by Agriculture Department, GoM in below format.

This annexure should be submitted strictly on the letter head duly filled in, signed and stamped. (Signature &

stamp of authorized signatory on each page is mandatory).

Item Description Total Cost in Rs.

1

Submission of raw data (in electronic form) along with canvassed filled in

interviewed schedules

2 Submission of final data and all final tables as per tabulations plan

3 Submission of draft evaluation report

4 Final report and recommendations

5 Total Costs (Item 1 to 4)

6 Local taxes (as applicable)

7 Grand Total

Commercial proposal instructions:

The Bidder has to fill the details for price bid only in the BoQ format provided in the

https://mahatender.gov.in portal.

Note:

i. All the prices are to be entered in Indian Rupees (INR) ONLY.

ii. The Bidder needs to account for all Out of Pocket expenses due to Boarding, Lodging and other related items.

iii. Prices indicated in the schedules shall be including of all taxes, Levies, duties etc. It is mandatory to provide breakup of all type of

applicable Taxes, Duties & Levies wherever asked for at the time of raising invoice. During the payment stage, DES reserves the

right to ask the Bidder to submit proof of payment against any of the taxes, duties, levies etc.

iv. For the purpose of evaluation of Commercial Bids, DES shall make appropriate assumptions to arrive at a common bid price for

all the Bidders. This however shall have no co-relation with the Contract value or actual payment to be made to the Bidder.

v. The Contract Price shall be a firm lump sum not subject to any alteration.

vi. The successful bidder shall be deemed to have satisfied itself as to the correctness and sufficiency of the contract price, which

shall, except as otherwise provided for in the contract, cover all its obligations under the contract.

vii. DES would make payments to the successful bidder as delivery. The payment would be done within 45 days from the date of

submission of invoices.

viii. Director, DES reserves the rights to waive aforementioned penalty considering prevailing circumstances.

ix. In case there is a discrepancy between the amount specified in figures and words, the amount specified in words would prevail.

x. No advance payment will be made at any stage.

xi. TDS will be deducted as applicable at source.

TAN of DES : MUMD08726E

GSTIN of DES : 27MUMD08726EIDH

____________________________________

Signature of Authorized Signatory (with official seal)

Name :

Designation :

Address :

Telephone & Fax :

E-mail address :

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 32 of 104

Page 33: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure I: Performance Bank Guarantee

(For a sum of 10% of the value of the contract value)

Ref. No. :

Date :

Bank Guarantee No. :

To,

The Accounts Officer,

Directorate of Economics & Statistics,

8th Floor, Administrative Building,

Government Colony, Bandra (East),

Mumbai-400 051

Against Letter of Intent number _________ dated _________ relating to Tender No.

EVL/1117/RKVY/502 Conduct evaluation study of “conducting evaluation study of Rashtriya

Krishi Vikas Yojna implemented by Agriculture Department, GoM” (hereinafter called the 'LoI’)

and the contract to be entered into between the Directorate of Economics & statistics,

Govt. of Maharashtra, (hereinafter called "DES") and _________________ (hereinafter called the

Bidder), this is to certify that at the request of the Bidder we ______________________ Bank, are

holding in trust in favour of --------------------, the amount of Rs. ___________________________

(write the sum here in words) to indemnify and keep indemnified the DES against any loss or damage

that may be caused to or suffered by the -------------------- by reason of any breach by the Bidder of any

of the terms and conditions of the contract that will be entered subsequently (within 15 days) and/or in

the performance thereof. We agree that the decision of --------------------, whether any breach of any of

the terms and conditions of the contract and/or in the performance thereof has been committed by the

Bidder and the amount of loss or damage that has been caused or suffered by -------------------- shall be

final and binding on us and the amount of the said loss or damage shall be paid by us forthwith on

demand and without demur to --------------------.

We __________________________________ Bank, further agree that the guarantee herein contained

shall remain in full force and effect during the period that would be taken for satisfactory performance

and fulfilment in all respects of the contract by the Bidder i.e. till _______________ (hereinafter

called the said date) and that if any claim accrues or arises against us _____________________ Bank,

by virtue of this guarantee before the said date, the same shall be enforceable against us

________________________ Bank, notwithstanding the fact that the notice of any such claim is given

to us __________________________ Bank, by -------------------- either before the said date or within

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 33 of 104

Page 34: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

the enforcement period of six months thereafter. Payment under this letter of guarantee shall be made

promptly, within one month of our receipt of notice to that effect from -------------------.

It is fully understood that this guarantee is effective from the date of the said LoI and that we

_________________________ Bank, undertake not to revoke this guarantee during its currency

without the consent in writing of --------------------.

We undertake to pay to -------------------- any money so demanded notwithstanding any dispute or

disputes raised by the Bidder in any suit or proceeding pending before any court or Tribunal relating

thereto our liability under this present guarantee being absolute and unequivocal. The payment so

made by us under this guarantee shall be a valid discharge of our liability for payment there under.

We _____________________________ Bank, further agree that -------------------- shall have the

fullest liberty, without affecting in any manner our obligations hereunder to vary any of the terms and

conditions of the said contract or to extend time of performance by the Bidder from time to time or to

postpone for any time or from time to time any of the powers exercisable by -------------------- against

the said Bidder and to forebear or enforce any of the terms and conditions relating to the said contract

and we, ________________________ Bank, shall not be released from our liability under this

guarantee by reason of any such variation or extension being granted to the said Bidder or for any

forbearance by -------------------- to the said Bidder or for any forbearance and or omission on the part

of -------------------- or any other matter or thing whatsoever, which under the law relating to sureties,

would, but for this provision have the effect of so releasing us from our liability under this guarantee.

This guarantee will not be discharged due to the change in the constitution of the Bank or the Bidder.

Our liability under this Bank Guarantee shall not exceed and is restricted to Rs._______________

(Rupees _________________ only).

_____________________________________

Signature of Authorized Signatory (with official seal)

Date :

Place :

Name :

Designation :

Address :

Telephone & Fax :

E-mail address :

________________ ________________

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 34 of 104

Page 35: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Signature of Witness 1 Signature of Witness 2

Name: __________________ Name: _____________________

(Bank's common seal)

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 35 of 104

Page 36: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure J: A. Draft Contract Form (CF) with Group I Category A1 empanelled agencies on

Stamp Paper of `100

AGREEMENT MADE this _________ day______________ of 2018 at Directorate of Economics & Statistics,

Government of Maharashtra, 8th Floor, Administrative Building, Government Colony, Bandra (E), Mumbai-

400051

Between

The Director, Directorate of Economics & Statistics (DES), Planning Department, Government of Maharashtra,

hereinafter referred to as FIRST PARTY (which term or expression, unless excluded by or repugnant to the

subject or context, shall mean and include its successors-in office and assigns) of the First Part

AND

M/s _________________, an organization registered under ________________ act in India and having its

registered office at ___________________________________________________ hereinafter referred to as

SECOND PARTY” (which term or expression, unless excluded by or repugnant to the subject or context, shall

mean and include its successors and permitted assigns) of the Second Part

NOW IT IS HEREBY AGREED between the parties hereto as follows:

And Whereas FIRST PARTY intends to conduct evaluation study of “conducting evaluation study of

Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM”

The SECOND PARTY has accepted the contract on the terms and conditions set out in the tender document

________ dated ______ as well in the acceptance of tender no.____ dated_________, which will hold good

during period of this agreement.

Upon breach by the SECOND PARTY of any of the conditions of the agreement, the DES may issue a

notice in writing, determine and put an end to this agreement without prejudice to the right of the Government

to claim damages for antecedent breaches thereof on the part of the SECOND PARTY and also to reasonable

compensation for the loss occasioned by the failure of the SECOND PARTY to fulfil the agreement as certified

in writing by the DES which certificate shall be conclusive evidence of the amount of such compensation

payable by the SECOND PARTY to the Government.

This agreement shall remain in force until final presentation as per expected important activity (e) has

been proceed the contract unless and until the party decides to cancel the contract at any time upon giving 15

days’ notice in writing to the other party.

In witness whereof the said____________ hath set his hand hereto and the DES has on behalf of the

Government of Maharashtra affixed his hand and seal thereto the day and year first above written.

Notice in connection with the contract may be given by DES, or any gazetted officer authorised by the

DES.

In consideration of the payments to be made by the DES to the SECOND PARTY as hereinafter

mentioned the SECOND PARTY hereby covenants with the DES to provide the Services and to remedy defects

therein conformity in all respects with the provisions of the Contract.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 36 of 104

Page 37: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

The Contract value will become payable by DES to the SECOND PARTY under the provisions of the

contract at the times and in the manner prescribed by the contract.

If subject to circumstances beyond control (Force Majeure) the contract fails to deliver the services in

accordance with the conditions mentioned in the contract, the First Party shall at his option be entitled either.

SECOND PARTY should adhere to the work plan strictly. Delay beyond 180 days shall attract penalty of Rs.

2000/- per week or part thereof. As per penalty clause and expected procedure (ii) condition should have been

followed. DES reserves the right to waive off penalty considering prevailing circumstances and the reasons for

delay for which SECOND PARTY is not responsible. If the final report of the study is not submitted as per the

agreed condition and within the stipulated timelines, where the delay is on account of the SECOND PARTY

then the DES will withhold the last instalment. All penalties shall be deducted subject to a cap of 10% of

contract value.

If the DES has not received requisite evaluation report because of the delay caused by the Second Party,

the performance Bank Guarantee shall be forfeited and no payments shall be effected full or part thereof to the

Second Party.

Signed, sealed and delivered

By-------------------------

------------------------------

For and on behalf of Directorate of Economics & Statistics, Planning Department, Government of

Maharashtra

Signed, sealed and delivered

By-----------------------------

For and on behalf of the “<SECOND PARTY>”,

----------------------------------------------

Witnesses: (Name, Designation, Contact No. & Signature)

(1)

(2)

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 37 of 104

Page 38: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

B. Draft MoU Form with Group II Category A2 empanelled agencieson Stamp Paper of`

100

MEMORANDUM OF UNDERSTANDING (MoU)

For

Evaluation study of Rashtriya Krishi Vikas Yojna

Between

Directorate of Economics & Statistics, Planning Department, Government of Maharashtra,

Mumbai 400051.

and

< Name of the empanelled agency >

This MoU is entered into on this _________ day______________ of at Directorate of Economics & Statistics,

Government of Maharashtra, 8th Floor, Administrative Building, Government Colony, Bandra (E), Mumbai-

400051

Between

The Director, Directorate of Economics & Statistics (DES), Planning Department, Government of Maharashtra,

hereinafter referred to as FIRST PARTY (which term or expression, unless excluded by or repugnant to the

subject or context, shall mean and include its successors-in office and assigns) of the First Part

AND

<Name of the Empanelled Organisation>hereinafter referred to as SECOND PARTY” situated at <Address of

Empanelled Organisation>

The FIRST PARTY & SECOND PARTY are hereinafter collectively referred to as PARTIES.

And whereas:

The FIRST PARTY desires to carryout detailed evaluation study of Rashtriya Krishi Vikas Yojna

implemented by the Agriculture Department, GoM.

1. In response to the Tender of FIRST PARTY, SECOND PARTY agreed to carry out evaluation

study as mentioned in the tender document & bid submitted by theSECOND PARTY.

2. The SECOND PARTY agreed on to undertake the evaluation study for

Rs. /- (Rs. in words only excluding all prevailing taxes and duties). The total contract value

including prevailing taxes and duties is Rs./- (Rs. in words only AT CURRENT TAXES.) This

may change at the time of billing as per govt. norms and regulations).

NOW IT IS HEREBY AGREED between the parties hereto as follows:

1. Objective, Methodology, Coverage, Sampling etc. of the study:

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 38 of 104

Page 39: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

The Agency has already spelled out the various details of the study the proposal RFP reference No.

OAP/1116/EVL/277 dated 09thMay, 2016& OAP/1116/EVL/679 dated 23rd December, 2016 submitted to DES.

These details are objectives, methodology, coverage, sampling, research tools, secondary data collection, and

work schedule.

The Tender document is also a part of this MoU. The assignment will be completed in 180 days from

the date of signing, barring any unusual circumstance or delay owing to circumstances not within our

control.

2. Output:

The SECOND PARTY will submit report covering results & recommendations in English language.

However, summary & recommendations will be submitted in both Marathi & English Language.

The Agency will present the draft report in stages, or one consolidated report for all projects together,

depending on the total no. of the projects/sites, spread up of the project sites etc. The report will cover

various aspects including Training, etc.

The agency will also submit a monthly report on the progress of the study on the last day of the

calendar month.

The Agency will make available three hard copies of the report. A soft copy of the report will also be

made available on CD.

3. Duration of MoU:

This MoU, has continued validity unless terminated by either PARTY.

4. Terms and conditions:

RFP reference No. OAP/1116/EVL/277 dated 09thMay, 2016&OAP/1116/EVL/679 dated 23rd December,

2016are the base document for this DES Tender including all terms, conditions and guidelines set forth. Agency

is advised to go through the Planning Department-Government Resolution No ममुाअ1016/प्र.क्र.78/का-1417,

dated 22ndJuly, 2016 and Government Corrigendum No. ममुाअ1016/प्र.क्र.78/का-1417, dated 26th September,

2017 as well.

5. Force Majeure:

It will not be treated as default in performance of the obligations under this agreement, if such

performance is prevented or delayed by events such as, but not limited to war, hostilities,

revolutions, riots, civil commotion, strikes, lockouts, conflagration, epidemics, accidents, fire,

wind, floods, droughts, earthquake or because of any other cause beyond the reasonable control

of the parties affected, provided notice in writing of any such cause with necessary evidence

that the obligations under the agreement is hereby affected or prevented or delayed is given

within 30 days from the happening for the event and in case it is not possible to serve the

notice within the said 30 days period, then within the shortest possible period without delay.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 39 of 104

Page 40: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

As soon as the cause for Force Majeure is removed, the party whose ability to perform its

obligation has been affected will notify the other of such cessation of the actual delay incurred

thereof. From the date of occurrence of a case of force majeure, obligations of the party

affected shall be suspended during the continuance of any liability so caused, until the cause

itself and the liability resulting there have been removed and the agreed time of completion of

the respective obligations under this contract shall stand extended by a period equal to period

of delay occasioned by such evevnts.

