david sacks portfolio
TRANSCRIPT
David Sacks Portfolio
51
Royal College of Music, London400 BED STUDENT ACCOMMODATION NEW BUILD
38
Belmont House, LondonOFFICE REFURBISHMENT
Mosman House, SydneyPRIVATE RESIDENTIAL CONVERSION
37 THORNHILL ROADISLINGTONN1 1JS
for SCOTT & ANNA SULLIVAN
GUARD TILLMAN POLLOCK LTD., ARCHITECTS020 7380 1199
4145
c
04 - 09C
GWGW
KITCHEN
shear glazed doors suppliedand installed by specialist contractor
DINING
new hardwood timber framed double-glazed door and frame
multi-layer toughened glass-balustrade to later detail
RECEPTION
fixed shear glazed lightsupplied and installed by specialist contractor
new hardwood floor boards to be laid level on timber packers on existing floor joists. allow for new flashgap skirtings.
extg fireplace opening to be enlarged with new lintol over, hearth to be built up with recess for gas fire and controls. new gas fire and gatherer by specialist sub-contractor.
agregate as specified laid on existing concrete slab
BEDROOM 3 BEDROOM 2BATHROOMrefer to bathroom details
new dropped ceiling over
new ceiling
new ceiling
new ceiling
new ceiling
wc
bath
shower
whb
new plasterboard and skim ceiling on new sw joists to SE's details
existing roof to be retained and protected
consruct new gas fireplace opening and raised hearth with recess for gas fire and controls. New gas fire and gatherer by specialist sub-contactor
MASTER BEDROOMMASTER
BATHROOM
repointing to existing copings as specified
mdf lined recess for venetian blind
new plaster to extend into recess
see drawing 04-35 for roof construction
new steel beam to engineers spec.
softwood support to laylight
render on curved surface
main contractor to supply and install 1 No. Monodraft FT-SP-305 sunpipe and flashings kit below level of existing ridge tile
new plaster to extend into recess
stone floor tiles on bal waterproofing on 18mm wbp ply on new tanalised swd joists
main contractor to supply and install new lacquered mdf wardrobe units doors on concealed hinges and magnetic tuch latches on spray-painted mdf carcass. Doors to have chamfered leading edge detail, carcass to incorporate adjustable height shelves and hanging rails
main contractor to supply and install new lacquered wardrobe unit doors on concealed hinges and magnetic tuch latches on spray-painted mdf carcass. Doors to have chamfered leading edge detail, carcass to incorporate adjustable height shelves and hanging rails
flashgap skirtings
cill detail supplied and installed by specialist
new steel cast into floor slab to engineers spec.
cabinet units by others
new Code 4 lead capping to top of existing parapet
sliding door track set flush with ceiling plaster
new level ceiling over
refurbish existing sliding sash windows
new plaster finish on sc render with flashgap skirting
new sliding door track set flush with ceiling plaster
level of existing slab
see external works
new shutter panels beyond
new shutter panels beyond
new stone hearth
D11A
D15A
W2
W1
W9
D1
new double-skin flue for gas fire connected to gatherer and to new lining to adapted existing flue
W7
new steel beam to eng's details
new stone hearthsand cement render to reveal and back of fireplace
new steel beam to eng's details
W17
new steel beam to eng's details
hwc cupboard / wardrobe unit beyond
new floor construction to allow for step-up shower
stone ballast on insulation on new asphalt roof covering on existing timber decking
W13
new traditionally detailed gridded double-glazed sliding sashes in existing sliding sash box frame. Allow for new weights etc W18
laminated glass laylight on sw bearers incorporating white interlayer
ceiling void over laylight to be lined with 18mm wbp ply - painted white
make good roof and valley gutter following installation of new steel work to SE's details
stone clad bedhead recess refer to detail drawing
new traditionally detailed gridded double-glazed sliding sashes in existing sliding sash box frame. Allow for new weights etc
new traditionally detailed gridded double-glazed sliding sashes in existing sliding sash box frame. Allow for new weights etc
W22
new stone tiled flooring on ply on existing levelled joists with underfloor heating cables laid between floor joists on Kingspan insulation supported by sw battens fixed to sides of joists
new hardwood floor boards to be laid level on timber packers on existing floor joists. Allow for new flashgap skirtings
new hardwood floor boards to be laid level on timber packers on existing floor joists. Allow for new flashgap skirtings
new hardwood flooring on ply on existing levelled joists with underfloor heating cables laid between floor joists on Kingspan insulation supported by sw battens fixed to sides of joists
new hardwood flooring on ply on existing levelled joists with underfloor heating cables laid between floor joists on Kingspan insulation supported by sw battens fixed to sides of joists. allow for new flashgap skirtings.
