CUMMINGS WESTLAKE LLC 12837 Louetta Road, Suite 201 Cypress, Texas 77429-5611 713-266-4456 Fax: 713-266-2333 June 2, 2017 Mr. Bill Boyd Interim Superintendent Crane ISD 511 W. 8th Street Crane, TX 79731 Re: Amendments to Crane Solar, LLC Chapter 313 Application – Crane ISD Dear Mr. Boyd: Attached are the amended pages of Crane Solar, LLC’s Chapter 313 application to Crane ISD. The amendments made are as follows:
• Page 7 of the application has been updated with revised wage data for county wages for all jobs in all industries.
• Tab 4 of the application – references to storage containers and spare parts in the project description have been removed at the request of the Comptroller. The definition of property related to the substation has been clarified.
• Tab 7 of the application – references to storage containers and spare parts in the project description have been removed at the request of the Comptroller. The definition of property related to the substation has been clarified.
• Tab 8 of the application – references to storage containers and spare parts in the project description have been removed at the request of the Comptroller. The definition of property related to the substation has been clarified.
• The map in Tab 11 showing the proposed project improvement layout has been revised to show the proposed location of the project substation and generation transmission tie in line. These improvements are shown in magenta and are entirely within the project boundary and reinvestment zone.
• The jobs waiver letter in Tab 12 has been updated with additional information. • Tab 14 has been updated with revised wage data for county wages for all jobs in all industries as
referenced in the first bullet point above. • Schedule A1 has been revised to remove the estimated cost of storage containers that were
deleted from Tabs 4, 7, and 8 as noted above. • Schedule A2 of the application has been updated to show the estimated investment over a 25-
year period based on the revised investment shown in Schedule A1. • Schedule B of the application has been updated to show the estimated value of buildings and
personal property based upon the revised investment shown in Schedules A1 and A2. Would you please contact me if you have questions or comments? Sincerely,
-
D. Dale Cummings cc: Karl Pierce, First Solar, Inc. Randall Rayford, First Solar, Inc. Sara Leon, Powell and Leon LLP
-
For more information, visit our website: www.TexasAhead.org/tax_programs/chapter313/50-296-A • 05-14/2 • Page 7
A p p l i c a t i o n f o r A p p r a i s e d Va l u e L i m i t a t i o n o n Q u a l i f i e d P r o p e r t yEconomic Development
and AnalysisForm 50-296-A
SECTION 14: Wage and Employment Information
1. What is the estimated number of permanent jobs (more than 1,600 hours a year), with the applicant or a contractor of the applicant, on the proposed qualified property during the last complete quarter before the application review start date (date your application is finally determined to be complete)? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _____________________
2. What is the last complete calendar quarter before application review start date:
First Quarter Second Quarter Third Quarter Fourth Quarter of _________ (year)3. What were the number of permanent jobs (more than 1,600 hours a year) this applicant had in Texas during the
most recent quarter reported to the Texas Workforce Commission (TWC)? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _____________________
Note: For job definitions see TAC §9.1051 and Tax Code §313.021(3).
4. What is the number of new qualifying jobs you are committing to create? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _____________________
5. What is the number of new non-qualifying jobs you are estimating you will create? . . . . . . . . . . . . . . . . . . . . . . . . . . . . _____________________
6. Do you intend to request that the governing body waive the minimum new qualifying job creation requirement, as provided under Tax Code §313.025(f-1)? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
6a. If yes, attach evidence in Tab 12 documenting that the new qualifying job creation requirement above exceeds the number of employees neces-sary for the operation, according to industry standards.
7. Attach in Tab 13 the four most recent quarters of data for each wage calculation below, including documentation from the TWC website. The final actual statutory minimum annual wage requirement for the applicant for each qualifying job — which may differ slightly from this estimate — will be based on information from the four quarterly periods for which data were available at the time of the application review start date (date of a completed application). See TAC §9.1051(21) and (22).
a. Average weekly wage for all jobs (all industries) in the county is . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _____________________
b. 110% of the average weekly wage for manufacturing jobs in the county is . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _____________________
c. 110% of the average weekly wage for manufacturing jobs in the region is . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _____________________
8. Which Tax Code section are you using to estimate the qualifying job wage standard required for this project? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . §313.021(5)(A) or §313.021(5)(B)
9. What is the minimum required annual wage for each qualifying job based on the qualified property? . . . . . . . . . . . . . . _____________________
10. What is the annual wage you are committing to pay for each of the new qualifying jobs you create on the qualified property? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _____________________
11. Will the qualifying jobs meet all minimum requirements set out in Tax Code §313.021(3)? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No12. Do you intend to satisfy the minimum qualifying job requirement through a determination of cumulative economic
benefits to the state as provided by §313.021(3)(F)? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No12a. If yes, attach in Tab 12 supporting documentation from the TWC, pursuant to §313.021(3)(F).
13. Do you intend to rely on the project being part of a single unified project, as allowed in §313.024(d-2), in meeting the qualifying job requirements? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
13a. If yes, attach in Tab 6 supporting documentation including a list of qualifying jobs in the other school district(s).
SECTION 15: Economic Impact
1. Complete and attach Schedules A1, A2, B, C, and D in Tab 14. Note: Excel spreadsheet versions of schedules are available for download and printing at URL listed below.