Should one or both parties be prevented from fulfilling the contractual obligations by a state of

force mejeure lasting for a period of six months or more, then the two parties shall consult each

other and decide regarding the future execution of this contract.

6. Termination of Services :

The DESreserves the right to terminate this Agreement with one month’s prior notice. In such

case, fees/amount payable to consultant shall be determind on the basis of completed work. No

other claims from the Agency will be entertained by the DES and the decision of the DESon

the consultation fees shall be final and binding on consultant.

7. Arbitration :

In case of any dispute in execution of the work, or interpritation of any conditions of the

agreement, the parties can mutually decide to appoint an Arbitrator under the provisions of

Arbitration & Concilation Act 1996, and the decision of the Arbitrator shall be final and

binding on both the parties.

8. Property of the DES:

All documents and reports prepared and delivered to the DES under this agreement while

rendering the services shall become the property of the DES. The Agency will in no way be

liable to any defect, damage or loss thereof, once the same has been delivered to the DES by

the Agency.

9. Confidentiality:

a. The FIRST PARTY and the SECOND PARTY agree to hold in confidence all

information/data designed by the SECOND PARTY as being confidential which is

obtained from FIRST PARTY or Government Agency, created during the performance of

the MOU and will not disclose the same to any third party without written consent of the

FIRST PARTY or Government Agency.

b. The above confidential clause under this MoU excludes the information/data possessed by

SECOND PARTY before entering into this MoU or independently developed and/or

information already available through public domain.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 40 of 104

Page 41: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

10. Amendments to Agreement:

Any amendment to extension of this Agreement, in order to be valid, will be in writing and

signed by all parties hereto.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and

year first hereinabove mentioned.

For and Behalf of:

The Director, Directorate of Economics

&Statistics, Govt. of Maharashtra, Mumbai.

<Agency>.

Signature : Signature :

Name : Name :

Designation: Additional Director, Evaluation,

DES, Mumbai.

Designation:,

WITNESS (Name, Designation, Contact No. & Signature)

1.

2.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 41 of 104

Page 42: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure K: Check-list for the documents to be included

# Documents to be submitted Submitted

(Y/N)

Technical Proposal - Envelope A

1. Annexure A: Bid Cover Letter

2. Online payment receipt of E.M.D. of Rs. 10,000/- &

Online payment receipt of Tender Fee of Rs. 1,000/-

3. Annexure B: Format to share Bidder’s Particulars and contact person’s details

4. Annexure C: Authorisation letter for attending pre-bid meeting (To be

provided on the letter head of Bidder)

5. Annexure D: Format for CV of 3 key staff members proposed

6. Annexure E: Draft Format for activity wise work plan

7. Annexure F: Brief Understanding of conducting evaluation study of Rashtriya

Krishi Vikas Yojna

8. Annexure G: Proposed methodology for evaluation study of conducting

evaluation study of Rashtriya Krishi Vikas Yojna

Commercial Proposal - Envelope B

9. Annexure H: Format for Price schedule

Complete tender document with signature on each page

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 42 of 104

Page 43: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure L: Organisation Structure, Government Resolution

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 43 of 104

Page 44: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 44 of 104

Page 45: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 45 of 104

Page 46: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 46 of 104

Page 47: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 47 of 104

Page 48: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 48 of 104

Page 49: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 49 of 104

Page 50: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 50 of 104

Page 51: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

List of Government Resolution for further reference:

1. शासन ननर्णय क्र.सनिती 2007/प्र.क्र.1/राकृनियो कक्ष, नि. 20/09/2007 https://www.maharashtra.gov.in/Site/Upload/Government%20Resolutions/Marathi/200709201519160

01.pdf

2. शासन ननर्णय क्र. सनिती -2008/प्र.क्र.62/राकृनियो कक्ष, नि. 23/07/2008https://www.maharashtra.gov.in/Site/Upload/Government%20Resolutions/Marathi/2008

0722170446001.pdf

3.शासन ननर्णय क्र. राकृनि -2010/प्र.क्र.39/राकृनियो कक्ष, नि. 15/04/2010 https://www.maharashtra.gov.in/Site/Upload/Government%20Resolutions/Marathi/201004161253090

01.pdf

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 51 of 104

Page 52: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure M: Scheme Related Information

Department/Agencywise and yearwise Projects/Schemes implemented under RKVY

Year Name of Agency Projects/

Schemes

Categeory

Infrastructure Production Special

2012-13 Dir. Extension 12 9 3

Dir. Hoticulture 3 1 2

National Horticulture Mission 5 5

MKV Prabhani 1 1

Soil Conservation 4 3 1

Minor Irrigaton 1 1

Marketing 1 1

Animal Husbandry 3 1 1 1

Dairy development 2 2

Total 32 6 16 10

2013-14 Dir. Extension 13 1 9 3

Dir. QC 9 7 2

Dir. Hoticulture 6 2 2 2

Dir. ATMA 1 1

Dir. Hoticulture 8 8

National Horticulture Mission 5 2 3

MSSCL, Mahabeej Akola 1 1

PDKV, Akola 2 2

Dir. Soil Conservation 5 4 1

Minor irgiation 1 1

Animal Husbandry 6 5 1

Dairy development 1 1

Fisheries 1 1

Sericulture 3 2 1

Total 62 21 31 10

2014-15 Dir. Extension 21 19 2

Dir. QC 2 2

Dir. Hoticulture 6 4 2

Dir. ATMA 1 1

Dir. Hoticulture 25 3 21 1

National Horticulture Mission 4 3 1

Mahabeej, Akola 1 1

PDKV, Akola 9 1 8

BSSKKV, Dapoli 4 2 2

Soil Conservation 5 4 1

MSWC 9 7 2

Animal Husbandry 6 3 3

Dairy development 4 3 1

Fisheries 1 1

Sericulture 2 1 1

Total 100 34 58 8

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 52 of 104

Page 53: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Year Name of Agency Projects/

Schemes

Categeory

Infrastructure Production Special

2015-16 Dir. Extension 16 1 15

Dir. QC 1 1

Dir. Hoticulture 27 26 1

Dir. ATMA 1 1

National Horticulture Mission 3 3

Mahabeej, Akola 2 1 1

MPKV, Rahuri 3 1 2

PDKV, Akola 1 1

MKV, Prabhani 1 1

BSSKKV, Dapoli 2 2

Minor Irrigaton 4 2 2

MSWC 1 1

Animal Husbandry 3 2 1

Sericulture 2 1 1

Total 67 14 50 3

2016-17 Dir. Extension 3 3

Dir. QC 3 2 1

Dir. Hoticulture 2 2

National Horticulture Mission 6 6

Dir. Hoticulture 1 1

Managing Dir. Sugar 1 1

Animal Husbandry 8 7 1

comm. Dairy 7 7

Comm.Fisheries 1 1

Sericulture 2 2

Total 34 29 5 0

2017-18 Dir. Extension 4 4

Dir. QC 6 6

Dir. Hoticulture 4 3 1

NAFED 1 1

National Horticulture Mission 4 3 1

Mahabeej, Akola 1 1

MPKV, Rahuri 1 1

MKV, Prabhani 1 1

BSSKKV, Dapoli 1 1

Marketing Board 4 4

Sugarcane Development 1 1

MSWC 7 7

Animal Husbandry 6 5 1

Dairy development 2 2

Fishery 9 2 7

Total 52 35 17 0

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 53 of 104

Page 54: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

The information regarding projects /schemes of RKVY is attached with it.

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 54 of 104

Page 55: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr. No Name of Agency

SLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

CategeoryStatus of

ProjectBeneficiaries Districts

1 2012-13 2012-13

INTEGRATED

PEST

MANAGEMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

10.73 Production Completed

All Cotton, Soyabean,

Pigeonpea, Paddy and

Chickpea growers of

the State

All Districts

2Project based Agriculture Extension-

Awareness Campaign 2012-13 2012-13 EXTENSION

PROMOTION OF

AGRICULTURE

MECHANISATION

2.00 Production Completed 352 All Districts

3 2012-13 2012-13CROP

DEVELOPMENT

ACTIVITIES

RELATED TO

ENHANCEMENT OF

SOIL HEALTH

60.25 Special Completed 1223Ahmednagar, Beed, Chandrapur,

Hingoli, Nandurbar

4 2012-13 2012-13 CROP

DEVELOPMENT

ACTIVITIES

RELATED TO

ENHANCEMENT OF

SOIL HEALTH

29.77 Special CompletedFarmers selected from

all 33 districtsAll Districts

5 Special Fodder Production Programme 2012-13 2012-13CROP

DEVELOPMENT5.93 Production Completed 24000 All Districts

6Supply of Fodder Crop Seed for

distribution2012-13 2012-13 SEED

PROMOTION OF

AGRICULTURE

MECHANISATION

9.26 Production Completed 96000 All Districts

7 2012-13 2012-13 EXTENSION

ACTIVITIES

RELATED TO

ENHANCEMENT OF

SOIL HEALTH

25.00 Special Completed 6200 All Districts

8 Maize Project 2012-13 2012-13CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

1.93 Production Completed

9 Soybean Project 2012-13 2012-13CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

0.67 Production Completed

10 Pulses Development 2012-13 2012-13CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

13.13 Production Completed 17000 All Districts

11 Sugarcane development Project 2012-13 2012-13CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

0.60 Production desanction 1200 All Districts

12 Cotton Nujeewoodu seeds Project 2012-13 2012-13CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

3.88 Production Completed 2000 All Districts

Dir Extention

Rain fed Area Development

Programmers (RADP)

Initiative for Nutritional Security

through Intensive Millets Promotion

(INSIMP)

Accelerated Fodder Development

Programme

Projectwise information of projects implemented during 2012-13 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

Surveillance and Monitoring of Pest on

Cotton and Soyabean

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 55 of 104

Page 56: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr. No Name of Agency

SLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

CategeoryStatus of

ProjectBeneficiaries Districts

Projectwise information of projects implemented during 2012-13 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

13Special Programme on Oil Palm Area

Expansion (OPAE)2012-13 2012-13 HORTICULTURE

ACTIVITIES

RELATING TO

ENHANCEMENT OF

HORTICULTURAL

PRODUCTION AND

PROMOTION OF

MICRO IRRIGATION

SYSTEMS

1.51 Special Completed 250 All Districts

14 2012-13

INTEGRATED

PEST

MANAGEMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

37.70 Production Completed 2000 All Districts

15 2012-13 2012-13

NATURAL

RESOURCE

MANAGEMENT

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD

CROPS

117.00 Special Completed All Districts

Dir Horticulture

16 Grape Project 2012-13 2012-13 HORTICULTURE

PROMOTION OF

AGRICULTURE

MECHANISATION

0.70 Production Completed 1000 All Districts

17E-content development for specified

cropes. Project 2012-13 2012-13

INFORMATION

TECHNOLOGY

PROMOTION OF

AGRICULTURE

MECHANISATION

0.29 Production Completed 250000 All Districts

18 Onion Project 2012-13 2012-13 HORTICULTURE

PROMOTION OF

AGRICULTURE

MECHANISATION

0.48 Production Completed 1000 5 Districts

19 2012-13 2012-13 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD

CROPS

1.11 Production Completed 2000 Nashik, Ahmednagar, Pune

20 Potato Project (Pepsico) 2012-13 2012-13 HORTICULTURE

PROMOTION OF

AGRICULTURE

MECHANISATION

1.54 Production Completed 1800

National Horticulture Mission

21Development Irrigation potential for

Seed production at MKV Parbhani2012-13 2012-13 10.12

Completed Aurangabad, Jalna, Beed, Latur,

Osmanabad, Nanded, Parbhani, Hingoli

22 Mahatma PhuleJal Bhumi Abhiyan 2012-13 2012-13

NATURAL

RESOURCE

MANAGEMENT

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD

CROPS

45.00 Infrastructure Completed All 33 Districts

23 2012-13MICRO/MINOR

IRRIGATION

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD

CROPS

25.00 Infrastructure Completed 2100 All DistrictsConstruction of Check Dams 2012-13

MKV Parbhani Infrastructure

Tomato Project ( HUL)

Intregated Management of control of

Leaf Blight Diseace(Sigatoka) of Banana2012-13

Vidharbh intensified irrigation

development programme (Hort)

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 56 of 104

Page 57: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr. No Name of Agency

SLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

CategeoryStatus of

ProjectBeneficiaries Districts

Projectwise information of projects implemented during 2012-13 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

24 2012-13

INNOVATIVE

PROGRAMMES/

TRAINING/

CAPACITY

BUILDING/

OTHERS

ACTIVITIES

RELATED TO

ENHANCEMENT OF

SOIL HEALTH 10.61 Infrastructure Completed 5600 All Dsitricts

25 2012-13 2012-13MICRO/MINOR

IRRIGATION

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD

CROPS

135.00 Special Completed

Protctive Irrigation By

Check dam on 30800

ha,70000 ha by Farm

Pond

All Districts

Soil Conservation

26 2012-13 2012-13MICRO/MINOR

IRRIGATION

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD

CROPS

48.00 Special Completed

Minor Irrigation

27 2012-13 Marketing 58.30 Infrastructure Yet not started 100 APMC's All Districts

Marketing

28Goat Development Scheme under 2012-

13 2012-13 2012-13

ANIMAL

HUSBANDRYANIMAL HEALTH 5.10 Special Completed 200 All Districts

29Procurment &distribution of fodder seed

/ sets 2012-13 2012-13

ANIMAL

HUSBANDRY

PROMOTION OF

AGRICULTURE

MECHANISATION

5.00 production Completed Marathwada, Nashik, Pune Region

30 2012-13ANIMAL

HUSBANDRY

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD

CROPS

9.98 Infrastructure Completed 950 Drought prone Districts of the State

Animal Husbundary

31

Advance milk processing infrastructure

development project by MRSDMM

under (NMPS) 2012-13

2012-13 2012-13 Dairy 13.67 Special CompletedFarmer members of

Milk UnionMumbai

32National Mission for protein Supplement

(NMPS) dairy 2012-132012-13 2012-13 Dairy 9.18 Special Completed

Dairy development

Establishment of Silage Making Unit in

Drought affected districts under RKVY

as Drought Mitigation Measures

2012-13

Computerized Auction System and office

Automation for APMC's in the State2012-13

Vidharbh intensified irrigation

development programme (MI)

Foundation Traning Programme on S.C.

