The Development of the NEES Consortium 1 CUREE September 28, 2001 NEES Teleconference NEES Consortium Development Robert Reitherman, PI Consortium of Universities for Research in Earthquake Engineering (CUREE) American Society of Civil Engineers Earthquake Engineering Research Institute Consortium of Universities for Research in Earthquake Engineering

Post on 20-Dec-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

The Development of the NEES Consortium 1CUREE

September 28, 2001 NEES Teleconference

NEES Consortium DevelopmentRobert Reitherman, PI

Consortium of Universities for Research in Earthquake Engineering (CUREE)

American Society of Civil Engineers

Earthquake Engineering

Research Institute

Consortium of Universities for Research in Earthquake

Engineering

The Development of the NEES Consortium 2CUREE

Tom Anderson and Joy Pauschke, NSF

Tom Finholt, CREW, University of Michigan

Tom Coffin, Tom Prudhomme: NCSA

Steve Mahin, UC Berkeley; John Shalf, Lawrence Berkeley Laboratory AccessGrid node

University of Kansas AccessGrid node

Darryl Wong, CUREE Webmaster

Thanks for arrangements for this meeting

The Development of the NEES Consortium 3CUREE

Project Assessment

Thomas Finholt

CREW, University of Michigan

Organizational Development Consultant

Andrew Neitlich

The Sago Group

Consortium of Universities for Research in Earthquake

Engineering

Robert Reitherman, PI

CUREE Executive Director

NEES Consortium Development Project Organization Chart

Cherri Pancake, Co-PIOregon State University

Catherine FrenchUniversity of Minnesota

Anke KamrathSan Diego Supercomputer

Center

Network and Facilities

Associate Task Group Leaders

Consortium Organization

Robert Nigbor, Co-PIUniversity of Southern California

Associate Task Group Leaders

Clifford GabrielLiaison to OSTP

William. HolmesRutherford & Chekene

Susan TubbesingEERI

Community Development

Sharon Wood, Co-PIUniversity of Texas at Austin

Associate Task Group Leaders

Thalia AnagnosSan Jose State University

Dante FrattaLouisiana State University

J. Peter KissingerCERF-ASCE

Kim RoddisUniversity of Kansas

NEES Collaboratory Research

Stephen Mahin, Co-PIUniversity of California,

Berkeley

Philip LiuCornell University

David McCallenLawrence Livermore NL

Thomas O’RourkeCornell University

Associate Task Group Leaders

Task Groups

The Development of the NEES Consortium 4CUREE

Task Groups

Project Assessment

Thomas Finholt

CREW, University of Michigan

Organizational Development Consultant

Andrew Neitlich

The Sago Group

Consortium Organization

Associate Task Group Leaders

Consortium of Universities for Research in Earthquake

Engineering

Robert Reitherman, PI

CUREE Executive Director

NEES Collaboratory Research

Stephen Mahin, Co-PIUniversity of California,

Berkeley

Philip LiuCornell University

David McCallenLawrence Livermore NL

Thomas O’RourkeCornell University

Associate Task Group Leaders

Cherri Pancake, Co-PIOregon State University

Catherine FrenchUniversity of Minnesota

Anke KamrathSan Diego Supercomputer

Center

Network and Facilities

Associate Task Group Leaders

Community Development

Sharon Wood, Co-PIUniversity of Texas at Austin

Associate Task Group Leaders

Thalia AnagnosSan Jose State University

Dante FrattaLouisiana State University

J. Peter KissingerCERF-ASCE

Kim RoddisUniversity of Kansas P

art

icip

atin

g v

ia A

cce

ssG

rid

tod

ay

Robert Nigbor, Co-PIUniversity of Southern California

Clifford GabrielLiaison to OSTP

William. HolmesRutherford & Chekene

Susan TubbesingEERI

The Development of the NEES Consortium 5CUREE

University-based and consortium-managed research

Organizational Partners

Consortium of Universities for

Research in Earthquake Engineering

The Development of the NEES Consortium 6CUREE

University-based and consortium-managed research

Largest and most multi-disciplinary civil engineering association

Organizational Partners

American Society of Civil Engineers

Consortium of Universities for

Research in Earthquake Engineering

The Development of the NEES Consortium 7CUREE

