david sacks portfolio

8
David Sacks Portfolio

Upload: david-sacks

Post on 18-Jul-2015

107 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: David Sacks Portfolio

David Sacks Portfolio

Page 2: David Sacks Portfolio

51

Royal College of Music, London400 BED STUDENT ACCOMMODATION NEW BUILD

38

Page 3: David Sacks Portfolio

Belmont House, LondonOFFICE REFURBISHMENT

Page 4: David Sacks Portfolio

Mosman House, SydneyPRIVATE RESIDENTIAL CONVERSION

Page 5: David Sacks Portfolio

37 THORNHILL ROADISLINGTONN1 1JS

for SCOTT & ANNA SULLIVAN

GUARD TILLMAN POLLOCK LTD., ARCHITECTS020 7380 1199

4145

c

04 - 09C

GWGW

KITCHEN

shear glazed doors suppliedand installed by specialist contractor

DINING

new hardwood timber framed double-glazed door and frame

multi-layer toughened glass-balustrade to later detail

RECEPTION

fixed shear glazed lightsupplied and installed by specialist contractor

new hardwood floor boards to be laid level on timber packers on existing floor joists. allow for new flashgap skirtings.

extg fireplace opening to be enlarged with new lintol over, hearth to be built up with recess for gas fire and controls. new gas fire and gatherer by specialist sub-contractor.

agregate as specified laid on existing concrete slab

BEDROOM 3 BEDROOM 2BATHROOMrefer to bathroom details

new dropped ceiling over

new ceiling

new ceiling

new ceiling

new ceiling

wc

bath

shower

whb

new plasterboard and skim ceiling on new sw joists to SE's details

existing roof to be retained and protected

consruct new gas fireplace opening and raised hearth with recess for gas fire and controls. New gas fire and gatherer by specialist sub-contactor

MASTER BEDROOMMASTER

BATHROOM

repointing to existing copings as specified

mdf lined recess for venetian blind

new plaster to extend into recess

see drawing 04-35 for roof construction

new steel beam to engineers spec.

softwood support to laylight

render on curved surface

main contractor to supply and install 1 No. Monodraft FT-SP-305 sunpipe and flashings kit below level of existing ridge tile

new plaster to extend into recess

stone floor tiles on bal waterproofing on 18mm wbp ply on new tanalised swd joists

main contractor to supply and install new lacquered mdf wardrobe units doors on concealed hinges and magnetic tuch latches on spray-painted mdf carcass. Doors to have chamfered leading edge detail, carcass to incorporate adjustable height shelves and hanging rails

main contractor to supply and install new lacquered wardrobe unit doors on concealed hinges and magnetic tuch latches on spray-painted mdf carcass. Doors to have chamfered leading edge detail, carcass to incorporate adjustable height shelves and hanging rails

flashgap skirtings

cill detail supplied and installed by specialist

new steel cast into floor slab to engineers spec.

cabinet units by others

new Code 4 lead capping to top of existing parapet

sliding door track set flush with ceiling plaster

new level ceiling over

refurbish existing sliding sash windows

new plaster finish on sc render with flashgap skirting

new sliding door track set flush with ceiling plaster

level of existing slab

see external works

new shutter panels beyond

new shutter panels beyond

new stone hearth

D11A

D15A

W2

W1

W9

D1

new double-skin flue for gas fire connected to gatherer and to new lining to adapted existing flue

W7

new steel beam to eng's details

new stone hearthsand cement render to reveal and back of fireplace

new steel beam to eng's details

W17

new steel beam to eng's details

hwc cupboard / wardrobe unit beyond

new floor construction to allow for step-up shower

stone ballast on insulation on new asphalt roof covering on existing timber decking