new joists housed into steels to engineers specification
RC base beam to engineers spec.
slot at top of curved rendered wall for air extract; plenum to be lines with curver plastic guttering and all faces of ply to be waterproofed with BAL WP1 waterproofing
new plastic rwp to radiused gutter to shower enclosure to discharge into existing valley gutter
recess for possible motorised rollerblind
D15B
D11B
whb
new fireplace
plasterboard and skim finish on 12mm wbp plyrecess
removable panels to accessA/C unit beyond
A/C unit beyond
new 100 x 50 swd joists @400mm centres as engineers spec
and with new double layerplasterboard to u/s to form recess
in ceiling to align with ceiling inside recesses
existing double trimmers retained
2 x layers plasterboard and skimon u/s extg joists
linear grill to trough drain
150 RC slab to engineersspecification incorporating underfloor heating on dpm on 100 floormate insulation on concrete to engineers spec.
SECTION AAAS PROPOSED
1:25
TIS
SU
ED
TO
TE
ND
ER
06.1
1.06
05.0
4.07
A
exis
ting
vau
lts re
tain
edne
w la
yout
of b
athr
m,
bedr
m 2
&3
resh
aped
ste
p-up
sho
wer
con
stru
ctio
npl
aste
rboa
rd a
nd s
kim
to b
edhe
ad w
all,
door
s to
und
erco
unte
r si
nk, p
ositi
on
of s
teel
und
er 2
nd fl
oor,
she
ar g
lazi
ng
to re
ar, e
xten
ded
bal
ustra
de,
W13
lin
tel,
note
s to
cab
inet
s
Do not scale off drawings. The contractor is responsible for checking all dimensions. Any discrepancies shall be reported to the architect.
01.0
5.07
Bre
cess
line
to m
aste
rbed
bed
head
17.0
7.07
Cfir
st fl
oor
bath
room
revi
sed,
cei
ling
to fr
ont L
G b
ay re
vise
d, s
pec
for
ceili
ng to
LG
flr r
evse
d
W16
W21
W12
W22
W17
W7
make good brickwork and pointing following removal of render and external store rooms
new stainless steel rwdp and hopper
party
wal
l lin
e
new traditionally detailed, gridded double-glazed sliding sashes in existing sash box frames
new traditionally detailed, gridded double-glazed sliding sashes in existing sash box frames
repair damaged coping stone to match existing
refurbish existing window
generally: brickwork to be repointed
cut out and replace damaged brickwork with brickwork to match existing
cut out and replace damaged brickwork with brickwork to match existing
cracks in brickwork made good to S.E.`s details and specifications
make good brick reveals following removal og burglar bars
refurbish existing window
crack in brickwork to be made good to S.E.`s details and specifications to match existing
new traditionally detailed double-glazed sliding sash window in new opening with traditional gauged brick arch, arch and cill under all to match existing
build up existing door opening in brickwork to match existing
existing gate opening built up in brickwork to match existing
150 RC slab on compacted mot type 2 fill to engineers specification.
line showing existing level of garden-landscape
clear sheerglaze door on floor spring and top centre
top of paintband to line withthe ground floor FFL
topsoil graded soil
indicates glass extent
existing footings to garden wall as site survey
level -1350mm, base of extg footingffl -1460mm
datum - 0
ffl -1100mm
pavement level varies; falls towards section
37 THORNHILL ROADISLINGTONN1 1JS
for SCOTT & ANNA SULLIVAN
GUARD TILLMAN POLLOCK LTD., ARCHITECTS020 7380 1199
4145
c
REAR ELEVATIONAS PROPOSED 04 - 07
A
1:25
T ISSUED TO TENDER 06.11.06
05.04.07Aexisting built-up roof housing retainedwall to terrace at level-change, rear double glazed doors, gen. notes
Do not scale off drawings. The contractor is responsible for checking all dimensions. Any discrepancies shall be reported to the architect.
GW GW
A
B
A
B
EE
FF
AB
CC
D D
G G
HH
K
J J
GW GW
.
