dangerous structures case study for tyre recycling centre

5
Deconstruct UK case study for dangerous structures. Client: Linbrooks Location: Purley Way, Croydon Contractor: Deconstruct UK Ltd Completion Date: September 2011 Sector: Dangerous Structures

Upload: deconstruct-uk

Post on 14-Jun-2015

420 views

Category:

Business


0 download

DESCRIPTION

Deconstruct dan

TRANSCRIPT

Page 1: Dangerous Structures Case Study for Tyre recycling centre

Deconstruct UK case study for dangerous structures.

Client: LinbrooksLocation: Purley Way, CroydonContractor: Deconstruct UK Ltd

Completion Date: September 2011Sector: Dangerous Structures

Page 2: Dangerous Structures Case Study for Tyre recycling centre

About the Project:

Demolition of warehouse structure following acatastrophic fire at a tyre recycling centre

in Croydon.

Our first objective here was to assist the London FireBrigade access the fire which continued to blazeunder the collapsed roof structure.

Once the fire was extinguished, the resultant contaminated debris and waste was cleared from site before the remaining structures were then demolished and the site cleared for the re-construction phase.

Page 3: Dangerous Structures Case Study for Tyre recycling centre

Project Challenges:

Operating plant to remove structures during the London Fire Brigade (LFB) operation to extinguish the flames and smouldering debris was challenging.

Power intakes had to be considered live throughout the operation. Heavy smoke and contaminated residues from tyres had to be managed with the correct selection of appropriate PPE and RPE.

Close coordination with the LFB Controlling Officer to ensure safe coordination was communicated between both teams to accurately deliver this challenging project.

Page 4: Dangerous Structures Case Study for Tyre recycling centre

Services provided by Deconstruct UK:

Our services:

Deconstruction Services ✓

Demolition Services ✓

Enabling Works

Asbestos Removal Services

Asbestos Surveying Services

Ground Works Services

Piling Services

Steelwork Installations

Builders Works

Emergency Dangerous Structures ✓

Temporary Works

Page 5: Dangerous Structures Case Study for Tyre recycling centre

Contact Details:

Deconstruct (UK) LimitedSilver House, 31-35 Beak StreetLondonW1F 9DPTel: 020 7734 6655Fax: 020 7734 6626

Email [email protected] Address www.deconstructuk.com

For more information about this case study, visit our case studies page here: www.deconstructuk.com