W13

new traditionally detailed gridded double-glazed sliding sashes in existing sliding sash box frame. Allow for new weights etc W18

laminated glass laylight on sw bearers incorporating white interlayer

ceiling void over laylight to be lined with 18mm wbp ply - painted white

make good roof and valley gutter following installation of new steel work to SE's details

stone clad bedhead recess refer to detail drawing

new traditionally detailed gridded double-glazed sliding sashes in existing sliding sash box frame. Allow for new weights etc

new traditionally detailed gridded double-glazed sliding sashes in existing sliding sash box frame. Allow for new weights etc

W22

new stone tiled flooring on ply on existing levelled joists with underfloor heating cables laid between floor joists on Kingspan insulation supported by sw battens fixed to sides of joists

new hardwood floor boards to be laid level on timber packers on existing floor joists. Allow for new flashgap skirtings

new hardwood floor boards to be laid level on timber packers on existing floor joists. Allow for new flashgap skirtings

new hardwood flooring on ply on existing levelled joists with underfloor heating cables laid between floor joists on Kingspan insulation supported by sw battens fixed to sides of joists

new hardwood flooring on ply on existing levelled joists with underfloor heating cables laid between floor joists on Kingspan insulation supported by sw battens fixed to sides of joists. allow for new flashgap skirtings.

new joists housed into steels to engineers specification

RC base beam to engineers spec.

slot at top of curved rendered wall for air extract; plenum to be lines with curver plastic guttering and all faces of ply to be waterproofed with BAL WP1 waterproofing

new plastic rwp to radiused gutter to shower enclosure to discharge into existing valley gutter

recess for possible motorised rollerblind

D15B

D11B

whb

new fireplace

plasterboard and skim finish on 12mm wbp plyrecess

removable panels to accessA/C unit beyond

A/C unit beyond

new 100 x 50 swd joists @400mm centres as engineers spec

and with new double layerplasterboard to u/s to form recess

in ceiling to align with ceiling inside recesses

existing double trimmers retained

2 x layers plasterboard and skimon u/s extg joists

linear grill to trough drain

150 RC slab to engineersspecification incorporating underfloor heating on dpm on 100 floormate insulation on concrete to engineers spec.

SECTION AAAS PROPOSED

1:25

TIS

SU

ED

TO

TE

ND

ER

06.1

1.06

05.0

4.07

A

exis

ting

vau

lts re

tain

edne

w la

yout

of b

athr

m,

bedr

m 2

&3

resh

aped

ste

p-up

sho

wer

con

stru

ctio

npl

aste

rboa

rd a

nd s

kim

to b

edhe

ad w

all,

door

s to

und

erco

unte

r si

nk, p

ositi

on

of s

teel

und

er 2

nd fl

oor,

she

ar g

lazi

ng

to re

ar, e

xten

ded

bal

ustra

de,

W13

lin

tel,

note

s to

cab

inet

s

Do not scale off drawings. The contractor is responsible for checking all dimensions. Any discrepancies shall be reported to the architect.

01.0

5.07

Bre

cess

line

to m

aste

rbed

bed

head

17.0

7.07

Cfir

st fl

oor

bath

room

revi

sed,

cei

ling

to fr

ont L

G b

ay re

vise

d, s

pec

for

ceili

ng to

LG

flr r

evse

d

W16

W21

W12

W22

W17

W7

make good brickwork and pointing following removal of render and external store rooms

new stainless steel rwdp and hopper

party

wal

l lin

e

new traditionally detailed, gridded double-glazed sliding sashes in existing sash box frames

new traditionally detailed, gridded double-glazed sliding sashes in existing sash box frames

repair damaged coping stone to match existing

refurbish existing window

generally: brickwork to be repointed

cut out and replace damaged brickwork with brickwork to match existing

cut out and replace damaged brickwork with brickwork to match existing

cracks in brickwork made good to S.E.`s details and specifications

make good brick reveals following removal og burglar bars

refurbish existing window

crack in brickwork to be made good to S.E.`s details and specifications to match existing

new traditionally detailed double-glazed sliding sash window in new opening with traditional gauged brick arch, arch and cill under all to match existing

