create shipment document

16
Create Shipment Document – VT01N Enter your shipping point in the field titled Transportation Planning Point Select the relevant Shipment type

Upload: sarosh

Post on 19-Jul-2016

154 views

Category:

Documents


8 download

DESCRIPTION

SAP SD Shipment Creation in VT01N

TRANSCRIPT

Page 1: Create Shipment Document

Create Shipment Document – VT01N

Enter your shipping point in the field titled Transportation Planning PointSelect the relevant Shipment type

Page 2: Create Shipment Document

From the Edit option on the top >> Select Further Deliveries

Page 3: Create Shipment Document

In this screen enter the outbound delivery number, for which shipment had to be done

Press execute

Page 4: Create Shipment Document

Now your outbound delivery is ready for shipment processing

Page 5: Create Shipment Document

Click on the Overview of Current Shipment button located at the top as shown in the screenshot

Page 6: Create Shipment Document

Once you click the overview button in the previous screen, you will enter the shipment screen

Page 7: Create Shipment Document

Select the vendor code that is facilitating your goods movement

Now we have to do the planning, check-in, loading start, loading end, shipment completion and shipment start option

Click on the button titled planning

Page 8: Create Shipment Document

Press enter

A pop up will come showing the distance from the source to the destination.

Page 9: Create Shipment Document

You will have to enter the

Shipping conditions – Domestic, Normal Exports or Deemed ExportsSpecial Processing Indicator – Courier or Normal ShipmentSupplement 1 - Absolute Amount, Full Truck Load 9 Metric Ton, Half Truck Load 9 Metric Ton, Rate Per KGSupplement 2 - Absolute Amount, Full Truck Load 9 Metric Ton, Half Truck Load 9 Metric Ton, Rate Per KG

Press execute

Page 10: Create Shipment Document

Now planning is done.You can see the green tick besides planning with the execution date and time

Page 11: Create Shipment Document

Now click on check-in, loading start, loading end, shipment completion and shipment start optionsYou can see the green tick besides each one of them with the execution date and time.

You will do the Shipment End only when the transporter comes back after delivering the goods at the destination point

Page 12: Create Shipment Document

Click on the shipment cost calculation tab

Page 13: Create Shipment Document

Select the relevant shipment cost calculation procedure

Page 14: Create Shipment Document
Page 15: Create Shipment Document

Click on freight cost estimate button

You can see the shipment costs determined in accordance with the terms and conditions with the transporter.

Save the document

Page 16: Create Shipment Document

Shipment document saved