Earthquake Engineering Research Institute

Includes many other backgrounds in addition to engineers

American Society of Civil Engineers

Consortium of Universities for

Research in Earthquake Engineering

University-based and consortium-managed research

Largest and most multi-disciplinary civil engineering association

Organizational Partners

The Development of the NEES Consortium 8CUREE

CUREE Membership Base

The Development of the NEES Consortium 9CUREE

J. Peter Kissinger, Senior VP

Mission: engineering and construction innovation

Entre to Institutes: Structural Engineering, Architectural Engineering, Construction, Oceans–Coasts-Ports-Rivers, and the Geo-Institute

Working Groups: Transformation of Engineering Practice, Federal Agencies & Applications Constituencies

Civil Engineering Research FoundationAmerican Society of Civil Engineers

The Development of the NEES Consortium 10CUREE

Susan Tubbesing, Executive Director

Broad view of earthquake engineering

Experienced in focusing and representing community viewpoints

Strategic plan linked to implementation and NEHRP goals

National Workshops and consortium formation

Earthquake EngineeringResearch Institute

The Development of the NEES Consortium 11CUREE

Our goals for today’s meeting, and beyond

What we expect from the System Integrator

What we expect from the Equipment Sites

What they expect from us (2-way street)

Clarify scope and coordination among awardees

A recruitment opportunity for our project

Begin to schedule and arrange next steps

Introduce the newest member of the NEES team

The Development of the NEES Consortium 12CUREE

Project Assessment

Thomas Finholt

CREW, University of Michigan

Organizational Development Consultant

Andrew Neitlich

The Sago Group

Consortium of Universities for Research in Earthquake

Engineering

Robert Reitherman, PI

CUREE Executive Director

Introduction of the Task Groups

Cherri Pancake, Co-PIOregon State University

Catherine FrenchUniversity of Minnesota

Anke KamrathSan Diego Supercomputer

Center

Network and Facilities

Associate Task Group Leaders

Consortium Organization

Robert Nigbor, Co-PIUniversity of Southern California

Associate Task Group Leaders

Clifford GabrielLiaison to OSTP

William. HolmesRutherford & Chekene

Susan TubbesingEERI

Community Development

Sharon Wood, Co-PIUniversity of Texas at Austin

Associate Task Group Leaders

Thalia AnagnosSan Jose State University

Dante FrattaLouisiana State University

J. Peter KissingerCERF-ASCE

Kim RoddisUniversity of Kansas

NEES Collaboratory Research

Stephen Mahin, Co-PIUniversity of California,

Berkeley

Philip LiuCornell University

David McCallenLawrence Livermore NL

Thomas O’RourkeCornell University

Associate Task Group Leaders

Task Groups

The Development of the NEES Consortium 13CUREE

Professor Stephen Mahin, Co-PIUniversity of California, Berkeley

Associate Task Group Leaders

Professor Philip LiuCornell University

Dr. David McCallenLawrence Livermore NL

Professor Thomas O’RourkeCornell University

Collaboratory Research Task Group

The Development of the NEES Consortium 14CUREE

Associate Task Group Leaders

Working Groups: 1. Sharing of Facilities2. Sharing of Data3. NEES Consortium’s Role in Facilitating Research4. Identification and Pursuit of External Projects

Professor Philip LiuCornell University

Dr. David McCallenLawrence Livermore NL

Professor Thomas O’RourkeCornell University

Collaboratory Research Task Group

Professor Stephen Mahin, Co-PIUniversity of California, Berkeley

The Development of the NEES Consortium 15CUREE

Networking and Facilities Task Group

Professor Catherine FrenchUniversity of Minnesota

Dr. Anke KamrathSan Diego Supercomputer Center

Professor Cherri Pancake, Co-PIOregon State University

Associate Task Group Leaders

The Development of the NEES Consortium 16CUREE

Professor Cherri Pancake, Co-PIOregon State University

Associate Task Group Leaders

Working Groups: 1. System Integration Liaison2. Coordination of Training for Facilities and Researchers

