ctci corporate presentation_overall1-final

122
CTCI Our Vision To become a leading global provider of engineering services and innovative technologies Corporate Presentation JAN 2008

Upload: visheshmongia

Post on 16-Oct-2014

584 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CTCI Corporate Presentation_Overall1-FINAL

CTCIOur VisionOur Vision

To become a leading global provider of engineering

services and innovative technologies

Corporate Presentation

JAN 2008

Page 2: CTCI Corporate Presentation_Overall1-FINAL

-- 2 --

Safety Map

Page 3: CTCI Corporate Presentation_Overall1-FINAL

-- 3 --

Emergency Phone Numbers Police Station 110

Fire/ Ambulance 119

Building Management ext. 1458

Supervisor in charge ext. 7511/ ext. 1365

Security Guard ext. 1458

Evacuation Plan

Evacuation assembly area is designated at the pedestrian island on Sec. 2, Tun Hwa South Road, opposite CTCI Tower.

Page 4: CTCI Corporate Presentation_Overall1-FINAL

-- 4 --

A Leading Global EPC Service Provider

Commitment to Customer Value

Net Sales of US$ 3 B by 2010

Our Goals

Page 5: CTCI Corporate Presentation_Overall1-FINAL

-- 5 --

Full Knowledge of Major Licensors and EPC Firms.

Strategic Alliance with Selected Technology Providers.

An International EPC Contractor with Local Facilities and Resources.

Own sufficient subsidiaries around the world to support project execution.

CTCI’S Strengths

Page 6: CTCI Corporate Presentation_Overall1-FINAL

-- 6 --

CTCI confirms its full commitment to the

Client with the highest standards of quality,

safety and protection of the environment.

CTCI confirms its performance to fulfill the

Client’s requirement for all customers, and

responsibility to society.

Value to the Client

Page 7: CTCI Corporate Presentation_Overall1-FINAL

-- 7 --

History

1959 – China Technical Consultants, Inc. (C.T.C.I.) established

1979 – CTCI Corporation founded by C.T.C.I. and two

financial organizations

(C.T.C.I. now renamed as CTCI Foundation)

1993 – A public listed company in TSE

Paid-in Capital ……………NT$6,167M (approx. US$189M)

Shareholder’s Total Equity…………….……US$271M

FY 2006 New Orders………………………..US$1,910M

CTCI Group Consolidated………US$2,166M

FY 2006 Turnover……………………………..US$717M

CTCI Group Consolidated………US$1,031M

Corporate Overview (1/2)

US$:NT$=1:32.57

Page 8: CTCI Corporate Presentation_Overall1-FINAL

-- 8 --

Number of Employees

CTCI Corporation 2,700 +

CTCI Worldwide 4,400 +

CTCI Offices

Taipei Headquarters

Kaohsiung Regional Operation

Center

Affiliated Companies

Domestic 15

Overseas 20

Corporate Overview (2/2)

Page 9: CTCI Corporate Presentation_Overall1-FINAL

-- 9 --

( Year ended December 31)

500

1500

2000

2500

Million US$

1000

0202 02

523

723 809

03

541

03

1554

03

1,844

Turnover New Orders Backlog

04

676956

04 04

2,109

05

972

491

05 05

1762

06

1031

2166

06 06

2821

Performance (2002-2006)

Page 10: CTCI Corporate Presentation_Overall1-FINAL

-- 10 --

Hydrocarbon

Gas Processing

Petroleum Refining

Petrochemical

Chemical

Terminal

Infra., Environ.&Power

Infrastructure

Transportation

Communication

Environment

Metal Mills

Brewery & Winery

Power Plants

Waste To Energy

Environmental & Resources

O&M and Management of Waste to Energy Plants

O&M and Management of Power Plants

Waste Management

Waste & Energy Recycling

Project Development of Waste & Energy

Business Areas

Page 11: CTCI Corporate Presentation_Overall1-FINAL

-- 11 --

Feasibility Study & Planning

Project Management

Engineering Design

Procurement

Fabrication

Construction

Commissioning

Maintenance

Activities and Services

Page 12: CTCI Corporate Presentation_Overall1-FINAL

-- 12 --

Organization Chart (1/4)

continued on next page……

Management

& Strategy

Committee

PresidentChairman

Executive

Management Office

(EMO)

Hydrocarbon

Business Operations

(HBO)

• Marketing & Sales Division• Project Division Ⅰ• Project Division Ⅱ• Project Division Ⅲ• Project Division Ⅳ• Project Service Dept. • Technology Center

• M&S Dept. (Taiwan)Ⅰ• M&S Dept. (China)Ⅱ• M&S Dept. (S.E.A./ India)Ⅲ• M&S Dept. (M.E.)Ⅳ

• Project Control Dept.

• Estimating

• Contract Management

• Project Quality & HSE

Management

• Corporate Admin. Dept.• Chief Financial Officer (CFO)

- Accounting Dept.- Finance Dept.- Investment Relationship Dept.

• H. R. Dept.• Admin. & General Services

Dept.• Planning Dept.• Legal Affairs Dept.

Page 13: CTCI Corporate Presentation_Overall1-FINAL

-- 13 --

Organization Chart (2/4)

continued on next page……

Infrastructure,

Environment

& Power

Business

Operations

(IEPBO)

• Marketing & Sales

Division• Power Projects Division• Infrastructure &

Environment Projects

Division• Project Service Div. • Technology Center

• M&S Dept. (Taiwan)Ⅰ• M&S Dept. (China) Ⅱ• M&S Dept. Ⅲ (S.E.A./ India)• M&S Dept. (M.E.)Ⅳ

• Power Dept.• Waste-to-Energy Dept.• Air Pollution Control Dept.

• Infrastructure Dept.• General Industrial Dept.• Environment Dept.

• Project Control Dept.• Estimating• Contract Management• Project Quality & HSE

Management

Management

& Strategy

Committee

PresidentChairman

Page 14: CTCI Corporate Presentation_Overall1-FINAL

-- 14 --

Organization Chart (3/4)

• Information Technology Center

• Research & Development Center

• Engineering Division

• Procurement Division

• Construction Division• Procurement Logistics• Project Procurement

Managers

• Process Engineering Dept.

• Piping Engineering Dept.

• Mechanical & Equipment Engineering Dept.

• Instrumentation & Control System Engineering Dept.

• Electrical Engineering Dept.

• Civil & Building Engineering Dept.

• Project Engineering Managers

• Planning & Proposal• Project Construction

Managers• Construction HSE

EPC &

Technical

Service

(EPCTS)

continued on next page……

Management

& Strategy

Committee

PresidentChairman

Page 15: CTCI Corporate Presentation_Overall1-FINAL

-- 15 --

Organization Chart (4/4)

• Chief Technical Officer (CTO)• Chief Information Officer (CIO)• China Regional Representative• Auditing Dept.• Q.A. & Safety Dept. • Overseas Subsidiaries• Domestic Subsidiaries

Environment

& Resources

Business

Operations

(ERBO)• HD Resources

Management

Corp.

• Sino Environmental Service

Corp.• Leading Energy Corp.• Fortune Energy Corp.• KD Holding Corp.• Administration Center

Management

& Strategy

Committee

PresidentChairman

Page 16: CTCI Corporate Presentation_Overall1-FINAL

-- 16 --

(as of DEC.2007)

Department Manpower

Executive Management 12

Project Group 607

Engineering 1,112

Procurement 101

Construction 656

IT Center 44

Budget & Operation Administration 9

QA/QC 9

Finance & Accounting 50

Human Resource 6

Administration & General Service 75

Other Supporting 20

Total 2701

Manpower

Page 17: CTCI Corporate Presentation_Overall1-FINAL

-- 17 --

CTCI Arabia, KSA

CTCI, Thailand

Jingding, China

CTCI Kaohsiung

CIMAS, VietnamCTCI, Malaysia

CIPEC, Philippines

Shang Ding, China

CTCI, Qatar

CTCI, Abu Dhabi

CTCI Taipei HQ

CTCI Worldwide Network

Page 18: CTCI Corporate Presentation_Overall1-FINAL

-- 18 --

DOMESTIC

E & C Engineering Corp.

Advanced Control & Systems Inc.