2. Attach an Economic Impact Analysis, if supplied by other than the Comptroller’s Office, in Tab 15. (not required)
3. If there are any other payments made in the state or economic information that you believe should be included in the economic analysis, attach a sepa-rate schedule showing the amount for each year affected, including an explanation, in Tab 15.
dcummText BoxAmendment No. 1 6-2-17
-
Crane Solar, LLC Chapter 313 Application to Crane ISD
Cummings Westlake, LLC
ATTACHMENT TO APPLICATION FOR APPRAISED VALUE LIMITATION ON QUALIFIED PROPERTY BY CRANE SOLAR, LLC TO CRANE ISD
TAB 4 Detailed Description of the Project
Provide a detailed description of the scope of the proposed project, including, at a minimum, the type and planned use of real and tangible personal property, the nature of the business, a timeline for property construction or installation, and any other relevant information. Crane Solar, LLC (“Crane Solar”) is requesting an appraised value limitation from Crane Independent School District (ISD) for the Crane Solar Project (the “Project”). Crane Solar proposes to develop a utility-scale, grid-connected solar photovoltaic energy (PV) plant in Crane Independent School District. The proposed Project will be constructed within a Reinvestment Zone that was created by Crane County Commissioners Court on February 28, 2017. Maps showing the location of the Project are attached in Tab 11. The Project will be constructed on approximately 1,300 acres, which is part of a larger, long-term lease agreement with a local landowner. The Project will be located entirely within Crane Independent School District. The proposed Project will include, but is not limited to, the following:
• Planned up to 200 MW-AC in size; • First Solar PV modules; • DC-to-AC inverters; • Medium and high-voltage electric cabling; • Tracker racking system (mounting structures); • Project substation which will include a high-voltage transformer, switchgear,
transmission equipment, telecommunications and SCADA control equipment, and all necessary equipment needed to connect the Project to the substation and subsequently to the transmission line described immediately below;
• High-voltage transmission line connecting the project to the grid (gen tie); • Operations and maintenance (O&M) building including telecommunications and
computing equipment; • Meteorological equipment to measure solar irradiance and other weather conditions; and • Associated equipment to safely operate, maintain, and deliver electricity to the grid.
Crane Solar requests a value limitation for all real property and tangible personal property installed for the Project, including but not limited to: solar modules/panels, racking and mounting structures, inverters, combiner boxes, meteorological equipment, foundations, roadways, buildings and offices, paving, fencing, collection system, electrical substations, generation transmission tie line and associated towers, and interconnection facilities. Construction of the Project is anticipated to begin in the fourth quarter of 2018 with project completion by the fourth quarter of 2019.
dcummText BoxAmendment No. 1 6-2-17
-
Crane Solar, LLC Chapter 313 Application to Crane ISD
Cummings Westlake, LLC
ATTACHMENT TO APPLICATION FOR APPRAISED VALUE LIMITATION ON QUALIFIED PROPERTY BY CRANE SOLAR, LLC TO CRANE ISD
TAB 7
Description of Qualified Investment The Project will be constructed on approximately 1,300 acres, which is part of a larger, long-term lease agreement with a local landowner. The Project will be located entirely within Crane Independent School District. The proposed Project will include, but is not limited to, the following:
• Planned up to 200 MW-AC in size; • First Solar PV modules; • DC-to-AC inverters; • Medium and high-voltage electric cabling; • Tracker racking system (mounting structures); • Project substation which will include a high-voltage transformer, switchgear,
transmission equipment, telecommunications and SCADA control equipment, and all necessary equipment needed to connect the Project to the substation and subsequently to the transmission line described immediately below;
• High-voltage transmission line connecting the project to the grid (gen tie); • Operations and maintenance (O&M) building including telecommunications and
computing equipment; • Meteorological equipment to measure solar irradiance and other weather conditions; and • Associated equipment to safely operate, maintain, and deliver electricity to the grid.
Crane Solar requests a value limitation for all real property and tangible personal property installed for the Project, including but not limited to: solar modules/panels, racking and mounting structures, inverters, combiner boxes, meteorological equipment, foundations, roadways, buildings and offices, paving, fencing, collection system, electrical substations, generation transmission tie line and associated towers, and interconnection facilities. Construction of the Project is anticipated to begin in the fourth quarter of 2018 with project completion during the fourth quarter of 2019.
NOTE - The maps in TAB 11 shows the proposed project area with a bold black line with the preliminary panel and inverter locations shown with red rectangles. The exact placement of these panels and inverters is subject to ongoing planning, soil studies, and engineering and will be finally determined before construction begins.
dcummText BoxAmendment No. 1 6-2-17
-
Crane Solar, LLC Chapter 313 Application to Crane ISD
Cummings Westlake, LLC
ATTACHMENT TO APPLICATION FOR APPRAISED VALUE LIMITATION ON QUALIFIED PROPERTY BY CRANE SOLAR, LLC TO CRANE ISD
TAB 8
Description of Qualified Property
The Project will be constructed on approximately 1,300 acres, which is part of a larger, long-term lease agreement with a local landowner. The Project will be located entirely within Crane Independent School District. The proposed Project will include, but is not limited to, the following:
• Planned up to 200 MW-AC in size; • First Solar PV modules; • DC-to-AC inverters; • Medium and high-voltage electric cabling; • Tracker racking system (mounting structures); • Project substation which will include a high-voltage transformer, switchgear,
transmission equipment, telecommunications and SCADA control equipment, and all necessary equipment needed to connect the Project to the substation and subsequently to the transmission line described immediately below;
• High-voltage transmission line connecting the project to the grid (gen tie); • Operations and maintenance (O&M) building including telecommunications and
computing equipment; • Meteorological equipment to measure solar irradiance and other weather conditions; and • Associated equipment to safely operate, maintain, and deliver electricity to the grid.