Professor Catherine FrenchUniversity of Minnesota

Dr. Anke KamrathSan Diego Supercomputer Center

Networking and Facilities Task Group

The Development of the NEES Consortium 17CUREE

Community Development Task Group

Professor Sharon Wood, Co-PIUniversity of Texas at Austin

Prof. Thalia AnagnosSan Jose State University

Prof. Dante FrattaLouisiana State University

J. Peter KissingerCERF-ASCE

Prof.Kim RoddisUniversity of Kansas

Associate Task Group Leaders

The Development of the NEES Consortium 18CUREE

Working Groups: 1. Publicity and Outreach2. University Involvement3. Educational Aspects4. Transformation of Engineering Practice5. Federal Agencies and Applications Constituencies

Prof. Thalia AnagnosSan Jose State University

Prof. Dante FrattaLouisiana State University

J. Peter KissingerCERF-ASCE

Prof.Kim RoddisUniversity of Kansas

Community Development Task Group

Professor Sharon Wood, Co-PIUniversity of Texas at Austin

Associate Task Group Leaders

The Development of the NEES Consortium 19CUREE

Consortium Organization Task Group

William HolmesRutherford & Chekene

Professor Robert Nigbor, Co-PIUniversity of Southern California

Susan TubbesingEERI

Associate Task Group Leaders

Clifford GabrielLiaison to OSTP

Photo not

available

The Development of the NEES Consortium 20CUREE

Working Groups: 1. National Workshops2. Inter-Institution Budgetary Issues3. Governance4. Consortium Establishment and Operation5. Ten-Year Planning

Professor Robert Nigbor, Co-PIUniversity of Southern California

Clifford GabrielLiaison to OSTP

William HolmesRutherford & Chekene

Susan TubbesingEERI

Consortium Organization Task Group

Associate Task Group Leaders

Photo not

available

The Development of the NEES Consortium 21CUREE

Professor Thomas Finholt

Director, Collaboratory for Research on Electronic Work (CREW)

University of Michigan

Project Assessmentand Technology Facilitation

The Development of the NEES Consortium 22CUREE

Project Assessment

Assessment Plan

Annual and Final Assessment

Technology Facilitation

AccessGrid, PlaceWare, Web, etc.

Organizational Development Consultant: Andrew Neitlich, Sago Group

Project Assessmentand Technology Facilitation

Professor Thomas Finholt

Director, Collaboratory for Research on Electronic Work (CREW)

University of Michigan

The Development of the NEES Consortium 23CUREE

Consortium Development Project Milestones(various required reports, assessments, plans, not shown here)

Website; workshops; outreach to broad earthquake engineering community

Form the NEES Consortium

Submit 10-yr Collaboratory operation plan to NSF

Interim operation of the NEES Consortium

The Development of the NEES Consortium 24CUREE

Consortium Development Decisionmaking

An influential grassroots level: Working Groups

Co-PI’s as “vice-presidents” of divisions

PI overall “CEO,” but…

Executive Council given power to decide key decisions by majority vote

EERI “counts the votes” (2 National Workshops)

Decisonmaking rules of the NEES Consortium to be determined, but collaboration is a given

The Development of the NEES Consortium 25CUREE

NE

ES

gri

d

System Integrator

The Development of the NEES Consortium 26CUREE

NE

ES

gri

d

Sim

ula

tion

/Exp

erim

enta

l Fac

ilitie

s

SiteCouncil

Site B

Site C

Site A

System Integrator

The Development of the NEES Consortium 27CUREE

SiteCouncil

NE

ES

gri

dNEES

Consortium Development

Site B

Site C

Site A

System Integrator

Sim

ula

tion

/Exp

erim

enta

l Fac

ilitie

s

The Development of the NEES Consortium 28CUREE

SiteCouncil

NE

ES

gri

dNEES

Consortium Development

Site B

Site C

Site A

NSF-funded NEES componentsSystem

Integrator

Sim

ula

tion

/Exp

erim

enta

l Fac

ilitie

s

The Development of the NEES Consortium 29CUREE

SiteCouncil

NE

ES

gri

d

System Integrator

EarthquakeResearchers

Educators &Students

ProfessionalEngineers

OtherPractitioners

NEES Consortium

Development

Site B

Site C

Site A

Othersite 1

Othersite 2

Sim

ula

tion

/Exp

erim

enta

l Fac

ilitie

s

The Development of the NEES Consortium 30CUREE

SiteCouncil

NEES Collaboratory

NE

ES

gri

d

System Integrator

EarthquakeResearchers

Educators &Students

ProfessionalEngineers

OtherPractitioners

NEES Consortium

Site B

Site C

Site A

Othersite 1

Othersite 2

NEES Consortium

Development

Sim

ula

tion

/Exp

erim

enta

l Fac

ilitie

s

The Development of the NEES Consortium 31CUREE

Consortium Developer as Central Sourceof Information to Community about NEES

nees.org website (NSF + SI + ES + CD)