Resources Engineering Services Inc.

CTCI Chemicals Corp.

CTCI Machinery Corp.

Sino Environmental Services Corp.

KD Holding Corp.

Leading Energy Corp.

HD Resources Management Corp.

Fortune Energy Corp.

OVERSEAS

Jingding Engineering &Construction Co. Ltd. Beijing, China

Shang Ding Engineering &Construction Co. Ltd. Shanghai, China

CTCI (Thailand) Co., Ltd. Thailand

CIMAS Engineering Co., Ltd. Vietnam

CTCI Engineering & Construction Sdn. Bhd. Malaysia

CIPEC Construction, Inc., Philippine

CTCI Arabia Ltd. Saudi Arabia

CTCI Overseas Corporation Ltd.,Hong KongCTAS Corporation, USA

CTAS Corporation, USA

Major Subsidiaries & Affiliates

Page 19: CTCI Corporate Presentation_Overall1-FINAL

-- 19 --

(US$M)

A. rating Moody’s A3/S&P A- or above

International Banks (13) 481

Taiwan Banks (15) 417

Sub-Total 898

B. rating below Moody’s A3/S&P A-

Taiwan Banks (22) 331

Grand Total 1,229

Financial Capability (1/2)

Total Bank Credit (DEC 2007)

Page 20: CTCI Corporate Presentation_Overall1-FINAL

-- 20 --

(US$M)

Grand Total Bank Credit

1,229

Utilized Bank Credit

400

Available Bank Credit

829

Financial Capability (2/2)

Available Bank Credit (DEC 2007)

Page 21: CTCI Corporate Presentation_Overall1-FINAL

-- 21 --

ISO 9001

Page 22: CTCI Corporate Presentation_Overall1-FINAL

-- 22 --

ISO 14001 & OHSAS 18001

Page 23: CTCI Corporate Presentation_Overall1-FINAL

-- 23 --

CTCIEngineeringEngineering

EngineeringEngineeringEngineering

Page 24: CTCI Corporate Presentation_Overall1-FINAL

-- 24 --

Process Design

Piping Design

Civil and Building Design

Instrumentation & Control System

Electrical Design

Mechanical and Equipment Design

Project Engineering Management

Engineering Design

Page 25: CTCI Corporate Presentation_Overall1-FINAL

-- 25 --

Office Allocation

Engineering Hub

Taipei 908

Kaohsiung 170

Global Engineering Satellites

Beijing 252

Bangkok 99

Hanoi 147

Total 1,579

Kaohsiung

Taipei

Engineering Manpower (1/3)(Resources)

Beijing

Hanoi

(as of Aug. 31, 2007)

Bangkok

Page 26: CTCI Corporate Presentation_Overall1-FINAL

-- 26 --

Department Manpower

Process 107

Piping 543

Civil & Building 320

Instrumentation & Control System 178

Electrical 170

Mechanical & Equipment 201

Project Engineering Mgr 60

Total 1,579

Engineering Manpower (2/3)(Discipline Allocation)

(as of Aug. 31, 2007)

Page 27: CTCI Corporate Presentation_Overall1-FINAL

-- 27 --

Total Engineering Man-hour Spent

(Fiscal Year)

MillionMH

2002

4.0

3.5

3.0

0

3.3

2003

3.81

2004

4.24.5

2005

3.87

2006

4.31

Engineering Manpower (3/3)(Capacity)

Page 28: CTCI Corporate Presentation_Overall1-FINAL

-- 28 --

Process Flow Diagram

MechanicalDesign/Rating

Plot Plan

Foundation Design

Structural Modeling

Structural Analysisand Design

Piping Stress Analysis

Piping ArrangementProduction

Isometric ProductionInterference Detection

Model (Design)Review

2DSchematic Database

ProcessSimulation

IntelligentP&ID

InstrumentDesign

ElectricalDesign

Instrument Layout

Electrical Layout

QTO

MTO

3DDesign

Database

Piping Design/Piping Modeling

Process Equipment Design

EquipmentModeling

Multi-Discipline Engineering Design Work Flow

Page 29: CTCI Corporate Presentation_Overall1-FINAL

-- 29 --

EMS: Engineering Management System

EDMS: Engineering Document Management System

CAD/CAE: Computer Aided Design/Engineering

PMS: Procurement Management System

ContractedScope of Work

EDMS

QTO

CMS

QT O

MTO

Database

Doc

PMS

MMS

Vendor Doc

OutsideENG. Doc Dwg

EMS

Req

CAD/CAE

MMS: Material Management System

CMS: Construction Management System

MTO: Material Take Off

QTO: Construction Quantity Take Off

CAD/CAE Linked to Project MIS

Page 30: CTCI Corporate Presentation_Overall1-FINAL

-- 30 --

Material Management System

Inventory Management System

Pro

jec

t

Pro

cu

rem

en

t T

ea

m

En

gin

ee

rin

gC

on

str

uc

tio

n

EngineeringDepartment

ProcurementDepartment

RequisitionPlan

EngineeringDesign M.T.O./SUM

Establish MTO Database Generate Material Reports

Check

StockAvailability

MaterialRequisitioning

Generate BulkMaterials

Equipment Requisitions

Requisition Approval

Budgeting and Cost Control

Material Coding System

Material CodesChecking/Adding

Material Purchasing

Inquiry 、 Bid Evaluation 、P.O. 、 Delivery

MaterialReceiving

Site MaterialDispatching/ Returning

Material Management

and Warehousing

Material Management

Page 31: CTCI Corporate Presentation_Overall1-FINAL

-- 31 --

Enterprise Network

Dedicated Circuit

Router

Video Conference

VoIP Telephony

Data Communication

Internet Connection

JDEC / Beijing

SDECShanghai

Eng. / Kaohsiung

E&C / Taipei

SESC / Taipei

ACS / Taipei

RES / Taipei

Sites / Taipei

CTCI Machinery Corp. / Kaohsiung

Sites / Taiwan

HQ / Taipei

CTCI-TBangkok

Page 32: CTCI Corporate Presentation_Overall1-FINAL

-- 32 --

CTCIProcurementProcurement

ProcurementProcurementProcurement

Page 33: CTCI Corporate Presentation_Overall1-FINAL

-- 33 --

Market Survey

Inquiry and Purchasing

Inspection and Expediting

Shipping, Delivery and Claim

Permits

Banking Affairs

Customs Clearance

Insurance

Tariffs

Subcontracting

Procurement Activities & Services

Page 34: CTCI Corporate Presentation_Overall1-FINAL

-- 34 --

Total Procurement Amount

A Continuous Large Procurement Amount makes CTCI a “Powerful” Purchaser

Direct Access to Vendor’s Top Management

CTCI can Procure Equipment & Materials at very Competitive Prices

(Fiscal Year)

500

400

300

(US$M)

368

02 03

337

04

682

600

05

652

700

06

763800

Procurement Power of CTCI Group

Page 35: CTCI Corporate Presentation_Overall1-FINAL

-- 35 --

CTCICTCI Machinery CorporationCTCI Machinery Corporation

CTCI Machinery CorporationCTCI Machinery CorporationCTCI Machinery Corporation

Page 36: CTCI Corporate Presentation_Overall1-FINAL

-- 36 --

American Mechanical Society of EngineersU (certified since 1982) U2 (certified since 1982)S (certified since 1992)PP (certified since 1992)

The National Board of Boiler and Pressure Vessel InspectorsNB (certified since 1992)R (certified since 1992)

China State Bureau of Quality and Technical SupervisionSafety Quality License (certified since 1999)