Crane Solar requests a value limitation for all real property and tangible personal property installed for the Project, including but not limited to: solar modules/panels, racking and mounting structures, inverters, combiner boxes, meteorological equipment, foundations, roadways, buildings and offices, paving, fencing, collection system, electrical substations, generation transmission tie line and associated towers, and interconnection facilities. Construction of the Project is anticipated to begin in the fourth quarter of 2018 with project completion during the fourth quarter of 2019.
dcummText BoxAmendment No. 1 6-2-17
-
11
LE
GE
ND
RE
IN
VE
ST
ME
NT
Z
ON
E
NO
RTH
LO
CA
TIO
N M
AP
NO
T T
O S
CA
LE
KE
Y P
LA
N
NO
T T
O S
CA
LE
SIT
E
LO
CA
TIO
N
SIT
E
LO
CA
TIO
N
SE
CT
IO
N L
IN
E
BLO
CK 17, SECTIO
N 5
A-1011
T:\ApplicationEngineering\Projects\2017\Crane\Crane Reinvestment Zone Map.dwg FS104849 Jan 16, 2017 - 8:18am
FIR
ST
S
OLA
R, IN
C.
13
5 M
AIN
S
TR
EE
T, 6T
H F
LO
OR
SA
N F
RA
NC
IS
CO
, C
ALIF
OR
NIA
94105
PH
ON
E:
(415) 935-2500
WW
W.F
IR
ST
SO
LA
R.C
OM
BLO
CK 17, SECTIO
N 3
A-529
BLO
CK 17, SECTIO
N 2
A-1010
BLO
CK 46, SECTIO
N 17
A-346
BLO
CK 46, SECTIO
N 16
A-343 &
A-345
BLO
CK 16, SECTIO
N 20
A-337
BLO
CK 17, SECTIO
N 4
A-300
BLO
CK 46, SECTIO
N 24
A-350
BLO
CK 46, SECTIO
N 9
A-349
BLO
CK 46, SECTIO
N 8
A-348
BLO
CK 46, SECTIO
N 7
A-201
BLO
CK 46, SECTIO
N 10
A-202
BLO
CK 46, SECTIO
N 23
A-203
BLO
CK 17, SECTIO
N 6
A-1012
BLO
CK 17, SECTIO
N 7
A-299
BLO
CK 18, SECTIO
N 11
A-534 &
A-1046
BLO
CK 17, SECTIO
N 8
A-531
BLO
CK 17, SECTIO
N 9
A-532
BLO
CK 17, SECTIO
N 10
A-1095
BLO
CK 17, SECTIO
N 11
A-1096
BLO
CK 17, SECTIO
N 12
A-1097
BLO
CK 46, SECTIO
N 18
A-347
BLO
CK 14, SECTIO
N 31
A-1214
B
L
O
C
K
1
8
,
S
E
C
T
I
O
N
2
A
-
1
0
4
5
B
L
O
C
K
1
8
,
S
E
C
T
I
O
N
1
0
A
-
2
9
8
BLO
CK 18, SECTIO
N 1
A-1213
B
L
O
C
K
1
7
,
S
E
C
T
I
O
N
1
A
-
5
3
0
B
L
O
C
K
1
4
,
S
E
C
T
I
O
N
3
2
A
-
1
2
1
2
WARD
CO
UN
TY
WIN
KLER
CO
UN
TY
ECTO
R CO
UN
TY
CRAN
E CO
UN
TY
CO
UN
TY
L
IN
E
dcummPolygonal Line
dcummRectangle
dcummRectangle
dcummRectangle
dcummRectangle
dcummOval
dcummText BoxCRANE SOLAR, LLC REINVESTMENT ZONE AND PROJECT BOUNDARY MAP - BOUNDARY SHOWN WITH BOLD BLUE LINE
dcummLine
dcummText BoxSECTIONS OUTLINED IN BOLD BLACK LINE ARE SECTIONS THAT APPLICANT HAS UNDER SITE CONTROL
dcummLine
dcummText BoxLOCATION OF SOLAR PANEL INSTALLATION (QUALIFIED INVESTMENT AND QUALIFED PROPERTY) ARE SHOWN IN BOLD RED RECTANGLES AND ARE WHOLLY WITHIN THE REINVESTMENT ZONE
dcummLine
dcummLine
dcummLine
dcummLine
dcummLine
dcummLine
dcummText BoxPROPOSED LOCATION OF OPERATIONS & MAINTENANCE BUILDING SHOWN WITH GREEN OVAL (SUBJECT TO CHANGE
dcummLine
dcummLine
dcummOval
dcummLine
dcummText BoxPROPOSED LOCATION OF PROJECT SUBSTATION (CIRCLE) AND TRANSMISSION LINE TIE IN (LINE)
dcummLine
dcummText BoxAMENDMENT NO. 1 6-2-17
-
Karl Pierce Project Development First Solar Inc. 11757 Katy Freeway Suite 400 Houston, Texas 77079 832-209-9909
June 2, 2017 Mr. Bill Boyd Interim Superintendent Crane Independent School District 511 E. 8th Street Crane, TX 79731 Re: Chapter 313 Job Waiver Request Dear Mr. Boyd,
Crane Solar, LLC requests that the Crane Independent School District’s Board of Trustees waive
the job requirement provision as allowed by Section 313.025(f-1) of the tax code. This waiver would be based on the school district’s board findings that the jobs creation requirement exceeds the industry standard for the number of employees reasonably necessary for the operation of the facility of the property owner that is described in the application.
Crane Solar, LLC requests that the Crane Independent School District make such a finding and
waive the job creation requirement for 10 permanent jobs. In line with industry standards for job requirements, Crane Solar, LLC has committed to create 2 total jobs for the project, which will be in Crane ISD.
Solar projects create many full and part-time, but temporary jobs during the construction phase
of the project, but require a relatively small number of highly skilled technicians to operate and maintain the project after commercial operation begins. The staffing of solar projects after commercial operations begin depends on the solar technology used, the size and location of the project, and the experience of the operator. Staffing is not linear, i.e., doubling the MW size of a project does not require doubling the number of employees. With current technology, First Solar believes that permanent staffing requirements of solar electric generating facilities is at least 120 MW per employee and may be more depending on project location.