“CUREE’s” announcement of the Consortium Development award is actually a PR piece for all of NEES

Multimedia programs to be available; archive of images, video, etc.

“Organizational capital” of CUREE member universities (workshops, co-scheduling events)

CUREE Board of Directors hands-off policy

The Development of the NEES Consortium 32CUREE

Taking Advantage of Opportunities to Advance NEES

The Development of the NEES Consortium 33CUREE

CUREE Calendar for Year 2002:The Development of NEES

The Development of the NEES Consortium 34CUREE

Newsletter announcement(printed and e-news)

The Development of the NEES Consortium 35CUREE

All NEES Equipment Sites, and System Integrator,To be Highlighted Via Print and Website/email

The Development of the NEES Consortium 36CUREE

Oregon State UniversityMultidirectional Wave Basin for Remote Tsunami Research

University of California, DavisGeotechnical Centrifuge

Rensselaer Polytechnic Institute100 g-ton Geotechnical Centrifuge

Tsunami Wave Basin

Centrifuge Research Equipment

The Development of the NEES Consortium 37CUREE

University at BuffaloHigh-Performance Hybrid Test Facility

University of Nevada, RenoMultiple Biaxial Shake TableResearch Facility

Shake Tables

The Development of the NEES Consortium 38CUREE

University of MinnesotaMulti-Axial Subassemblage Testing System (MAST)

University of Colorado at BoulderFast Hybrid Test Platform for SeismicPerformance Evaluation of Structural Systems

University of California, BerkeleyReconfigurable Reaction Wall

Large Scale LaboratoryExperimentation Systems

The Development of the NEES Consortium 39CUREE

University of Texas at AustinLarge Scale Mobile Shakers andAssociated Instrumentation

University of California, Los AngelesField Testing and Monitoring of Structural Performance

Field Experimentation and Monitoring

The Development of the NEES Consortium 40CUREE

Our goals for today’s meeting, and beyond

Introduce the newest member of the NEES team

The Development of the NEES Consortium 41CUREE

Our goals for today’s meeting, and beyond

Introduce the newest member of the NEES team

What we expect from the System Integrator

What we expect from the Equipment Sites

What they expect from us (2-way street)

Clarify scope and coordination among awardees

A recruitment opportunity for our project

Begin to schedule and arrange next steps

Co-PI Presentations and Discussion on Specific Aspects of the Project

The Development of the NEES Consortium 42CUREE

next speaker: Stephen Mahin

The Development of the NEES Consortium 43CUREE

September 28, 2001 NEES Teleconference

Collaboratory Vision Task GroupProfessor Stephen A. Mahin, Co-PI

University of California at Berkeley

Associate Task Group Leaders

• Professor Philip Liu, Cornell University

• Dr. David McCallen, Lawrence Livermore National Lab

• Professor Thomas O’Rourke, Cornell University

The Development of the NEES Consortium 44CUREE

NEES implemented as a collaboratory

The NEES Collaboratory will accelerate intellectual discovery in the field of earthquake engineering and improve seismic safety by:

Bringing researchers, educators and students together with members from the broad earthquake engineering, information technology and computer science communities

Providing them ready access to powerful shared-use, next-generation experimental, computational, information management and communication tools

Facilitating their interaction as if they were “just across the hall”

The diversity of talents, backgrounds, experience and disciplinary concerns represented within NEES Collaboratory will provide an unparalleled stimulus to intellectual inquiry.