& Watershed Management

2012-13

Vidharbh intensified irrigation

development programme (SC)

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 57 of 104

Page 58: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of Agency

SLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries Districts

1 2013-14 2013-14AGRICULTURE

MECHANISATION

NTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

30.00 Infrastructure Completed 3663 33 Districts of the State

2Project based Agriculture Extension-Awareness

Campaign 2013-14 2013-14 EXTENSION

PROMOTION OF

AGRICULTURE

MECHANISATION

2.00 Production Completed

The Farmers in the

projected crop

clusters will be

benefitted with the

progrmme

All Districts in the State

3 2013-14 2013-14CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

48.00 Special Completed 1.26 Lakh

Nandurbar, Satara, Beed, Osmanabad,

Nanded, Parbhani, Hingoli, Yeotmal, Wardha,

Nashik, Ahmednagar, Pune, Solapur,

Chandrapur, Thane, Raigad, Ratnagiri

4 Accelerated Fodder Development Programme 2013-14 2013-14 ANIMAL

HUSBANDRY

PROMOTION OF

AGRICULTURE

MECHANISATION

25.00 Special Completed Farmers selected

from all 33 Districts

All Districts in State

5 2013-14 2013-14 EXTENSION

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

22.50 Special CompletedFarmers Selected

from semi- arid & sub-

humid districts

All Districts

6 2013-14 2013-14CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

15.50 Production Completed

Small & Marginal Farmers

26 Sugarcane growing Districts in the State

7 2013-14 2013-14 EXTENSION

PROMOTION OF

AGRICULTURE

MECHANISATION

6.60 Production Completed Small & Marginal

Farmers

All districts

8 Intensive sugarcane productivity project 2013-14 2013-14CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

Production Completed Small & Marginal

Farmers

All districts

9 Maize Project 2013-14 2013-14MARKETING AND

POST HARVEST

MANAGEMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

Production Completed

Aurangabad, Jalna, Buldhana, Dhule,

Nandurbar, Nashik, Jalgaon, Ahmednagar,

Sangli, Solapur, Osmanabad, Pune

10 Soybean Project 2013-14 2013-14CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

Production CompletedLatur, Osmanabad, Nanded, Beed, Parbhani,

Buldhana, Amravati, Yavatmal

11 Pulses Development 2013-14 2013-14CROP

DEVELOPMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

Production CompletedSmall & Marginal

Farmers All districts

12 Cotton Jain Irrigation system Project 2013-14 2013-14CROP

DEVELOPMENT Production Completed Small & Marginal

Farmers

All districts

13 Cotton Nujeewoodu seeds Project 2013-14 2013-14CROP

DEVELOPMENT Production Completed Small & Marginal

Farmers

All districts

Dir Extension

14 Strengthing of Taluka seed farm 2013-14 2013-14 SEED

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

2.40 Infrastructure Completed 194194 Taluka Seed Farm in District of

Maharashtra

15

Strengthening of Soil Testing, Bio Fertilizer

Testing Labs and IPM Labs and Distibution of

Soil Health Cards

2013-14 2013-14INTEGRATED PEST

MANAGEMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

1.53 Infrastructure CompletedFarmers/Exporters/Pu

blic

Dhule, Jalgaon, Aurangabad, Parbhani,

Nanded, Amravati, Yeotmal, Buldhana,

Wardha, Ahmednagar

Rain fed Area Development Programmers

(RADP)

Sugercane productivity improvement

Programme

Coarse Cereal Development Programme

Agriculture Mechanization

Initiative for Nutritional Security through

Intensive Millets Promotion (INSIMP)

Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay

Rs.in Cr.

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 58 of 104

Page 59: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of Agency

SLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries Districts

Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay

Rs.in Cr.

16Establishment / Strengthening of Pesticides

Residue Testing Laboratory2013-14 2013-14 HORTICULTURE

PROMOTION OF

AGRICULTURE

MECHANISATION

0.57 Infrastructure CompletedFarmers, Exporter,

Pune, Nagpur

17Establishment / Strengthening of Seed Testing

laboratory2013-14 2013-14 SEED

PROMOTION OF

AGRICULTURE

MECHANISATION

1.00 Infrastructure Completed Farmers, Exporter,

Public

Pune, Nagpur, Parbhani

18Strengthening of Ferrtilizers

Testing Laborataries2013-14 2013-14

FERTILISERS AND

INM

PROMOTION OF

AGRICULTURE

MECHANISATION

1.50 Infrastructure Completed Farmers, Exporter,

Public

Pune, Nashik, Aurangabad, Amravati,

Kolhapur

19Strengthening of Insecticide Testing

Laborataries2013-14 2013-14

INTEGRATED PEST

MANAGEMENT

PROMOTION OF

AGRICULTURE

MECHANISATION

1.30 Infrastructure Completed Farmers, Exporter,

Public

Pune, Thane, Aurangabad, Amravati

20Extension support for

Strengthening of Agri Polyclinic2013-14 2013-14 EXTENSION

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

3.25 Infrastructure Completed NA All Districts in all Maharashtra

21 Promotion of Organic Farming 2013-14 2013-14ORGANIC

FARMING / BIO

FERTILISER

PROMOTION OF

AGRICULTURE

MECHANISATION

3.00 Production Completed All Category 33 Districts

22Scheme for Production and Strengthening of

Vermi-compost2013-14 2013-14

ORGANIC

FARMING / BIO

FERTILISER

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

Production Completed

Dir QC

23 2013-14 2013-14MICRO/MINOR

IRRIGATION

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

196.89 Infrastructure Completed 67492 26 Districts

24 Automation in drip irrigation system 2013-14MICRO/MINOR

IRRIGATION

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

2.00 Infrastructure Completed 930 33 Districts

25 2013-14 2013-14 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

0.76 Special Completed All Categories Kolhapur, Sangli, Sindhudurg

26 2013-14 2013-14NATURAL

RESOURCE

MANAGEMENT

70.00 Special CompletedSmall, marginal,

SC/ST farmaers &

other farmers

Buldhana, Akola, Washim, Amravati,

Yeotmal, Wardha, Nagpur, Chandrapur

27 2013-14 HORTICULTURE

ACTIVITIES

RELATED TO

ENHANCEMENT OF

SOIL HEALTH

0.75 Production Completed Individual Farmers &

their Community

All Districts in the Maharashtra State

28

Creation of facilities for online registration of

Grapes, Pomegranate, Vegetables &

Phytosanitary Certification for Export

2013-14 2013-14 HORTICULTURE

PROMOTION OF

AGRICULTURE

MECHANISATION

0.50 Production Completed

Farmers, Exporter,

Agricultural

Exporters, Grower

Exporters, Trader

Exporters

18 Districts & Cell at Commissionerate Level

Dir. Horticulture

29Strengthening of Agriculture extension

management Training Institutes2013-14 2013-14

INNOVATIVE

PROGRAMMES/

TRAINING/

CAPACITY

BUILDING/ OTHERS

INTEGRATED PEST

MANAGEMENT

SCHEMES

Production Completed

30 2013-14 2013-14 HORTICULTURE

PROMOTION OF

AGRICULTURE

MECHANISATION

0.40 Production Completed 400 Nashik, SangliGrape Project(Deepak Fertilizer &

Petrochemical Ltd.)

Dir. ATMA

Geographical Indication Registration of

Agricultural & Horticultural Crops from

Maharashtra State

2013-14

Special Programme on Oil Palm Area

Expansion (OPAE)

Vidharbh intensified irrigation development

programme (Hort)

2013-14

Micro -Irrigation

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 59 of 104

Page 60: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of Agency

SLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries Districts

Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay

Rs.in Cr.

31 2013-14 2013-14 HORTICULTURE

INTEGRATED PEST

MANAGEMENT

SCHEMES

0.30 Production Completed 3000 Nashik, Sangli

32

Grape Project(MRDBS Pune)

2013-14 2013-14 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

2.00 Production Completed 97 Nashik, Solapur, Pune

33 Grape Project(Mahindra Subhlabh) 2013-14 2013-14 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

0.40 Production Completed 500 Nasik, A. nagar, Sangli, Satara, Solapur,

Osmanabad, Latur

34 2013-14 2013-14 HORTICULTURE

INTEGRATED PEST

MANAGEMENT

SCHEMES

0.23 Production Completed 200 Nashik, Solapur, Pune, Ahmednagar

35 2013-14 2013-14 HORTICULTURE

INTEGRATED PEST

MANAGEMENT

SCHEMES

0.30 Production Completed 250 Solapur, Sangli

36 2013-14 2013-14 HORTICULTURE

INTEGRATED PEST

MANAGEMENT

SCHEMES

0.40 Production Completed 300 Kolhapur, Sangli

37 2013-14 2013-14 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

0.50 Production Completed 500 Kolhapur, Sangli

Dir Horticulture

38 2013-14 2013-14 HORTICULTURE

PROMOTION OF

AGRICULTURE

MECHANISATION

0.28 Production Completed 3000 Jalgaon, Dhule, Nandurbar, Buldhana

39 2013-14 2013-14 HORTICULTURE

PROMOTION OF

AGRICULTURE

MECHANISATION

1.02 Production Completed 2200 Nashik

40 2013-14 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

7.32 Production Completed 10000 Pune, Nashik, Ahmednagar

41 2013-14 2013-14 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

100.00 Infrastructure Completed 16000

Nashik, Djule, Jalgaon, Pune, Ahmednagar,

Pune, Satara, Sangli, Aurangabad, Jalna,

Beed, Latur, Parbhani, Osmanabad, Buldhana

42 2013-14 HORTICULTURE 12.00 Infrastructure Completed

National Horticulture Mission

43 2013-14 SEED

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

12.98 Infrastructure Completed 40000 All Districts

MSSCL Mahabeej Akola

44 2013-14 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

0.99 Infrastructure Completed

The Farmers of the

region through

Department of

Agriculture

All Districts

DNA fingerprinting in citrus. for

“Identification of galgal, rangpur lime and

jambhery rootstock at the nursery stage at

(PDKV)

2013-14

Construction of seed processing plant & seed

warehouses by MSSCL2013-14

Strengthening of Community tank componant

(MIDH)

Onion Storage Structure 2013-14

Tomato Project ( HUL)

Vegetable Project( Daulat Agro) 2013-14

Pomogranate Project ( Deepak Fertilizer)

Banana Project (Desai Fruits & Vegetable)

Banana Project ( B. G. Ghadage Milk

Processing Private Ltd.)

Banana Project(Sanjeevani Agro Coop Society

Ltd.)

White Onion Project (Jain Irrigation)

Grape Project(Rallies India)

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 60 of 104

Page 61: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of Agency

SLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries Districts

Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay

Rs.in Cr.

45

Establishment of plant tissue culture laboratory

for production of quality planting

Material.(PDKV)

Infrastructure Completed

The Farmers of the

region through

Department of

Agriculture

The Farmers of the region through

Department of Agriculture

PDKV Akola 2013-14 HORTICULTURE

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

6.00

46 2013-14 2013-14NATURAL

RESOURCE

MANAGEMENT

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

20.00 Infrastructure Completed

Small, marginal,

SC/ST farmaers &

other farmers

All Districts

47 Mahatma PhuleJal Bhumi Abhiyan 2013-14 2013-14NATURAL

RESOURCE

MANAGEMENT

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

26.00 Infrastructure Completed

Small, marginal,

SC/ST farmaers &

other farmers

All Districts

48 2013-14 2013-14NATURAL

RESOURCE

MANAGEMENT

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

40.00 Special Completed

Small, Marginal,

SC/ST farmers &

Other Farmers

Buldhana, Akola, Washim, Amravati,

Yeotmal, Wardha, Nagpur, Chandrapur

49 River Valley Project 2013-14 2013-14NATURAL

RESOURCE

MANAGEMENT

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

5.00 Infrastructure Completed

Small, marginal,

SC/ST farmaers &

other farmers,

members of Self Help

Groups

Solapur, Ahmednagar, Satara, Sangli,

Aurangabad, Jalna, Beed,

50

Development of water resources through

construction of rain-water harvesting structure

& Land treatmentat Kiwal, Dist. Satara

2013-14 2013-14NATURAL

RESOURCE

MANAGEMENT

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

1.58 Infrastructure Completed 1474 Satara

Dir. Soil Conservation

51Vidharbh intensified irrigation development

programme (MI)2013-14 2013-14

MiCRO/IRRIGATIO

N 40.00 Special Completed

Minor Irrigation

52Supply of Mini Hatchery Units to Self help

groups in Gadchiroli2013-14 2013-14

ANIMAL

HUSBANDRY

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

0.20 Production Completed 700 Gadchiroli

53Supply of Medicines to the animal’s in Cattle

Camps of Drought Prone Area.2013-14 2013-14

ANIMAL

HUSBANDRY

PROMOTION OF

AGRICULTURE

MECHANISATION

1.30 Production Completed

54Distribution of 100 units of (30 female and 2

male Goats) size in Gadchiroli2013-14 2013-14

ANIMAL

HUSBANDRY

PROMOTION OF

AGRICULTURE

MECHANISATION

2.64 Production Completed 100 Gadchiroli

55 2013-14ANIMAL

HUSBANDRY

PROMOTION OF

AGRICULTURE

MECHANISATION

22.79 Production Completed 1490 All Districts

56 2013-14ANIMAL

HUSBANDRY

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

22.95 Production Completed 2000 All Districts

57National Mission for protein Supplement 2013-

14 ( AH)2013-14 2013-14

DAIRY

DEVELOPMENT

INTEGRATED

DEVELOPMENT OF

MAJOR FOOD CROPS

2.29 Special CompletedFarmer members of

Primary DCS linked

with milk unions

Animal husbundry

Distribution of 40 female & 2 male goat in

DPAP area2013-14

Establishment of broiler units of 1000 birds

capacity2013-14

Vidharbh intensified irrigation development

programme (SC)

National Watershed Development programme

2013-14

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 61 of 104

Page 62: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of Agency

SLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries Districts

Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay

Rs.in Cr.

