Page 1: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

D E C O M I S S I O N I N G P R O J E C T

Page 2: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

WELCOME

Let’s Begin Now

Page 3: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

PRESENTATION OUTLINE

4:00pm

IntroductionIn this part of subtopic,Introduction of Decomvillecompany will be presented.project background, Initial design& final design will be introduce.

4:05pm

Technical/Loading/StandardsFeasibility study was conductedand will be presented in thissubtopic

4:15pm

HSE/EnvironmentalHealth safety and environmentalprecautions is properlyconstructed and will be presentedin this subtopic. 4:25pm

Construction CostInvestment capital cost and valueengineering will be presented inthis subtopic.

4:30pm

Q & AQuestion & Answer session.

Page 4: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

A B O U T U SDecomVi l le (M) Sdn Bhd | E l Mundo Perdido De Kumang

Page 5: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Meet Our Brains

Ir. Mohammed Alamer

Page 6: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Meet Our Brains

Tan Jor Yi Aidil Adnan Nurul Naqila Ainiza Khaidzi

Technical Director Operation Manager Project Director Senior Project Manager

Page 7: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

P R O J E C T B A C K G R O U N DKumang Plat form

Page 8: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)
Page 9: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

PLATFORM BACKGROUND

Platform

Commissioning

Depth of platform

Distance from shore

Platform

Commission

Depth

Location

Page 10: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

PLATFROM DETAILS

2010 2035 2050

Service Operational Period (25 years)

Decommissioning (15 years)ENTERTAINMENT HUB

OPERATION PERIOD

End of Platform Service Life

Estimated Design Service Life (EDSL) = Reference Service Life (RSL) x Materials x Environmental

RSL = 25 yearsMaterial = 1Environmental = 0.6EDSL = 15 Years* Reference on ISO 15686

Page 11: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

1

2

3

4

5

6

DECOM PROCESS FLOW

2015

2016

2016

2017

2035

2036

Page 12: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

I N I T I A L I D E ADecomvi l le Enterta inment Hub

Page 13: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

INITIAL DESIGN

Page 14: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

F I N A L D E S I G NE l Mundo Perdido De Kumang (The Lost Wor ld of Kumang )

Page 15: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

FINAL DESIGN

Page 16: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

L A Y O U T A N D F A C I L I T I E S

Page 17: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)
Page 18: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

EQUIPMENTS ON DECK

SEWAGE TREATMENT PLANT ( 2 Units )

WATER TANK ( 3 Units )

WATER DESALINATION

( 2 Units )

AIR PRESSURE TANK( 4 Units )

POWER GENERATOR( 2 Units )

WASTE MANAGEMENT( 1 Unit )

Page 19: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

C O D E S & S T A N D A R D

Page 20: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

CODES & STANDARD

PETRONAS Technical Standards: Design of Fixed Offshore Structures, PTS 34. 19. 10. 30, Revision 7, April 2012

American Petroleum Institute: Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms – Working Stress Design, 21st Edition, October 2007

ISO 15686 – Building Service Life Planning

Page 21: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

T E C H N I C A L D E S I G N

Load Cons iderat ion

Page 22: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

LOAD CONSIDERATION

Main Deck Wellhead Access Platform Cellar Deck Sub-Cellar Deck

Page 23: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

MAIN DECK

Page 24: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

MAIN DECK

Page 25: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

MAIN DECK

Page 26: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

MAIN DECK

Page 27: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

MAIN DECK

Page 28: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

MAIN DECK

Page 29: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

MAIN DECK

Page 30: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

MAIN DECK

Page 31: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

WELLHEAD ACCESS PLATFORM

Page 32: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

CELLAR DECK

Page 33: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

SUB-CELLAR DECK

Page 34: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

SDV ACCESS DECK

Page 35: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

SDV ACCESS DECK

Page 36: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

FOR ALL DECKS

• Floor Finishes : 1 kN/m2

• Piping and Utilities : 1 kN/m2

• Partitions : 2.5 kN/m2

Page 37: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

UNDERWATER FACILITIES

• Underwater Elevator:• Material Loads:

