x Any deviation from these drawings must be communicated in writing to and reviewed by your local GE Healthcare Installation Project Manager prior to making changes. x Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation Project Manager can supply a reference list of rigging contractors. x New construction requires the following; 1. Secure area for equipment, analysis, 4. Restrooms. x Provide for refuse removal and disposal (e.g. crates, cartons, packing) 2. Power for drills and other test equipment, 3. Capability for image x Contact a radiation physicist or consultant to specify radiation containment requirements. Women's Health Site Planning GE Healthcare Customer Site Readiness Requirements Drawing Index A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation. Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning These sheets are a document set and should not be separated. Electrical information and references are contained on all sheets. GE Equipment Delivery Requirements The items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipment delivery to the IS site. Equipment will not be delivered if these requirements are not satisfied. * REQUIRED REFERENCE * Pre Installation Manual These drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the operation of such equipment in compliance with GE Healthcare's written specifications and all applicable federal, state, and/or local requirements.

Upload: truongdan

Post on 30-Dec-2016

221 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Customer Site Readiness Requirements Drawing Index GE

Any deviation from these drawings must be communicated in writing toand reviewed by your local GE Healthcare Installation Project Managerprior to making changes.

Make arrangements for any rigging, special handling, or facilitymodifications that must be made to deliver the equipment to theinstallation site. If desired, your local GE Healthcare Installation ProjectManager can supply a reference list of rigging contractors.

New construction requires the following; 1. Secure area for equipment,

analysis, 4. Restrooms.

Provide for refuse removal and disposal (e.g. crates, cartons, packing)

2. Power for drills and other test equipment, 3. Capability for image

Contact a radiation physicist or consultant to specify radiationcontainment requirements.

Women's HealthSite Planning

GE HealthcareCustomer Site Readiness

RequirementsDrawing Index

A mandatory component of this drawing set is the GE HealthcarePre Installation manual. Failure to reference the Pre Installationmanual will result in incomplete documentation required forsite design and preparation.

Pre Installation documents for GE Healthcare products can beaccessed on the web at:

www.gehealthcare.com/siteplanning

These sheets are a document set and should not be separated.Electrical information and references are contained on all sheets.

GE Equipment DeliveryRequirements

The items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipmentdelivery to the IS site. Equipment will not be delivered if these requirements are not satisfied.

* REQUIRED REFERENCE *

Pre Installation Manual

These drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the operation of such equipment in compliance with GE Healthcare's written specifications and all applicable federal, state, and/or local requirements.

Page 2: Customer Site Readiness Requirements Drawing Index GE
Page 3: Customer Site Readiness Requirements Drawing Index GE
Page 4: Customer Site Readiness Requirements Drawing Index GE
Page 5: Customer Site Readiness Requirements Drawing Index GE
Page 6: Customer Site Readiness Requirements Drawing Index GE
Page 7: Customer Site Readiness Requirements Drawing Index GE
Page 8: Customer Site Readiness Requirements Drawing Index GE