cross-border infrastructure: a toolkit project finance structuring: case study - nam theun 2 session...

33
Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad The views expressed here are those of the presenter and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent.

Upload: mike-hodgeman

Post on 29-Mar-2015

228 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Project Finance Structuring: Case Study - Nam Theun 2

Session on Finance

Sidharth Sinha

Indian Institute of Management, Ahmedabad

The views expressed here are those of the presenter and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they

represent.

Page 2: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itProject History

• 1970s - Mekong secretariat identified the hydropower potential of

the Nam Theun River

• 1989/91 - World Bank feasibility study undertaken by Snowy

Mountains Engineering Corp

• 1993 - Government of Lao PDR (GOL) and private sponsors

(leader: Transfield) sign an agreement to develop the project

• 1994 - GOL asks World Bank to participate to the project financing

• 1997 - A first series of environmental and social safeguard

documents is produced

• 1997/98 - Asian crisis: Laos and Thailand agree to delay the

project development

• 2000 - EGAT and NTPC (leader: EDF) agree on a proposed

electricity tariff (May 2000)

Page 3: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itProject History (continued)

• 2001 - Shareholders agreement signed between EDFI, EDL, EGCO and ITD (September 2001)

• 2002 - NTPC is created as a Lao company (September 2002)

• Concession agreement signed (October 2002)

• Joint work between GOL, World Bank and NTPC to finalize safeguards documents

• 2003 - Power purchase agreement signed (November 2003)

• 2004 - Project financing activities

• Completion of safeguards documents with the participation of WB, ADB and AFD

• 2005 - Financial close (June 2005) and beginning of full construction activities

• 2009 - Beginning of commercial operation (December 2009)

Page 4: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itSchematic Diagram

Page 5: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itProject Details

• The development, construction, and operation of a 1,070 MW transbasin diversion power plant on the Nam Theun, a tributary of the Mekong.

• The project site is in the central provinces of Khammuane and Bolikhamxay, about 250 kilometers southeast of Vientiane, and stretches from the top of the annamite mountain chain along the Lao PDR-Viet Nam border, to the Nakai Plateau, and ultimately to the confluence of the lower Xe Bang Fai with the Mekong.

• It will capture the flow of water from the watershed of the Nam Theun and the Nakai Plateau by building a dam 39 meters (m) high at the northwestern end of the plateau.

Page 6: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itProject Details (continued)

• The project will create a reservoir of 450 square kilometers (km2) on the Nakai Plateau.

• Water from the reservoir will drop about 350 meters to a powerhouse at the base of the Nakai escarpment near the town of Gnommalat.

• The water discharged from the powerhouse will then flow through a 27 km channel to the Xe Bang Fai, which drains into the Mekong approximately 150 km south of the Nam Theun confluence.

• A regulating pond will be constructed downstream of the powerhouse to ensure smooth release of water into the downstream water courses.

Page 7: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itSponsors

• Franco-Lao-Thai partnership with multilateral support

• Nam Theun 2 Power Company Limited (NTPC) is a Lao company established in Sept 2002 with the following shareholders:

35% EDF International (EDFI) 25% Electricity Generating Public Company Limited

(ECGO) 25% Government of the Lao PDR (GOL) 15% Italian-Thai Development Public Company Limited

(ITD)

• EDF is also acting as head contractor, managing three civil work subcontracts and two electromechanical works subcontracts.

Page 8: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itContractual Arrangements

• Concession agreement signed between GOL and NTPC on 3 October 2002 for a 25 year period following the beginning of commercial operation

• Power purchase agreements signed on 11 November 2003 for a 25 year operating period

between EGAT and NTPC (5,600 GWh per year), between EDL and NTPC (300 GWh per year).

Page 9: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itContractual Arrangements (continued)

• Head construction contract between NTPC and EDF-CIH provides for a date certain, fixed-price turnkey contract and comprises five major sub-contracts

• NTPC will take full responsibility for O&M for the project

• All environment and social commitments described in the concession agreement:

Long term Binding E&S : ~ 10% of total project costs

Page 10: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Page 11: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itSummary of Project Base Cost Estimates ($ million)

Item Foreign

Exchange Local

Currency Total

a. Construction cost 396.2 315.3 711.5 b. Environmental-social

mitigation 48.8 0.0 48.8

c. Development cost A 150.6 14.0 164.6 d. Financing cost B 173.0 106.3 279.3 e. Base contingencies 27.1 18.7 45.8 Total base cost 795.7 454.3 1,250.0 Total contingent costs 116.6 83.4 200.0 Total 912.3 537.7 1,450.0 63% 37% 100%

Page 12: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itProject Capital Structure

US dollar THB Total %

($ million) ($ million

equivalent) ($ million)

Equity 345.2 4.8 350.0 28.0%

Debt 450.0 450.0 900.0 72.0%

Total 795.2 454.8 1,250.0 100.0%

% 63.6% 36.4% 100.0%

Page 13: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itFinancing Plan

Page 14: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itExchange Rate Risk

• Debt and equity are denominated in a mix of dollars (63%) and baht (37%) to match the composition of the two currencies in project base costs.

• The 50/50 mix of US dollar and baht debt is designed to match the tariff paid by EGAT and EdL.

• EGAT and EdL will carry exchange rate risk.

• To the extent the Lao PDR government will receive royalty and taxes in dollars some of the risk will be mitigated.