• Acrylic sheets : 2.5 kN/m2

• Dead Load

• Hoistways : 2.0 kN/m2

• Live Loads:

• Elevator car : 3.0 kN/m2

• Underwater Restaurant & Walkway:• Material Loads:

• Acrylic sheets : 3.0 kN/m2

• Structural steel members : 4.5 kN/m2

• Live Loads:

• Restaurant : 4.8 kN/m2

• Walkway / Corridor : 4.8 kN/m2

(PTS 34.19.10.30)

• Miscellaneous:(applicable only to restaurant & walkway)

• Floor Finishes : 1.0 kN/m2

• Piping & Utilities : 1.0 kN/m2

Page 38: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

LOAD CONSIDERATION

Extra decks sitting on Main Deck

Page 39: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

WIND LOAD CONSIDERATION

Page 40: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

LOAD CONSIDERATION

OMNI-DIRECTION WIND CRITERIA FOR EL MUNDO PERDIDO DE KUMANG

Wind speed (m/s)1-YEAR

(Operating)5-YEAR 50-YEAR

100-YEAR(Storm)

1-min mean 17 20 22 24

Data source: Model hindcast model data grid points #11012 (vicinity of F9JT-A)

OMNI-DIRECTION WAVE CRITERIA FOR EL MUNDO PERDIDO DE KUMANG

1-YEAR (Operating) 100-YEAR (Storm)

Hmax (m) 9.1 11.7

Tass (s) 9.4 10.6

OMNI-DIRECTION OCEAN CURRENT CRITERIA FOR EL MUNDO PERDIDO DE KUMANG

Layer in water column Height above seabed 1-YEAR 100-YEAR

Surface 1.0*D 0.85 m/s 1.20 m/s

Mid depth 0.5*D 0.67 m/s 0.95 m/s

Near seabed 0.01*D 0.39 m/s 0.55 m/s

Page 41: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

METOCEAN CRITERIA

Page 42: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

T E C H N I C A L D E S I G N

Member Unity Check (UC)

Page 43: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Member Unity Check (UC)

Main Deck Wellhead Access Platform

Page 44: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Member Unity Check (UC)

Cellar Deck Sub-Cellar Deck

Page 45: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Member Unity Check (UC)

SDV Access Deck Vertical/Diagonal Members

Page 46: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Member Unity Check (UC)

Jacket members at elevation = +6.1m

Page 47: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Member Unity Check (UC)

Jacket members at elevation = -11.0m

Page 48: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Member Unity Check (UC)

Jacket members at elevation = -31.5m

Page 49: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Member Unity Check (UC)

Jacket legs and diagonal braces

Page 50: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

T E C H N I C A L D E S I G N

Pi le React ion

Page 51: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Pile Reaction Force X

F9JT-A El Mundo Perdido de Kumang

Joint No. F9JT-A E.M.P. de Kumang Ratio

100A 5199.343 kN 5273.661 kN 1.014

100B 4150.494 kN 4398.816 kN 1.060

100C -4223.813 kN -4521.640 kN 1.071

100D -5362.426 kN -5486.595 kN 1.023

Page 52: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Pile Reaction Force Y

F9JT-A El Mundo Perdido de Kumang

Joint No. F9JT-A E.M.P. de Kumang Ratio

100A 3080.038 kN 3412.594 kN 1.108

100B -4864.648 kN -5092.793 kN 1.047

100C -4312.803 kN -4509.153 kN 1.046

100D 2531.132 kN 2785.417 kN 1.100

Page 53: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Pile Reaction Force Z

