Cost reduction through industrialization,
standardization and simplification.
– how to get there.
Petroleumstilsynets Temadag, 12 November 2015
Tom Eddy Johansen, Forsys Subsea, JV between FMC Technologies and Technip
Tarjei Haugen, FMC Technologies
Increased Oil Recovery14 October 2015 1
A reminder…
"We can't solve problems
by using the same kind of
thinking we used when
we created them."
Albert Einstein
Increased Oil Recovery14 October 2015 2
We are facing a very different challenge Operators declining returns – Cost increase per subsea Well Unit – Oil price
Offshore Development
CAPEX distr.
14%
9-15%
30-50%12%
30%
5%
Installation
Subsea
Drilling &
CompletionRiser &
Flowlines
Topside
Facility
(FPSO/
Platform)
Other
Oil price
0
5
10
15
20
25
0
20
40
60
80
100
120
MUSD/wellBrent, USD/bbl
Brent - USD/bbl Subsea Equipment MUSD/well
Source: Quest and FMC Sales Support
*
*Running prices
*
Increased Oil Recovery14 October 2015 3
Main Cost Reduction Drivers
VolumeTechnology
Collaboration
Volume
- Common standard/requirements for
the industry (material, valves etc.)
- Enable stocking programs based on
standard requirements and ITPs
Technology
- Innovation through simplification of
technical solutions
Collaboration
- Working differently together
- Simplification of project execution
Increased Oil Recovery14 October 2015 4
Standardization
Configuration
Standard components
Manufacturing
Increased Oil Recovery14 October 2015 5
The subsea business legacy
Dual world
However experience
shows that not all type of
equipment fits into a
manufacturing model
Some products are still
truly construction
• E.g. manifolds
Need to be able to work
within both worlds
simultaneously
Infancy
Our industry has its legacy
from building platforms
Typical construction
activities:
• Site team
• Site instructions
• Site….etc.
Few large projects with
dedicated resources
Industrialization
Approx. 5-8 years ago,
moved to cross project
Product Line teams
• Serving several projects
Maturation
Mature technology require
industrialization
• Manufacturing solutions
Multiple projects require
matrix organization
• Shared resources
Ma
nu
fac
turi
ng C
on
stru
ctio
n
Increased Oil Recovery14 October 2015 6
Adopting both modelsTwo ways of quality assurance
Construction• Buildings
• Bridges
• Platforms
Quality
Assurance• Inspection
• Testing
Tailored Products • Project Specific
Manufacturing• Cars
• Electronics
• Household Appliances
Quality
Assurance
• Standardization
• Refining of processes for
“built in Quality” (still incl.
inspection and testing)
Configured
products• Standardized
Project Supply
• Manifolds
• Well jumpers
• Flowbases
• Subsea Distr. Unit’s
Product Delivery
• SCM’s
• Instruments
• Connectors
• Valves
• Tubing
Hangers
• X-mas Trees
• Well Heads
• etc.
Increased Oil Recovery14 October 2015 7
Requirement Rose
0
5
10
15
20
25
30
35
QA requirement 1QA requirement 2
QA requirement 3QA requirement 4
QA requirement 5
QA requirement 6
QA requirement 7
QA requirement 8
QA requirement 9
QA requirement 10
Tech requrement 1
Tech requrement 2
Tech requrement 3
Tech requrement 4
Tech requrement 5
Tech requrement 6
Tech requrement 7
Tech requrement 8Tech requrement 9
Tech requrement 10Dok. Requirement 1
Dok. Requirement 2Dok. Requirement 3
Dok. Requirement 4
Dok. Requirement 5
Dok. Requirement 6
Dok. Requirement 7
Dok. Requirement 8
Dok. Requirement 9
Dok. Requirement 10
Matr. Requirement 1
Matr. Requirement 2
Matr. Requirement 3
Matr. Requirement 4
Matr. Requirement 5
Matr. Requirement 6
Matr. Requirement 7
Matr. Requirement 8Matr. Requirement 9
Matr. Requirement 10
Operator 1
Operator 2
Operator 3
Operator 4
Codes and Std
Increased Oil Recovery14 October 2015 8
Requirement Rose
0
5
10
15
20
25
30
35
QA requirement 1QA requirement 2
QA requirement 3QA requirement 4
QA requirement 5