The Development of the NEES Consortium 45CUREE

Deliverables

Articulate in a white paper the vision of how the Collaboratory will function

Provide the “performance specifications” to the Task Group on Consortium Organization for what the Consortium must be able to do

Identify efforts external to the Consortium Development award’s scope needed to integrate the components of NEES into a successful whole

Aggressively seek funding for those external efforts, bringing together interested members of the community to work on activities

The Development of the NEES Consortium 46CUREE

The Vision Thing

Adopt an approach that is: Strategic Systematic Holistic Inclusive

Build on previous work, and acknowledge expertise

Broad definition of community (Data users, research participants, facility operators, etc.)

Systematic input from organizational experts, NSF best practices, existing collaboratories, etc.

The Development of the NEES Consortium 47CUREE

NEES will provide the earthquake engineering community ready access to shared-use, next-generation experimental and computational resources, as well as to curated data repositories, in order to accelerate the development and validation of model-based analysis.

NSF 00-56

Address issues related to: Mission of Collaboratory Nature of Collaboratory

activities Infrastructure, resources

and activities required to realize vision

Policy and organizational features needed to realize vision

Mitigating barriers to success

The Vision Thing

The Development of the NEES Consortium 48CUREE

The Vision Thing

A collaboratory is a network- enabled “…center without walls” in which the nation’s researchers can perform their research without regard to geographical location, interacting with colleagues, accessing instrumentation, sharing data and computational resources, and accessing information in digital libraries.”National Collaboratories: Applying Information Technology to Scientific Research [NRC, 1993]

Address issues related to: Mission of Collaboratory Nature of Collaboratory

activities Infrastructure, resources

and activities required to realize vision

Policy and organizational features needed to realize vision

Mitigating barriers to success

The Development of the NEES Consortium 49CUREE

• Research and collaboration functions before, during and after campaigns

• Quality of service issues related to collaboration tools and enabling technology

Collaboratory FunctionLevels

The Vision Thing

Address issues related to: Mission of Collaboratory Nature of Collaboratory

activities Infrastructure, resources

and activities required to realize vision

Policy and organizational features needed to realize vision

Mitigating barriers to success

The Development of the NEES Consortium 50CUREE

The NEES Consortium must:• Lead, coordinate and serve as the focal point for

NEES

• Operate all components of the NEES Collaboratory

• Operate under ten-year strategic, business and critical self-assessment plans,

• Operate under policies and procedures that address shared-use access, user fees, and operating cost reimbursement policies, etc.

• Enhance the interaction of the NEES Collaboratory with the earthquake engineering community to promote integrated experimentation, computation, theory, databases and simulation.

• Conduct/coordinate outreach and training activities

• Develop connectivity and interactions with other relevant sites located at US academic, federal and national laboratory sites & at international sites

• Pursue technology development opportunities

• Interface with NSF and other Federal agenciesNSF 00-56

The Vision Thing

Address issues related to: Mission of Collaboratory Nature of Collaboratory

activities Infrastructure, resources

and activities required to realize vision

Policy and organizational features needed to realize vision

Mitigating barriers to success

The Development of the NEES Consortium 51CUREE

The Vision Thing

Engage broad community in development and evaluation of “critical parameters” and scenarios related to character and operation of Collaboratory

Community participation in writing and reviewing white paper on collaboratory vision

Close coordination with other parts of NEES program

Testbeds involving broad segments of the earthquake engineering community

Active identification and pursuit of funding opportunities

Address issues related to: Mission of Collaboratory Nature of Collaboratory

activities Infrastructure, resources

and activities required to realize vision

Policy and organizational features needed to realize vision

Mitigating barriers to success

The Development of the NEES Consortium 52CUREE

Working Groups

Sharing of Facilities Sharing of Data Role of the Consortium in Facilitating NEES

Research Identification and Pursuit of External Projects

Seek broad and diverse participation. Close collaboration with related SI, Site Council, EERCs, NRC and other groups, organizations and agencies.

Working groups will be phased out as they complete their charge. They may also be transformed, or new groups formed, to address emerging issues.

Initial Working Groups include:

The Development of the NEES Consortium 53CUREE

Sharing of Facilities

What kinds of policies must be set and enforced by the NEES Consortium, or adopted by others, to encourage and ensure adequate sharing of facilities and other collaboratory resources? What policies should be established regarding user fees, cost reimbursement, operating budgets, etc.