58 2013-14DAIRY

DEVELOPMENT13.60 Special Completed

Dairy Department

59National Mission for protein Supplement 2013-

14 (FISHERY)2013-14 2013-14 FISHERIES 9.00 Special

Project not

Implemented

Fisheries

60 2013-14 Sericulture 8.40 Production Completed 8500 26 Districts

61Purchase of Cold Storage at Egg Culture

Production Centre Gadhinglaj, Kolhapur2013-14 2013-14 Sericulture 0.27 Infrastructure Completed

Farmer from

Kolhapur District Kolhapur

62 Mud House (Tusser Granage ) 2013-14 2013-14 Sericulture 4.73 Infrastructure Completed400 Gadchiroli, Gondia, Yeotmal

Sericulture

Cultivation of Mulberry for development of

Silk Industry 2013-142013-14

Strethening and Modernization of Milk Union

(NMPS) (Corrected as per 16 SLSC minutes)2013-14

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 62 of 104

Page 63: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY Project

Cost Categeory Status of Project Beneficiaries Districts

1Project based Agriculture Extension-Awareness

Campaign 2014-15 2014-15 Extension 6.00 Special Completed 16 Lakh

Thane, Raigad, Ratnagiri, Sindhudurg, Nashik,

Dhule, Nandurbar, Jalgaon, Anmednagar, Pune,

Solapur, Satara, Sangli, Kolhapur, Aurangabad,

Jalna, Beed, Latur, Osmanabad, Nanded,

Parbhani, Hingoli, Buldhana, Akola, Amravati,

Washim, Yavatmal, Wardha, Nagpur,

Bhandara, Gondia, Chandrapur, Gadchiroli

2 2014-15 2014-15 Extension 24.77 Production Completed 408750.00

Thane, Raigad, Ratnagiri, Sindhudurg, Nashik,

Dhule, Nandurbar, Jalgaon, Anmednagar, Pune,

Solapur, Satara, Sangli, Kolhapur, Aurangabad,

Jalna, Beed, Latur, Osmanabad, Nanded,

Parbhani, Hingoli, Buldhana, Akola, Amravati,

Washim, Yavatmal, Wardha, Nagpur,

Bhandara, Gondia, Chandrapur, Gadchiroli

3

Accelerated Fodder Development Programme

(Draught Mitigation) (Special)

2014-15 2014-15Crop

Development12.50 Special Completed 193750

Raigad, Nashik, Nandurbar, Jalgaon,

Ahmednagar, Pune, Solapur, Kolhapur,

Aurangabad, Jalna, Beed, Latur, Osmanabad,

Nanded, Parbhani, Hingoli, Buldhana, Washim,

Yeotmal, Chandrapur, Gadchiroli,

4

Accelerated Fodder Development Programme

(Draught Mitigation)(General) 2014-15 2014-15Crop

Development12.50 Production Completed

5

High Density Cotton Development Programme

2014-15 2014-15Crop

Development5.96 Production Completed 17500.00

Nashik, Dhule, Nandurbar, Jalgaon,

Ahmednagar, Aurangabad, Jalna, Beed,

osmanabad, Nanded, Parbhani & Hingoli

6 2014-15 2014-15Crop

Development13.32 Production Completed 9275

Nashik, Dhule, Nandurbar, Jalgaon,

Ahmednagar, Aurangabad, Jalna, Beed,

osmanabad, Nanded, Parbhani & Hingoli,

Pune,Satara, Sangli, Kolhapur, Aurangabad,

Wardha, Nagpur, Yavatmal, Gondia

7

Paddy development Programme

2014-15 2014-15Crop

Development23.12 Production Completed 1 lakh

Thane, Raigad, Nashik, Nandurbar,

Osmanabad, Nagpur, Chandrapur, Gadchiroli,

Gondiya, Bhandara

8 2014-15 2014-15Crop

Development1.07 Production Completed 25000.00

Thane, Raigad, Palghar, Nashik, Nandurbar,

Jalgaon, Aurangabad, Jalna, Beed, Latur,

Osmanabad, Nanded, Parbhani, Hingoli,

Buldhana, Akola, Washim, Amravati,

Yavatmal, Wardha, Nagpur, Chandrapur,

Gadchiroli, Gondiya

9 2014-15 2014-15Crop

Development23.96 Production Completed 120000

Thane, Raigad, Ratnagiri, Sindhudurg, Nashik,

Dhule, Nandurbar, Jalgaon, Kolhapur, Jalna,

Latur,Nanded, Parbhani, Buldhana, Akola,

Amravati, Yavatmal,

10

Maize Project

2014-15 2014-15Crop

Development18.26 Production Completed 1 lakh

Aurangabad, Jalna, Beed, Nashik, Jalgaon,

Dhule, Nandurbar, Amravati, Akola, Yeotmal,

Buldhana, Nagpur, Wardha, Sangli, Satara,

Pune, Ahmednagar, Solapur, Latur,

Osmanabad, Nanded, Parbhani

11Soybean Project

2014-15 2014-15Crop

Development1.54 Production Completed 100000

Latur, Akola, Amravati, Buldhana, Washim,

Wardha, Nagpur, Osmanabad, Beed

12Pulses Development

2014-15 2014-15Crop

Development1.57 Production Completed 50000

Latur, Osmanabad, Beed,

13Rice Projects

2014-15 2014-15Crop

Development0.24 Production Completed 1000

Gadchiroli, 12 blocks in the district

14Rice Projects(Saguna baugh,Chaitanya Rice

Mill, Kamani Oil Mill)2014-15 2014-15

Crop

Development0.74 Production Completed 1000

Gadchiroli

Coarse Cereal Development Programme

Sugercane productivity improvement Programme

Promotion of Hybrid Pigion Pea

(ICPH2740)Through Production Programme

Accelerated Fodder Development Programme

Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 63 of 104

Page 64: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY Project

Cost Categeory Status of Project Beneficiaries Districts

Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

15

Cotton Jain Irrigation system Project

2014-15 2014-15Crop

Development5.79 Production Completed

30000 in 1st

Training & 10000 in

2nd Training

Jalgaon, Dhule, Nandurbar, Aurangabad Jalna,

Beed, Parbhani, Nanded, Hingoli, Akola,

Buldhana, Washim, Amravati, Yeotmal,

Nagpur, Wardha, Chandrapur

16

Cotton Nujeewoodu seeds Project

2014-15 2014-15Crop

Development7.50 Production Completed 39640

Aurangabad, Beed, Jalgaon, Akola, Buldhana,

Amravati, Yavatmal, Parbhnai, Wardha,

Nanded,

17Cotton Project ( Kaweri Seeds)

2014-15 2014-15Crop

Development3.29 Production Completed 41500

Akola, Washim, Buldhana, Amravati,

Yavatmal, Wardha, Parbhani, Hingoli, Beed

18Cotton Project (COTAAP)

2014-15 2014-15Crop

Development0.27 Production Completed 600

Jalgaon

19Rice - III -Gomtesh ( 3 Years)

2014-15 2014-15Crop

Development2.46 Production Completed 5000

Kolhapur

20

Research and Development project to limit the

no. of crop cutting experiments through TOPS

Technology CRIDA Hydrabad (2 Years)2014-15 2014-15 Research 3.77 Production Completed 5600

Jalgaon, Jalna, Aurangabad, Yeotmal, Nagpur,

Latur, Amravati, Nashik, Dhule, Ahmednagar,

Pune, Solapur, Osmanabad, Washim, Akola

21Sugarcane Olam Agro India Ltd Hemarus

Industries Ltd ( 2 Years)2014-15 2014-15

Crop

DevelopmentSugarcane 17.37 Production Completed/Desanctioned 12123

Kolhapur

Dir Extension

22

Strengthening of District Soil Survey & Soil

Testing Labs in Maharashtra 2014-15 2014-15 2.70 Infrastructure Completed29 Government Soil

Testing Laboratory

29 Districts

23 2014-15 11.25 Infrastructure Completed NAPune, Thane, Kolhapur, Nashik, Aurangabad,

Amravati, Nagpur

Dir QC

24

Strengthening of existing centrally sponsored

scheme on Micro Irrigation 2014-15 2014-15

HORTICULTUR

E50.00 Infrastructure Completed 25621

Nashik, Dhule, Nandurbar, Jalgaon,

Ahmednagar, Pune, Solapur, Satara, Sangli,

Kolhapur, Aurangabad, Jalna, Beed, Latur,

Osmanabad, Nanded, Hingoli, Parbhani

25

Additional programme for Micro-Irrigation in

drought like situation affected areas 22

districts.( Mitigate Drought Situation)2014-15 2014-15

HORTICULTUR

E50.00 Infrastructure Completed 25621

Nashik, Dhule, Nandurbar, Jalgaon,

Ahmednagar, Pune, Solapur, Satara, Sangli,

Kolhapur, Aurangabad, Jalna, Beed, Latur,

Osmanabad, Nanded, Hingoli, Parbhani

26 2014-15HORTICULTUR

E6.26 Production Completed Approx. 5 lakhs

Thane, Raigad, Ratnagiri, Sindhudurga, Beed,

Osmanabad, Aurangabad, Latur, Jalna, Nashik,

Ahmednagar, Solapur, Sangli, Satara, Dhule,

Jalgaon, Nanded, Parbhani, Hingoli, Amravati,

Yeotmal, Buldhana, Wardha, Nagpur, Akola,

Washim

27

Vidharbh intensified irrigation development

programme (Hort) 2014-15 2014-15HORTICULTUR

E35.64 Infrastructure Completed

Buldhana,Akola, Washim, Amravati, Yeotmal,

Wardha, Nagpur, Chandrapur, Bhandara,

Gondia

28

Additional programme under Vidharbh

intensified irrigation development programme

(Hort) Additional

2014-15 2014-15HORTICULTUR

E50.00 Infrastructure Completed 25000

Yeotmal, Akola, Amravati, Wardha, Buldhana,

Washim, Nagpur, Chadrapur, Bhandara,

Gondia, Gadchiroli

29

Promotion of export through development of

VEGNET, MANGONET,& Strengthening of

GRAPENET, ANARNET & phytosanetery

Authorities.2014-15

HORTICULTUR

E1.00 Production Completed 30000

Thane, Raigad, Ratnagiri, Sindhudurg, Jalna,

Latur, Aurangabad, Nashik, Jalgaon, Beed,

Ahmednagar, Pune, Satara, Sangli, Solapur,

Osmanabad, Buldhana, Amravati, Nanded &

Phytosanitarty Cell at Commisionarate Level

Dir . HorticultureHORTICULTUR

E

30Strengthening of Agriculture extension

management Training Institutes2014-15 2014-15 3.67 Infrastructure Completed NA

33 Districts

Dir ATMA

31 2014-15 2014-15 Horticulture 0.41 Production Completed

32 2014-15 2014-15 Horticulture 4.49 Production Completed 3000 Nashik, Sangli

33 2014-15 2014-15 Horticulture 0.26 Production Completed 200 Nashik, Solapur, Pune, AhmednagarPomogranate Project ( Deepak Fertilizer)

Grape Project(Deepak Fertilizer & Petrochemical

Ltd.)400 Nashik, Sangli

Grape Project(Rallies India)

2014-15

Horticultural Pest Surveillance, Advisory &

Management project (HORT SAP )

2014-15

Strengthening of Quality Control laboratories

@& residue in for increasing analyzing capacity 2014-15

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 64 of 104

Page 65: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY Project

Cost Categeory Status of Project Beneficiaries Districts

Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

34 PomogranateProject ( Rallies India Ltd) 2014-15 2014-15 Horticulture 1.28 Production Completed 2500 Ahmednagar, Solapur, Nashik

35 Orange Project( Rallies India Ltd) 2014-15 2014-15 Horticulture 0.79 Production Completed 1000 Amravati

36 2014-15 2014-15 Horticulture 1.37 Production Completed 250 Solapur, Sangli

37 2014-15 2014-15 Horticulture 1.47 Production Completed 300 Kolhapur, Sangli

38 2014-15 Horticulture 2.64 Production Ongoing 500 Kolhapur, Sangli

39Cashewnut Project( Asseso Interprises Ltd)

2014-15 2014-15 Horticulture 1.62 Production Completed 500Ratnagiri

40 White Onion Project (Jain Irrigation) 2014-15 Horticulture 5.34 Production Ongoing 3000 Jalgaon, Dhule, Nandurbar, Buldhana

41 2014-15 2014-15 Horticulture 1.70 Production Completed 2200 Nashik

42 2014-15 Horticulture 4.06 Production Completed 2000 Osmanabad, Latur,Beed

43 2014-15 Horticulture 0.19 Production Completed 200 Pune

44 2014-15 Horticulture 0.96 Production Completed 740 Pune, Satara

45 2014-15 Horticulture 2.30 Production Completed 500 Pune

46 2014-15 Horticulture 4.99 Production Completed 435Pune, Ahmednagar, Satara, Buldhana, Jalna,

Osmanabad

47 2014-15 Horticulture 9.16 Production Completed 1000Aurangabad, Jalna, Beed, Latur, Osmanabad,

Parbhani, Nanded, Hingoli

48 2014-15 Horticulture 0.73 Production Completed 450 Thane, Palghar, Pune

49 2014-15 Horticulture 3.39 Production Completed 635 Thane, Latur

50Project On Vegetable Initiatives For Urban

Cluster- Aurangabad 2014-15 2014-15 Horticulture 15.00 Special Completed 5000

Aurangabad, Jalna, Beed, Osmanabad, Latur,

Nanded, Parbhani, Hingoli

51 2014-15 2014-15 NHM 50.00 Infrastructure Completed 16000

Nashik, Djule, Jalgaon, Pune, Ahmednagar,

Pune, Satara, Sangli, Aurangabad, Jalna, Beed,

Latur, Parbhani, Osmanabad, Buldhana

52 2014-15 NHM 20.20 Infrastructure Completed 25 lakh All 33 Districts

53

Financial assistance for Cost of planting

material of flowers and vegetables for poly house

/shed net ( 1 Year)