RE
BED 5
KITCHEN
shear glazed doorsupplied and installed by specialist contractor
glass pivot door andfixed panel by specialists
DINING
FOR NEW LANDSCAPING REFER TO DRAWING NR. 02-02
kitchen counter by others
full height lacquered mdf kitchen units
new solid core pivot door
new gas fireplace fittings to specialist spec. supplied and installed by others
edge of floor above
lacquered mdf kitchen unitsby others
new solid core pivot fire doors
new concrete screed power floated on pocketed polystyrene insulationincorporating under floor heating, on new insulation, on new damp proofing, on new rc slab to engineers specification
wc
whbwhb wc
new timber staircase detailed to match existing stairs above
for shower rm and w/c refer to detail dwgs
new external double-glazed door, frame and hw sill
STORAGE
RAD 1
RAD 2
ex'g MH
oven under
sink dishwasher(under)
fridge
w/d
new rwdp
new stub stack connectedto exist'g connection
future planting
future planting new stainless steel rwdp with B.I.G.T.
new svp
100mm dia. earthenwareunderground drain
new floor connector
100mm dia. earthenwareunderground drain
retainext. gully
KITCHEN
new high level cupboardsfor electronics and gas meter
brick up existing gatewayin London Stock to match existingand allow to tooth into existing
new brickwork wallto be tied into existing masonry to engineers specs.
concrete floor finish as dining / kitchen area on RC slab
internal walls of store to berendered as external
20mm S/C render with stainless steel accessories on new brickwork walling toengineers specification
glass side panel
new RC column to engineersspecification
render on new masonry enclosureto form fireplace opening with new raised hearth
new steel over to engineersspecifications
extent of ceiling recess
new opening in existing wallwith lintols over to engineersspecification
12.5 plasterboard skim on swdframing to form boxing to existingwall
excavated area
new opening in existing brickwall with lintols over to engineersspecification
scroll handrail and postto be salvaged from groundfloor, protected and reused
new brickwork to betoothed into existing
all existing walls at lower ground floor to be damp proofed as specified
new plaster finishes on damp-proofing render on existing walls with stop-beads to form flashgap detail at floor junctions
shower
form new hole in existing masonrywall for extract ductwork fromin-line extract fan housed under stairs
new concrete floor power floated incorporating under floor heating, on new insulation, on new damp proofing, on new rc slab to engineers specification
12.5 plasterboard and skim laidlevel on packing pieces on undersideof existing joists
main contractor to allow for connecting, testing & commissioningof all sinks, taps and appliances to hot and cold supplies, gas, drainage and electrical supplies to kitchen fittings supplied andinstalled by others
kitchen island byspecialist
sink
existing fireplace openingto be blocked up with masonryand to incorporate passive grilleventilation
svp with insulation wrappedaround all sides and in plasterboard skimmed boxing on swdframing
brick up existingopening and renderwith s/c render to match existing
brick up existingopening and renderwith s/c render to match existing
brick up existingopening and renderwith s/c render to match existing
form new opening in sidewall and install new lintol over to engineers spec. and make good render to return sides and head. installnew concrete threshold and link to damp-proofing to ensure water tight.
electric induction hob
D6
D5
D3
D4D7
D9
D10 D8
D2
D11
W1
W2
W3
W7
W6
new condensing gas fired boiler
stainless steel grille to linear trough drain at window
new stone hearth
supply and install full height cupboard units with 44mm lacquered solid core doors and 18mm spray-painted mdf carcassing and adustable shelving
new full-height damp-proofing render by specialist
supply and install new spray-painted wardrobe unit constructed from 18mm mdf
new floor connector
new timber shutters to later detail
gravel laid to match internal FFL
form new hole in masonry wall for extract ductwork
new 100mm dia. earthenware underground drain to connect to existing manhole
steel angle around terrace
TERRACE
new RC column to engineersspecification
sidewall partially rebuilt in new rendered brickwork to engineers specification
sidewall partially rebuilt in new rendered brickwork to engineers specification freezer
new steel post fixed to existing wall to engineers specification
face/line of wall to be checked on siteface of wall to align with brickwork over
gravel laid to match internal FFL
shear glazed doorsupplied and installed by specialist contractor
new rw pipe connection to extg manhole (following existing route)
new rw pipe below ground connecting to extg manhole
100mm dia. earthenwareunderground drain
width of casing to new ground beam to engineersspecifications
concrete floor; RC slab
stainless steel grille to linear trough drain at window
RW below ground
@ 1:100 fall
RA
D 1
RAD 12
soil below ground
@ 1:40 fall
conduits to be laid below RC slab
concrete floor as dining / kitchen
concrete floor & steps as dining / kitchen
Vola one-handle mixer withswivel spout mounted to 2mm stainless steel on 38mm mdf
Vola one-handle mixer withswivel spout mounted to 2mm stainless steel on 38mm mdf new timber framed,
opaque glazed door D1
37 THORNHILL ROADISLINGTONN1 1JS
for SCOTT & ANNA SULLIVAN
GUARD TILLMAN POLLOCK LTD., ARCHITECTS020 7380 1199
4145
c
GARDEN LEVEL FLOOR PLANAS PROPOSED
04- 01C
1:25
T ISSUED TO TENDER 06.11.06
A 27.03.07new and repositioned whb in wcexisting vaults retained
B 05.04.07double height glazing to rear, removal of kitchen sink recess, recess construction to dining area, planting notes
Do not scale off drawings. The contractor is responsible for checking all dimensions. Any discrepancies shall be reported to the architect.