CTCI Machinery Corporation Certification

Page 37: CTCI Corporate Presentation_Overall1-FINAL

-- 37 --

Towers & Drums 300 Tons/Month

Heat Exchangers 200 Tons/Month

Steel Structures 600 Tons/Month

Piping Prefabrication 30000 Dia.-in/Month

CTCI Machinery Corporation Capacity

Page 38: CTCI Corporate Presentation_Overall1-FINAL

-- 38 --

Zirconium & Zirconium-based Alloys

Aluminium & Aluminium-based Alloys

Titanium & Titanium-based Alloys

Duplex Stainless Steel

Copper & Copper-based Alloys

Copper-Nickel

Nickel

Monel

Inconel & Incoloy

Hastelloy

CTCI Machinery Corporation Excellence

Page 39: CTCI Corporate Presentation_Overall1-FINAL

-- 39 --

CTCIConstructionConstruction

ConstructionConstructionConstruction

Page 40: CTCI Corporate Presentation_Overall1-FINAL

-- 40 --

Equipment Installation & Rigging

Piping Fabrication & Erection

Steel Structure Fabrication & Erection

Electrical Installation & Wiring

Instrument Installation, Piping & Wiring

Civil & Architectural

Painting & Insulation

Construction Management

Pre-commissioning

Construction Activities & Services

Page 41: CTCI Corporate Presentation_Overall1-FINAL

-- 41 --

06

37.5

Total Construction Man-hour

Construction Management

All Disciplines

South Asia in Proven

Experience in Management

of International Workers –

Chinese, Thai, Filipino,

Vietnamese

(Fiscal Year)

30.0

20.0

10.0

MillionMH

002

15.7

03

21.7

04

24

40.0

05

38.1

Construction Capability of CTCI Group

Page 42: CTCI Corporate Presentation_Overall1-FINAL

-- 42 --

Site Organization

Manpower Mobilization & Control

Temporary Facilities & Utilities

Construction Schedule Control

Construction Equipment

Construction Procedure Planning

Procurement & Subcontracting

Quality Control & Assurance

Safety & Security

Material Control & Warehousing

Cost Control

Computer Application

Document Control

Welding Control

Office Administration

Pre-commissioning

Construction Management

Page 43: CTCI Corporate Presentation_Overall1-FINAL

-- 43 --

CTCIGlobal General ContractorGlobal General Contractor

Global General ContractorGlobal General ContractorGlobal General Contractor

Page 44: CTCI Corporate Presentation_Overall1-FINAL

-- 44 --

Product/Process Process Licensor

Oil & Gas……1

Crude Distillation (Topping) ABB Lummus

Vacuum Distillation (VDU) ABB Lummus, ExxonMobil

Catalytic Reforming ABB Lummus, Engelhard, IFP, UOP

HDS IFP, Union Oil, Haldor Topsoe

RDS Chevron, Gulf, Union Oil, UOP

Delayed Coking ABB Lummus

Visbreaker ABB Lummus

FCC / RFCC S&W, Exxon, KBR, UOP

continued on next page……

Reference w/Process Licensors (1/6)

Page 45: CTCI Corporate Presentation_Overall1-FINAL

-- 45 --

Product/Process Process Licensor

Oil & Gas……2

Hydrocracking UOP, Union Oil

Alkylation Exxon, Phillips, Stratco

Isomerization UOP

Lube Oil Badger, Chevron, Gulf, ExxonMobil

SRU Comprimo, Pritchard, Parsons, Amoco

, Technip KTI

Gasification Texaco

TAME IFP

Sweetening Merichem, UOP

Synthesis Gas Haldor Topsoe, Texaco

continued on next page……

Reference w/Process Licensors (2/6)

Page 46: CTCI Corporate Presentation_Overall1-FINAL

-- 46 --

Product/Process Process Licensor

Petrochemicals……1

Acetaldehyde Aldehyde

Acrylonitrile BP

Aromatics UOP

Bis-Phenol A Chiyoda, Idemitsu

Butadiene Extraction Nippon Zeon, ABB Lummus

Caprolactam (CPL) Stamicarbon

Cumeme CD Tech, UOP

EB / SM Mobil / Badger, ABB Lummus / UOP

EDC / VCM Solvay, Geon

EO / EG Shell, UCC, SD, Atochemcontinued on next page……

Reference w/Process Licensors (3/6)

Page 47: CTCI Corporate Presentation_Overall1-FINAL

-- 47 --

Product/Process Process Licensor

Petrochemicals……2

FA (Formic Acid) BASF

MEK (Methyl Ethyl Ketone) Arco

MMA (Methyl Mathacrylic) Comprimo, ICI, MRC

MTBE Arco, IFP, UOP

Olefins S&W, KBR, ABB Lummus

Propylene (OCT) ABB Lummus

PDH UOP

Phenol KBR, UOP, GE

PA (Phthalic Anhydride) BASF

PTA BP, Invista, Tecnimont, Hitachi

SBR B.F. Goodrich

Vinyl Acetate Bayer

continued on next page……

Reference w/Process Licensors (4/6)

Page 48: CTCI Corporate Presentation_Overall1-FINAL

-- 48 --

Product/Process Process Licensor

Polymers

LLDPE / HDPE Borealis, Mitsui Chemicals, Nissan,

Quantum, UCC

LDPE BASF, Gulf

PP Basell, BASF, Hercules

PS KHI, Nova

PVC Oxychem, FPC, Westlake

ABS Monsanto, JSR, Toray, Kumho

SAN Monsanto, Mitsui Chemicals

continued on next page……

Reference w/Process Licensors (5/6)

Page 49: CTCI Corporate Presentation_Overall1-FINAL

-- 49 --

Product/Process Process Licensor

Others

Acetic Acid BP

AG Chemicals Rohm & Haas

Chlor-Alkali Asahi Glass, Asahi Kasei, Ineos

Ion Exchange Resin Rohm & Haas, Mitsubishi Chemical

Polyol Dow Chemical

Wax Unocal

Municipal IncineratoR Martin

Reference w/Process Licensors (6/6)

Page 50: CTCI Corporate Presentation_Overall1-FINAL

-- 50 --

ABB Lummus Badger Technologies

Bechtel Fluor

Foster Wheeler Halliburton KBR

McDermort Parsons

SNC-Lavalin Stone & Webster

Aker Kvaerner Linde

Lurgi Sembcorp Simon-Carve

s

Technip Tecnicas Reunidas

Tecnimont Uhde

Chiyoda JGC

Mitsubishi Heavy Ind. Toyo Engineering

Reference w/Major E&C Firms - Hydrocarbon Related

Page 51: CTCI Corporate Presentation_Overall1-FINAL

-- 51 --

Air Products Air Liquide

Arco Asahi Kasel

BASF Basell (Montell)

Bayer BOC

BP ChevronPhillips

Ciba Specialty Dow Chemical

DuPont ExxonMobil

Huntsman (ICI PU Business) Ineos (ICI Chlor Business)