2014-15 2014-15 NHM 5.00 Production Completed 410

All 33 Districts

54Financial assistance for Green House & Shed

( 1 Year)2014-15 2014-15 NHM 15.00 Infrastructure Completed 410

All 33 Districts

55 2014-15 Horticulture 2.31 Production Completed 500 Satara

Dir. Horticulture

56

To Construct Pack House ( 1 Year)

2014-15 2014-15 NHM 10.00 Infrastructure Completed 571

Thane, Ratnagiri, Sindhudurg, Dhule, Jalgaon,

Nandurbar, Ahmednagar, Pune, Solapur, Satara,

Sangli, Kolhapur, Aurangabad, Jalna, Beed,

Latur, Osmanabad, Parbhani, Hingoli,

Buldhana, Nagpur, Chandrapur

57

Project proposal on Low Cost Onion St orage

Structure ( 1 Year)2014-15 2014-15 NHM 10.00 Infrastructure Completed 1193

Nashik, Dhule, Jalgaon, Ahmednagar, Pune,

Solapur, Satara, Sangli, Kolhapur, Aurangabad,

Jalna, Latur, Osmanabad, Buldhana

58 2014-15 NHM 50.00 infrastructure Ongoing 50000 22 Districts

59 2015-16 Horticulture Fruits 9.16 Production 1000Aurangabad, Jalna, Beed, Latur, Osmanabad,

Parbhani, Nanded, Hingoli

National Horticulture Mission

60 2014-15 2.06 Production Completed

Rainfed area farmers

in Vidharbha,

Marathwada &

Khandesh Cotton

growing Belt

Vidharbha, Marathwada, Khandesh

Mahabeej Akola

61 2014-15 5.00 Production Completed 10000 Jurisdiction of MPKV, Rahuri

62 2014-15 1.47 Production Completed 2625 All the Districts in MPKV Jurisdiction

63 2014-15 0.16 Production Completed 4725 Akola, Amravati, BuldhanaIn-Situ conservation of Minor millets crops in 2014-15

Irrigation water requirment advisory service 2014-15

Training & Demonstrationon Balance fertilizer 2014-15

Development of Transgenic BT cotton Hybrid in

public Sector using Monsanto bollgard-2

Technology 2014-15

Pomogranate Project (Export Quality

Production - Natural organic Fruits & 2014-15

Quality production programme of Strawberry 2014-15

Interventions to save perennial orchads in 2014-15

Strengthening of Community tank componant

(MIDH)

Project based Horticulture Development 2014-15

Pomegranate III (Export Quality Production) 2014-15

Vegetables (Ashvina Trading) 2 years 2014-15

Vegetables V (FPOs) 2014-15

Seed Production of Potato ( 3 Years)2014-15

Exportable Vegetable Project( K.B.) 2014-15

Grape - III ( 2 Years)- KVK Baramati 2014-15

Tomato Project ( HUL)

Onion & Potato Projects( Natural Sugar Allied 2014-15

Vegetable Project( Metro Cash & Carry bear) 2014-15

Banana Project (Desai Fruits & Vegetable)

Banana Project ( B. G. Ghadage Milk Processing

Private Ltd.) Banana Project(Sanjeevani Agro Coop Society Ltd.) 2014-15

2014-15

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 65 of 104

Page 66: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY Project

Cost Categeory Status of Project Beneficiaries Districts

Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

64 2014-15 0.34 Production Completed 2880

Akola, Amravati, Buldhana, Washim, Yeotmal,

Wardha, Nagpur, Gondia, Gadchiroli,

Chandrapur, Bhandara

65 2014-15 0.22 Production Completed 11745

Akola, Amravati, Buldhana, Washim, Yeotmal,

Wardha, Nagpur, Gondia, Gadchiroli,

Chandrapur, Bhandara

66 2014-15 0.37 Production Completed 1080

Akola, Amravati, Buldhana, Washim, Yeotmal,

Wardha, Nagpur, Gondia, Gadchiroli,

Chandrapur, Bhandara

67 2014-15 0.57 Production Completed 1000 11 Districts of Vidharbha Region

68 2014-15 0.87 Production Completed Nil

All 11 districts coming under jurisdiation of Dr.

Panjabrao Deshmukh Krishori Vidyapeeth

69 2014-15 4.36 Infrastructure Completed 50000 Thane, Raigad, Ratnagiri, Sindhudurg

PDKV Akola

70 2014-15 3.10 Infrastructure Completed 6000 All District of Kokan Region

71 2014-15 0.82 Infrastructure Completed

The members of 14

fishermen socieites

of 2 districts

Sindhudurg, Ratnagiri

72 2014-15 3.60 Production Completed 1500 nos./ year All Districts of Maharashtra

73 2014-15 2.13 Production Completed

950 beneficiaries

and 475000 Farmers

would be impacted

Sindhudurg, Ratnagiri, Raigad, Thane

BSKKV Dapoli

74

National Watershed Development programme

2014-15 2014-15 6.65 Infrastructure completed

Nashik, Solapur, Satara, Sangli, Kolhapur,

Jalna, Beed, Latur, Hingoli, Akola, Amravati,

Yeotmal

75 2014-15 2014-15 25.00 Infrastructure Completed 3200 All 33 Districts

76

Additional Programme under Mahatma

PhuleJal Bhumi Sandharan Abhiyan in Drought

like situation affected areas of 22 diatricts (

Mitigate Drought Situation)

2014-15 2014-15 50.00 Infrastructure CompletedFarmers impact as

per works done22 Districts

77 2014-15 2014-15 66.14 Special CompletedBeneficiary Farmers

of 11 Districts

Buldhana, Akola, Washim, Amravati, Yeotmal,

Wardha, Nagpur, Chandrapur, Bhandara,

Gondiya, Gadchiroli

78

Additional Programme under Vidharbh

intensified irrigation development programme (

Mitigate Drought Situation) (SC) Additional2014-15 2014-15 40.00 Infrastructure Completed

Smaall, Marginal,

SC/ST farmers

actually benefitted &

Other Farmers

Vidharbha Region

Soil Conservation

79

Vidharbh intensified irrigation development

programme (MI) 2014-15 2014-15 48.22 Special Completed 474

Yavatmal, Akola, Amravati, Wardha, Buldhana,

Washim, Nagpur, Chandrapur, Bhandara,

Gadchiroli and Gondia.

80

Additional programme under Vidharbh

intensified irrigation development programme

(MI) Additional2014-15 2014-15 60.00 special Completed

Small, Marginal

SC/ST Farmers

actually benefitted &

other Farmers

11 Districts in Vidharbha Region

81 2014-15 0.11 Infrastructure OngoingIndirect benefit to

farmers

Ahmednagar (Rahata Tahsil)

82 2014-15 6.03 Infrastructure Ongoing 27000 Amravati

83 2014-15 1.50 Infrastructure Completed 50000 Beed

84 2014-15 5.81 Infrastructure Ongoing100000 farmers

indirectly

Satara (Karad Tahsil)

85 2014-15 0.39 Infrastructure Ongoing 200 Ratnagiri , Sindhudurg

86 2014-15 16.70 Infrastructure Ongoing Approx 15000 p.a. 24 Districts

87 2014-15 4.34 Infrastructure Completed 20000 Satara, Latur, Ahmednagar, Pune

MSWC

Establishment of Cleaning & Grading facility at 2014-15

Establishment of warehouses at 20 Primary 2014-15

Development of Marketing Infrastructure 2014-15

Infrastructure Development at Agricultural

produce Marketing Committee,Karad. 2014-15

To conduct large scale front line demonstration 2014-15

Development of Weekly Bazar at Loni, Tal.

Rahata Dist Ahmednagar2014-15

Establishment of Marketing Infrastructure at 2014-15

Vidharbh intensified irrigation development

programme (SC)

Mahatma Phule Jal Bhumi Abhiyan

Strengthening of Fisheries extension by 2014-15

Production of Konkan Kanyal goat in Konkan

region 2014-15

Innovative Water Resources development for 2014-15

Production of different Bio-fertilizers in BSKKV 2014-15

Establishment of Circular hatchery for Crap

seed production2014-15

Enterpreneuship & skill development through 2014-15

Barcoding of varities & landraces in purview of

protection of plant varities & farmers act2001 2014-15

Seed production training in field &

Horticultural crop to farmers extension workers

& stakeholders in Vidarbh region

2014-15

Crop diversificatin in Vidarbh region under seed

spice crop 2014-15

Quality seed production & promotion of newly

developed varities at Dr. PDKV , Akola 2014-15

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 66 of 104

Page 67: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY Project

Cost Categeory Status of Project Beneficiaries Districts

Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

88 2014-15 10.00 Production Completed 660 all districts

89 2014-15 0.79 Infrastructure Completed 50000 Farmers All Districts of Maharashtra

90 2014-15 2.55 Infrastructure Completed 1000

Nagpur, Akola, Gondia, Wardha, Gadchiroli,

Buldhana, Yeotmal, Amravati, Bhandara,

Chandrapur

91 2014-15 4.31 production CompletedSmall & Marginal

Farmers Pune, Akola

92

Establishment of Stall -fed 40+2 Goat Units in

DPAP area in Maharashtra ( 2 Years) 2014-15 2014-15 17.55 production Ongoing 894 25 Districts to be covered

93 2014-15 1.32 Infrastructure Ongoing 5000 5 Districts Covered

Animal Husbundry

94

Infrastructure Development of Dairy product

manufacturing Unit of Maharashtra State Co-

Op. Milk Fed. LTD. (MRSDMM Mahanand)

Mumbai (NMPS)

2014-15 2014-15 8.00 Special Completed 24 lakh All Districts

95 2014-15 12.33 Infrastructure Completed 50000 Kolhapur

96 2014-15 12.45 Infrastructure Completed 385000 Kolhapur

97 2014-15 5.00 Infrastructure Completed 23000 Sangli

Dairy

98National Mission for protein Supplement

(FISHERY)2014-15 2014-15 0.00 Special Completed

Fishery

99 2014-15 2.76 Infrastructure Completed 8000 23 Districts

100Tasar Development through quality seed

production in Maharashtra2014-15 3.27 Production Completed 6000

6 Districts (not mentioned)

Sericulture

2014-15

Development of Cocoon Market & model 2014-15

Establishment of Milk byproduts byYashwant 2014-15

Establishment of Satellite Dairy milk processing 2014-15

Modernization of Milk processing unit & ETP at 2014-15

Prevention & Therapeutic Management for 2014-15

Establishment of training centre for field 2014-15

Establishment of training & Demonstration

centreon commercial poultry farming under

MAFSU

2014-15

Fodder production at farms of MLDB, Ship &

Goat Dev. Carporation of Maharashtra2014-15

Stall fed 40+2 goat unit by Punyashlok Ahilydevi 2014-15

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 67 of 104

Page 68: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr. No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries

Districts

1 2015-16 2015-16 Extension 4.57 Production CompletedAll Farmers of the

StateAll Districts

2015-16 2016-17 ExtensionTRAINING/

STUDY TOUR4.57 Completed

2 2015-16 2015-16 ANHB FEED AND

FODDER 25.00 Production Completed 412500

Nashik, Dhule, Jalgaon, Nandurbar, Ahmednagar,

Pune, Solapur, Satara, Kolhapur, Aurangabad, Jalna,

Beed, Latur, Osmanabad, Nanded, Parbhani, Hingoli,

Buldhana, Akola, Amravati, Washim, Yavatmal,

Wardha, Nagpur, Bhandara, Gondia, Chandrapur and

Gadchiroli

3 2015-16 Crop Development Other 10.00 Infrastructure Completed 16667 All 34 districts

4 2015-16 2015-16 Crop Development Coarse Cereals 2.25 Production Completed 25000

Thane, Raigad, Palghar, Nashik, Nandurbar, Jalgaon,

Aurangabad, Jalna, Beed, Latur, Osmanabad, Nanded,

Parbhani, Hingoli, Buldhana, Akola, Washim,

Amravati, Yavatmal, Wardha, Nagpur, Chandrapur,

Gadchiroli, Gondiya

5

Integrated Paddy Development Programme

2015-16 2015-16 Crop Development Paddy 7.35 Production Completed 1177500

Thane, Raigad, Nashik, Sindhudurg, Nandurbar,Pune,

Nagpur, Bhandara, Osmanabad, Chandrapur,

Kolhapur, Gondia, Gadchiroli

6

Promotion of Pulses through Inter- cropping

2015-16 2015-16 Crop Development Oilseed & Pulses 5.50 Production Completed 312500

Thane, Raigad, Palghar, Nashik, Sindhudurg,

Nandurbar, Jalgaon, Aurangabad, Jalna, Beed, Latur,

Osmanabad, Nanded, Parbhani, Hingoli, Buldhana,

Akola, Washim, Amravati, Yavatmal, Wardha,

Nagpur, Chandrapur

7 2015-16 Crop Development Cotton 4.55 Production Completed 12500

Nashik, Dhule, Nandurbar, Jalgaon, Ahmednagar,

Aurangabad, Jalna, Beed, osmanabad, Nanded,

Parbhani & Hingoli

8An operational piolet project in Maharashtra

(CGIAR - CCAFS) 2015-16 2015-16 ReserchAgri. Research

Project0.57 Production Completed

Research project

hence no direct

beneficiaries

Osmanabad, Yeotmal

9

Incresing farmers satisfaction with crop insurance

in Maharashtra,developing novel science &

technology base scheme (CGIAR)

2015-16 2015-16 ReserchAgri. Research

Project1.35

Production and

growthCompleted

Research project

hence no direct

beneficiaries

All Districts of Maharashtra

10

Historical & operational satelite derived

information for crop insurance contract in

Maharashtra (E mausam)

2015-16 2015-16 ReserchAgri. Research

Project1.34

Production and

growthCompleted 25000

Aurangabad

11

Villege level crop insurance piolet project using

satelite remote sencing & unmaned arial vehical

(Drone) technology (Skymet)

