decker island tidal habitat restoration...

2
CALIFORNIA NATURAL RESOURCES AGENCY | RESOURCES.CA.GOV/ECORESTORE The Department of Water Resources’ (DWR) Fish Restoraon Program (FRP) acquired approximately 140 acres on Decker Island in 2015 for dal wetland restoraon. Decker Island was created by the U.S. Army Corps of Engineers (USACE) during the construcon of the Sacramento River Deep Water Ship Channel in the early 1900’s. Decker Island is bordered on the west by the Sacramento River and on the east and south by Horseshoe Bend. The Decker Island Tidal Habitat Restoraon Project (Project) is intended to parally fulfill DWR’s 8,000- acre dal habitat restoraon obligaons pursuant to the 2008 U.S. Fish and Wildlife Service (USFWS) Delta Smelt Biological Opinion (BiOp) for long-term coordinated operaons of the State Water Project (SWP) and the federal Central Valley Project (CVP). Addionally, the Project would also be consistent with the 2009 Naonal Marine Fisheries Service (NMFS) Salmonid BiOp for SWP/CVP operaons because dal habitat restoraon would provide access for salmonid rearing at Decker Island. The goal of the Project is to restore unrestricted dal connecvity to the interior of Decker Island to create a dal wetland and associated high marsh, and riparian habitats on the site to benefit nave fish species. To achieve this goal, the Project will involve breaching the perimeter levee to restore dal hydrology to the site. The Project consists of restoraon planning, modeling, design, perming, construcon, and monitoring. Preliminary planning, conceptual design, baseline data collecon (e.g. topography and bathymetry), and hydrodynamic modeling were conducted in 2015. In 2016, FRP connued with restoraon planning and environmental compliance documentaon preparaon. DWR is the CEQA Lead Agency for this project. A draſt Migated Negave Declaraon (MND) was released for public review on August 4, 2016. DECKER ISLAND TIDAL HABITAT RESTORATION PROJECT Solano County TIDAL WETLAND RESTORATION GOALS / TARGET The goals of the effort are to: Enhance habitat appropriate for spawning and/or rearing salmonids, Delta Smelt, and other nave fish species, enhance available producvity for nave fish within and adjacent to the restoraon site; and provide connecvity to the marsh plain for migrang salmonids. LOCATION AND LANDOWNER The site is in Solano County on the eastern side of Decker Island, along Horseshoe Bend. DWR became the landowner of the 140-acre site in 2015. FUNDING Fully funded by the SWP for all phases of the effort PERMITTING Permits and environmental compliance in process or submied: USACE - 404 and 408 Permission Naonal Historic Preservaon Act - Secon 106 USFWS - Secon 7 NMFS - Secon 7

Upload: vuongnhu

Post on 24-May-2018

219 views

Category:

Documents


2 download

TRANSCRIPT

CALIFORNIA NATURAL RESOURCES AGENCY | RESOURCES.CA.GOV/ECORESTORE

The Department of Water Resources’ (DWR) Fish Restoration Program (FRP) acquired approximately 140 acres on Decker Island in 2015 for tidal wetland restoration. Decker Island was created by the U.S. Army Corps of Engineers (USACE) during the construction of the Sacramento River Deep Water Ship Channel in the early 1900’s. Decker Island is bordered on the west by the Sacramento River and on the east and south by Horseshoe Bend. The Decker Island Tidal Habitat Restoration Project (Project) is intended to partially fulfill DWR’s 8,000-acre tidal habitat restoration obligations pursuant to the 2008 U.S. Fish and Wildlife Service (USFWS) Delta Smelt Biological Opinion (BiOp) for long-term coordinated operations of the State Water Project (SWP) and the federal Central Valley Project (CVP). Additionally, the Project would also be consistent with the 2009 National Marine Fisheries Service (NMFS) Salmonid BiOp for SWP/CVP operations because tidal habitat restoration would provide access for salmonid rearing at Decker Island.

The goal of the Project is to restore unrestricted tidal connectivity to the interior of Decker Island to create a tidal wetland and associated high marsh, and riparian habitats on the site to benefit native fish species. To achieve this goal, the Project will involve breaching the perimeter levee to restore tidal hydrology to the site. The Project consists of restoration planning, modeling, design, permitting, construction, and monitoring. Preliminary planning, conceptual design, baseline data collection (e.g. topography and bathymetry), and hydrodynamic modeling were conducted in 2015. In 2016, FRP continued with restoration planning and environmental compliance documentation preparation. DWR is the CEQA Lead Agency for this project. A draft Mitigated Negative Declaration (MND) was released for public review on August 4, 2016.