Sharing of DataHow to facilitate sharing of metadata and data, while preserving appropriate policies related to intellectual property rights? What are these policies? What policies are needed to insure adequate quality and completeness of data? How to rapidly disseminate data (raw, archival, curated)? What is meant by data curation?

Working Groups

The Development of the NEES Consortium 54CUREE

Role of the Consortium in Facilitating NEES ResearchHow actively should the new consortium facilitate research, without rigidly directing what is supposed to be a community-based, flexible way of conducting investigations?

Identification and Pursuit of External ProjectsWhat projects, funded externally to the current consortium development project, should be fostered to accelerate the realization of the collaboratory or enrich its vision?

• International cooperation?• Advanced instrumentation and other technologies

(evaluation, evaluation and deployment)? • Software (enabling middleware and applications)? • Experimental-simulation demonstration projects

(research, curriculum development, general education…)

Working Groups

The Development of the NEES Consortium 55CUREE

Summary & Goals

NEES Collaboratory will fundamentally change the processes by which earthquake engineering research is initiated and executed, accelerate the generation and dissemination of basic knowledge, facilitate development of effective educational programs, and minimize the lag time between knowledge development and its application.

Milestones: Draft White Paper and initial parameter write-ups

on web by end of month 3 Evolving drafts, parameter statements and

scenarios updated on web Presentation and refinement at national workshop Final Draft in month 11

Collaborate

Or

Else

The Development of the NEES Consortium 56CUREE

next speaker: Cherri Pancake

The Development of the NEES Consortium 57CUREE

September 28, 2001 NEES Teleconference

Networking and Facilities Task GroupProfessor Cherri Pancake, Co-PI

Oregon State University

Associate Task Group Leaders

• Professor Catherine French, University of Minnesota

• Dr. Anke Kamrath, UC San Diego Supercomputer Center

The Development of the NEES Consortium 58CUREE

Working Groups

System Integration Liaison Liaison with NEES Equipment Sites Liaison with System Integration team (Later) plan future operation of NEESgrid & sites

Coordinate Training for Facilities and Researchers Coordinate training: Sites operational before Oct 04 Plan for coordinating training 2004-2014 (Later) Recruit & integrate non-funded sites into NEES (Later)

The Development of the NEES Consortium 59CUREE

System Integration Liaison Working Group

Initial issues Establish how liaisons will work

With equipment sites With SI team

Form WG and subgroups Identify time-critical concerns Develop blueprint for initial tasks

Establish mechanisms for facilitating communications within/among subgroups

The Development of the NEES Consortium 60CUREE

Equipment Sites Subgroup

Tasks Work with sites to identify concerns/issues

about connecting to NEESgrid at various levels (network, service, application)

Ensure that final grid will be operable within funding and expertise constraints

Verify that user needs of community will be served

The Development of the NEES Consortium 61CUREE

Discussion of Sites Liaison

Strawman for who should participate in Working Group Cathy French (Associate TG Leader) Plus 2-4 others from equipment sites

Selected by (but not necessarily on) Site Council

Half from Early Adopter sites Overall, must be representative of different

levels of experience/expertise

The Development of the NEES Consortium 62CUREE

How liaison should work Can liaison be done through email and telecons?

Is initial face-to-face meeting needed? Should interactions be scheduled on fixed

period? How much detail should they see about SI plans?

Discussion of Sites Liaison

The Development of the NEES Consortium 63CUREE

System Integration Team Subgroup

Tasks Track SI developments and interpret their

significance to CD Provide input to SI team on behalf of Consortium

and equipment sites Periodically review SI plans and update CD team Develop cost estimating factors for budgeting

future grid maintenance

The Development of the NEES Consortium 64CUREE

Strawman for composition of Working Group Anke Kamrath (Associate TG Leader) Representatives from SI team

“System deployment/operations” (Rob Pennington?)

“User requirements” (Tom Finholt?) 2-3 (?) from “information components”

(Zalusek, Hardin, Parson, Futrelle?)

Discussion of System Integration Liaison

The Development of the NEES Consortium 65CUREE

How liaison should workCan liaison be done through email and

telecons? Is initial face-to-face meeting needed? Should interactions be scheduled on fixed period?

Should all interactions between CD and SI teams be through this WG?