build up existing door opening in brickwork to match existing

existing gate opening built up in brickwork to match existing

150 RC slab on compacted mot type 2 fill to engineers specification.

line showing existing level of garden-landscape

clear sheerglaze door on floor spring and top centre

top of paintband to line withthe ground floor FFL

topsoil graded soil

indicates glass extent

existing footings to garden wall as site survey

level -1350mm, base of extg footingffl -1460mm

datum - 0

ffl -1100mm

pavement level varies; falls towards section

37 THORNHILL ROADISLINGTONN1 1JS

for SCOTT & ANNA SULLIVAN

GUARD TILLMAN POLLOCK LTD., ARCHITECTS020 7380 1199

4145

c

REAR ELEVATIONAS PROPOSED 04 - 07

A

1:25

T ISSUED TO TENDER 06.11.06

05.04.07Aexisting built-up roof housing retainedwall to terrace at level-change, rear double glazed doors, gen. notes

Do not scale off drawings. The contractor is responsible for checking all dimensions. Any discrepancies shall be reported to the architect.

GW GW

A

B

A

B

EE

FF

AB

CC

D D

G G

HH

K

J J

GW GW

.

RE

BED 5

KITCHEN

shear glazed doorsupplied and installed by specialist contractor

glass pivot door andfixed panel by specialists

DINING

FOR NEW LANDSCAPING REFER TO DRAWING NR. 02-02

kitchen counter by others

full height lacquered mdf kitchen units

new solid core pivot door

new gas fireplace fittings to specialist spec. supplied and installed by others

edge of floor above

lacquered mdf kitchen unitsby others

new solid core pivot fire doors

new concrete screed power floated on pocketed polystyrene insulationincorporating under floor heating, on new insulation, on new damp proofing, on new rc slab to engineers specification

wc

whbwhb wc

new timber staircase detailed to match existing stairs above

for shower rm and w/c refer to detail dwgs

new external double-glazed door, frame and hw sill

STORAGE

RAD 1

RAD 2

ex'g MH

oven under

sink dishwasher(under)

fridge

w/d

new rwdp

new stub stack connectedto exist'g connection

future planting

future planting new stainless steel rwdp with B.I.G.T.

new svp

100mm dia. earthenwareunderground drain

new floor connector

100mm dia. earthenwareunderground drain

retainext. gully

KITCHEN

new high level cupboardsfor electronics and gas meter

brick up existing gatewayin London Stock to match existingand allow to tooth into existing

new brickwork wallto be tied into existing masonry to engineers specs.

concrete floor finish as dining / kitchen area on RC slab

internal walls of store to berendered as external

20mm S/C render with stainless steel accessories on new brickwork walling toengineers specification

glass side panel

new RC column to engineersspecification

render on new masonry enclosureto form fireplace opening with new raised hearth

new steel over to engineersspecifications

extent of ceiling recess

new opening in existing wallwith lintols over to engineersspecification

12.5 plasterboard skim on swdframing to form boxing to existingwall

excavated area

new opening in existing brickwall with lintols over to engineersspecification

scroll handrail and postto be salvaged from groundfloor, protected and reused

new brickwork to betoothed into existing

all existing walls at lower ground floor to be damp proofed as specified

new plaster finishes on damp-proofing render on existing walls with stop-beads to form flashgap detail at floor junctions

shower

form new hole in existing masonrywall for extract ductwork fromin-line extract fan housed under stairs

new concrete floor power floated incorporating under floor heating, on new insulation, on new damp proofing, on new rc slab to engineers specification