Lucite (ICI MMA business) Monsanto

Occidental Chemical PPG

Rhone-Poulenc Rohm & Haas

Shell Solvay

Ube Industries

Reference w/Major Int’l Clients - Hydrocarbon Related

Page 52: CTCI Corporate Presentation_Overall1-FINAL

-- 52 --

Alstom

Electrowatt

Parsons Brinkerhoff

Pacific Consultant International

Systra

Sofretu

TYLin International

Reference w/Major E&C Firms - Infra., Environ. & Power Related

Page 53: CTCI Corporate Presentation_Overall1-FINAL

-- 53 --

Alstom Jet Tech

ABB MHI

ADI MBEL

B&W Volund

CH2M HILL TSK

Chube Electric Toshiba

Hitachi Siemens

IHIGE

Reference w/Major Int’l Clients - Infra., Environ. & Power Related

Page 54: CTCI Corporate Presentation_Overall1-FINAL

-- 54 --

CTCIMajor Project ReferenceMajor Project Reference

Major Project ReferenceMajor Project ReferenceMajor Project Reference

Page 55: CTCI Corporate Presentation_Overall1-FINAL

-- 55 --

No. of Project

Crude Distillation (Topping) 12

Vacuum Distillation 6

Reformer/CCR 6

FCC/RFCC 7

Hydrocracker 5

HDS/RDS 28

SRU/SRU Tail Gas Treating 29

Alkylation/Isomerization 8

MTBE/TAME 5

Visbreaking/Delayed Coking 4

Lube Oil/Condensate processing 6

Synthesis Gas 14

TOTAL 130

Experience Summary - Refinery

Page 56: CTCI Corporate Presentation_Overall1-FINAL

-- 56 --

No. of Project

Olefins 17

Aromatics 8

Butadiene Extraction 5

Acetaldehyde 1

Carbon Black 5

EDC/VCM 2

EO/EG 8

Methyl Methacrylate (MMA) 7

Acrylonitrile (AN) 1

EB/SM 5

Cumene/Phenol/Bis-Phenol A 9

CPL 2

PTA 20

Other 50

Total 140

Experience Summary - Petrochemical

Page 57: CTCI Corporate Presentation_Overall1-FINAL

-- 57 --

Polyethylene (LLDPE/LDPE/HDPE) 11

Polyvinyl Chloride (PVC) 5

Polypropylene (PP) 11

Polystyrene (PS) 2

ABS/SAN 11

SBR/BR/TPE 6

Spandex/PTMG 3

Acryllc Fiber Polyester 2

Total 51

Experience Summary - Polymer

No. of Project

Page 58: CTCI Corporate Presentation_Overall1-FINAL

-- 58 --

No. of Project

Co-generation 15

Combined Cycle 23

Fossil 11

Nuclear 15

Power Transmission & Distribution 17

Total 81

Experience Summary - Power

Page 59: CTCI Corporate Presentation_Overall1-FINAL

-- 59 --

No. of Project

Glass Industry 2

Air Separation Unit (ASU) 15

Pulp & Paper 2

Electronics Business 30

Iron Making 9

Steel Making 7

Hot Rolling Mill 5

Cold Rolling Mill 8

Non-Ferrous 3

Utility 10

Storage and Terminal 25

Pipeline 11

Total 127

Experience Summary - General Industry

Page 60: CTCI Corporate Presentation_Overall1-FINAL

-- 60 --

No. of

Project

High Speed Railway 28

Massive Rapid Transit (MRT) 37

Freeway, Tunnel and Road Work 19

Others 11

Total 95

Experience Summary - Transportation

Page 61: CTCI Corporate Presentation_Overall1-FINAL

-- 61 --

No. of Project

SCR De Nox 83

Flue Gas Desulfurization (FGD) 8

Electrostatic Precipitator (EP) 8

Water and Waste Water Treatment 17

Solid/Liquid Waste Treatment (Incinerator) 34

Environment Impact Assessment 19

Air Quality Management / Planning 5

Noise Abatement and Vibration Control l5

Soil and Ground Water Remediation 15

Industrial & Environmental Safety Monitoring 16

Total 220

Experience Summary - Environmental

Page 62: CTCI Corporate Presentation_Overall1-FINAL

-- 62 --

CTCICTCI Operation

In Taiwan

CTCI Operation

In Taiwan

Page 63: CTCI Corporate Presentation_Overall1-FINAL

CTCI’s Experience in Taiwan(From Jan.2000 to Jun.2007)

CPC Tao-Yuan Refinery

FPG Complex

CPC Kao-Hsiung Refinery

Ta-Lin Petrochemical Complex

Ta-Sheh, Jen-Wu Petrochemical ComplexLin-Yuan Petrochemical Complex

▲▲

▲GGPC Complex

FCFC, Aroma 3 ProjectFPCC, Lube Base Oil (LBO) Project

▲Tai-Chung Harbor

CPC,LNG Receiving Terminal Project

CPC, Diesel HDS ProjectCPC, Jet Fuel Treating ProjectCPC, N-Paraffins ProjectCPDC, Caprolactam III Project

CPC, Alkylation Project

TSMC, EB-1 EBMax ProjectOUCC, EC ProjectOUCC, EA ProjectOUCC, EO/EG ProjectTPCC, AMS Recovery Project

FPCC, Olefin 3 ProjectFPCC, Refinery Complex ProjectFPCC, RCC ProjectFPCC, Diesel HDS ProjectFPC, MMA Project GGPC EIS Service Project

CAPCO, No.6 PTA Project

Page 64: CTCI Corporate Presentation_Overall1-FINAL

-- 64 --

continued on next page……

Client Location Project Scope Completion

Chinese Petroleum Tai-Chung Northern LNG EPC Progressing

Corporation Receiving Terminal

Formosa Petrochemical Mai-Liao, KHU Fired Heaters EPC Progressing

Corporation Yun-Lin 29.67 MMKcal/Hr

Formosa Petrochemical Mai-Liao, Lube Base Oil C Progressing

Corporation Yun-Lin 9,000 BPSD

Formosa Chemicals Lon-Der, IPA Plant E Progressing

& Fibre Corporation Yi-Lan 300,000 MTA

Formosa Petrochemical Mai-Liao, LNS/SLP-3/LPF-2 E 2007

Corporation Yun-Lin

Formosa Petrochemical Mai-Liao, PRU-2/OCT E 2007

Corporation Yun-Lin

JGC Formosa Chemicals Mai-Liao, ARO-3 Plant E+C 2007

& Fibre Corporation Yun-Lin 1,271,000 MTA

Major Reference – Taiwan (1/4)

Page 65: CTCI Corporate Presentation_Overall1-FINAL

-- 65 --

continued on next page……

Client Location Project Scope Completion

Formosa Chemicals Mai-Liao, ARO-3 Fired Heaters EPC 2007

& Fibre Corporation Yun-Lin 480.68 MMKCal/Hr

Formosa Chemicals Mai-Liao, SM-3 Fired Heaters EPC 2007

& Fibre Corporation Yun-Lin 66.4 MMKcal/Hr

Formosa Petrochemical Mai-Liao, Olefin 3 Plant E+C 2007

Corporation Yun-Lin 1,200,000 MTA

Taiwan Styrene Lin-Yuan, EB-1 EBMax Project EPC 2006

Monomer Corporation Kao-Hsiung

Formosa Chemicals Mai-Liao, Phenol Revamping E+C 2005

& Fibre Corporation Yun-Lin 400,000 MTA

Formosa BP Chemicals Mai-Liao, Acetic Acid E 2005

Corporation Yun-Lin 300,000 MTA

JGC Corporation CPC Tao-Yuan Alkylation EPC 2003

Refinery 8,600 BPSD

Major Reference – Taiwan (2/4)

Page 66: CTCI Corporate Presentation_Overall1-FINAL

-- 66 --

continued on next page……

Client Location Project Scope Completion

Chinese Petroleum Kao-Hsiung Diesel HDS EPC 2003

Corporation 20,000 BPSD

Chinese Petroleum Ta-Lin, Jet Fuel Treating EPC 2003

Corporation Kao-Hsiung 18,000 BPSD

Chinese Petroleum Ta-Lin, N-Paraffins EPC 2003

Corporation Kao-Hsiung 130,000 MTA

China American Tai-Chung No.6 PTA Project EPC 2003

Petrochemical Co., Ltd 700,000 MTA

Chang Chun Kao-Hsiung Phenol Project E 2002

Petrochemical Co., Ltd 200,000 MTA

Formosa Petrochemical Mia-Liao, Olefin-1 Revamping C 2002

Corporation Yun-Lin 700,000 MTA

Formosa Asahi Mai-Liao, PTMG II Expansion C 2002

Spandex Co., Ltd Yun-Lin 14,000 MTA

Major Reference – Taiwan (3/4)

Page 67: CTCI Corporate Presentation_Overall1-FINAL

-- 67 --

Client Location Project Scope Completion

Nan-Ya Plastics Mai-Liao, BPA II Project C 2001

Corporation Yun-Lin 100,000 MTA

Oriental Union Lin-Yuan, EC Project EPC 2001

Chemical Corporation Kao-Hsiung 40,000 MTA

Oriental Union Lin-Yuan, EA Project EPC 2000

Chemical Corporation Kao-Hsiung 40,000 MTA

Oriental Union Lin-Yuan, EO/EG Project EPC 2000

Chemical Corporation Kao-Hsiung 180,000 MTA

China Petrochemical Kao-Hsiung Caprolactam Project EPC 2000

Development Corporation 120,000 MTA

Taiwan Prosperity Lin-Yuan, AMS Recovery EPC 2000

Chemical Corporation Kao-Hsiung 130,000 MTA

Major Reference – Taiwan (4/4)