Discussion of System Integration Liaison

The Development of the NEES Consortium 66CUREE

Initial issues: Form Working Group and subgroups

Identify time-critical concerns Develop blueprint for initial tasks

Establish how site (SI-provided) and researcher (site-provided) training will be coordinated

Establish mechanisms for disseminating information on training activities to audience groups

Working Group on Coordination of TrainingFor Facilities and Researchers

The Development of the NEES Consortium 67CUREE

Tasks Review initial plans and provide feedback Ensure training needs of equipment sites are met Verify that timing coincides with site calendars

Discussion Should participation begin with Early Adopter

sites? Who else? Does Site Council already have input into SI

planning process, or will we provide that channel? When will initial training plan be available for

review?

Site Training Subgroup

The Development of the NEES Consortium 68CUREE

Researcher Training Subgroup Tasks

Identify sites that will go on-line early Review their initial plans for training Work with them to identify procedures for

coordinating and publicizing training capabilities Discussion

Should participation begin with sites likely to go on-line first? Some more representative group?

At what point will sites have initial plans for training ready?

Is it reasonable to establish joint procedures for developing/reviewing training plans?

The Development of the NEES Consortium 69CUREE

next speaker: Sharon Wood

The Development of the NEES Consortium 70CUREE

September 28, 2001 NEES Teleconference

Networking and Facilities Task GroupProfessor Sharon Wood, Co-PI

University of Texas at Austin

Associate Task Group Leaders

• Professor Thalia Anagnos, San Jose State University

• Professor Dante Fratta, Louisiana State University

• J. Peter Kissinger, CERF-ASCE

• Professor Kim Roddis, University of Kansas

The Development of the NEES Consortium 71CUREE

Community Development

Why does the success of NEES depend on the engagement of a broad earthquake engineering community?

How is the earthquake engineering community defined?

How will the community be engaged?

What do the Working Groups do?

How will input from the community influence the development of the consortium?

How will the Task Group interact with the System Integrator and the NEES Equipment Sites?

The Development of the NEES Consortium 72CUREE

Why?

NEESgrid

NEES Equipment Sites

The Development of the NEES Consortium 73CUREE

Why?

The Development of the NEES Consortium 74CUREE

Who?

Researchers, educators, and students from colleges and universities with academic programs in civil or ocean engineering.

Practicing engineers

Researchers at federal laboratories

Building officials, emergency planners

State and government organizations

The Development of the NEES Consortium 75CUREE

How?

Regional Workshops located throughout the US.

Publicize workshops and invite a variety of individuals who may not have participated in previous NSF workshops.

Provide information about the experimental, computational, and networking capabilities of NEES.

Brainstorm about vision for how NEES can be used.

Recruit participants to join working groups

The Development of the NEES Consortium 76CUREE

What?

Publicity and Outreach University Involvement Educational Aspects Transforming Engineering Practice Federal Agencies and Applications

Constituencies

The Development of the NEES Consortium 77CUREE

Educational Aspects

Get-Away Special concept used by NASA

Students propose simple experiments

Experiments “ride along” during a shaking table experiment

The Development of the NEES Consortium 78CUREE

Impact

At least one member of the Executive Council will attend each of the regional workshops.

Brief reports will be sent to the appropriate working groups describing discussions.

Participants will join working groups. Remote participation is encouraged.

The Development of the NEES Consortium 79CUREE

Interaction with System Integrator

Are the user surveys intended for users at the host institutions or remote users?

Is there a need to include user surveys in the regional workshops?

The Development of the NEES Consortium 80CUREE

How do the community building activities differ from those proposed by the consortium development team? Can some of these activities be combined?

What are the minimum hardware and software requirements for a remote observer and a remote user?

Interaction with System Integrator

The Development of the NEES Consortium 81CUREE

Interaction with Equipment Sites

What are the unique capabilities of your site?

How much time will be set aside for non-resident researchers?

What types of remote participation have you envisioned?

Have researchers from outside your university used your experimental facilities in the past?

What level of technical expertise do you expect the non-resident researchers to have?

The Development of the NEES Consortium 82CUREE

Will visiting students be permitted to take classes?

Will housing be available on campus?

Will office space and computers be available?

Has a fee structure been established?