C 07.06.07
dining room fireplace revised, floor construction revised, conduits shown in floor, manhole omitted & drainage re-routed, radiator to cloakrm revised
Thornhill Road, LondonPRIVATE RESIDENTIAL CONVERSION
108.29
grey metal-framed double-glazed pivot door
grey metal-framed double-glazed top hung window
slate roof
rooflight with self-cleaning glass
sand / cement render with clear sealant
grey finished s.s. flue
grey finished s.s. flue
grey metal flush gutters
grey metal angle trim to ridge
sand / cement render wall with clear sealant
grey painted metal cladding to projecting wall
fixed glazed projecting box / oriel window with grey metal surround
grey metal flush corner trim
grey metal flush rectangular rwp
grey metal flush rectangular rwp
grey metal flush corner trim
square opening with splayed cill
PROPOSED SITE SECTION Y-Y TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P19Ffor JAMES & MARIE CAPLIN scale 1: 100@A3 JANUARY '08 GUARD TILLMAN POLLOCK LTD
cedar boarding
slate roof
grey metal flush gutter
cedar boarding
TYPICAL EAVES DETAIL TRENARREN, PERRANPORTH. CORNWALL for JAMES & MARIE CAPLIN scale 1:5 JANUARY '08 GUARD TILLMAN POLLOCK LTD DWG NO.: 4140/ P23F
PROPOSED WEST ELEVATION TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P16Efor JAMES & MARIE CAPLIN scale 1: 100@A3 OCTOBER '07 GUARD TILLMAN POLLOCK LTD
sand / cement render with clear sealant
grey metal-framed double-glazed sliding doors
grey metal fascia and corner trim
grey metal-framed double-glazed fixed windows
grey finished s.s. flue
timber door
grey metal-framed double-glazed fixed windows
glass louvres
grey painted metal cladding to projecting wall
grey painted metal cladding to sides of projecting box/ oriel window
grey metal rectangular rwp
grey metal rectangular rwp
grey metal fascia and corner trim
105.
36
106.6
9
106.27
106.86
107.76
108.45
109.01
109.29
109.99
110.35
111.96111.77
112.17
112.18
111.78
112.04
112.06
112.16112.21
110.
97
110.
91
110.
91
110.
49
109.
45
109.
66
109.
92
110.
0310
9.37
109.
20
109.
00
108.
81
108.
73
108.
24
107.
78
107.
29
106.
59
106.
92
107.
03
106.
01
105.
81
105.
79
105.
30
106.
47
105.
78
105.
01
104.
65104.
64104.
59
104.
52
105.
12
105.
71
106.
19
104.
98
104.
08
104.
17
101.9710
2.45
103.
48
101.94
Ridge Height 100.3m
Eave Height 96.81m
Vege
tatio
n
Den
se
Vege
tatio
n
Den
se
Unk
empt
veg
etat
ion
Unk
empt
veg
etat
ion
Wooden Pikett Fence
Post & Wire Fence
Post & Wire Fence
104.0
103.0
105.0
106.0
106.0107.0
107.0
108.0
109.0
110.0
111.0
112.0
O/H
Cable
TP
101.08
100.
83
101.34
100.82100.51100.15
100.11
101.
2010
3.86
103.
59
104.
74
105.
14
104.
49
104.
51
103.
72
103.
84
102.73
102.
50
103.
04
103.
24
103.
66
99.25
99.05
98.53
99.4
7
101.09
Eave Height 96.7m
Ridge Height 98.85m
Gra
ss L
awn
Unk
empt
veg
etat
ion
104.0
103.0
105.0
O/H C
able
O/H Cable
99.5
9
99.3
0
99.25
99.6
2
98.93
99.2
5
101.56
101.70
100.97
101.53
102.
00
102.06101.96
101.62
101.
74
101.
73
101.
10
100.
94
100.
81
100.
52
101.53
101.61
101.
48
101.4
7
99.9
8
96.92
96.02
97.98
97.68
96.97
96.06
96.13
96.93
97.90
98.9
598.0
5
97.3
2
96.8
4 97.8
0100.65
100.86
100.91 100.91 100.30
99.0
98.0
O/H Cable
O/H Cable
97.98
99.6
5
99.8
9
98.6
4
99.0
0 98.9
9
100.0
98.0
098.5
0
100.91
100.91
100.30
100.11
101.
