Design and Construction of Recent

Bridge Pier Protection Systems

Zolan Prucz and Buck Ouyang,

Modjeski and Masters, Inc.

Rahman Bhati, Rahman and Assoc. Inc.

Paul Fossier, LADOTD

2013 Louisiana Transportation Engineering

Conference

Baton Rouge, Louisiana

Page 2: Design and Construction of Recent Bridge Pier Protection Systems

• Historical Developments

• Lessons from Past Collisions

• Current AASHTO Criteria

• Bridge Pier Protection Projects:

- I-210 Prien Lake Bridge

- I-10 Mississippi River Bridge

- LA 27 Ellender Ferry Bridge

Outline

Page 3: Design and Construction of Recent Bridge Pier Protection Systems

Prior to 1980: Criteria was limited to special

projects, movable bridge fenders

1980 – 1984: Increase in awareness and increased research efforts

1984 – 1991: LADOTD Criteria for Vessel

Collision Design

After 1991: AASHTO Guide Specifications

AASHTO LRFD Bridge Design

AASHTO LRFD Movable Br. Design

Historical Developments

Page 4: Design and Construction of Recent Bridge Pier Protection Systems

May 26, 2002 M/V Robert Y. Love Tow Collision with the I-40 Bridge, OK

Lessons form Past Collisions

MM-62

MM-60

Pier 3 Pier 2 Pier 1 Pier 4

West Abutment

Pier 1

Page 5: Design and Construction of Recent Bridge Pier Protection Systems

Pier 3 Pier 2 Pier 1 Pier 4

May 26, 2002 M/V Robert Y. Love Tow Collision with the I-40 Bridge, OK

Page 6: Design and Construction of Recent Bridge Pier Protection Systems

February 2, 2007 4 - Barge Tow Collision with the US 80 Bridge, Vicksburg

Page 7: Design and Construction of Recent Bridge Pier Protection Systems

May 9, 1980 Summit Venture Collision with the Sunshine Skyway Bridge

Page 8: Design and Construction of Recent Bridge Pier Protection Systems

May 9, 1980 Summit Venture Collision with the Sunshine Skyway Bridge

Page 9: Design and Construction of Recent Bridge Pier Protection Systems

September 27, 1996 Collision of the Julie N Tanker with the Million Dollar Bridge

Page 10: Design and Construction of Recent Bridge Pier Protection Systems

AASHTO Method II

AF = (N) (PA) (PG) (PC)

AF = Annual Frequency of Collapse

N = Annual Number of Vessels

PA = Probability of Vessel Aberrancy

PG = Geometric Probability

PC = Probability of Collapse

AF acceptable: < 0.0001 for Critical Bridges

< 0.001 for Regular Bridges

Current AASHTO Criteria

AASHTO Method I

Page 11: Design and Construction of Recent Bridge Pier Protection Systems

Vessel Collision Loads

Ships Barge Tows

Page 12: Design and Construction of Recent Bridge Pier Protection Systems

Ship Collision Loads

February 19, 1981 Collision of Tanker Gerd Maersk with Newport Bridge, RI.

Page 13: Design and Construction of Recent Bridge Pier Protection Systems

Barge Collision Loads

Page 14: Design and Construction of Recent Bridge Pier Protection Systems

BRIDGE

CHARACTERISTICS WATERWAY

CHARACTERISTICS

VESSEL TRAFFIC

CHARACTERISTICS NAVIGATION

CHARACTERISTICS

PERFORMANCE

CRITERIA

Approach to Bridge Pier Protection Design

PROTECTION

ALTERNATIVES

Page 15: Design and Construction of Recent Bridge Pier Protection Systems

I-210 Prien Lake Bridge Project

Page 16: Design and Construction of Recent Bridge Pier Protection Systems

Original Fender

Page 17: Design and Construction of Recent Bridge Pier Protection Systems

Vessel Traffic Characteristics

Page 18: Design and Construction of Recent Bridge Pier Protection Systems

I-210

Navigation Conditions

Page 19: Design and Construction of Recent Bridge Pier Protection Systems

Performance Criteria

Unusual Challenges:

• Large vessel sizes carrying chemicals

• Difficult navigation conditions

• Low global and local pier capacities

• Limited space for a protection system

Page 20: Design and Construction of Recent Bridge Pier Protection Systems
Page 21: Design and Construction of Recent Bridge Pier Protection Systems

Pier Protection Performance Requirements:

• Longitudinal capacity - large impact loads; may deform or share resistance with the pier

• Transverse capacity - less impact loads; must be rigid enough to prevent contact with the pier columns

• Size - improve navigation, prevent contact with pier columns and shaft

• Facing - smooth, low friction, prevent sparks

Page 22: Design and Construction of Recent Bridge Pier Protection Systems

Pier Protection Solutions

Page 23: Design and Construction of Recent Bridge Pier Protection Systems

Concrete cap

Concrete walls

Micropiles

Page 24: Design and Construction of Recent Bridge Pier Protection Systems

Design and Construction

Page 25: Design and Construction of Recent Bridge Pier Protection Systems

Contractor: F. Miller Construction Company/ Orion Marine

Construction Company, Inc.