Page 15: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itHydrology Risk

Historic Flow Records

0

2000

4000

6000

8000

10000

12000

14000

19

50

19

52

19

54

19

56

19

58

19

60

19

62

19

64

19

66

19

68

19

70

19

72

19

74

19

76

19

78

19

80

19

82

19

84

19

86

19

88

19

90

19

92

19

94

19

96

19

98

20

00

20

02

millio

n c

ub

ic m

ete

rs

Total Flow capacity

Page 16: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itHydrology Risk

• The annual inflows have varied historically, on average,

by approximately 20 percent from the long-term average

of 7,526 million m3. This is almost double the capacity of

the reservoir, so that in an average year, the reservoir

should be fully replenished even after operating the plant

at full capacity during the dry season.

• The minimum water flow recorded was 3,776 million m3

in 1998. This was the result of El Nino that brought

droughts over much of Southeast Asia.

Page 17: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itHydrology Risk (continued)

• The reservoir’s probable maximum capacity is 3,910 million m3 amounting to an annual mean energy of 5,700 GWh.

• 1998 would have been the only year since 1950 when the flow would not have been sufficient to fill the reservoir from empty.

• However, as the reservoir will not be fully emptied during operations but will always retain a minimum water level, even in 1998 the reservoir’s probable maximum active storage of 3,530 million m3 could have been filled by the water inflows

Page 18: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

• At full supply level (FSL) at an elevation of 538.0 m, the reservoir would have an area of 450 sq km and would hold 3,910 million cubic meters of water.

• The powerhouse would have an installed capacity of 1,070 MW.

• Annual energy generation of 5,462 GWh.

Page 19: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Energy Component

Quantity GWh/year

(1)

EGAT Obligation to

Purchase

Applicable Tariff

Payment

Primary Energy (PE)

4,406 100% 50% in USD, 50% in THB

(2)

USD and THB

respectively

Secondary Energy 1 (SE1)

948 100% 50% in USD, 50% in THB

(2)

100 % THB (3)

Secondary Energy 2 (SE2)

282 0% 100 % THB Fixed over the Term

100 % THB

Total 5,636 95%

Page 20: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itDeclarations

• NTPC makes periodic declarations to EGAT. Declarations contain information as to the energy availability which may be provided by NTPC. Declarations serve two main functions:

to determine the amount of NTPC’s revenues payable by EGAT; and

to determine the amount of liquidated damages payable by NTPC to EGAT.

• Any unavailability reduces the revenues payable by EGAT, whilst any outage results in liquidated damages payable by NTPC

Page 21: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itDispatch

• EGAT has the flexibility to dispatch NTPC on a unit by unit basis as it requires, subject only to certain operational constraints.

• As EGAT is not required to dispatch all of NTPC’s declaration, if it dispatches less, dispatch shortfall occurs.

• As EGAT would have paid NTPC based on all of that declaration, it has the right to “make-up” subsequently, i.e. the right to dispatch for electrical energy without incurring any additional payment obligation.

• Dispatch excess: EGAT may dispatch more than all of NTPC’s declaration, subject to the limitations to be observed by EGAT in NTPC’s declarations

Page 22: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itExcess Dispatch

• An excess energy month is: any month in which there is spillage of water from the

reservoir; August or September and the water level is above 537.5 m

ASL on the last day of the preceding month; or as elected by NTPC.

• Increased risk of spillage during an excess energy month.

• All the dispatch excess energy as determined at the end of an excess energy month shall be accounted as SE2, provided, however, that the outstanding amount of accumulated dispatch shortfall energy is below 200 GWh.

Page 23: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Page 24: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Page 25: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Page 26: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itOfftake Risk

• Thailand now has surplus generating capacity, because of the economic downturn in the late 1990s and the large amount of capacity that was then under development and could not be stopped on reasonable terms.

• On the basis of demand forecast, excluding new plant from end-2003, the capacity surplus will be consumed by 2006.

• By the time of NT2 COD, the project will supply about one-half year of energy demand growth. NT2 would provide about 6 percent of the incremental energy requirement over 2009 to 2016.

Page 27: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itOfftake Risk

Page 28: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Page 29: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Page 30: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it • Graph shows comparative economic costs for the most prominent large-scale generation options available to Thailand.

• A screening curve shows the cost per kWh of a generation plant at a range of capacity utilization rates (or CU rates).

• While CCGT has a lower investment cost per kW of capacity than does NT2, it has variable operating and fuels costs that NT2 does not have.

• At CU rates above 30 percent, NT2 is the least-cost alternative for Thailand.

Page 31: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itLiquidity Risk

• The debt has to be repaid within 15 years - much less than the life of the project.

• The royalty and tax rates to be applied in each year have been designed specifically for the project on the basis of NTPC’s debt repayment schedule.

NTPC is exempt from income tax over the 2009–2014

period and then pays the following the rates over the

remainder of the concession; 5.0% between 2015 and

2021, 15.0% between 2022 and 2027, and 30.0%

between 2028 and 2034.

Page 32: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itLiquidity Risk

• The royalty and tax rates...(continued) The increase in the income tax rate from 5.0% to 15.0%

is not implemented until immediately after all NTPC debt

is repaid at the end of 2021.

The royalty is applied at 5.2% between 2009 and 2024,

15.0% between 2025 and 2029, and 30.0% over the

remainder of the concession.

Page 33: Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itCountry Risk

• Loans are guaranteed by

World Bank, ADB

Export Credit Agencies

• Development agencies loans

• Only THB loan not guaranteed