12.5 plasterboard and skim laidlevel on packing pieces on undersideof existing joists

main contractor to allow for connecting, testing & commissioningof all sinks, taps and appliances to hot and cold supplies, gas, drainage and electrical supplies to kitchen fittings supplied andinstalled by others

kitchen island byspecialist

sink

existing fireplace openingto be blocked up with masonryand to incorporate passive grilleventilation

svp with insulation wrappedaround all sides and in plasterboard skimmed boxing on swdframing

brick up existingopening and renderwith s/c render to match existing

brick up existingopening and renderwith s/c render to match existing

brick up existingopening and renderwith s/c render to match existing

form new opening in sidewall and install new lintol over to engineers spec. and make good render to return sides and head. installnew concrete threshold and link to damp-proofing to ensure water tight.

electric induction hob

D6

D5

D3

D4D7

D9

D10 D8

D2

D11

W1

W2

W3

W7

W6

new condensing gas fired boiler

stainless steel grille to linear trough drain at window

new stone hearth

supply and install full height cupboard units with 44mm lacquered solid core doors and 18mm spray-painted mdf carcassing and adustable shelving

new full-height damp-proofing render by specialist

supply and install new spray-painted wardrobe unit constructed from 18mm mdf

new floor connector

new timber shutters to later detail

gravel laid to match internal FFL

form new hole in masonry wall for extract ductwork

new 100mm dia. earthenware underground drain to connect to existing manhole

steel angle around terrace

TERRACE

new RC column to engineersspecification

sidewall partially rebuilt in new rendered brickwork to engineers specification

sidewall partially rebuilt in new rendered brickwork to engineers specification freezer

new steel post fixed to existing wall to engineers specification

face/line of wall to be checked on siteface of wall to align with brickwork over

gravel laid to match internal FFL

shear glazed doorsupplied and installed by specialist contractor

new rw pipe connection to extg manhole (following existing route)

new rw pipe below ground connecting to extg manhole

100mm dia. earthenwareunderground drain

width of casing to new ground beam to engineersspecifications

concrete floor; RC slab

stainless steel grille to linear trough drain at window

RW below ground

@ 1:100 fall

RA

D 1

RAD 12

soil below ground

@ 1:40 fall

conduits to be laid below RC slab

concrete floor as dining / kitchen

concrete floor & steps as dining / kitchen

Vola one-handle mixer withswivel spout mounted to 2mm stainless steel on 38mm mdf

Vola one-handle mixer withswivel spout mounted to 2mm stainless steel on 38mm mdf new timber framed,

opaque glazed door D1

37 THORNHILL ROADISLINGTONN1 1JS

for SCOTT & ANNA SULLIVAN

GUARD TILLMAN POLLOCK LTD., ARCHITECTS020 7380 1199

4145

c

GARDEN LEVEL FLOOR PLANAS PROPOSED

04- 01C

1:25

T ISSUED TO TENDER 06.11.06

A 27.03.07new and repositioned whb in wcexisting vaults retained

B 05.04.07double height glazing to rear, removal of kitchen sink recess, recess construction to dining area, planting notes

Do not scale off drawings. The contractor is responsible for checking all dimensions. Any discrepancies shall be reported to the architect.

C 07.06.07

dining room fireplace revised, floor construction revised, conduits shown in floor, manhole omitted & drainage re-routed, radiator to cloakrm revised

Thornhill Road, LondonPRIVATE RESIDENTIAL CONVERSION

Page 6: David Sacks Portfolio

108.29

grey metal-framed double-glazed pivot door

grey metal-framed double-glazed top hung window

slate roof

rooflight with self-cleaning glass

sand / cement render with clear sealant

grey finished s.s. flue

grey finished s.s. flue

grey metal flush gutters

grey metal angle trim to ridge

sand / cement render wall with clear sealant

grey painted metal cladding to projecting wall

fixed glazed projecting box / oriel window with grey metal surround

grey metal flush corner trim

grey metal flush rectangular rwp

grey metal flush rectangular rwp

grey metal flush corner trim

square opening with splayed cill

PROPOSED SITE SECTION Y-Y TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P19Ffor JAMES & MARIE CAPLIN scale 1: 100@A3 JANUARY '08 GUARD TILLMAN POLLOCK LTD

cedar boarding

slate roof

grey metal flush gutter

cedar boarding

TYPICAL EAVES DETAIL TRENARREN, PERRANPORTH. CORNWALL for JAMES & MARIE CAPLIN scale 1:5 JANUARY '08 GUARD TILLMAN POLLOCK LTD DWG NO.: 4140/ P23F