First Solar, Inc., the parent company of Crane Solar, LLC, has more experience in the operation
and maintenance (O&M) of solar electric generating facilities than any other company in the world. First Solar has developed one of the largest and most advanced O&M programs in the industry. First Solar has more than 7.1 gigawatts (GW) of utility-scale PV plants under its O&M program.
dcummText BoxAmendment No. 1 6-2-17
-
Based on First Solar’s experience in operating and maintaining a large fleet of solar electric generating facilities and the solar technology to be used, the company believes that two permanent employees will be required to operate the proposed 200 MW Crane Solar, LLC project.
Sincerely,
Karl Pierce
dcummText BoxAmendment No. 1 6-2-17
-
CRANE SOLAR, LLCTAB 13 TO CHAPTER 313 APPLICATION
CHAPTER 313 WAGE CALCULATION - ALL JOBS - ALL INDUSTRIES
QUARTER YEAR AVG WEEKLY WAGES* ANNUALIZEDFIRST 2016 1,140.00$ 59,280.00$ SECOND 2016 1,079.00$ 56,108.00$ THIRD 2016 1,104.00$ 57,408.00$ FOURTH 2016 1,174.00$ 61,048.00$
AVERAGE 1,124.25$ 58,461.00$
CHAPTER 313 WAGE CALCULATION - MANUFACTURING JOBS
QUARTER YEAR AVG WEEKLY WAGES* ANNUALIZEDFIRST 2016 Not applicable Not applicableSECOND 2016 Not applicable Not applicableTHIRD 2016 Not applicable Not applicableFOURTH 2016 Not applicable Not applicable
AVERAGE Not applicable Not applicable
X 110% 110%
Not applicable Not applicable
CHAPTER 313 WAGE CALCULATION - REGIONAL WAGE RATE
REGION YEAR AVG WEEKLY WAGES* ANNUALIZEDPermian Basin 2015 1,007.35$ 52,382.00$
X 110% 110%
1,108.08$ 57,620.20$
* SEE ATTACHED TWC DOCUMENTATION
CRANE ISD - CRANE COUNTY
CRANE ISD - CRANE COUNTY
dcummText BoxAmendment No. 1 6-2-17
-
Quarterly Employment and Wages (QCEW)Back
Page 1 of 1 (40 results/page)
Year Period Area Ownership Division Level Ind Code Industry Avg Weekly Wages
2016 1st Qtr Crane County Private 00 0 10 Total, All Industries $1,140
2016 2nd Qtr Crane County Private 00 0 10 Total, All Industries $1,079
2016 3rd Qtr Crane County Private 00 0 10 Total, All Industries $1,104
2016 4th Qtr Crane County Private 00 0 10 Total, All Industries $1,174
dcummText BoxAmendment No. 1 6-2-17
-
Date
4/17
/201
7Ap
plic
ant N
ame
Cran
e So
lar,
LLC
Form
50-
296A
ISD
Nam
eCr
ane
ISD
Rev
ised
May
201
4
Colu
mn
ACo
lum
n B
Colu
mn
CCo
lum
n D
Colu
mn
E
Year
Scho
ol Y
ear
(YYY
Y-YY
YY)
Tax
Year
(F
ill in
act
ual t
ax y
ear
belo
w)
Y
YYY
New
inve
stm
ent (
orig
inal
cos
t) in
tang
ible
pe
rson
al p
rope
rty
plac
ed in
ser
vice
dur
ing
this
ye
ar th
at w
ill b
ecom
e Q
ualif
ied
Prop
erty
New
inve
stm
ent m
ade
durin
g th
is y
ear i
n bu
ildin
gs o
r per
man
ent n
onre
mov
able
co
mpo
nent
s of
bui
ldin
gs th
at w
ill b
ecom
e Q
ualif
ied
Prop
erty
Oth
er n
ew in
vest
men
t mad
e du
ring
this
yea
r tha
t w
ill n
ot b
ecom
e Q
ualif
ied
Prop
erty
[S
EE
NO
TE]
Oth
er n
ew in
vest
men
t mad
e du
ring
this
yea
r tha
t m
ay b
ecom
e Q
ualif
ied
Prop
erty
[SE
E N
OTE
]
Tota
l Inv
estm
ent
(Sum
of C
olum
ns A
+B+C
+D)
[The
onl
y ot
her i
nves
tmen
t mad
e be
fore
filin
g co
mpl
ete
appl
icat
ion
with
dis
trict
that
may
be
com
e Q
ualif
ied
Prop
erty
is la
nd.]
-$
-
$
-$
-
$
-$
QTP
120
18-2
019
2018
50,0
00,0
00$
-$
-
$
-$
50
,000
,000
$
QTP
220
19-2
020
2019
249,
750,
000
$
20
0,00
0$
-$
-
$
249,
950,
000
$
299,
750,
000
$
20
0,00
0$
-$
-
$
299,
950,
000
$
Tota
l Qua
lifie
d In
vest
men
t (su
m o
f gre
en c
ells
)29
9,95
0,00
0$
For A
ll C
olum
ns:
List
am
ount
inve
sted
eac
h ye
ar, n
ot c
umul
ativ
e to
tals
.C
olum
n A:
Col
umn
B:
Col
umn
C:
Col
umn
D:
Tota
l Inv
estm
ent:
Add
toge
ther
eac
h ce
ll in
a c
olum
n an
d en
ter t
he s
um in
the
blue
tota
l inv
estm
ent r
ow. E
nter
the
data
from
this
row
into
the
first
row
in S
ched
ule
A2.