DECKER ISLAND TIDAL HABITAT RESTORATION PROJECT

Solano County

TIDAL WETLAND

RESTORATION GOALS / TARGET

The goals of the effort are to:

� Enhance habitat appropriate for spawning and/or rearing salmonids, Delta Smelt, and other native fish species, enhance available productivity for native fish within and adjacent to the restoration site; and provide connectivity to the marsh plain for migrating salmonids.

LOCATION AND LANDOWNER

The site is in Solano County on the eastern side of Decker Island, along Horseshoe Bend. DWR became the landowner of the 140-acre site in 2015.

FUNDING

Fully funded by the SWP for all phases of the effort

PERMITTING

� Permits and environmental compliance in process or submitted:

• USACE - 404 and 408 Permission

• National Historic Preservation Act - Section 106

• USFWS - Section 7

• NMFS - Section 7

CALIFORNIA NATURAL RESOURCES AGENCY | RESOURCES.CA.GOV/ECORESTORE

� Central Valley Flood Protection Board

• Encroachment Permit, including USACE Section408 review

� Central Valley Regional Water Quality Control Board

• Section 401 and Waste Discharge Report

� State Lands Commission

• Notice of Proposed Use of State Lands

� California Department of Fish and Wildlife:

• Streambed Alteration Agreement Section 1600

• Potentially an Incidental Take Permit

� Delta Stewardship Council

• Delta Plan Consistency Determination

� CEQA compliance status: MND circulated andexpected to be certified in October 2016

ESTIMATED TIMELINE

� August 2016: Draft CEQA document filed at StateClearinghouse

� Fall 2016: Permit applications submitted

� February 2017: Permits obtained

� June 2017: Construction specifications complete

� August 2017: Begin construction

� November 2017: Construction complete

PROJECT PROPONENT

Department of Water Resources, Fish Restoration Program Ling-ru Chu [email protected] (916) 376-9826

ADDITIONAL INFORMATION

Department of Water Resources: http://www.water.ca.gov/environmentalservices/frpa_decker_restoration.cfm

SOLANOCOUNTY

CONTRA COSTACOUNTY

ALAMEDACOUNTY

SAN JOAQUINCOUNTY

YOLOCOUNTY

SUTTERCOUNTY

SACRAMENTOCOUNTY

80

80

505

680

5

5

99

99

12

4

50

CALIFORNIA NATURAL RESOURCES AGENCY | RESOURCES.CA.GOV/ECORESTORE

N

16

0

MILES

5 10 20

CALIFORNIA ECO RESTORE PROJECTS

Knights Landing Outfall Gate

Lindsey Slough

Sherman Island: Mayberry Farms

Sherman Island: Whale’s Mouth

Sherman Island: Mayberry Slough

Twitchell Island: East End

Decker Island

Dutch Slough

Fremont Weir Adult Fish Passage

Hill Slough

McCormack Williamson Tract

Tule Red

Wallace Weir Fish Rescue Facility

Bradmoor Island

Goat Island

Grizzly Slough

Lisbon Weir

Lower Putah Creek Realignment

Lower Yolo Ranch

Prospect Island

Sherman Island: Whale’s Belly

Southport Levee

Twitchell Island: Levee

Twitchell Island: West End

Yolo Bypass Floodplain Restoration

Winter Island

2016 / 2017(Target Construction Start Dates)

2018+(Target Construction Start Dates)

COMPLETED(Construction Completed)

Fish Passage Improvements

Floodplain Restoration

Setback Levee

Subsidence Reversaland Carbon Storage

Tidal Restoration

Yolo Bypass Boundary

Legal Delta and Suisun Marsh Boundaries

Water Bodies

LEGEND

Fish Passage Improvements

Floodplain Restora on

Setback Levee

Subsidence Reversaland Carbon Storage

Tidal Restora n

Yolo Bypass Boundary

Legal Delta and Suisun Marsh Boundaries

Water Bodies

LEGEND

DECKER ISLAND