PROPOSED WEST ELEVATION TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P16Efor JAMES & MARIE CAPLIN scale 1: 100@A3 OCTOBER '07 GUARD TILLMAN POLLOCK LTD

sand / cement render with clear sealant

grey metal-framed double-glazed sliding doors

grey metal fascia and corner trim

grey metal-framed double-glazed fixed windows

grey finished s.s. flue

timber door

grey metal-framed double-glazed fixed windows

glass louvres

grey painted metal cladding to projecting wall

grey painted metal cladding to sides of projecting box/ oriel window

grey metal rectangular rwp

grey metal rectangular rwp

grey metal fascia and corner trim

105.

36

106.6

9

106.27

106.86

107.76

108.45

109.01

109.29

109.99

110.35

111.96111.77

112.17

112.18

111.78

112.04

112.06

112.16112.21

110.

97

110.

91

110.

91

110.

49

109.

45

109.

66

109.

92

110.

0310

9.37

109.

20

109.

00

108.

81

108.

73

108.

24

107.

78

107.

29

106.

59

106.

92

107.

03

106.

01

105.

81

105.

79

105.

30

106.

47

105.

78

105.

01

104.

65104.

64104.

59

104.

52

105.

12

105.

71

106.

19

104.

98

104.

08

104.

17

101.9710

2.45

103.

48

101.94

Ridge Height 100.3m

Eave Height 96.81m

Vege

tatio

n

Den

se

Vege

tatio

n

Den

se

Unk

empt

veg

etat

ion

Unk

empt

veg

etat

ion

Wooden Pikett Fence

Post & Wire Fence

Post & Wire Fence

104.0

103.0

105.0

106.0

106.0107.0

107.0

108.0

109.0

110.0

111.0

112.0

O/H

Cable

TP

101.08

100.

83

101.34

100.82100.51100.15

100.11

101.

2010

3.86

103.

59

104.

74

105.

14

104.

49

104.

51

103.

72

103.

84

102.73

102.

50

103.

04

103.

24

103.

66

99.25

99.05

98.53

99.4

7

101.09

Eave Height 96.7m

Ridge Height 98.85m

Gra

ss L

awn

Unk

empt

veg

etat

ion

104.0

103.0

105.0

O/H C

able

O/H Cable

99.5

9

99.3

0

99.25

99.6

2

98.93

99.2

5

101.56

101.70

100.97

101.53

102.

00

102.06101.96

101.62

101.

74

101.

73

101.

10

100.

94

100.

81

100.

52

101.53

101.61

101.

48

101.4

7

99.9

8

96.92

96.02

97.98

97.68

96.97

96.06

96.13

96.93

97.90

98.9

598.0

5

97.3

2

96.8

4 97.8

0100.65

100.86

100.91 100.91 100.30

99.0

98.0

O/H Cable

O/H Cable

97.98

99.6

5

99.8

9

98.6

4

99.0

0 98.9

9

100.0

98.0

098.5

0

100.91

100.91

100.30

100.11

101.

20

103.