Qua
lifie
d In
vest
men
t:Fo
r the
gre
en q
ualif
ied
inve
stm
ent c
ell,
ente
r the
sum
of a
ll th
e gr
een-
shad
ed c
ells
.
Not
elig
ible
to b
ecom
e Q
ualif
ied
Prop
erty
Inve
stm
ent m
ade
afte
r fili
ng c
ompl
ete
appl
icat
ion
with
dis
trict
, but
bef
ore
final
boa
rd
appr
oval
of a
pplic
atio
n
Sche
dule
A1:
Tot
al In
vest
men
t for
Eco
nom
ic Im
pact
(thr
ough
the
Qua
lifyi
ng T
ime
Perio
d)
PRO
PERT
Y IN
VEST
MEN
T AM
OUN
TS
(Est
imat
ed In
vest
men
t in
each
yea
r. D
o no
t put
cum
ulat
ive
tota
ls.)
Inve
stm
ent m
ade
afte
r fin
al b
oard
app
rova
l of
appl
icat
ion
and
befo
re J
an. 1
of f
irst c
ompl
ete
tax
year
of q
ualif
ying
tim
e pe
riod
Com
plet
e ta
x ye
ars
of q
ualif
ying
tim
e pe
riod
Inve
stm
ent m
ade
befo
re fi
ling
com
plet
e ap
plic
atio
n w
ith d
istri
ct
--
Year
pre
cedi
ng th
e fir
st c
ompl
ete
tax
year
of t
he
qual
ifyin
g tim
e pe
riod
(ass
umin
g no
def
erra
ls o
f qu
alify
ing
time
perio
d)
2017
Dol
lar v
alue
of o
ther
inve
stm
ent t
hat m
ay a
ffect
eco
nom
ic im
pact
and
tota
l val
ue. E
xam
ples
of o
ther
inve
stm
ent t
hat m
ay re
sult
in q
ualif
ied
prop
erty
are
land
or p
rofe
ssio
nal s
ervi
ces.
Tota
l Inv
estm
ent t
hrou
gh Q
ualif
ying
Tim
e Pe
riod
[ENT
ER th
is ro
w in
Sch
edul
e A2
]
This
repr
esen
ts th
e to
tal d
olla
r am
ount
of p
lann
ed in
vest
men
t in
tang
ible
per
sona
l pro
perty
. Onl
y in
clud
e es
timat
es o
f inv
estm
ent f
or "r
epla
cem
ent"
prop
erty
if th
e pr
oper
ty is
spe
cific
ally
des
crib
ed in
the
appl
icat
ion.
Onl
y ta
ngib
le p
erso
nal p
rope
rty th
at is
spe
cific
ally
des
crib
ed in
the
appl
icat
ion
can
beco
me
qual
ified
pro
perty
.Th
e to
tal d
olla
r am
ount
of p
lann
ed in
vest
men
t eac
h ye
ar in
bui
ldin
gs o
r non
rem
ovab
le c
ompo
nent
of b
uild
ings
.D
olla
r val
ue o
f oth
er in
vest
men
t tha
t may
affe
ct e
cono
mic
impa
ct a
nd to
tal v
alue
. Exa
mpl
es o
f oth
er in
vest
men
t tha
t will
not
bec
ome
qual
ified
pro
perty
incl
ude
inve
stm
ent m
eetin
g th
e de
finiti
on o
f 313
.021
(1) b
ut n
ot c
reat
ing
a ne
w im
prov
emen
t as
defin
ed b
y TA
C 9
.105
1. T
his
is p
ropo
sed
prop
erty
that
fu
nctio
nally
repl
aces
exi
stin
g pr
oper
ty; i
s us
ed to
mai
ntai
n, re
furb
ish,
reno
vate
, mod
ify o
r upg
rade
exi
stin
g pr
oper
ty; o
r is
affix
ed to
exi
stin
g pr
oper
ty—
desc
ribed
in S
ECTI
ON
13,
que
stio
n #5
of t
he a
pplic
atio
n.
Ente
r am
ount
s fr
om T
OTA
L ro
w a
bove
in S
ched
ule
A2
dcummText BoxAmendment No. 1 6-2-17
-
Date
4/17
/201
7Ap
plic
ant N
ame
Cran
e So
lar,
LLC
Form
50-
296A
ISD
Nam
eCr
ane
ISD
Rev
ised
May
201
4
Colu
mn
ACo
lum
n B
Colu
mn
CCo
lum
n D
Colu
mn
E
Year
Scho
ol Y
ear
(YYY
Y-YY
YY)
Tax
Year
(F
ill in
act
ual t
ax y
ear
belo
w)
Y
YYY
New
inve
stm
ent (
orig
inal
cos
t) in
tang
ible
pe
rson
al p
rope
rty
plac
ed in
ser
vice
dur
ing
this
yea
r tha
t will
bec
ome
Qua
lifie
d Pr
oper
ty
New
inve
stm
ent m
ade
durin
g th
is y
ear i
n bu
ildin
gs o
r per
man
ent n
onre
mov
able
co
mpo
nent
s of
bui
ldin
gs th
at w
ill b
ecom
e Q
ualif
ied
Prop
erty
Oth
er in
vest
men
t mad
e du
ring
this
yea
r tha
t w
ill n
ot b
ecom
e Q
ualif
ied
Prop
erty
[SEE
N
OTE
]
Oth
er in
vest
men
t mad
e du
ring
this
yea
r tha
t w
ill b
ecom
e Q
ualif
ied
Prop
erty
{SEE
NO
TE]
Tota
l Inv
estm
ent
(A+B
+C+D
)
$
299,
750,
000
$
2
00,0
00
$
-
$
-
$
299,
950,
000
020
17-2
018
2017
$
-
$
-
$
-
$
-
$
-
020
18-2
019
2018
$
-
$
-
$
-
$
-
$
-
020
19-2
020
2019
$
-
$
-
$
-
$
-
$
-