F9JT-A El Mundo Perdido de Kumang

Joint No. F9JT-A E.M.P. de Kumang Ratio

100A 40433.848 kN 39867.078 kN 0.986

100B 30469.609 kN 31389.258 kN 1.030

100C 27011.361 kN 28242.867 kN 1.046

100D 36485.691 kN 36371.449 kN 0.997

Page 54: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Pile Reaction

F9JT-AJoint No. 100A 100B 100C 100D

Fx (kN) 5199.343 4150.494 -4223.813 -5362.426

Fy (kN) 3080.038 -4864.648 -4312.803 2531.132

Fz (kN) 40433.848 30469.609 27011.361 36485.691

FR (kN) 40882.953 31203.232 26949.079 36190.208

El Mundo Perdido de KumangJoint No. 100A 100B 100C 100D

Fx (kN) 5273.661 4398.816 -4521.640 -5486.595

Fy (kN) 3412.594 -5092.793 -4509.153 2785.417

Fz (kN) 39867.078 31389.258 28242.867 36371.449

FR (kN) 40358.905 32162.399 28180.603 36079.169

Ratio 0.987 1.031 1.046 0.997

Page 55: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

T E C H N I C A L D E S I G N

Addit iona l S t ructures

Page 56: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Additional Structures

Steel Type & Grade Universal Beam Tubular Sections Box Sections

Page 57: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Additional Structures

Major components which require additional structures:

Page 58: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Container Hotel on Main Deck

Page 59: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Structural Framing for Underwater Facilities

Page 60: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Support for Underwater Elevator Columns

Elevation = +6.1m Elevation = -11m Elevation = -31.5m

Page 61: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Support for Underwater Elevator Columns

Elevation = +6.1m Elevation = -11m Elevation = -31.5m

Page 62: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Underwater Elevator Columns

Designed section: Maximum

Combined UC:

Page 63: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Structural Framing for Underwater Walkway

Designed section: Maximum Combined UC:

Page 64: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Structural Framing for Underwater Restaurant

Designed section: Maximum Combined UC:

Page 65: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

A d d i t i o n a l S t r u c t u r e sConstruct ion Sequence of St ructura l Framings

Page 66: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

1234

5

Construction Sequence

1

2

Page 67: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

1234

5

Construction Sequence

1

2

3

4

Page 68: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

1234

5

Construction Sequence

1

2 3

Page 69: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

1234

5

Construction Sequence

1

2

Page 70: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

U N D E R W A T E R R E S T A U R A N TConstruct ion p lan and sequence

Page 71: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

CONSTRUCTION SEQUENCE

ONLAND TRANSPORT INSTALLATION RECULTURE

Page 72: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

EXPECTED

Page 73: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

H S EHealth Safety & Env ironment

Page 74: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

3 PILLARS

Security Team Security Plan Emergency Escape Plan

Page 75: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

EMERGENCY ESCAPE PLAN

Our Emergency Escape Plan

Page 76: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

OTHER HSE

Others HSE precautions

Page 77: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

E N V I R O N M E N T A L P R O T E C T I O NMercury Disposa l , So l id Waste Management , Sewage Treatment P lant

Page 78: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

ENVIRONMENTAL PROTECTION

Mercury Disposal Solid Waste Management

Page 79: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

ENVIRONMENTAL PROTECTION

Sewage Treatment Plant

Page 80: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

T R A N S P O R T A T I O N & C O N S T R U C T I O N C O S TCost Est imat ion

Page 81: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Transportation

Fast Crew Boat (FCB) Fast Support Vessels (FSV)

This boat are dispensable vessels thatserve many vital functions. High speedheavy weather crew changes.

This type of vessel is used in case anemergency occurred

Passenger Passenger

Page 82: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

Transportation

Dumb Barge Crane BargeBring variety of heavy machines andmaterials. Main transportation forunderwater restaurant.

To hoist/lift heavy machineries andstructures. Also for aid in constructionprocess

Construction Construction

Page 83: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

TRANSPORTATION COST

UNDERWATER RESTAURANT COST

Page 84: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

INVESTMENT CAPITAL

Page 85: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

INVESTMENT SUMMARY

Page 86: DECOMVILLE (EL MUNDO PERDIDO DE KUMANNG)

T H A N K Y O U !A n y Q u e s t i o n s ?