2015-16 2015-16 ReserchAgri. Research

Project0.63

Production and

growthCompleted

Osmanabad, Yeotmal, Aurangabad, Akola

12Inspection of piolet villege level index insurance

(Swissray)2015-16 2015-16 Reserch

Agri. Research

Project0.21

Production and

growthCompleted 45000-50000

Yavatmal, Aurangabad, Osmanabad, Akola

13Rice (VST Tillers)

2015-16 2015-16 Crop Development Paddy 0.93Production and

growthCompleted 2000

Bhandara, Gondia, Gadchiroli, Chandrapur, Nagpur,

Thane

14Rice (Saguna Bagh - Karjat)

2015-16 2015-16 Crop Development Paddy 2.02Production and

growthCompleted 2000

Raigad, Palghar, Thane, Ratnagiri, Sindhudurg,

Kolhapur, Satara, Sangli, Pune, Nashik

15Cotton - I (COTTAP)

2015-16 2015-16 Crop Development Cotton 0.34Production and

growthCompleted 1500

Jalgaon

16Cotton -II (Bayer Crop Sciences)

2015-16 2015-16 Crop Development Cotton 0.81Production and

growthCompleted 2500 to 3500

Akola, Wardha, Yeotmal, Jalna, Nanded

Dir Extension

Cotton HDPS

2015-16

Accelerated Fodder Development Programme

Installation of infrasture units of hydrophonix

technology of low cost green fodder production

2015-16

Promotion of Hybrid Pigion Pea

(ICPH2740)Through Production Programme

Project based Agriculture Extension-Awareness

Campaign

Projectwise information of projects implemented during 2015-16 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 68 of 104

Page 69: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr. No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries

Districts

Projectwise information of projects implemented during 2015-16 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

17

Construction of Building for Insecticide & Bio-

Pesticide Testing Laboratory, Thane 2015-16 2015-16 IPMT

PROMOTION OF

BIO-

FERTILISERS

1.11 Infrastructure Completed

Seven Districts have

been directly and

indirectly benefited

Mumbai Sub Urban, Thane, Palghar, Raigad,

Ratnagiri, Nashik, Dhule, Nandurbar,

Dir. Q.C

18

Vidharbh intensified irrigation development

programme (Hort)2015-16 2015-16

Minor/ Micro

Irigation

DEVELOPMENT

OF

HORTICULTUR

E FARMS/

FACILITIES

50.00 Special Completed

No. of beneficiary

farmers (11

Districts)

Amravati, Yeotmal, Wardha, Nagpur, Chandrapur,

Bhandara, Gondiya, Gadchiroli, Akola, Washim,

Buldhana

19 2015-16 Horticulture

DEVELOPMENT

OF

HORTICULTUR

E FARMS/

FACILITIES

13.38 Production Completed Approx. 5 lakhs

Thane, Raigad, Ratnagiri, Sindhudurg, Solapur,

Ahmednagar, Sangli, Satara, Nashik,

20 2015-16 Crop DevelopmentCOARSE

CEREALS4.74 Production Completed 7000 Aurangabad

21 2015-16 Crop Development Oilseed & Pulses 0.74 Production Completed 700 Latur, Osmanabad, Beed

22 2015-16 Crop Development Oilseed & Pulses 1.49 Production Completed 100000Latur, Akola, Amravati, Buldhana, Washim, Wardha,

Nagpur, Osmanabad, Beed

23 2015-16 Horticulture Vegetable 0.45 Production Completed 179 Farmers Yearly Gevarai, Lambkanwadi

24 2015-16 Horticulture Vegetable 2.99 Production Completed 550 Farmers Yearly Buldhana and Jalna

25 2015-16 Horticulture Vegetable 6.14 Production Completed 2000 Aurangabad, Jalna, Jalgaon

26 2015-16 Crop Development Vegetable 1.57 Production Completed 3500 Ahmednagar, Buldhana

27 2015-16 Other #REF! 6.60 Production Completed 1251 Satara, Sangli

28 2015-16 Horticulture Fruits 2.47Production &

growthCompleted 1200

Jalgaon

29 2015-16 Crop Development Cotton 0.42 Production Completed 14000 Yavatmal

30Collaborative Project for Cotton Mechanization

for state of Maharashtra (John Deere)2015-16 2015-16 Crop Development Cotton 0.01 Production Completed 1500

Akola

31 2015-16 1.35 Production CompletedNo direct

beneficiary

    All districts of Maharashtra

32

Historical & operational satelite derived

information for crop insurance contract in

Maharashtra

2015-16 2015-16 1.34 Production Completed 25000

Aurangabad

33 2015-16 0.63 Production CompletedNo individual

beneficiariesOsmanabad, Yavatmal

34 Inspection of pilot village leve index insurance 2015-16 2015-16 0.21 Production Completed 45000 Aurangabad,Osmanabad, Akola,Yavatmal

35 2015-16 0.93 Production Completed 2000Bhandara, Gondia, Gadchiroli, Chandrapur, Nagpur,

Thane

36 2015-16 2.02 Production Completed 2000Raigad, Palghar, Thane, Ratnagiri, Sindhudurg,

Kolhapur, Satara, Sangli, Pune, Nashik

37 2015-16 Horticulture Vegetable 0.67 Production Completed 500 Pune

38 2015-16 Horticulture Vegetable 4.10 Production Completed 1250 Kolhapur

39 2015-16 Horticulture Vegetable 1.96 Production Completed 500 Pune

40 2015-16 Horticulture Vegetable 0.16 Production Completed 2000 Jalgaon, Dhule, Nandurbar, Buldhana

41 2015-16 Horticulture Fruits 14.41 Production Completed 200 Nasik, Sangli, Solapur, Pune

42 Cotton - I (COTTAP) 2015-16 2015-16 0.34 Production Completed 1500 Jalgaon

43 2015-16 0.81 Production Completed 2500 to 3500 Akola, Wardha, Yeotmal, Jalna, NandedCotton -II (Bayer Crop Sciences) 2015-16

Vegetable (Kay bee Exports) 2015-16

White Onion Project (Jain Irrigation) 2015-16

Financial Assistance hiring of machinery for

viticulture management (MRDBS) - Grapes

2015-16

Rice (Saguna Bagh - Karjat)2015-16

Tomato (Krushi Jeevan Agro Farmer producer

Com. Narayangaon)

2015-16

Potato, Baraphawala Agro Processors,

Gadhhinglaj

2015-16

Increasing farmers satisfaction with crop

insurance in Maharashtra,developing novel

science & technology base scheme

2015-16

Village level crop insurance piolet project using

satelite remote sencing & unmaned arial vehical 2015-16

Rice (VST Tillers)2015-16

Jaggery (Shrikant Agro Industries) 2015-16

Processing of Banana Pseudo -stem into value

added products in Jalgaon (Tapti Valley Banana 2015-16

Improving lives of Cotton Growing farmers in

Vidarbha, (AFPRO, BCI)

2015-16

Vegetable Seed Production (East West Seed

India)

2015-16

Vegetable (Akash Agri Solutions) 2015-16

Green peas (Trimurti Foodtech & Advanta Ltd.) 2015-16

Pulses Productivity Improvement & Value Chain

(Rallis India Limited)2015-16

Value Chain Development in Soybean (ADM

Agro industries India Pvt Ltd)2015-16

Onion Seed Production (East West Seed India) 2015-16

Integrated Development of Horticulture/

Agriculture American Sweet Corn-Kernels, 2015-16

Horticulture Crop Pest Surveillance, Advisory and

Management Project (HORTSAP)2015-16

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 69 of 104

Page 70: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr. No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries

Districts

Projectwise information of projects implemented during 2015-16 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

44Processing of Banana Pesudo -stem into value

added products in Jalgaon Dist .2015-16 2015-16 2.47 Production Completed 1200

Jalgaon

Dir Horticulture

45

Training & Capacity Building Programme for

field Functionaries & ATMA Committee at

VANAMATI & RAMETI

#REF! 2015-16 #REF! #REF! #REF! Infrastructure Completed 403

All 33 Districts

Director ATMA

46 2015-16 NHM Farm ponds 25.00 Infrastructure Completed 3000

Akola, Amravati, Washim, Yeotmal, Buldhana,

Wardha, Aurangabad, Nagpur, Chandrapur,

Gadchiroli, Gondiya, Bhandara, Jalna, Beed, Latur,

Nanded, Parbhani, Hingoli, Osmanabad

47Financial assistance for Protected Cultivation

Project2015-16 2015-16 Horticulture

NURSERIES

AND GREEN

HOUSES

25.00 Infrastructure Completed 700All Districts

48 Low Cost Storage Structure for Onion. 2015-16 2015-16Marketing & Post

HarvestPOST HARVEST 25.00 Infrastructure Completed 2857 10 Districts of Maharashtra

NHM

49 2015-16 Seed Seed Distribution 20.38 Production Completed 220000

Akola, Amravati, Washim, Yeotmal, Buldhana,

Wardha, Aurangabad, Nagpur, Chandrapur,

Gadchiroli, Gondiya, Bhandara, Jalna, Beed, Latur,

Nanded, Parbhani, Hingoli, Osmanabad, Raigad,

Thane, Kolhapur, Satara, Sangli, Dhule, Jalgaon,

Nashik, Ahmednagar, Pune, Solapur

50

Construction of Solar Power operated multi

chamber Air Conditioned and dehumidified seed

storage 1,000 MT capacity2015-16 2015-16 Seed

SEED

PROCESSING

CENTERS AND

STORAGE

1.80 Infrastructure Completed 100000

Akola, Amravati, Washim, Yeotmal, Buldhana,

Wardha, Aurangabad, Nagpur, Chandrapur,

Gadchiroli, Gondiya, Bhandara, Jalna, Beed, Latur,

Nanded, Parbhani, Hingoli, Osmanabad, Raigad,

Thane, Kolhapur, Satara, Sangli, Dhule, Jalgaon,

Nashik, Ahmednagar, Pune, Solapur

Mahabeej Akola

51 2015-16 Extension

KVKs /

KNOWLEDGE

CENTRES /

DISSEMINATIO

N

5.90 Production Ongoing 5550

Ahmednagar, Satara, Sangli, Kolhapur, Nashik, Pune,

Solapur, Dhule, Nandurbar, Jalgaon

52 2015-16 NRM

CONSERVATIO

N STRUCTURES

AND

WATERSHED

DEV

1.19 Infrastructure Completed 460

Khed, Maval, Ambegaon in Pune District

53 2015-16 NRMLAND

RECLAMATION1.39 Production Completed

200 farmers willl be

directly impacted &

about 10000 farmers

will be indirectly

benefiitted

10 Districts of Western Maharashtra

Rain-Runoff Water Harvesting Storage Tanks for

Smallholder Farming Systems2015-16

Enhancement of ground water recharge through

open and bore wells2015-16

Farmer FIRST

2015-16

Production growth Stream project "Foundation

and Certified Seed Production & Distribution of

new Varieties of Pulses, Oil seeds, Cereals,

Vegetables seeds" 2015-16

Strengthening of existing component of new

community tank (MIDH)under the RKVY 2015-

16 in vidharbha & Marathwada region2015-16

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 70 of 104

Page 71: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr. No Name of AgencySLSC Sanction

YearReport Year Sector Sub sector

RKVY

Project

Cost

CategoryStatus of

ProjectBeneficiaries

Districts

Projectwise information of projects implemented during 2015-16 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai

Rs.in Cr.

MPKV Rahuri

54 2015-16 Extension

NEW

APPROACHES

TO EXTENSION

9.01 Production Ongoing 5550

Aurangabad, Jalna, Beed, Latur, Osmanabad, Parbhani,

Nanded, Hingoli

PDKV Akola

55 2015-16

KVKs /

KNOWLEDGE

CENTRES /

DISSEMINATION

New 4.60 Production Ongoing 5550

Aurangabad, Jalna, Beed, Latur, Osmanabad, Parbhani,

Nanded, Hingoli

MKV Parbhani

56 2015-16 Crop Development

NEW

APPROACHES

TO EXTENSION

1.12 Production Ongoing 4950

Ratnagiri and Sindhudurg

57 2015-16 Horticulture Area Expansion 0.53 Production Completed 520 Ratnagiri and Sindhudurg

BSSKV Dapoli

Mahatma PhuleJal Bhumi Abhiyan

2015-16 NRM

WATER

CONSERVATIO

N STRUCTURES

AND

WATERSHED

DEV

75.00 Infrastructure CompletedFarmers impact as

per works done

All Districts

2011-12MICRO/MINOR

IRRIGATION

INNOVATIVE

SCHEMES25.00 Infrastructure Completed

59 2015-16 2015-16 NRM

WATER

CONSERVATIO

N STRUCTURES

AND

WATERSHED

DEV

37.50 Special Completed

No. of beneficiary

farmers (11

Districts)

Amravati, Yeotmal, Wardha, Nagpur, Chandrapur,

Bhandara, Gondiya, Gadchiroli, Akola, Washim,

Buldhana

60 2015-16 2015-16

PERCOLATION

TANKS/ MINOR

IRRIGATION

TANKS

New 37.50 Special Completed

No. of beneficiary

farmers (11

Districts)

Amravati, Yeotmal, Wardha, Nagpur, Chandrapur,

Bhandara, Gondiya, Gadchiroli, Akola, Washim,

Buldhana

Minor Irrigation

61 2015-16 Marketing & PHM

settting

up/strengthening

of Market

infrastructure

10.22 Infrastructure completed 12000

Nagpur, Wardha, Amravati, Akola, Yavatmal

MSWC

62 2015-16 ANHBBreed

Development146.00 Production Ongoing

26.29 lakh farmers

would be impactdAll Maharashtra

63

Expansion and modernization of main dairy and

establishment of chilling center at Bhavan Tal-

Sillod Dist- Aurangabad

2015-16 2015-16 Dairy Milk Processing 10.27 Infrastructure Completed 60000

Aurangabad

64 2015-16 Dairy Milk Processing 11.52 Infrastructure Completed 15000 Kolhapur

Animal Husbundry

65 2015-16 SericultureCocoon

Production8.36 Production Completed 7000 All Districts

66 2015-16 Sericulture Other 0.42 Infrastructure Ongoing 100 All Districts

Sericulture

Project for increasing Mulberry Plan-tation for

development of Silk Industry In Maharashtra2015-16

Project for distribution of Handloom to Farmers

for development of Sericulture In Maharashtra

2015-16

Establishment of Milk Processing Plant (Satellite

Dairy) at Gadhinglaj Shree Warana Sahakari

2015-16

Improving A. I. Delivery System 2015-16

Establishment of Warehousing Infra-structure,

Online Trading & pledge loan Facility of

Backward & Suicide Prone district of the

2015-16

Vidharbh intensified irrigation development

programme (MI)