120
20-2
021
2020
$
-
$
-
43
,694
$
43
,694
$
2
2021
-202
220
21 $
-
$
-
100,
042
$
100,
042
$
320
22-2
023
2022
$
-
$
-
85
,703
$
85
,703
$
4
2023
-202
420
23 $
-
$
-
98,7
24$
98,7
24$
520
24-2
025
2024
$
-
$
-
10
7,94
9$
10
7,94
9$
6
2025
-202
620
25 $
-
$
-
380,
898
$
380,
898
$
720
26-2
027
2026
$
-
$
-
38
8,04
1$
38
8,04
1$
8
2027
-202
820
27 $
-
$
-
398,
024
$
398,
024
$
920
28-2
029
2028
$
-
$
-
41
3,78
4$
41
3,78
4$
10
2029
-203
020
29 $
-
$
-
402,
967
$
402,
967
$
Tota
l Inv
estm
ent m
ade
thro
ugh
limita
tion
299,
750,
000
$
200,
000
$
2,
419,
826
$
-
$
30
2,36
9,82
6$
1120
30-2
031
2030
425,
501
$
425,
501
$
1220
31-2
032
2031
444,
537
$
444,
537
$
1320
32-2
033
2032
428,
768
$
428,
768
$
1420
33-2
034
2033
465,
778
$
465,
778
$
1520
34-2
035
2034
471,
420
$
471,
420
$
1620
35-2
036
2035
470,
853
$
470,
853
$
1720
36-2
037
2036
476,
568
$
476,
568
$
1820
37-2
038
2037
480,
945
$
480,
945
$
1920
38-2
039
2038
500,
558
$
500,
558
$
2020
39-2
040
2039
518,
408
$
518,
408
$
2120
40-2
041
2040
542,
944
$
542,
944
$
2220
41-2
042
2041
544,
274
$
544,
274
$
2320
42-2
043
2042
558,
583
$
558,
583
$
2420
43-2
044
2043
584,
738
$
584,
738
$
2520
44-2
045
2044
600,
586
$
600,
586
$
* ** ***
For A
ll C
olum
ns:
List
am
ount
inve
sted
eac
h ye
ar, n
ot c
umul
ativ
e to
tals
. Onl
y in
clud
e in
vest
men
ts in
the
rem
aini
ng ro
ws
of S
ched
ule
A2 th
at w
ere
not c
aptu
red
on S
ched
ule
A1.
Col
umn
A:
Col
umn
B:
Col
umn
C:
Col
umn
D:
Sche
dule
A2:
Tot
al In
vest
men
t for
Eco
nom
ic Im
pact
(inc
ludi
ng Q
ualif
ied
Prop
erty
and
oth
er in
vest
men
ts)
PRO
PERT
Y IN
VEST
MEN
T AM
OUN
TS
(Est
imat
ed In
vest
men
t in
each
yea
r. D
o no
t put
cum
ulat
ive
tota
ls.)
Tota
l Inv
estm
ent f
rom
Sch
edul
e A1
*--
Dol
lar v
alue
of o
ther
inve
stm
ent t
hat m
ay a
ffect
eco
nom
ic im
pact
and
tota
l val
ue. E
xam
ples
of o
ther
inve
stm
ent t
hat m
ay re
sult
in q
ualif
ied
prop
erty
are
land
or p
rofe
ssio
nal s
ervi
ces.
Addi
tiona
l yea
rs fo
r 25
year
eco
nom
ic im
pact
as
requ
ired
by
313.
026(
c)(1
)
All i
nves
tmen
ts m
ade
thro
ugh
the
qual
ifyin
g tim
e pe
riod
are
capt
ured
and
tota
led
on S
ched
ule
A1 [b
lue
box]
and
inco
rpor
ated
into
this
sch
edul
e in
the
first
row
.
This
repr
esen
ts th
e to
tal d
olla
r am
ount
of p
lann
ed in
vest
men
t in
tang
ible
per
sona
l pro
perty
. Onl
y in
clud
e es
timat
es o
f inv
estm
ent f
or "r
epla
cem
ent"
prop
erty
if th
e pr
oper
ty is
spe
cific
ally
des
crib
ed in
the
appl
icat
ion.
Onl
y ta
ngib
le p
erso
nal p
rope
rty th
at is
spe
cific
ally
des
crib
ed in
the
appl
icat
ion
can
beco
me
qual
ified
pro
perty
.
TOTA
LS F
ROM
SCH
EDUL
E A1
Ente
r am
ount
s fr
om T
OTA
L ro
w in
Sch
edul
e A1
in th
e ro
w b
elow
The
tota
l dol
lar a
mou
nt o
f pla
nned
inve
stm
ent e
ach
year
in b
uild
ings
or n
onre
mov
able
com
pone
nt o
f bui
ldin
gs.
Each
yea
r prio
r to
star
t of v
alue
lim
itatio
n pe
riod*
*
In
sert
as m
any
row
s as
nec
essa
ry
Each
yea
r prio
r to
star
t of v
alue
lim
itatio
n pe
riod*
*
In
sert
as m
any
row
s as
nec
essa
ry
Each
yea
r prio
r to
star
t of v
alue
lim
itatio
n pe
riod*
*
In
sert
as m
any
row
s as
nec
essa
ry
Dol
lar v
alue
of o
ther
inve
stm
ent t
hat m
ay a
ffect
eco
nom
ic im
pact
and
tota
l val
ue. E
xam
ples
of o
ther
inve
stm
ent t
hat w
ill n
ot b
ecom
e qu
alifi
ed p
rope
rty in
clud
e in
vest
men
t mee
ting
the
defin
ition
of 3
13.0
21(1
) but
not
cre
atin
g a
new
impr
ovem
ent a
s de
fined
by
TAC
9.1
051.