QA requirement 6
QA requirement 7
QA requirement 8
QA requirement 9
QA requirement 10
Tech requrement 1
Tech requrement 2
Tech requrement 3
Tech requrement 4
Tech requrement 5
Tech requrement 6
Tech requrement 7
Tech requrement 8Tech requrement 9
Tech requrement 10Dok. Requirement 1
Dok. Requirement 2Dok. Requirement 3
Dok. Requirement 4
Dok. Requirement 5
Dok. Requirement 6
Dok. Requirement 7
Dok. Requirement 8
Dok. Requirement 9
Dok. Requirement 10
Matr. Requirement 1
Matr. Requirement 2
Matr. Requirement 3
Matr. Requirement 4
Matr. Requirement 5
Matr. Requirement 6
Matr. Requirement 7
Matr. Requirement 8Matr. Requirement 9
Matr. Requirement 10
Operator 1
Operator 2
Operator 3
Operator 4
Codes and Std
Increased Oil Recovery14 October 2015 9
Requirement Rose
0
5
10
15
20
25
30
35
QA requirement 1QA requirement 2
QA requirement 3QA requirement 4
QA requirement 5
QA requirement 6
QA requirement 7
QA requirement 8
QA requirement 9
QA requirement 10
Tech requrement 1
Tech requrement 2
Tech requrement 3
Tech requrement 4
Tech requrement 5
Tech requrement 6
Tech requrement 7
Tech requrement 8Tech requrement 9
Tech requrement 10Dok. Requirement 1
Dok. Requirement 2Dok. Requirement 3
Dok. Requirement 4
Dok. Requirement 5
Dok. Requirement 6
Dok. Requirement 7
Dok. Requirement 8
Dok. Requirement 9
Dok. Requirement 10
Matr. Requirement 1
Matr. Requirement 2
Matr. Requirement 3
Matr. Requirement 4
Matr. Requirement 5
Matr. Requirement 6
Matr. Requirement 7
Matr. Requirement 8Matr. Requirement 9
Matr. Requirement…
Increased Oil Recovery14 October 2015 10
Collaboration and lean executionExample: Transfer of Customer Requirements
Increased Oil Recovery14 October 2015 11
What does this mean in practical terms?
…and are we ready for it?
Challenge ourselves and adjust the requirements to a “good enough” level.
Seek co-operation across the company boundary through the established
international standards, codes and JIPs.
Build trust to the EPC/EPCI contractors and focus on reviewing and auditing the
processes and system to ensure good build in quality.
Enable and encourage stoking program based on standard requirements and ITPs.
Leave the idea of “you get what you inspect”.
When need for inspection, consider use of an independent party inspector.
Qualification of products, manufacturing processes and acceptance criteria should
be valid across the industry.
The barrier for changing the requirements should be high.
Reduce the requirements for insight and review of engineering documentation.
Let the contractors establish a base of approved standard documents.
Reduce requirements for documentation and accept retained Q-documents
(MRBs etc.)
Increased Oil Recovery14 October 2015 12
Standardization – Real example
0
20
40
60
80
100
10 12 14 16 18 20 22 24 26 28 30 32 34 36 38
Standard
w/Stocking Plan
Repeated
Customer Standard
New customer
specification
Lead Time (months)
Price (
%)
Increased Oil Recovery14 October 2015 13
Closing remarks
• We are entering a new phase within Subsea Developments
– All about cost
• Major changes have to take place in the Supply Industry’s ability to
simplify and drive out cost
– Creating volume in processes and supply chain
– Fully take onboard the consequence of “modular standard” – “configure at
the assembly line”
– Technology innovation to simplify and drive out cost
• Major changes have to take place in Customers Specification and
buying practice
– Accept Vendor based component Specifications
– Allow tendering on functional specs
– Allow tendering at pre-FEED stage
Increased Oil Recovery14 October 2015 14
Reward
Adopting manufacturing solutions creates
a win-win-win situation.
• Improved and uniform quality
• Predicable OTD
• Lower cost and subsequent
lower price
Increased Oil Recovery14 October 2015 15
Let’s do it !