Vidharbh intensified irrigation development

programme (SC)

582015-16

Construction of Check Dams 2011-12

Transfer of integrated crop manage-ment and

technologies developed by BSKKV Dapoli 2015-16

Capacity Building for Farmers of Konkan for

Commercial Cultivation of Manga Bamboo

2015-16

Transfer of integrated crop management

technologies developed by MKV2015-16

Transfer of integrated crop management and

technologies developed by PDKV Akola 2015-16

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 71 of 104

Page 72: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of Agency

SLSC

Sanction

Year

Report Year Sector Sub sector

RKVY

Project

Cost

Category Status Beneficiaries Districts

1 2015-16

Crop

Developm

ent

Coarse Cereals 3.24 Production Ongoing 16667

Nasik, Dhule, Nandurbar, Jalgaon, Ahanednagar,

Aurangabad, Jalne, Beed, Osmanabad, Nanded,

Parbhani, Hingoli,

2 2015-16

Crop

Developm

ent

Paddy 9.00 Production Ongoing

89155

Nasik, Dhule, Nandurbar, Jalgaon, Ahanednagar, Pune,

Sangli, Aurangabad, Jalne, Beed, Latur, Osmanabad, Nanded,

Parbhani, Hingoli, Buldhana, Akola, Washim, Amravati,

Yavatmal, Wardha, Nagpur, Bhandara, Gondia, Chandrapur,

Gadchiroli

3

To set up training center at KVK

Gadchiroli for Rice mechanization in

PPP-IAD with V.S.T. Tillers

2016-17 2016-17

Crop

Developm

ent

Paddy Production Ongoing 1876 Gadchiroli

Dir Extension

4 Upgradation of District Soil Survey, Soil

Testing Lab. in Maharashtra State.

2016-17 2015-16 IPMTSoil Testing

Lab7.60 Infrastructure Ongoing

29 Government

Soil Testing

Laboratory

29 Districts

5 2015-16

Crop

Developm

ent

Cotton 0.50 Production Ongoing NA

Ahamednagar, Aurangabad, Jalgaon, Dhule,

Parbhani, Nanded, Buldhana, Amravati ,Yavatmal,

Wardha

6 2016-17 Lab 9.45 Infrastructure Ongoing

The Farmers of

all districts will

be benefitted

indirectly

Thane, Nasik, Kolhapur, Pune, Aurangabad,

Parbhani, Nagpur, Amravati

Dir Quality Control

7

Vidharbh intensified irrigation deve-

lopment programme (Horticulture -

Micro Irigation)2016-17 2015-16

Minor/

Micro

Irigation

DEVELOPME

NT OF

HORTICULT

URE FARMS/

FACILITIES

50.00 Infrastructure Ongoing 23336Buldhana, Akola, Washim, Amravati, Yeotmal,

Wardha, Gondiya, Gadchiroli, Bhandara

8 2015-16

Minor/

Micro

Irigation

#REF! 50.00 Infrastructure Ongoing 22678 Beed, Aurangabad, Jalna, Osmanabad, Nanded,

Hingoli, Latur, Parbhani,

Dir Horticulture

9

Training & Capacity Building

Programme for field Functionaries &

ATMA Committee at VANAMATI &

RAMETI

2016-17 2016-17 ExtensionTRAINING/

STUDY TOUR5.99 Infrastructure Ongoing

total 6335 officers

and other staff

trained , toal number

of trainings

conducted is 219

All District

10 2015-16Horticultur

e

NURSERIES

AND GREEN

HOUSES

50.00 Infrastructure Ongoing 520 All districts

11Protected Cultivation Project

(Committed liabilities)2016-17 2016-17 11.90 Infrastructure Ongoing

167Kolhapur

Projectwise information of projects implemented during 2016-17 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Financial assistance for Protected

Cultivation Project2016-17

Mirco Irrigation Programme for

Marathwada Region 2016-17

Strengthening of state Bio control & Bio

fertilizer Laboratories2016-17

Field trials of straight varieties of cotton

(BG-1) 2016-17

Promotion of Hybrid Pigion Pea

(ICPH2740)Through Production

Programme

2016-17

Integrated Paddy Development

Programme2016-17

Rs.in Cr.

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 72 of 104

Page 73: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of Agency

SLSC

Sanction

Year

Report Year Sector Sub sector

RKVY

Project

Cost

Category Status Beneficiaries Districts

Projectwise information of projects implemented during 2016-17 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Rs.in Cr.

12 2015-16

Marketing

& Post

Harvest

Storage Facility 25.00 Infrastructure Ongoing 2857

Nashik, Dhule, Jalgaon, Nandurbar, Pune,

Ahmednagar, Solapur, Satara, Sangli, Aurangabad,

Jalna, Beed, Latur, Parbhani, Osmanabad, Akola,

Buldhana

13

Plastic linning to farm ponds

2016-17 2016-17

Crop

Developm

ent

35.00 Infrastructure Ongoing

4620

All 34 Districts of Maharashtra

14 2015-16 Infrastructure Ongoing 3300 All 34 Districts of Maharashtra

National Horticulture Mission 2016-17 2016-17

15 2016-17 Infrastructure Ongoing All Districts of Maharashtra

Director Horticulture

16 2016-17 2016-17 AMEC

Machine &

equipment

assistance

8.00 Infrastructure Ongoing

22

Excluding Kokan division all district

Managing Dir Sugar

17 2015-16 ANHB Poultry 22.83 Infrastructure Ongoing 6089 14 Districts of Vidharbha and Marathwada

18Distribution of electrified Chaff Cutter

2016-17 2015-16 ANHBFEED AND

FODDER24.11 Infrastructure Ongoing

3110834 Districts of State

19 2016-17 ANHB 3.75 Infrastructure Ongoing

Entire

communities

involved in

rearing of small

ruminants.

All District

20 2016-17 ANHB 1.01 Infrastructure Ongoing 200 Aurangabad, Jalgaon, Amaravati and Solapur

21 2016-17 ANHB 4.63 Infrastructure Ongoing

All farmers

having Livestock

& poultry of the

Maharashtra state

& other states All Districts

22 2016-17 ANHB 4.13 Production Ongoing 1000 All Districts

23 2016-17 ANHB 70.00 Infrastructure Ongoing

All farmers

having Livestock

& poultry of the

Maharashtra state

& other states All Districts

24 2016-17 ANHB 16.51Infrastructure

Ongoing 8000 Parbhani, Hingoli, Nanded, Beed, Jalna, Aurangabad

Animal Husbundry

25 2015-16 Dairy 12.35 Infrastructure OngoingAll over Jalgaon

district Jalgaon

Modernization and Capacity

enhancement of dairy unit of Jalgaon 2016-17

Creation of BSL-III Laboratory for Avian

Influenza and other Zoontic pathogens at

Disease Investigation Section,

Aundh,Pune 7 (DIS) 2016-17

Strengthening & Modernization of

Teaching Veterinary Clinical Complex. 2016-17

Establishment of Ram & Buck rearing

centers

2016-17

Establishment a National Referance

Testing Laboratory for Veterinary

Biological in Institute of Veterinary

Biological Products, Aundh, Pune 7

(IVBP)

2016-17

Cultivation of Perennial Fodder Crops &

Silage Production

2016-17

Providing Backward & Forward Linkage

for Encouraging Poultry

2016-17

Strengthening of Sheep & Goat breeding

farms (Padegaon (Aurangabad), Bilakhed

(Jalgaon), Dahiwadi (Satara), Ambejogai

(Beed), Mahud (Solapur))

2016-17

Mechanization Harvesting in Sugarcane

25.00

25.003880Assistance for Mechanization in

Horticulture under RKVY

2016-17

Low Cost Storage Structure for Onion

2016-17

Financial assistance for indivisual farm

pond linning

2016-17

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 73 of 104

Page 74: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No Name of Agency

SLSC

Sanction

Year

Report Year Sector Sub sector

RKVY

Project

Cost

Category Status Beneficiaries Districts

Projectwise information of projects implemented during 2016-17 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Rs.in Cr.

26 2015-16 Dairy 12.13 Infrastructure OngoingAll over Jalgaon

district Jalgaon

27 2015-16 Dairy 8.70 Infrastructure Ongoing 80000 Mumbai

28 2015-16 Dairy 8.80 Infrastructure Ongoing 20000

Aurangabad, Jalna, Beed, Latur, Osmanabad,

Nanded, Parbhani, Hingoli, Buldhana, Amravati,

Yavatmal, Wardha, Nagpur, Bhandara, Gondia,

Chandrapur, Gadchiroli, Washim, Akola

29 2015-16 Dairy 3.30 Infrastructure Ongoing 10000 Sangli

30 2015-16 Dairy 1.03 Infrastructure OngoingAll over

Kolhapur district Kolhapur

31 2015-16 Dairy 0.77 Infrastructure OngoingAll overKolhapur

district Kolhapur

Comm Dairy

32 2016-17 Dairy

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

107.00 Infrastructure Ongoing 3253 Mumbai subburban

Comm Fisheries

33 2015-16 Sericulture 10.98 Infrastructure Ongoing 58000 All districts

34Development of Cocoon Market at Jalna

2016-17 2016-17 Sericulture other 6.20 Infrastructure Ongoing6670

All Districts

Sericulture

Establishment of Rearing Houses For

Development of Silk Production in

2016-17

Providing infrastructure & post

harwesting facility to fishermen at 6 fish

landing centers2016-17

Financial Assistance for Expansion &

Modernization of existing Dairy at

2016-17

Capital investment subsidy for

reprocessing of skim milk mpowder to

improve it's self life (Warna Sahakari

Dudh Utpadak Sangh,Kolhapur)

2016-17

Capital investment subsidy for

reprocessing of skim milk mpowder to

improve it's self life (Kolhapur Dist

Sahakari Dudh Utpadak Sangh,Kolhapur)

2016-17

Modernization and Capacity

enhancement of the milk processing and 2016-17

Establishment of new dairy plant and

milk byproduct unit at Nerul, Navi

2016-17

Project for strengthening of dairy sector

in 11 districts of Vidharbha &

Marathwada region 2016-17

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 74 of 104

Page 75: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No

Name of AgencySLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

Beneficiaries Status Category Districts

1

Agriculture Awareness programme under

USSS Campaign2017-18 2017-18 Extension

TRAINING/

STUDY TOUR3.09 All Farmers of the State Ongoing Production All 34 Districts in the State

2

Enhancing Pigeon Pea Productivity and

Stability in Maharashtra State through

introduction of improved pigeon pea

production technologies

2017-18 2017-18 ExtensionTRAINING/

STUDY TOUR0.00 25000 Ongoing Production

Amravati, Wardha, Parbhani, Latur, Osmanabad,

Ahmednagar, Pune

3

Establishment of single eye bud nursery for

Sugarcane2017-18 2017-18

Crop

DevelopmentOther 15.15

1200 nurserymen &

20000 FarmersOngoing Production

Nashik, Dhule, Nandurbar, Jalgaon, Ahmednagar,

Pune, Solapur, Satara, Sangli, Kolhapur,

Aurangabad, Jalna, Beed, Latur, Osmanabad,

Nanded, Parbhani, Hingoli, Bhandara

4

Paddy Seed Chain Development and

Mechanization Programme2017-18 2017-18

Crop

DevelopmentPaddy 13.22 123115 Ongoing Production

Thane, Palghar, Raigad, Ratnagiri, Sindhudurg,

Nandurbar, Ahmednagar, Sangli, Kolhapur

Dir. Extension

5 2017-18 2016-17 200.00 12000 Ongoing Infrastructure All Districts (Except Mumbai urban and sub urban)

6

Mechanization Project under 'Unnat Sheti -

Samrudha Shetkari' Campaign (Additionl

project) 2017-18 2017-18

Agriculture

mechanizatio

n

Machine &

equipment

assistance

200.00 More than 12000 Farmers Ongoing Infrastructure All 34 Districts

7

Strengthening and modernization of Soil

Testing Laboratory at Nagpur & Wardha2017-18 2017-18

Agriculture

mechanizatio

n

Machine &

equipment

assistance

0.25No fo farmers in Nagpur

District 2,68,265

Ongoing Infrastructure Nagpur & Wardha

8

Strengthening of Quality Control & Residue

testing laboratories in Maharashtra State &

to obtain the membership of international

organizations of Seed testing (ISTA) &

maintaining NABL accreditation

2017-18 2017-18Crop

DevelopmentCotton 4.35

The Farmers of all

districts will be directly

benefitted

Ongoing All Districts

Mechanization Project under 'Unnat

Sheti - Samrudha Shetkari' Campaign

Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Mumbai

Rs.in Cr.

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 75 of 104

Page 76: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No

Name of AgencySLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

Beneficiaries Status Category Districts

Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Mumbai

Rs.in Cr.