Thi
s is
pro
pose
d pr
oper
ty th
at fu
nctio
nally
re
plac
es e
xist
ing
prop
erty
; is
used
to m
aint
ain,
refu
rbis
h, re
nova
te, m
odify
or u
pgra
de e
xist
ing
prop
erty
; or i
s af
fixed
to e
xist
ing
prop
erty
—de
scrib
ed in
SEC
TIO
N 1
3, q
uest
ion
#5 o
f the
app
licat
ion.
Onl
y in
vest
men
t mad
e du
ring
defe
rrals
of t
he s
tart
of th
e lim
itatio
n (a
fter t
he e
nd o
f qua
lifyi
ng ti
me
perio
d bu
t bef
ore
the
star
t of t
he V
alue
Lim
itatio
n Pe
riod)
sho
uld
be in
clud
ed in
the
"yea
r prio
r to
star
t of v
alue
lim
itatio
n pe
riod"
row
(s).
If th
e lim
itatio
n st
arts
at t
he e
nd o
f the
qua
lifyi
ng ti
me
perio
d or
the
qual
ifyin
g tim
e pe
riod
over
laps
the
limita
tion,
no
inve
stm
ent s
houl
d be
incl
uded
on
this
line
.
If yo
ur q
ualif
ying
tim
e pe
riod
will
ove
rlap
your
val
ue li
mita
tion
perio
d, d
o no
t als
o in
clud
e in
vest
men
t mad
e du
ring
the
qual
ifyin
g tim
e pe
riod
in y
ears
1 a
nd/o
r 2 o
f the
val
ue li
mita
tion
perio
d, d
epen
ding
on
the
over
lap.
Onl
y in
clud
e in
vest
men
ts/y
ears
that
wer
e no
t cap
ture
d on
Sch
edul
e A1
.
Valu
e lim
itatio
n pe
riod*
**
Con
tinue
to m
aint
ain
viab
le p
rese
nce
dcummText BoxAmendment No. 1 6-2-17
-
Dat
e4/
17/2
017
Appl
ican
t Nam
eFo
rm 5
0-29
6AIS
D N
ame
Rev
ised
May
201
4
Year
Scho
ol Y
ear
(YYY
Y-YY
YY)
Tax
Year
(Fill
in a
ctua
l tax
ye
ar)
YYYY
Estim
ated
Mar
ket V
alue
of
Land
Estim
ated
Tot
al M
arke
t Va
lue
of n
ew b
uild
ings
or
othe
r new
impr
ovem
ents
Estim
ated
Tot
al M
arke
t Va
lue
of ta
ngib
le p
erso
nal
prop
erty
in th
e ne
w
build
ings
or "
in o
r on
the
new
impr
ovem
ents
"
Mar
ket V
alue
less
any
ex
empt
ions
(suc
h as
po
llutio
n co
ntro
l) an
d be
fore
lim
itatio
nFi
nal t
axab
le v
alue
for I
&S
afte
r all
redu
ctio
nsFi
nal t
axab
le v
alue
for
M&O
afte
r all
redu
ctio
ns
Each
yea
r prio
r to
star
t of
Valu
e Li
mita
tion
Perio
d
In
sert
as m
any
row
s as
nec
essa
ry20
17-2
018
2017
$
-
$
-
$
-
$
-
$
-
$
-
Each
yea
r prio
r to
star
t of
Valu
e Li
mita
tion
Perio
d
In
sert
as m
any
row
s as
nec
essa
ry20
18-2
019
2018
$
-
$
-
$
-
$
-
$
-
$
-
Each
yea
r prio
r to
star
t of
Valu
e Li
mita
tion
Perio
d
In
sert
as m
any
row
s as
nec
essa
ry20
19-2
020
2019
$
-
$
-
$
5,0
00,0
00
$
-
$
5,0
00,0
00
$
5,0
00,0
00
120
20-2
021
2020
$
-
$
2
00,0
00
$
29
5,45
3,80
0 $
295,
653,
800
$
29
5,65
3,80
0 $
25,
000,
000
220
21-2
022
2021
$
-
$
1
97,0
00
$
27
1,83
0,49
6 $
272,
027,
496
$
27
2,02
7,49
6 $
25,
000,
000
320
22-2
023
2022
$
-
$
1
94,0
00
$
22
8,36
6,10
0 $
228,
560,
100
$
22
8,56
0,10
0 $
25,
000,
000
420
23-2
024
2023
$
-
$
1
91,1
00
$
20
3,91
6,20
0 $
204,
107,
300
$
20
4,10
7,30
0 $
25,
000,
000
520
24-2
025
2024
$
-
$
1
88,2
00
$
17
9,46
6,30
0 $
179,
654,
500
$
17
9,65
4,50
0 $
25,
000,
000
620
25-2
026
2025
$
-
$
1
85,4
00
$
15
5,01
6,50
0 $
155,
201,
900
$
15
5,20
1,90
0 $
25,
000,
000
720
26-2
027
2026
$
-
$
1
82,6
00
$
12
7,85
0,30
0 $
128,
032,
900
$
12
8,03
2,90
0 $
25,
000,
000
820
27-2
028
2027
$
-
$
1
79,9
00
$
10
3,40
0,60
0 $
103,
580,
500
$
10
3,58
0,50
0 $
25,
000,
000
920
28-2
029
2028
$
-
$
1
77,2
00
$
8
7,09
9,90
0 $
87,
277,
100
$
8
7,27
7,10
0 $
25,
000,
000
1020
29-2
030
2029
$
-
$
1
74,5
00
$
7
8,94
8,20
0 $
79,
122,
700
$
7
9,12
2,70
0 $
25,
000,
000
1120
30-2
031
2030
$
-
$
1
71,9
00
$
5
7,21
4,90
0 $
57,
386,
800
$
5
7,38
6,80
0 $
57,
386,
800
1220
31-2
032
2031
$
-
$
1
69,3
00
$
5
4,49
6,00
0 $
54,
665,
300
$
5
4,66
5,30
0 $
54,
665,
300
1320
32-2
033
2032
$
-
$
1
66,8
00
$
5
4,49
3,50
0 $
54,
660,
300
$
5
4,66
0,30
0 $
54,
660,
300
1420
33-2
034
2033
$
-
$
1
64,3
00
$
5
4,49
1,00
0 $
54,
655,
300
$
5
4,65
5,30
0 $
54,
655,
300
1520
34-2
035
2034
$
-
$
1
61,8
00
$
5
4,48