59

101.0

102.0

PROPOSED SITE PLAN TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P04for JAMES & MARIE CAPLIN scale 1: 200 JAN '07 GUARD TILLMAN POLLOCK LTD

N

PROPOSED SITE PLAN TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P04for JAMES & MARIE CAPLIN scale 1: 200 JAN '07 GUARD TILLMAN POLLOCK LTD PROPOSED SITE PLAN TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P04for JAMES & MARIE CAPLIN scale 1: 200 JAN '07 GUARD TILLMAN POLLOCK LTD TRENARREN, PERRANPORTH. CORNWALL

line of existing fence

line of new fence

line of existing fence

line of existing fence

line of existing fence

To Ramoth Way

existing rosemary bushes retained

VegetationDense

PROPOSED SITE PLAN DWG NO.: 4140/ P07Efor JAMES & MARIE CAPLIN scale 1: 200@A3 OCTOBER '07 GUARD TILLMAN POLLOCK LTD

existing garage

Parking Area

outline of existing house

X

to soakaway

timber deck

gardentimber steps

concrete paving

underground blue water tank

gravel driveway

U

U

V

V

Z

Y

T T

Z

Y

W

W

X

timber deck

concrete pavingbin store

approximate position of shaft

13 metre diameter safety zone around old shaft

Tranarren Parrenporth, CornwallPRIVATE RESIDENTIAL NEW BUILD

Page 7: David Sacks Portfolio

25 PEMBRIDGE VILLAS LONDON W11 for CHRIS & NATASHA HARRISON

TERRACE

STOREKITCHEN

clear double-glazed sliding sash window

TERRACETV AREA

LIVING ROOM

fixed double-glazed window panel

BATHROOM 1 MASTER BEDROOM

glass roof

BEDROOM 1BEDROOM 2

TERRACE

BEDROOM 3

clear double-glazed sliding door

bench

BATHROOM 2

bath

glass balustrade

new planter

ADJOINING PROPERTY

shower

10

10

50

100

SCALE IN CM

50 100

existing windows to be replaced with triple-glazed sliding sash windows

existing windows to be replaced with triple-glazed sliding sash windows

existing windows to be replaced with triple-glazed sliding sash windows

new work shown hatched

new full-height timber framed, double-glazed doors painted to match existing

new timber framed double glazed slidiing sash window to match existing

new double glazed fixed patent glazing in metal frames

extension of rear wall in brickwork to match existing

rendered and painted white to match existing

new white painted timber-framed double-glazed folding/sliding doors with rendered white surrounds

concrete coping to match existing

PROPOSED SECTION B-B

GUARD TILLMAN POLLOCK LTD.

SCALE 1:50 4151/P24BFEBRUARY 2007

25 Pembridge VillasNo. 23 No. 27

10

10

50

100

SCALE IN CM

50 100

existing windows to be replaced with triple-glazed sliding sash windows, painted to match existing

existing windows to be replaced with triple-glazed sliding sash windows, painted to match existing

existing windows to be replaced with triple-glazed sliding sash windows, painted to match existing

rendered and white painted wall to match existing with white painted fascia over

new white painted timber-framed double-glazed folding/sliding doors with rendered white surrounds

25 PEMBRIDGE VILLAS LONDON W11 for CHRIS & NATASHA HARRISON

PROPOSED STREET ELEVATION

GUARD TILLMAN POLLOCK LTD.

SCALE 1:50 4151/P26BFEBRUARY 2007

25 PEMBRIDGE VILLAS LONDON W11 for CHRIS & NATASHA HARRISON

dining

25 Pembridge VillasNo. 23 No. 27

STUDYTERRACE

up

CLOAKRM

STORE

STORE STORE

KITCHEN

DINING

island unit

full

he

igh

t u

nits

full

he

igh

t u

nits

full

he

igh

t u

nits

sliding sash window

TERRACE

TV AREA

bench desk

10

10

50

100

SCALE IN CM

50 100

new full-height timber framed, double-glazed doors painted white

new work shown hatched

a b

a b

c

c

flush timber doors painted white

existing windows to be replaced with triple-glazed sliding sash windows, painted to match existing

PROPOSED LOWER GROUND FLOOR PLAN

GUARD TILLMAN POLLOCK LTD.

SCALE 1:50 4151/P16BFEBRUARY 2007

Pembridge Villas, LondonPRIVATE RESIDENTIAL CONVERSION

Page 8: David Sacks Portfolio

Full portfolio available upon request.