9

Establishment of Biological Control

Laboratory for mass production of bio-agents

against sugarcane insect pests and diseases

and dissemination of technology for

enhanced cane and sugar productivity in

2017-18 2017-18 Lab #REF! 5.00 4800 Ongoing Ahmednagar, Solapur, Pune and Satara

10

Development of demonstration cum

seed/planting material production areas of

forage crops at government fields/TSF in

different agro-climatic conditions of

Maharashtra

2017-18 2017-18 Lab Fertilizer Lab 6.22 5000 OngoingInfrastructure and

assets32 Districts

Dir. Q.C

11

Strengthening of Government Nurseries

2017-18 2017-18 Horticulture Nuseries 5.36Farmers will be

benefitted indirectlyOngoing

Infrastructure and

assets

The project is proposed for all 119 Govt Nurseries

in 34 districts of

the Maharashtra state It will help in.

strengthening of infrastructures, which will improve

the quality

12

Turmeric mechanization and post -harvest

management project2017-18 2017-18 Horticulture Nuseries 10.01 415 Ongoing

Infrastructure and

assets(Satara, Sangli and Kolhapur

13

Development of high-tech Horticulture

Government Nursery2017-18 2017-18 Horticulture Nuseries 19.97

Farmers will be

benefitted indirectlyOngoing

Infrastructure and

assets

Palghar, Ratnagiri, Railgad, Sindhudurg, Nashik,

Jalgaon, Ahmednagar, Solapur, Sangli,

Aurangabad, Beed, Latur, Parbhani, Hingoli,

Nanded, Amravati, Washim, Yeotmal, Wardha,

Bhandara, Gondia, Gadchiroli

14

Strengthening of Hortinet Treceability

System for export of Fresh Fruit &

Vegetables 2017-18 2017-18 Horticulture Nuseries 2.00 50000 OngoingProduction and

growth

All Districts

Dir. Horticulture

15

Development of multi chamber and multi

commodity cold storage with export assisting

infrastructure and processing unit at

Vashi,Navi Mumbai.(NAFED)

2017-18 2017-18 Other 10.92 5000 OngoingInfrastructure and

assetsThane, Palghar, Raigad, Pune, Nashik

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 76 of 104

Page 77: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No

Name of AgencySLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

Beneficiaries Status Category Districts

Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Mumbai

Rs.in Cr.

NAFED

16

Financial assistance for protected cultivation

2017-18 2017-18 NHMProtected

cultivation50.00 2050 No (Adequate no. of

SC/ST farmers will be

selected)

OngoingInfrastructure and

assetsAll Districts of the State

17

Low cost Onion Storage Structure

2017-18 2017-18 NHM #REF! 50.00 5657 OngoingInfrastructure and

assets26 Districts of Maharashtra

18

Plantation of Medicinal plants - Aayush

Programme2017-18 2017-18 NHM #REF! 3.56 650 Not implemented

Production and

growth

Sindhudurg, Ratnagiri, Pune, Ahmednagar, Solapur,

Satara, Jalgaon, Nandurbar, Jalna, Beed, Latur,

Osmanabad, Parbhani, Nanded, Amravati, Akola,

Buldhana, Washim, Yeotmal, Nagpur, Wardha,

Bhandara Gondia, Chandrapur

19

Peri-urban Horticulture Development for

Smart City- Pune (Sub-Scheme RKVY)2017-18 2017-18 NHM #REF! 0.00 Ongoing

Infrsructure and

assetsPune

National Horticulture Mission

20

Distribution of Pulses & Oil seeds Certified

Seed 2017-18 2016-17 2.47 334666 Ongoing

Production and

growth

Akola, Amravati, Buldhana, Washim, Yeotmal,

Aurangabad, Beed, Jalna, Raigad, Thane, Palghar,

Ratnagiri, Sindhudurg, Kolhapur, Sangli, Satara,

Hingoli, Latur, Nanded, Osmanabad, Parbhani,

Bhandara, Gondiya, Chandrapur,Gadchiroli, Mahabeej Akola

21

Establishment of lift irrigation scheme for

optimization of sustainable seed production

programme at the university campus of

MPKV, Rahuri.

2017-18 2017-18 ExtensionTRAINING/

STUDY TOUR15.22 110173 Ongoing

Procduction and

growthTotal 34 Districts

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 77 of 104

Page 78: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No

Name of AgencySLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

Beneficiaries Status Category Districts

Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Mumbai

Rs.in Cr.

MPKV Rahuri

22

Silkworm hybrid cocoon production &

transfer of Sericulture technology in

Marathwada Region 2017-18 2017-18 NHM 0.36 1600 OngoingProduction and

growtg

Parbhani, Beed, Nanded, Hingoli, Latur,

Osmanabad,

MKV Parbhani

23

Strengthening of Laboratory at Khar Land

Research Station, Panvel and capacity

building of farmers in soil health and fish

production.

2017-18 2017-18 Horticulture

Machine &

equipment

assistance

4.19 2000 OngoingInfrastructure and

assets

(Palghar, Thane, Raigad, Ratnagiri and Sindhudurg)

of Konkan region

BSKKV Dapoli

24

Infrastructure Development in APMC Karjat

2017-18 2017-18 Marketing #REF! 0.62 75000 OngoingInfrastructure and

assetsAhmednagar

25

Infrastructure Development in APMC

Jamkhed2017-18 2017-18 Marketing #REF! 0.81 46174 Ongoing

Infrastructure and

assetsAhmednagar

26

Construction of godowns in 108 APMCs for

implementing agriculture produce pledge

loan scheme in the State 2017-18 2017-18 Marketing #REF! 0.00 100000 OngoingInfrastructure and

assets33 Districts

27

Setting up of grain cleaning unit in 31

APMCs including Civil work, Machinery &

Electrical works 2017-18 2017-18 Marketing #REF! 0.00 50000 OngoingInfrastructure and

assets17 Districts

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 78 of 104

Page 79: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No

Name of AgencySLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

Beneficiaries Status Category Districts

Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Mumbai

Rs.in Cr.

Marketing Board

28

Mechanization harvesting in sugarcane

2017-18 2017-18 AMEC

Machine &

equipment

assistance

15.00 15000 OngoingInfrastructure and

assetsMaharashtra State Sugar cane growing districts.

Sugarcane Development

29

Development of multi chamber cold storage

with PHM infrastructure & processing unit at

8 centers in MSWC 2017-18 2017-18 Marketing

settting

up/strengthening

of Market

infrastructure

22.50 3400 OngoingInfrastructure and

assets

Nagpur, Amrawati, Buldhana, Wardha, Akola,

Pune, Thane

30

Development of storage facility by

establishment of warehousing infrastructure,

online trading facility and easy finance

through mortgage of warehouse receipt at 10

centers

2017-18 2017-18 Marketing

settting

up/strengthening

of Market

infrastructure

12.32 5000 OngoingInfrastructure and

assets

Pune, Ratnagiri, Raigad, Yavatmal, Sangli,

Aurangabad, Palghar

31

Strengthening of storage facility in

Vidharbha and Marathwada region at 10

centers in Maharashtra 2017-18 2017-18 Marketing

settting

up/strengthening

of Market

infrastructure

10.18 7000 OngoingInfrastructure and

assets

Latur, Amravati, Aurangabad, Buldhana,

Osmanabad, Parbhani, Hingoli

32

Development Of Warehousing /Cold Storage

Facility along Proposed Mumbai-Nagpur

Corridor 2017-18 2017-18 Marketing

settting

up/strengthening

of Market

infrastructure

24.60 40000 OngoingInfrastructure and

assets

Wardha,Washim,Aurangabad,Ahmednagar,Amrava

ti,Nagpur

33

A Perishable Complex for Import/ Export, At

Dronagiri node JNPT, Mumbai2017-18 2017-18 Marketing

settting

up/strengthening

of Market

infrastructure

5.0010000 farmers to be

impactedOngoing

Infrastructure and

assetsMumbai

34

Upgradation of Warehousing Infrastructure

with replacement of AC sheet roofing by

Galvalume sheet roofing & warehousing

infrastructure for direct Marketing.

2017-18 2017-18 Marketing

settting

up/strengthening

of Market

infrastructure

22.2010000 farmers to be

impactedOngoing

Infrastructure and

assetsAll districts

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 79 of 104

Page 80: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No

Name of AgencySLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

Beneficiaries Status Category Districts

Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Mumbai

Rs.in Cr.

35

Up gradation of flooring of warehousing

infrastructure at various centers all over

Maharashtra & concrete roads in W H

complexes in districts of Gadchiroli,

Bhandara, Gondia & Chandrapur.

2017-18 2017-18 Marketing

settting

up/strengthening

of Market

infrastructure

23.99 200000 OngoingInfrastructure and

assetsGadchiroli, Bhandara, Gondia & Chandrapur.

MSWC

36 2017-18 2016-17 3.42 150-200 OngoingInfrastructure and

assets Kolhapur & All Maharashtra

37

Dairy development programme in Vidharbha

& Maratwada Region2017-18 2017-18 ANHB #REF! 340.00 90000 Ongoing

Production and

growth

10 Districts of Vidharbha & Marathwada

RegionAkola, Amravati, Buldhana, Wardha,

Nagpur, Chandrapur, Latur, Osmanabad, Nanded,

Jalna

38

Establishment of incinerator facility for

upgradation of QC at IVBP, Pune.2017-18 2017-18 ANHB #REF! 0.50 All Livestock & poultry

population of State of

Maharashtra

Ongoing Pune

39

Establishment of dedicated fermenter facility

for production of anaerobic bacterial vaccine

(BQ, ET) at IVBP, Pune 2017-18 2017-18 ANHB #REF! 10.00

All farmers having

Livestock of the

Maharashtra state & other

states

Ongoing

Infrastructure and

assetsAll Districts

40

Strengthening of TVCC and diagnostic lab at

Post Graduate Institute of Veterinary and

Animal Science, Akola. 2017-18 2017-18 ANHB #REF! 4.50

1. Livestock farmers

2. Field Veterinarians

3. UG/Post Graduate

students

Ongoing

Infrastructure and

assets

Akola, Washim, Buldana, Yeotmal and Amravati

41

Establishment of commercial small animal

breeding centre under GMP norms at

IVBP,Pune 2017-18 2017-18 ANHB #REF! 10.00

All farmers having

Livestock of the

Maharashtra state & other

states

Ongoing

Infrastructure and

assetsAll Districts

Animal Husbundary

42

Establishment of 10 MTPD skim milk

powder Plant and expansion &

modernization of 50 TLPD milk processing

plant to 1 LLPD of Lokmangal Multistate Co-

op. Society Ltd., at Bibi Darphal, North

2017-18 2017-18 Dairy 12.40

3 lakhs milk producers

from 270 farmers club

established by Lokmangal

Society & 1.5 lakh

another non members

Ongoing

Infrastructure and

assetsSolapur, Latur, Sangli, Osmanabad, Beed

Centre of excellance for Genetic

improvement for KVK

Baramati(Baramati,Indapur, Daund)

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 80 of 104

Page 81: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No

Name of AgencySLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

Beneficiaries Status Category Districts

Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Mumbai

Rs.in Cr.

43

Expansion & modernization of 50 TLPD

milk processing plant to 1 LLPD and to set

up 2 milk chilling centers of 10 TLPD of

Sampatrao Deshmukh Co-op. Milk union,

Kadepur, Sangli

2017-18 2017-18 Dairy 7.73 10000 Ongoing

Infrastructure and

assetsSangli

Dairy development

44 2016-17 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

3.44 150-200 Ongoing Infrastructure Kolhapur & All Maharashtra

45

Renovation of Fish seed Production Centre

2017-18 2017-18 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

6.25 10000 Ongoing Infrastructure Bhandara

46

Establishment of Brood Bank for quality Fish

Seed Production in Maharashtra2017-18 2017-18 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

20.00 All over Maharashtra Ongoing ProductionAmravati, Solapur, Sangli, Aurangabad, Latur,

Nagpur

47

Assistance to the Fishermen Seed Production

Centre & Portable Hatcheries.2017-18 2017-18 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

2.52 All over Maharashtra. Ongoing Production All districts of Maharashtra

48

Assistance to land Fish farmer for Fingerling

Rearing2017-18 2017-18 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

1.26 Ongoing Production 36 Districts of Maharashtra

49

Mesh Size Regulation at Cod and for

Sustainable Fishing in Marine Sector2017-18 2017-18 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

1.794259 Fishermen & 07

coastal districtOngoing Production all 7 coastal districts of Maharashtra

50

Bivalve (Mussel) / Oyster Culture in Sea

Water(name change)2017-18 2017-18 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

2.57 5145000 Ongoing Production

49 creeks in Palghar, Thane, Mumbai City,

Mumbai Suburban, Raigad, Ratnagiri, Sindhudurg

51

Assistance to the Fishermen of Coastal

Districts for Crab Culture2017-18 2017-18 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

0.99 350 Ongoing ProductionPalghar, Thane, Mumbai City, Mumbai Suburban,

Raigad, Ratnagiri, Sindhudurg

Pilot Project of Fish Feed Mill Plant in

Maharashtra2017-18

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 81 of 104

Page 82: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Sr.No

Name of AgencySLSC

Sanction

Year

Report

YearSector Sub sector

RKVY

Project

Cost

Beneficiaries Status Category Districts

Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,

Mumbai

Rs.in Cr.

52

Establishment Multi Species (Crab, & Sea

bass) Seed Production Centre (Hatchery)

Vagheshwar - Sindhudurg 2017-18 2017-18 Fisheries

INFRASTRUCT

URE/PONDS OF

FISHRIES/DEPT/

AGENCY

15.80 490 Ongoing ProductionPalghar, Thane, Mumbai City, Mumbai Suburban,

Raigad, Ratnagiri, Sindhudurg

Fishery

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 82 of 104

Page 83: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 83 of 104

Page 84: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 84 of 104

Page 85: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 85 of 104

Page 86: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 86 of 104

Page 87: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 87 of 104

Page 88: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 88 of 104

Page 89: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 89 of 104

Page 90: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 90 of 104

Page 91: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 91 of 104

Page 92: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 92 of 104

Page 93: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 93 of 104

Page 94: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 94 of 104

Page 95: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 95 of 104

Page 96: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 96 of 104

Page 97: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 97 of 104

Page 98: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 98 of 104

Page 99: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 99 of 104

Page 100: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 100 of 104

Page 101: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 101 of 104

Page 102: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 102 of 104

Page 103: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 103 of 104

Page 104: Directorate of Economics and Statistics · 2018-07-06 · Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM . Tender Notification No. EVL/1117/RKVY/502 . Refer

Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies

Annexure N: Projects/schemes details

Issued by Directorate of Economics & Statistics, Mumbai, GoM

Page 104 of 104