Page 68: CTCI Corporate Presentation_Overall1-FINAL

-- 68 --

CTCICTCI Operation

In China

CTCI Operation

In China

Page 69: CTCI Corporate Presentation_Overall1-FINAL

-- 69 --

Jingding Engrg. & Const. Co., Ltd. - Corporate Overview

Established in 1993

Capital RMB 14M

Turnover (2006) USD 6M

Share Holders

CTCI Overseas, HK 100%

Offices

Beijing Head Offices

Number of Employees 410

New Orders (2006) RMB 82M

Turnover (2006) RMB 47M

Current Backlog (2006) RMB 64M

Page 70: CTCI Corporate Presentation_Overall1-FINAL

-- 70 --

Local Expatriate

Jingding Engrg. & Const. Co., Ltd. - Manpower Resources

Management 14 2

Project Group 24 3

Engineering 348 1- Process 15- Piping 140 - Equipment 37- Civil & Structure 80- Instrument 35- Electrical 35- IT center 6

Procurement 8

Construction 16 1

TOTAL 410 7

Page 71: CTCI Corporate Presentation_Overall1-FINAL

-- 71 --

Jingding Engrg. & Const. Co., Ltd. - Certificates

The First Class Design Institute for

Petrochemical and Chemical Industries

(No. 0109011)

Pressure Vessel Design

(No. RSP ZSH( 三 ) – 050)

Page 72: CTCI Corporate Presentation_Overall1-FINAL

-- 72 --

Page 73: CTCI Corporate Presentation_Overall1-FINAL

-- 73 --

Page 74: CTCI Corporate Presentation_Overall1-FINAL

-- 74 --

Jingding Engrg. & Const. Co., Ltd. - Business License (No.000335)

Page 75: CTCI Corporate Presentation_Overall1-FINAL

-- 75 --

Shang Ding Engrg. & Const. Co., Ltd. - Corporate Overview

Established in 2003

Capital RMB 52M

Share HoldersCTCI Overseas, HK 52%

E&C Engineering Corp. 48%

Offices Shanghai

Number of Employees 172

New Orders (2005) RMB 119M

Turnover (2005) RMB 109M

Current Backlog (2005) RMB 367M

Page 76: CTCI Corporate Presentation_Overall1-FINAL

-- 76 --

Shang Ding Engrg. & Const. Co., Ltd. - Certificates

Class A EPC General Contractor for Mechanical & Electrical

Construction

Class A EPC General Contractor for Environmental Engineering

Class B EPC General Contractor for Building Construction

Class B EPC General Contractor for Petrochemical Industries

Class B EPC General Contractor for Infrastructure

Class B General Contractor for Electrical Construction

Class B General Contractor for Municipal Engineering

Page 77: CTCI Corporate Presentation_Overall1-FINAL

-- 77 --

Page 78: CTCI Corporate Presentation_Overall1-FINAL

-- 78 --

Shang Ding Engrg. & Const. Co., Ltd. - Business License (No.034332)

Page 79: CTCI Corporate Presentation_Overall1-FINAL

-- 79 --

Shang Ding Engrg. & Const. Co., Ltd. - Business Areas

InfrastructureWater / Wastewater Treatment

Air Pollution Control

Waste-To-Energy

Power Plants

High TechHigh Tech Industries

Biotech

MEP for Hospital

Information Technology & AutomationIntegration of Computer, Communication and Control

Environmental Monitoring

Transportation Control

High Tech Products Agent

Software Engineering

Page 80: CTCI Corporate Presentation_Overall1-FINAL

CTCI’s Experience in ChinaO2 Generation System - Jilin

SAN II Project - Zhenjiang

Ag Plant - Nantong

PVC Plant - Suzhou

IER Project - Shanghai

PU System House - Shanghai

LPG Terminal - Quanzhou

CP-1 Power Plant DeNox System -ZhangzhouDry Film Resin Plant - Zhongshan

PTA Plant - Zhuhai

PPAM Plant - Hong Kong

PTA Plant -Xiamen, Fujian

ABS II Plant – ZhenjiangWest-East Natural Gas Pipeline – Nanjing

LDPE Project – Nanjing

C1 Project – Nanjing

EO/EG Project – Huizhou

AF Project – Ningbo

MMA Project – Shanghai

SAR Project – Shanghai

Liquid Waste Incinerator –Huizhou

PVDC Project – Nantong

LNG Project - Shanghai

44

45

46

4847

Carbon Black Plant - Zhangjiagang

Chromium Sulfate Project - Suzhou

Multi - Product Resins - Shanghai

Epoxy Plant – Panyu, Guangdong

24

27

25

PMMA Project - Zhenjiang

PFA Plant - Zhenjiang

SBR Project - Nantong

Ethylene Plant Expansion – Shanghai

PVC Plant – Ningbo

PTA Plant - Ningbo

ABS Plant - Ningbo

PTA Plant - Xiamen, Fujian

Relocation of O2 Plant – Guangdong

MMA Project – Shanghai

PVC Plant – Zibo

IIP Project – Shanghai

PTA Plant – Shanghai

PTA Plant Revamping – Xiamen, Fujian

ABS III Plant – Zhenjiang

EB/ SM Plant – Dushanzi, Xinjiang

TiO2 Plant – Shangdong

BR Plant – Nantong

SEBS Plant – Nantong

FCC Plant – Qinzhou, Guangxi

28

29

26

31

30

32Beijing

Kaohsiung

JDEC

CTCI H.Q.

CTCI Overseas Liaison Office

SDEC

1

Nanjing Shanghai

Hong Kong

Taipei

44

272

263

4528

8

9

11

654

7

3147

2610

12Xiamen

Guangzhou

13

46

48

29

14 15

24

33

2

3

4

5

6

7

8

9

1

10

11

12

13

14

15

16

17

33

3416

17

34

18

19

20

21

22

35

18 3025

35

32

19 20

21

22

36

37

35

36

38

40

39

40

41 42

23

4123

38

EPC LSTK

ENG’G

COST ESTIMATE

CONSTR. MGT

Additive Project - Shanghai

42

4343

Page 81: CTCI Corporate Presentation_Overall1-FINAL

-- 81 --

Client Location Project Scope Completion

ZGPC Chemical Zhanjiang, ABS III Plant ED Ongoing

Jiangsu 100,000 MTA

Stone & Webster Dushanzi EB/SM Plant EB Ongoing

Xinjiang 320,000 MTA

E.I. du Pont (DuPont) Dongying, TiO2 Plant EPsCM Ongoing

Shangdong 200,000 MTA

TSRC (Nantong) Nantong, BR Plant EB Ongoing

Jiangsu 72,000 MTA

TSRC (Nantong) Nantong, SEBS Plant EB & ED Ongoing

Jiangsu 20,000 MTA

Shanghai LNG Company Shanghai Shanghai LNG EPC Ongoing

3,000,000 MTA

continued on next page……

Major Reference – China (1/8)

Page 82: CTCI Corporate Presentation_Overall1-FINAL

-- 82 --

__Client Location Project Scope Completion

PetroChina Qiangzhou, FCC Plant FEED Ongoing

Guangxi Guangxi 3,500,000 MTA

Petrochemical

Company

Oriental Pudong, PTA Plant EPsCM 2006

Petrochemical Shanghai 600,000 MTA

Formosa Petrochemical Ningbo, PP Plant ED 2006

Corp. Zhejiang 300,000 MTA

Formosa Chemicals Ningbo, ABSII Plant ED 2006

& Fibers Crop. Zhejiang 125,000 MTA

BASF/Huntsman Caojing, Integrated EPsCM 2006

3 JVs Shanghai Isocyanates

Project

Major Reference – China (2/8)

continued on next page……

Page 83: CTCI Corporate Presentation_Overall1-FINAL

-- 83 --

Client Location Project Scope Completion

BASF-YPC Nanjing, C1 Units EPC 2005

Jiangsu - FA:50,000 MTA

- PA:30,000 MTA

- MA:30,000 MTA

- DMF:30,000 MTA

Ningbo Rayon Ningbo, Acrylic Fiber EPC 2005

Acrylic Fiber Zhejiang Project 50,000 MTA

Lucite Caojing, MMA Plant EPC 2005

Shanghai 90,000 MTA

Shanghai Secco Caojing, SAR Plant EPC 2005

Petrochemical Shanghai 278,000 MTA

CNOOC and Shell Huizhou, Liquid Waste EPC 2005

Petrochemicals Guangdong Incinerator

Formosa Chemicals Ningbo, IPA Plant ED 2005

& Fibers Zhejiang 600,000 MTA

continued on next page……

Major Reference – China (3/8)