Will all experimental projects need to have at least one researcher from the equipment site as a Co-PI?

Interaction with Equipment Sites

The Development of the NEES Consortium 83CUREE

next speaker: Bob Nigbor

The Development of the NEES Consortium 84CUREE

September 28, 2001 NEES Teleconference

Consortium Organization Task GroupProfessor Robert Nigbor, Co-PI

University of Southern California

Associate Task Group Leaders

• Susan Tubbesing, EERI

• William Holmes, Rutherford & Chekene

• Clifford Gabriel, Office of Science and Technology Policy (liaison)

The Development of the NEES Consortium 85CUREE

NEES Consortium Organization

establish the NEES Consortium as a legal entity no later than October 1, 2003;

submit a proposal to NSF by October 1, 2003 covering NEES operation for the 2004-2014 decade.

Major Consortium Development Goals:

The Development of the NEES Consortium 86CUREE

Major Issues

Development of a consensus-based vision and mission for “NEES Inc.”

What is an optimal organizational structure?

What is an appropriate financial model for NEES Inc?

What is an appropriate financial model for the NEES Collaboratory?

How do we transition the control of NEES in Year 3?

How do we define the operating parameters, in sufficient detail for a 10-year proposal, for something that does not exist yet?

The Development of the NEES Consortium 87CUREE

Vision and Mission for NEES Inc.

A strong, clear vision is needed early to allow us to address the specific major issues

A well-defined corporate mission will facilitate operational and financial decisions for NEES Inc.

Both must be a focus of the first National Workshop

The Development of the NEES Consortium 88CUREE

Organizational Structure

The Development of the NEES Consortium 89CUREE

Financial Models for NEES Inc.

Source(s) of income Direct expenses Indirect expenses

Will NEES Inc. be a conduit for operating costs of the equipment sites?

The Development of the NEES Consortium 90CUREE

Financial Model for the Collaboratory

How to structure use fees for equipment sites?

How to distribute income from equipment site use?

How to efficiently share operating costs?

How to deal with multi-institution budgetary issues?

The Development of the NEES Consortium 91CUREE

Year 3: Transition to NEES Inc. Control

Interim operation of NEES Inc.

Handoff of NEESgrid products and system

Begin generating new research projects and proposals involving the NEES Collaboratory

The Development of the NEES Consortium 92CUREE

Ten-Year Proposal

Guestimation of operating parameters will be difficult and critical.

How do we deal with uncertain issues such as maintaining, updating, repairing, and replacing hardware and software?

What are the opportunities for future funding outside of NSF and how do we factor this into a proposal?

The Development of the NEES Consortium 93CUREE

Working Groups Within the Task Group on Consortium Organization

National Workshops and Community Consensus

Inter-Institution Budgetary Issues

Governance Structure

Consortium Establishment and Interim Operation

Ten-Year Planning

The Development of the NEES Consortium 94CUREE

September 28, 2001 NEES Teleconference

Project Assessmentand Collaboration Technology

Professor Thomas FinholtUniversity of Michigan

The Development of the NEES Consortium 95CUREE

Year 1 deliverables

Survey of extended earthquake engineering community Researchers Practitioners

Issues: Consortium design NEES policies Interest in NEES Resources to support NEES use General attitudes toward collaboration and

resource sharing

The Development of the NEES Consortium 96CUREE

Year 2 deliverables

Interviews Follow up after workshops

Focus groups During workshops Probe opinions about Consortium design and

governance

The Development of the NEES Consortium 97CUREE

Year 3 deliverables

Usage Number of users Frequency of use Patterns

Impact Research productivity Practitioner awareness Public awareness

Evaluation metrics

The Development of the NEES Consortium 98CUREE

Technology Support for CD team

Video conferencing H.323 Hardware or software multiple conferencing

unit (MCU) Polycom-based

Data conferencing Web-based Placeware

The Development of the NEES Consortium 99CUREE

Technology Support of Community

Remote participation in meetings Placeware Streaming video and audio

Web site Usability assessment Discussion support Useful links Archives of:

Meeting minutes Critical documents

The Development of the NEES Consortium 100CUREE

The Development of the NEES Consortium 101CUREE

end of Consortium Development presentation of September 28, 2001 teleconference