8,50
0 $
54,
650,
300
$
5
4,65
0,30
0 $
54,
650,
300
1620
35-2
036
2035
$
-
$
1
59,4
00
$
5
4,48
6,10
0 $
54,
645,
500
$
5
4,64
5,50
0 $
54,
645,
500
1720
36-2
037
2036
$
-
$
1
57,0
00
$
5
4,48
3,70
0 $
54,
640,
700
$
5
4,64
0,70
0 $
54,
640,
700
1820
37-2
038
2037
$
-
$
1
54,6
00
$
5
4,48
1,30
0 $
54,
635,
900
$
5
4,63
5,90
0 $
54,
635,
900
1920
38-2
039
2038
$
-
$
1
52,3
00
$
5
4,47
9,00
0 $
54,
631,
300
$
5
4,63
1,30
0 $
54,
631,
300
2020
39-2
040
2039
$
-
$
1
50,0
00
$
5
4,47
6,70
0 $
54,
626,
700
$
5
4,62
6,70
0 $
54,
626,
700
2120
40-2
041
2040
$
-
$
1
47,8
00
$
5
4,47
4,50
0 $
54,
622,
300
$
5
4,62
2,30
0 $
54,
622,
300
2220
41-2
042
2041
$
-
$
1
45,6
00
$
5
4,47
2,30
0 $
54,
617,
900
$
5
4,61
7,90
0 $
54,
617,
900
2320
42-2
043
2042
$
-
$
1
43,4
00
$
5
4,47
0,10
0 $
54,
613,
500
$
5
4,61
3,50
0 $
54,
613,
500
2420
43-2
044
2043
$
-
$
1
41,2
00
$
5
4,46
7,90
0 $
54,
609,
100
$
5
4,60
9,10
0 $
54,
609,
100
2520
44-2
045
2044
$
-
$
1
39,1
00
$
5
4,46
5,80
0 $
54,
604,
900
$
5
4,60
4,90
0 $
54,
604,
900
Not
es:
Con
tinue
to m
aint
ain
viab
le p
rese
nce
Mar
ket v
alue
in fu
ture
yea
rs is
goo
d fa
ith e
stim
ate
of fu
ture
taxa
ble
valu
e fo
r the
pur
pose
s of
pro
perty
taxa
tion.
Onl
y in
clud
e m
arke
t val
ue fo
r elig
ible
pro
perty
on
this
sch
edul
e.
Addi
tiona
l yea
rs fo
r
25
yea
r eco
nom
ic im
pact
as
requ
ired
by
313.
026(
c)(1
)
Sche
dule
B:
Estim
ated
Mar
ket A
nd T
axab
le V
alue
(of Q
ualif
ied
Prop
erty
Onl
y)
Cran
e So
lar,
LLC
Cran
e IS
DQ
ualif
ied
Prop
erty
Estim
ated
Tax
able
Val
ue
Valu
e Li
mita
tion
Perio
d
dcummText BoxAmendment No. 1 6-2-17
Crane Solar LLC Schedules Amended 5-15-17.pdfSchedule A1Schedule A2Schedule B
Wage Rate Calculations_CISD_5-23-17.pdfSheet1
1: What is the estimated number of permanent jobs (more than 1,600 hours a year), with the applicant or a contractor of the applicant, on the proposed qualified property during the last complete quarter before the application review start date (date your application is finally determined to be complete)?: 0
First Quarter: OnSecond Quarter: OffThird Quarter: OffFourth Quarter of: OffSection 14: year: 20173: What were the number of permanent jobs (more than 1,600 hours a year) this applicant had in Texas during the most recent quarter reported to the Texas Workforce Commission (TWC)?: 0
4: What is the number of new qualifying jobs you are committing to create?: 2
5: What is the number of new non-qualifying jobs you are estimating you will create?: 0
6: Do you intend to request that the governing body waive the minimum new qualifying job creation requirement, as provided under Tax Code §313: 025(f-1)?: Yes_46
a: Average weekly wage for all jobs (all industries) in the county is: 1124.25
b: 110% of the average weekly wage for manufacturing jobs in the county is: 0
c: 110% of the average weekly wage for manufacturing jobs in the region is: 1108.08
8: Which Tax Code section are you using to estimate the qualifying job wage standard required for this project?: off
9: What is the minimum required annual wage for each qualifying job based on the qualified property?: 57620.20
10: What is the annual wage you are committing to pay for each of the new qualifying jobs you create on the qualified property?: 57620.20
11: Will the qualifying jobs meet all minimum requirements set out in Tax Code §313: 021(3)?: Yes_47
12: Do you intend to satisfy the minimum qualifying job requirement through a determination of cumulative economic benefits to the state as provided by §313: 021(3)(F?: No_48
13: Do you intend to rely on the project being part of a single unified project, as allowed in §313: 024(d-2), in meeting the qualifying job requirements?: No_49