Page 84: CTCI Corporate Presentation_Overall1-FINAL

-- 84 --

continued on next page……

Client Location Project Scope Completion

Formosa Zhangzhou, CP-1 Power EPC 2005

Petrochemical Fujian Plant DeNox System

Petrochemical Fujian Revamp to E 2005

1,200,000 MTA

Nantong SKT New Nantong, PVDC Project EPC 2005

Materials Jiangsu 10,000 MTA

BASF-YPC Nanjing, LDPE Plant EPC 2005

Jiangsu 400,000 MTA

CNOOC and Shell Huizhou, EO/EG Plant EPC 2005

Petrochemicals Guangdong 320,000 MTA

Formosa Plastics Ningbo, PVC Plant E 2004

Xiang Lu Xiamen, PTA Plant EB 2004

Major Reference – China (4/8)

Page 85: CTCI Corporate Presentation_Overall1-FINAL

-- 85 --

continued on next page……

Major Reference – China (5/8)

___Client Location Project Scope Completi

on

China Petroleum Nanjing, West-East EPC 2003

Pipeline Engineering Jiangsu Natural Gas

Pipeline Tunnel

Crossing River

Project

Lucite Caojing, MMA Plant E 2003

Shanghai 90,000 MTA Phase I

SAR Plant

278,000 MTA

Qilu Petrochemical Zibo, S-PVC Plant EB 2003

Shangdong 400,000 MTA

Formosa Chemicals Ningbo, ABS Plant E 2003

& Fibers Zhejiang 120,000 MTA

ZGPC Chemical Zhengjiang, ABS II Plant EPC 2002

Jiangsu 30,000 MTA

Page 86: CTCI Corporate Presentation_Overall1-FINAL

-- 86 --

continued on next page……

Major Reference – China (6/8)

___Client Location Project Scope Completio

n

Xiang Lu Xiamen, PTA Plant EPC 2002

Petrochemical Fujian 900,000 MTA

Rohm & Haas Nantong, Ag Chemical EPC 2001

Nantong Chemical Jiangsu Plant 8,000 MTA

(incl’d EB for OSBL)

Shanghai Shanghai Ethylene Plant EB 2001

Petrochemical Revamping &

Expansion to

700,000 MTA

LCY Chemical Zhengjiang, PFA Plant E 2001

Jiangsu 15,000 MTA

ZGPC Chemical Zhenjiang, SAN-II Plant EPC 2000

Jiangsu 30,000 MTA

Rohm & Haas Shanghai IER Plant EPC 1999

Shanghai Chemical 13,710 MTA

(incl’d EB for OSBL)

Page 87: CTCI Corporate Presentation_Overall1-FINAL

-- 87 --

continued on next page……

Major Reference – China (7/8)

Client Location Project Scope Completi

on

Suzhou Huasu Suzhou, PVC Plant E-C 1999

Plastics Jiangsu 100,000 MTA

LCY Chemical Zhenjiang, PMMA Plant EB 1999

Jiangsu 25,000 MTA

Montell-TPP China Hong Kong PPAM Plant EPC 1999

Advanced Polymer 6,000 MTA

Fujian Huaxing Quanzhou, LPG Terminal EPC 1998

Petrochemical Fujian 2 x 25,000 M3

Shanghai CIBA Gao Shanghai Additive Project CM 1997

Qiao Chemical

ICI Polyurethane Shanghai PU System EPC 1996

House

Jihua Petrochemical Jilin Oxygen EPC 1995

Generation System

Page 88: CTCI Corporate Presentation_Overall1-FINAL

-- 88 --

Major Reference – China (8/8)

Client Location Project Scope Completi

on

Taiwan Synthetic Nantong SBR Plant EB 1995

Rubber Chemical Jiangsu 100,000 MTA

Air Products Shekou Relocation of E 1992

Guangdong Oxygen Plan

Legend: EB – Basic Engineering ED – Detailed Engineering P – Supply Ps - Procurement Service C – Construction CM - Construction Management

Page 89: CTCI Corporate Presentation_Overall1-FINAL

-- 89 --

CTCICTCI Operation

In Thailand

CTCI Operation

In Thailand

Page 90: CTCI Corporate Presentation_Overall1-FINAL

-- 90 --

Established in 1987

Capital Baht 100 Million

Revenues (2006) Baht 1,396 Million

Revenues (up to March 2007) Baht 476 Million

Number of Employees 400+

Shareholders

Thais 51%

CTCI Corporation 49%

Offices

Bangkok Head Office and Engineering Office

Rayong Eastern Province Operation Center (EPOC)

- Construction and Fabrication Base

CTCI(Thailand)Co., Ltd. Corporate Overview

Page 91: CTCI Corporate Presentation_Overall1-FINAL

-- 91 --

BanpanKongBanpanKong

Nakhon SawanNakhon Sawan

LampangLampang

SrirachaSriracha

Khon KaenKhon Kaen

Nakong PathongNakong Pathong

TOC C2 Cold Train and C3 Train

Vinythai VCM Plant

MPKC (“Bayer”) ABS/SAN Plant

Amata 170 MW CCPP Piping Work

Bayer BPA & PC II Expansion Mechanical Work

TPC-OXY PVC Paste Resin Plant

HMC PP-I Upgrading; PP-II; Year 2001 & 2002 Debottleneck

TIG ASU 400 TPD

Tuntex PTA Plant ISBL; Waste Gas Venturi Scrubber; RVF

Maxxis Rubber Tire Plant

Bangchak Gas Oil HDS

PPG Coatings Plant

CTCIT Bangkok OfficeCTCIT Bangkok Office

CTCIT EPOC Work ShopCTCIT EPOC Work Shop

Rayong Purifier Topping Unit

Diapolyacrylic PMMA Plant

HMC PDH Plant

Thai MMA TBA #2 and New MMA Tank

Rohm & Haas PAA Plant

RayongRayong

Thai Oil New Gas Turbine

PTTUT CUP 1

Bangchak Product Quality Improvement Project

BangkokBangkok

PPCL Phenol Project

Major Reference in Thailand

Page 92: CTCI Corporate Presentation_Overall1-FINAL

-- 92 --

continued on next page……

Client Project Scope Completion

HMC - PDH Project EPC Ongoing

Bangckak Petroleum - Product Quality Improvement EPC Ongoing

PPCL - PTT Phenol Project EPC Ongoing

PTT Chem Co. - Cluster Flare Project EPC Ongoing

Thai Oil Co. - GTG/HRSG Project EPC Ongoing

PTT Utility Co. - CUP 1 Phase 4 EPC Ongoing

PTT Utility Co. - CUP 1 Phase 3 EPC Ongoing

PTT Utility Co. - CUP 1 Phase 1&2 EPC 2006

Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction

Major Reference – Thailand (1/7)

Page 93: CTCI Corporate Presentation_Overall1-FINAL

-- 93 --

continued on next page……

Client Project Scope Completion

Mitsubishi Corp. - BLCP Power Plant Visitor Center EPC 2006

MAXXIS - Rubber Tire Phase I Stage 2 C 2006

TSL - TSL Expansion EPC 2005

Thai Olefins Co., - New Parallel C3 EPC 2005

SIEMENS - Piping Work for IPT Power EPC 2004

Plant for CT#2

Thai Caprolactam - Oxime Dehydration Unit EPC 2004

Thai Olefins Co., - Air Oxidation Unit EPC 2004

Bangkok Industrial - BIGIII Liquifier Upgrade EPC 2004 Gases Project

Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction

Major Reference – Thailand (2/7)

Page 94: CTCI Corporate Presentation_Overall1-FINAL

-- 94 --

continued on next page……

Client Project Scope Completion

SIEMENS - Piping Work for IPT Power EPC 2004

Plant

Thai Olefins Co., - New Parallel Cold Train EPC 2004

Tuntex - CTA-RVF Project EPC 2004

MAXXIS International - Rubber Tire Plant C 2004

Thai Caprolactum Co., - New Train of NH3 Oxidizer EPC 2003

HMC - Deduster Project EPC 2003

Cementhai / SMPC - P-Xylene Tank Project EPC 2003

Thai Industrial Gas - Steel Structure and Pipe Line C 2003

Thai Polyethylene Co., - R-1 Expansion Project EPC 2002

Thai Polyethylene Co., - Low Polymer Transfer Line EPC 2002

Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction

Major Reference – Thailand (3/7)