20
103.
59
101.0
102.0
PROPOSED SITE PLAN TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P04for JAMES & MARIE CAPLIN scale 1: 200 JAN '07 GUARD TILLMAN POLLOCK LTD
N
PROPOSED SITE PLAN TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P04for JAMES & MARIE CAPLIN scale 1: 200 JAN '07 GUARD TILLMAN POLLOCK LTD PROPOSED SITE PLAN TRENARREN, PERRANPORTH. CORNWALL DWG NO.: 4140/ P04for JAMES & MARIE CAPLIN scale 1: 200 JAN '07 GUARD TILLMAN POLLOCK LTD TRENARREN, PERRANPORTH. CORNWALL
line of existing fence
line of new fence
line of existing fence
line of existing fence
line of existing fence
To Ramoth Way
existing rosemary bushes retained
VegetationDense
PROPOSED SITE PLAN DWG NO.: 4140/ P07Efor JAMES & MARIE CAPLIN scale 1: 200@A3 OCTOBER '07 GUARD TILLMAN POLLOCK LTD
existing garage
Parking Area
outline of existing house
X
to soakaway
timber deck
gardentimber steps
concrete paving
underground blue water tank
gravel driveway
U
U
V
V
Z
Y
T T
Z
Y
W
W
X
timber deck
concrete pavingbin store
approximate position of shaft
13 metre diameter safety zone around old shaft
Tranarren Parrenporth, CornwallPRIVATE RESIDENTIAL NEW BUILD
25 PEMBRIDGE VILLAS LONDON W11 for CHRIS & NATASHA HARRISON
TERRACE
STOREKITCHEN
clear double-glazed sliding sash window
TERRACETV AREA
LIVING ROOM
fixed double-glazed window panel
BATHROOM 1 MASTER BEDROOM
glass roof
BEDROOM 1BEDROOM 2
TERRACE
BEDROOM 3
clear double-glazed sliding door
bench
BATHROOM 2
bath
glass balustrade
new planter
ADJOINING PROPERTY
shower
10
10
50
100
SCALE IN CM
50 100
existing windows to be replaced with triple-glazed sliding sash windows
existing windows to be replaced with triple-glazed sliding sash windows
existing windows to be replaced with triple-glazed sliding sash windows
new work shown hatched
new full-height timber framed, double-glazed doors painted to match existing
new timber framed double glazed slidiing sash window to match existing
new double glazed fixed patent glazing in metal frames
extension of rear wall in brickwork to match existing
rendered and painted white to match existing
new white painted timber-framed double-glazed folding/sliding doors with rendered white surrounds
concrete coping to match existing
PROPOSED SECTION B-B
GUARD TILLMAN POLLOCK LTD.
SCALE 1:50 4151/P24BFEBRUARY 2007
25 Pembridge VillasNo. 23 No. 27
10
10
50
100
SCALE IN CM
50 100
existing windows to be replaced with triple-glazed sliding sash windows, painted to match existing
existing windows to be replaced with triple-glazed sliding sash windows, painted to match existing
existing windows to be replaced with triple-glazed sliding sash windows, painted to match existing
rendered and white painted wall to match existing with white painted fascia over
new white painted timber-framed double-glazed folding/sliding doors with rendered white surrounds
25 PEMBRIDGE VILLAS LONDON W11 for CHRIS & NATASHA HARRISON
PROPOSED STREET ELEVATION
GUARD TILLMAN POLLOCK LTD.
SCALE 1:50 4151/P26BFEBRUARY 2007
25 PEMBRIDGE VILLAS LONDON W11 for CHRIS & NATASHA HARRISON
dining
25 Pembridge VillasNo. 23 No. 27
STUDYTERRACE
up
CLOAKRM
STORE
STORE STORE
KITCHEN
DINING
island unit
full
he
igh
t u
nits
full
he
igh
t u
nits
full
he
igh
t u
nits
sliding sash window
TERRACE
TV AREA
bench desk
10
10
50
100
SCALE IN CM
50 100
new full-height timber framed, double-glazed doors painted white
new work shown hatched
a b
a b
c
c
flush timber doors painted white
existing windows to be replaced with triple-glazed sliding sash windows, painted to match existing
PROPOSED LOWER GROUND FLOOR PLAN
GUARD TILLMAN POLLOCK LTD.
SCALE 1:50 4151/P16BFEBRUARY 2007
Pembridge Villas, LondonPRIVATE RESIDENTIAL CONVERSION
Full portfolio available upon request.