cv 2016_3 - abdul halim
TRANSCRIPT
CURRICULUM VITAE
Name : Abdul Halim Abdul Hisam
Nationality : Malaysian
Year of Birth : 23rd April 1988
Qualification : Bachelor of Engineering Technology in Naval Architecture and
Shipbuilding
UniKL Malaysian Institute Of Marine Engineering Technology
Diploma of Ship Design
UniKL Malaysian Institute Of Marine Engineering Technology
Registered with Royal Institute of Naval Architecture (RINA)
Position : Field Engineer / Naval Architect
Working Experience : 3 years 4 Months
Contact No : +60127647754
WORKING EXPERIENCE
Feb 2013 – Present : TL OFFSHORE SDN BHD
(A SapuraKencana Petroleum Bhd Company)
Field Engineer, Offshore Construction Division
Project Involvement and Client : F14 and F29 Gas Field Development Project,
Sarawak Shell Berhad.
Developing detailed offshore Installation methods and preparing working procedure through review and interpretation of client’s AFC project drawings
Preparing and finalizing project materials and equipment by identifying and quantifying all relevant items to be procured under OIC scope of works, including preparation of all the required installation aids
Conduct site inspection to identify constraints, project obstruction and rigging methods for newly proposed project.
Transportation Analysis on Reel Packing, Containers, PLET, Riser Guard and Concrete Mattress
Transportation Analysis on Linepipes Transportation.
Performed Seafastening Design and Analysis.
Barge Deck Strength Checks.
Stability and Motion Checks
Interface with PMT/Client/Marine warranty surveyor (MWS) on resolution of technical matters.
Welding design and sizing
Marine Structural Checks and review
Miscellaneous Structural Integrity checks pertaining to marine vessel
_______________________________________________________________________________________________________
Project Involvement and Client : Permas Field Development Project, Murphy Sarawak Oil Co. Ltd.
Developing detailed offshore Installation methods and preparing working procedure through review and interpretation of client’s AFC project drawings
Preparing and finalizing project materials and equipment by identifying and quantifying all relevant items to be procured under OIC scope of works, including preparation of all the required installation aids
Conduct site inspection to identify constraints, project obstruction and rigging methods for newly proposed project.
Spool, riser and J-tube Installation
Transportation Analysis on Linepipes Transportation, Spool, Riser and J-tube.
Assist on Mooring Analysis
Performed Seafastening Design and Analysis.
Barge Deck Strength Checks.
Stability and Motion Checks
Interface with PMT/Client/Marine warranty surveyor (MWS) on resolution of technical matters.
Welding design and sizing
Marine Structural Checks and review
Miscellaneous Structural Integrity checks pertaining to marine vessel
Project Involvement and Client : Tapis Field Development Project, Exxonmobil
Exploration and Production Malaysia Inc. (EXXON)
Developing detailed offshore Installation methods and preparing working procedure through review and interpretation of client’s AFC project drawings
Preparing and finalizing project materials and equipment by identifying and quantifying all relevant items to be procured under OIC scope of works, including preparation of all
the required installation aids
Conduct site inspection to identify constraints, project obstruction and rigging methods for newly proposed project.
Transportation Analysis on Linepipes Transportation, Spool, Riser and J-tube.
Spool, Riser and J-tube installation
Assist on Engineered Lift Analysis
Assist on Mooring Analysis
Performed Seafastening Design and Analysis.
Barge Deck Strength Checks.
Stability and Motion Checks
Interface with PMT/Client/Marine warranty surveyor (MWS) on resolution of technical matters.
Welding design and sizing
Marine Structural Checks and review
Miscellaneous Structural Integrity checks pertaining to marine vessel
Project Involvement and Client : Lundin Malaysia B.V.
Developing detailed offshore Installation methods and preparing working procedure through review and interpretation of client’s AFC project drawings
Preparing and finalizing project materials and equipment by identifying and quantifying all relevant items to be procured under OIC scope of works, including preparation of all
the required installation aids
Conduct site inspection to identify constraints, project obstruction and rigging methods for newly proposed project.
Substructure Floatation & Upending Analysis.
_______________________________________________________________________________________________________
Project Involvement and Client: Cendor Phase II Development Project, Petrofac (Malaysia-PM304) Limited.
Cendor MOPU WellHead Support Frame (WHSF) Decommissioning (39MT)
Installation of Bridge Support Frame (BSF) (26MT)
Installation of CDW-A/CDW-B Bridge Section 2 (200MT)
Removal of Seawater Lift Tower From Cendor MOPU (40MT)
Transportation Analysis for CDW-A Bridge Section 2
Seafastening Design for CDW-A Bridge Section 2.
Transportation Analysis for CENDOR MOPU WHSF and Seawater Lift Tower
Seafastening Design For CENDOR MOPU WHSF and Seawater Lift Tower
Barge Deck Strength Checks.
Stability and Motion Checks
Interface with PMT/Client/Marine warranty surveyor (MWS) on resolution of technical matters.
Welding design and sizing
Marine Structural Checks and review
Miscellaneous Structural Integrity checks pertaining to marine vessel
Project Involvement and Client: JX Nippon Oil,
LWP Jacket Modelling (1442.33MT) using SACS software
Transportation analysis for LWP Jacket Project Involvement and Client: Petronas Carigali Sdn Bhd,
Developing detailed offshore Installation methods and preparing working procedure through review and interpretation of client’s AFC project drawings
Preparing and finalizing project materials and equipment by identifying and quantifying all relevant items to be procured under OIC scope of works, including preparation of all
the required installation aids
Transportation Analysis on Linepipes Transportation.
Performed Seafastening Design and Analysis.
Barge Deck Strength Checks.
Stability and Motion Checks
Interface with PMT/Client/Marine warranty surveyor (MWS) on resolution of technical matters.
Welding design and sizing
Marine Structural Checks and review
Miscellaneous Structural Integrity checks pertaining to marine vessel
Project Involvement and Client : Bunga Orkid Field Development Project, Talisman
Malaysia Limited. (FIELD ENGINEER)
Installation of 24” x 5km BOC – BOD Pipeline
Installation of dummy spool
Pre – Commissioning of 24” x 5km BOC –BOD Pipeline
Project Involvement and Client : BARDEGG-2 and Baronia EOR Development Project, Petronas Carigali Sdn Bhd. (Naval Architect)
TTJT-A Jacket double block upending
_______________________________________________________________________________________________________
COURSES ATTENDED
1. BOSIET Training 2. Loss Prevention System Training
3. Pile Driveability Training at TL Offshore
4. Moses Advance (Moses Software Developed by Ultramarine, Inc) 2013 at TL Offshore
5. Autodesk 2013 Building Design Essentials at Prestariang Systems Sdn Bhd
6. CIDB, Oil & Gas Training 2015. 7. Basic Hydrogen Sulphide
PERSONAL SKILLS
ICT
1. Moses
2. Sacs
3. Autocad 4. Microsoft Office
5. Maxsurf Hull Modeler,
6. Hydromax
7. Navcad
8. Rhino