EMAD FATHY Mechanical CONSTRUCTION MANAGER EGYPTIAN NATIONAL EDUCATION BSC. Mechanical Engineer, Helwan University, Egypt YEARS OF EXPERIENCE 15 Years ___________________________________________________________________________ _______________ REPRESENTATIVE EXPERIENCE 2008 – Present KAMCO Joined KAMCO in the capacity of Site Engineer and was in charge for all daily construction site activities and required documentation. Also, in charge of all equipment used in daily construction and site administration. Most of these projects were designed and managed in the supervision of reputed international designers and consultants. I was responsible to establish and maintain good client relations ensuring direct management and administration of all field operations of construction site. Act professional and with due diligence at all times to fully implement the established quality procedures for timely completion of executed projects. Following are the major turnkey basis timely executed and completed “Fast Track Projects” which includes civil, communication and electro-mechanical works: 2008-2010 Saudi Kqyan Admin and Maintance Buildings, Jubail Position: Site Engineer 2010-2012 Saudi Marine Cable Factory, Tanajib Position: construction Manager 2012-2013 Dreser-Rand Arabia, Dammam Position: Construction Manager C.V – Emad Fathy - Const Mgr Page 1

Upload: emad-salim

Post on 12-Apr-2017

39 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: CV - Emad Fathi

EMAD FATHYMechanical CONSTRUCTION MANAGER

EGYPTIAN NATIONAL

EDUCATIONBSC. Mechanical Engineer, Helwan University, Egypt

YEARS OF EXPERIENCE 15 Years __________________________________________________________________________________________

REPRESENTATIVE EXPERIENCE

2008 – Present KAMCO

Joined KAMCO in the capacity of Site Engineer and was in charge for all daily construction site activities and required documentation. Also, in charge of all equipment used in daily construction and site administration. Most of these projects were designed and managed in the supervision of reputed international designers and consultants.I was responsible to establish and maintain good client relations ensuring direct management and administration of all field operations of construction site. Act professional and with due diligence at all times to fully implement the established quality procedures for timely completion of executed projects.

Following are the major turnkey basis timely executed and completed “Fast Track Projects” which includes civil, communication and electro-mechanical works:

2008-2010 Saudi Kqyan Admin and Maintance Buildings, JubailPosition: Site Engineer

2010-2012 Saudi Marine Cable Factory, TanajibPosition: construction Manager

2012-2013 Dreser-Rand Arabia, DammamPosition: Construction Manager

2014 Feb-Aug 2014 Al Qarayan Mini Steel Plant, Dammam Position: Construction Manager(Civil & Concrete Works)

Following is the brief work history and work responsibilities both at construction site and office in the capacity of Construction Manager:

As a Construction Manager I was whole in charge for all construction site activities includes but not limit all equipments, materials etc were used in construction and coordinate with engineering department to update the

C.V – Emad Fathy - Const Mgr Page 1

Page 2: CV - Emad Fathi

designs & confirming the site construction are progressing as per requirement. Coordinating with subordinates and ensuring the construction is in quality & schedule. Most of these projects were designed and managed in the supervision of reputed international designers and consultants.

The field construction operations includes the overall supervision and construction of projects and quality control all field operations of Civil Structural and Architectural including steel building works, interior and exterior finishing works, estimating and scheduling, over all supervision of related works such as, electrical, Telecommunication, HVAC, plumbing works, high pressured oil pipe line works, compressor lines, fire fighting system, PA system etc and all maintenance works for industrial and commercial buildings etc.

The office operations includes assisting planning, designing and preparing schedules, cost analysis, field operations with sub contractors and suppliers of various trades and coordination with consultants and clients etc.

In addition for HSE, I had to confirm the implementation of the safety accountability programs such ensuring subordinates safety performance and accountability and compliance to the safety program, communicate safety requirement to subordinates, taking part in activities that emphasize the commitment to the project safety program, review and respond to safety assessment, Monitoring tool box, Participate safety assessment, safety audit, incident investigation, Enforce the disciplinary program, Ensuring all employees receive required training etc.

Previous Experience with other Companies:

Private Project – Toblat, as Executive Engineer – 4 Years Private Project – Toblat, as Maintenance Manager – 1 Year Water Operations Management, as Executive Engineer – 2 Years PVTD, as Project Consulting Specialist, 2 Years

Expertises in above Projects: Manage construction activities for all concrete works. Water & waste water lines (nets) construction Execute, operate & maintain water & waste water stations Preparing tenders conditions & specifications booklets Providing consultancy services in :

international systems ( ISO 9001/2000 – 14001/2004 – OHSAS 180001/2007 )

industrial subjects ( productivity – maintenance – quality – feasibility study – planning )

Preparing & executing training programs Concrete mixers operating & maintenance Production lines management & planning Maintenance planning Automatic control circuits maintenance (classic control)

=====