Page 95: CTCI Corporate Presentation_Overall1-FINAL

-- 95 --

Legend:

E – Engineering P – Procurement Ps - Procurement Service

C – Construction CM - Construction Management

Client Project Scope Completion

Peroxythai - Distillation Upgrade EPC 2002

Tuntex - Feasibility Study for Plant E 2002

Expansion

Thai Polyethylene Co., - LLDPE Modification Project EPC 2002

Thai Olefins Co., - New Ethylene Recovery EPC 2001

Compressor Installation

HMC Polymers - Year 2002 Debottleneck EPC 2001

- Year 2001 Debottleneck EPC 2001

Bayer Polymer - BPA and PC II Expansion

- PC II Mechanical Work C

2001

Major Reference – Thailand (4/7)

Page 96: CTCI Corporate Presentation_Overall1-FINAL

-- 96 --

Client Project Scope Completion

Thai MMA New MMA Tank EPC 2001

Thai MMA TBA #2 EPC 2001

Diapolyacrylic PMMA Plant Modification EPC 2001

PPG Coatings Coating Plant Modification EPC 2001

Tuntex PTA Plant Waste Gas EPC 2000

Petrochemicals Venturi Scrubber

Siam Styrene SM Furnace Modification C 2000

Monomer

The Aromatics Admin. Bldg. Extension EPC 2000

Thailand

Rohm & Haas Poly Acrylic Acid Plant EPC 1999

Chemical 22,000 MTA

Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction

Major Reference – Thailand (5/7)

Page 97: CTCI Corporate Presentation_Overall1-FINAL

-- 97 --

Client Projec Scope Completi

Rayong Purifier Fired Heater for Purifier Unit EPC 1998

17,000 BPSD

Siemens Power Gen/ 170 MW CCPP Piping Work EPC 1998

Amata-EGCO Power

Thai Industrial Gases ASU 400 TPD EPC 1997

Rayong Purifier Purifier Unit 17,000 BPSD E 1997

Siam Styrene SM Fire Heater C 1996

Monomer

TPC-OXY PVC Paste Resin Plant EPC 1996

25,000 MTA

Thai Oil HCU-2 Piping Work C 1996

HMC Polymers PP-II Plant 170,000 MTA EPC 1996

Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction

Major Reference – Thailand (6/7)

Page 98: CTCI Corporate Presentation_Overall1-FINAL

-- 98 --

Client Project Scope Completion

Grand Pacific ABS/SAN Plant Expansion EPC 1995

Chemical 18,000 MTA

HMC Polymers PP-I Plant Upgrading EPC 1995

Vinythai VCM/Chlorine Plant 140,000 EPs 1995

MTA

Bayer Polymer ABS/SAN Plant 46,000 MTA EPs 1995

(was “MPKC”)

Tuntex Petrochemicals PTA Plant 350,000 MTA ISBL EPC 1995

Thai Oil Various Construction Work C 1994

Bangchak Petroleum Gas Oil HDS 18,000 BPSD EPC 1993

Bangchak Petroleum Plant No. 2 Modification E 1992

Thai Oil Sriracha Refinery Expansion C 1989

(TOC II)

Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction

Major Reference – Thailand (7/7)

Page 99: CTCI Corporate Presentation_Overall1-FINAL

-- 99 --

CTCICTCI Operation

In Vietnam

CTCI Operation

In Vietnam

Page 100: CTCI Corporate Presentation_Overall1-FINAL

-- 100 --

Established in July 2001

Registered Capital USD 5M

Share Holders

- CTCI Overseas, HK 50%

- LILAMA, Vietnam 33%

- Sincerity Eng’g., Taiwan 17%

Office Hanoi

Number of Employees 157

New Orders (2006) USD 6.6M

Turnover (2006) USD 2.5M

Current Backlog USD 7.0M

CIMAS Engineering Co., Ltd. Corporate Overview

Page 101: CTCI Corporate Presentation_Overall1-FINAL

-- 101 --

Phu My 3 Power PlantPiping Design & Field Engineer

7km Phu My-Go Dau pipelineInstrument Design

Na Duong Power Plant (2x50MW)Electrical Design

Dung Quat Refinery Package 2&3Detail Design

Van Tri Waste WaterTreatment PlantPiping Design

Dung Quat Refinery-BuildingWorksDesign

Condensate Processing PlantPiping, Civil Design

& Field Engineer

Kim Lien & Truc Bach Waste Water TreatmentPiping Design

Ca Mau 1 & 2 Power PlantPiping

Design,Procure,Construction

Da Nhim RehabilitationField Engineer

Major Reference in Vietnam

Page 102: CTCI Corporate Presentation_Overall1-FINAL

-- 102 --

__Client Project Scope Completio

n

MHI Da Nhim Rehabilitation E Ongoing

TPGM Dung Quat Refinery Project E Ongoing

(Building Work for P1, P2 & P3)

MHI/MC Omon 1A Thermal Power Plant E Ongoing

Siemens Ca Mau I&II CCPP Piping Work EPC Ongoing

Petro-Vietnam Condensate Process Plant EPC 2006

Petroleum

Development Co.

EBARA Kim Lien & Truc Bach E 2005

Waste Water Treatment

Major Reference – Vietnam (1/3)

Page 103: CTCI Corporate Presentation_Overall1-FINAL

-- 103 --

Client Project Scope Completion

ECC 45-1 7 Km Pipeline-Phu My Go Dau E 2004

(Low Pressure Pipeline)

Siemens Phu My 3 CCPP Piping Work EPC 2004

EBARA Van Tri Waste Water E 2003

Treatment Plant

LILAMA Na Duong 2x50MW Power Plant E 2003

ZNSM Dzung Quat Refinery E Put on holdPackage 2 & 3

Major Reference – Vietnam (2/3)

Legend: E – Engineering P – Supply Ps - Procurement Service C – Construction CM - Construction Management

Page 104: CTCI Corporate Presentation_Overall1-FINAL

-- 104 --

CTCICTCI ReferenceIn Singapore, Malaysia, Indonesia & The Philippines

CTCI ReferenceIn Singapore, Malaysia, Indonesia & The Philippines

Page 105: CTCI Corporate Presentation_Overall1-FINAL

-- 105 --

Titan Butadiene/Propylene Plant

Kuala Lumpur

Johor Bahru

Melaka

Titan OSBL Pipelines Project

Titan PP Plant

Malaysian Refining Co.PSR-II Melaka Refinery

Teluk Gong Panglima PowerCCGT Piping Project

Major Reference in Malaysia

Page 106: CTCI Corporate Presentation_Overall1-FINAL

-- 106 --

San Lorenzo 500 MW Piping

Petron / Gas Oil Hydrotreater #3 and Isomerization Unit

Batangas

Manila

Bataan

Major Reference in the Philippines

Page 107: CTCI Corporate Presentation_Overall1-FINAL

-- 107 --

JurongJurong

SeletarSeletar

Singapore

Esso / Power System Expansion

Esso / Propane Recovery fro

m CVS

PUB / Senoko Power Station Fuel Oil Tank Facility

PUB / Senoko Power StationElectrochlorination System

SRC /Visbreaker Project &

Catalytic

PUB / Jurong Power Station 2x100MW Gas Turbine Construction Work

SRC / HCU-2 Project Piping Work

SRC / RCC Project Piping Work

Chevron / Lube Oil Additive Engineering Work

Major Reference in Singapore

Page 108: CTCI Corporate Presentation_Overall1-FINAL

-- 108 --

continued on next page……

Client Project Scope Completion

Singapore……1

Chevron Chemical Lube Oil Additive E 1997

Singapore Refinery RCC Project Piping Work C 1995

Singapore Refinery HCU-2 Project Piping Work C 1986

PUB Jurong Power Station 2x100MW C 1986Gas Turbine Construction Work

Reference – Singapore, Malaysia,Indonesia & the Philippines (1/4)