Subcontractor: Nicholson Construction Company, Inc. (Micropiles)

Page 26: Design and Construction of Recent Bridge Pier Protection Systems

8” DRILL HOLE WALL

CASING 7” OD

POST GROUT TUBE

GROUT

NO. 18 CENTER BAR

GROUT

POST GROUT TUBE

8” DRILL HOLE WALL

BOTTOM OF MICROPILE EL. -120

TOP OF MICROPILE CASING, EL. 5.0

DRILL HOLE WALL 8” DIAM.

MUDLINE, APPROX. EL. -30.0

BOTTOM OF CASING, EL. -65

TOP OF NO. 18 CENTER BAR

Page 27: Design and Construction of Recent Bridge Pier Protection Systems
Page 28: Design and Construction of Recent Bridge Pier Protection Systems
Page 29: Design and Construction of Recent Bridge Pier Protection Systems
Page 30: Design and Construction of Recent Bridge Pier Protection Systems
Page 31: Design and Construction of Recent Bridge Pier Protection Systems
Page 32: Design and Construction of Recent Bridge Pier Protection Systems
Page 33: Design and Construction of Recent Bridge Pier Protection Systems
Page 34: Design and Construction of Recent Bridge Pier Protection Systems
Page 35: Design and Construction of Recent Bridge Pier Protection Systems
Page 36: Design and Construction of Recent Bridge Pier Protection Systems

I-10 Mississippi River Bridge Project

Pier 5

Page 37: Design and Construction of Recent Bridge Pier Protection Systems

Feb 2007 M/T Kition Allision

DWT = 96,315 Tonnes

L = 798 Feet, B = 137 Feet

Page 38: Design and Construction of Recent Bridge Pier Protection Systems

Bridge and Existing Fender Characteristics

Pier 5 Pier 6

Page 39: Design and Construction of Recent Bridge Pier Protection Systems

Pier 5 Pier 6 Pier 4

Pier 5

Page 40: Design and Construction of Recent Bridge Pier Protection Systems

Original Fender Characteristics

Page 41: Design and Construction of Recent Bridge Pier Protection Systems

Vessel Traffic Characteristics

Ship Traffic: 25,000 to 125,000 DWT

Common Barge Tows: Hopper barge tows: 7 wide x 5 long

Tanker barge tows: 2 wide x 3 long

Page 42: Design and Construction of Recent Bridge Pier Protection Systems

Navigation Conditions

High volume of through traffic combined with local traffic

Docks and vessel anchorages near the bridge

Cross currents

Page 43: Design and Construction of Recent Bridge Pier Protection Systems

Performance Criteria

Unusual Challenges:

• Large size ships and barge tows

• Vessel maneuvering operations near bridge

• Frequent accidents

• Low local pier capacities

• Protruding underwater pier ledge

• Deep water and high currents

• Limited space for a protection system

Page 44: Design and Construction of Recent Bridge Pier Protection Systems

Pier Protection Performance Requirements:

• Capacity -

- strong and rigid enough to prevent contact with the pier columns

- deformable / crushable to limit load levels on the bridge pier

• Size - prevent contact with pier columns and underwater ledge

• Facing - smooth, low friction, prevent sparks

Page 45: Design and Construction of Recent Bridge Pier Protection Systems

Pier Protection Solutions

Page 46: Design and Construction of Recent Bridge Pier Protection Systems
Page 47: Design and Construction of Recent Bridge Pier Protection Systems

Contractor: Weeks Marine, Inc., Houston, TX

Precaster: Standard Concrete Products, Theodore, AL

Page 48: Design and Construction of Recent Bridge Pier Protection Systems
Page 49: Design and Construction of Recent Bridge Pier Protection Systems
Page 50: Design and Construction of Recent Bridge Pier Protection Systems
Page 51: Design and Construction of Recent Bridge Pier Protection Systems
Page 52: Design and Construction of Recent Bridge Pier Protection Systems

LA 27 Ellender Ferry Bridge Project

Page 53: Design and Construction of Recent Bridge Pier Protection Systems

Vessel Traffic and Navigation Conditions

Common Barge Tows: Hopper barge tows: 2 wide x 4 long

Tanker barge tows: 2 wide x 2 long

Page 54: Design and Construction of Recent Bridge Pier Protection Systems
Page 55: Design and Construction of Recent Bridge Pier Protection Systems
Page 56: Design and Construction of Recent Bridge Pier Protection Systems

• Lake Charles Pilots Association (I-210 Bridge)

• The LPA Group Inc. (I-210 Bridge)

• F. Miller Construction, LLC. (I-210 Bridge and Ellender Ferry Bridge)

• Weeks Marine, Inc. (I-10 Bridge)

• Standard Concrete Products (I-10 Bridge)

• Pictometry International Corporation

• LADOTD

Acknowledgements / Photo Credits:

Page 57: Design and Construction of Recent Bridge Pier Protection Systems

• Today’s design requirements specify vessel collision loads that are significantly higher than those considered in the past

• New bridge piers are typically placed outside the channel or designed for collision loads.

• Providing protection to existing bridges presents design, construction and economical challenges.

• The cost of providing protection to existing bridges based on current criteria can be as high as the cost of the bridge.

Summary