Page 109: CTCI Corporate Presentation_Overall1-FINAL

-- 109 --

Client Project Scope Completion

Singapore……2

PUB Senoko Power Station EPC 1985Electrochlorination System

Esso Refinery Propane Recovery from CVS EPC 1985

PUB Senoko Power Station Fuel Oil EPC 1984Tank Facility

Esso Refinery Power System Expansion EPC 1983

Singapore Refinery Visbreaker Project & Catalytic E-C 1983Reformer Piping Work

continued on next page……

Reference – Singapore, Malaysia,Indonesia & the Philippines (2/4)

Page 110: CTCI Corporate Presentation_Overall1-FINAL

-- 110 --

Client Project Scope Completio

n

Malaysia

Titan Petchem (M) Butadiene/Propylene Project, EPC Ongoing Pasir Gudang

Teluk Gong Panglima Panglima CCGT Piping Work, EPC 2002 Power Co. Melaka

Titan Petchem (M) OSBL Pipelines, Pasir Gudang EPC 2000

Titan Petchem (M) PP Plant 100,000 MTA, E 1991Pasir Gudang

Malaysian Refining PSR-II Melaka Refinery E 1996

continued on next page……

Reference – Singapore, Malaysia,Indonesia & the Philippines (3/4)

Page 111: CTCI Corporate Presentation_Overall1-FINAL

-- 111 --

Client Project Scope Completion

Philippine

Petron Gas Oil Hydrotreater #3 EPC 2005

22,000 BPSD and Isomerization

Unit 11,000 BPSD

Petron Gas Oil Hydrotreater #3 F.S. 2002

22,000 BPSD

Basic Engrg.

First Gas Power San Lorenzo 500 MW Piping EPC 2002

Work, Batangas

Legend: E – Engineering P – Procurement Ps - Procurement Service C – Construction CM - Construction Management

Reference – Singapore, Malaysia,Indonesia & the Philippines (4/4)

Page 112: CTCI Corporate Presentation_Overall1-FINAL

-- 112 --

CTCICTCI Operation

In The Mid East

CTCI Operation

In The Mid East

Page 113: CTCI Corporate Presentation_Overall1-FINAL

-- 113 --

2

3

4

5

6

7

8

9

1

10

11

12

13

14

15

Riyadh Refinery Plant Expansion-KSA

Yanbu Domestic Refinery-KSA

Yanbu Export Fuel Refinery-KSA

Yanbu Lube Oil Refining (Luberef II)-KSA

EG & Polymer Plant-KSA

Ethylene Plant-KSA

EG & LLDPE Plant-KSA

LNG Plant-Qatar

Methanol & MTBE Plant-Qatar

Fertilizer Plant Urea Quality Improvement-KSA

ABS/SAN Plant - Iran

Ethylene Plant Expansion- Qatar

Hydro-Chlorination Generation Unit-KSA

Riyadh Water Transmission System Pumping Station -KSA

1

4 57

8

91013

11 12 15

3

14

2

6

Aqaba Fertilizer Plant- Jordan

UAEUAE

QATARQATAR

16 Saudi Kayan EO/EG Project- KSA

16

Major Reference in Middle East

Page 114: CTCI Corporate Presentation_Overall1-FINAL

-- 114 --

Client Location Project Scope Completion

Saudi Kayan Jubail, Saudi Kayan EO/EG EPC OngoingPetrochemical KSA Project Company

Qatar Petrochemical Mesaieed, Ethylene Plant EPC OngoingCo., (QAPCO) Qatar Expansion

525,000 MTA to 720,000 MTA S&W Process

Ghaed Bassir Golpayegan, Iran ABS/SAN Plant EPCM 2004Petrochemical Co., Ltd ABS: 35,000 MTA

SAN: 22,000 MTA Kumho Process

Al Jubail Fertilizer Co. Jubail, Fertilizer Plant Urea EPsCa 2002(SAMAD) KSA Quality Improvement

630,000 MTAStamicarbon Process

continued on next page……

Major Reference- Middle EastPetrochemical Field (1/3)

Page 115: CTCI Corporate Presentation_Overall1-FINAL

-- 115 --

Client Location Project Scope Completion

Qatar Fuel Additives Mesaieed, Methanol & MTBE E 1998

Co., Ltd. Qatar Plant

(QAFAC) MeOH: 830,000 MTA

MTBE: 600,000 MTA

MeOH:ICI Process

MTBE: UOP Process

Qatar Liquefied Gas Ras Laffan LNG Plant E 1996

Co., Ltd. Qatar

(QATARGAS),

continued on next page……

Major Reference- Middle EastPetrochemical Field (2/3)

Page 116: CTCI Corporate Presentation_Overall1-FINAL

-- 116 --

Client Location Project Scope Completion

• Arabian Petrochemical Co. Jubail, Ethylene Plant C 1985(Petrokemya) KSA 500,000 MTA.

• Eastern Petrochemical Co Jubail, EG & LLDPE Plant EC 1985(SHARQ) KSA EG: 450,000 MTA

Shell ProcessLLDPE: 300,000 MTAUCC Process

• Saudi Yanbu Yanbu, EG & Polymer Plant C 1984Petrochemical Co. KSA EG: 220,000 MTA (YANPET) SD Process

HDPE/LLDPE: 300,000 MTAUCC Process

• Jordan Fertilizer Jordan Aqaba Fertilizer Plant C 1982Industry Co., Ltd.

Major Reference- Middle EastPetrochemical Field (3/3)

Page 117: CTCI Corporate Presentation_Overall1-FINAL

-- 117 --

Client Location Project Scope Completion• Petromin Lubricating Yanbu, Yanbu Lube Oil E 1996

Oil Co. KSA Refining (Luberef II)25,400 BPSDMobil Process

• Petromin Mobil Yanbu Yanbu, Yanbu Export Fuel EC 1982Refinery Co. Ltd. KSA Refinery 1984

• General Petroleum & Yanbu, Yanbu Domestic C 1982Mineral Organization KSA Refinery(Petromin)

• General Petroleum & Riyadh, Riyadh Refinery C 1980Mineral Organization KSA Plant Expansion(Petromin) UOP Process

Major Reference – Middle EastRefinery Field

Page 118: CTCI Corporate Presentation_Overall1-FINAL

-- 118 --

Client Location Project ScopeCompletion

• Jeddah Oil Refinery Jeddah, Hydro-Chlorination EPC 1984

Co. KSA Generation Unit

• Saline Water Riyadh, Riyadh Water E 1984

Conversion Corp. KSA Transmission

System Pumping

Station

Major Reference – Middle EastOthers

Legend: E – Engineering P – SupplyPs - Procurement Service C - ConstructionCa – Construction Advisor CM - Construction Management

Page 119: CTCI Corporate Presentation_Overall1-FINAL

-- 119 --

CTCICTCI Operation

In Other Areas

CTCI Operation

In Other Areas

Page 120: CTCI Corporate Presentation_Overall1-FINAL

-- 120 --

Client Location Project Scope Completi

on

Formosa Plastics USA USA OL-2 OSBL E 1999

Westlake Group USA IEM Revamping E 1999

Formosa Plastics USA USA Gasoline HDS E 1997

Karnaphuli Fertilizer Bangladesh Fertilizer Plant E 1992

Formosa Plastics USA USA OL-1 OSBL E 1991

Guam Oil & Refinery Guam Jet Fuel E 1977

Modification

continued on next page……

Reference – Other Areas (1/2)

Page 121: CTCI Corporate Presentation_Overall1-FINAL

-- 121 --

Client Location Project Scope Completion

B&W USA De-NOx SCR E+P for Power Plant - Campbell, Michigan 2004- Lewis Creek, TX 2003- Karn, Michigan 2002- Huntington Beach 2001

Westlake Group USA IEM Plant EPC 2002

Formosa Plastics USA VCM Plant E 1999 USA Debottlenecking

Legend:

E - Engineering P - Procurement Ps - Procurement Service

C - Construction CM - Construction Management

Reference – Other Areas (2/2)

Page 122: CTCI Corporate Presentation_Overall1-FINAL

-- 122 --

CTCIThank You Very MuchThank You Very Much