Page 1: Cost Reduction and Control

1

Page 2: Cost Reduction and Control

2

Cost reduction refers to the real and permanent reduction in the unit cost of the goods manufactured or services rendered.

COST REDUCTION CAN BE EFFECTED BY EITHER OF THE FOLLOWING WAYS:

(i) By reduction in unit cost of production:

This is usually brought by elimination of wasteful and non-essential elements in the design of products and from techniques and practices carried out.

(Any reduction in costs due to changes in Government policy like reduction in taxes or duties or due to price agreements do not come into the area of cost reduction as these are not real and permanent reductions in costs).

Page 3: Cost Reduction and Control

3

(ii) By increasing productivity:

This refers to increase in the volume of output with the expenditure remaining the same. But this should not be achieved at the cost of the characteristics and quality of the product.

AREAS OF COST REDUCTION:

1. Design

2. Factory organisation and method

3. Product planning

4. Factory layout and equipment

5. Utility services

6. Marketing

7. Finance

Page 4: Cost Reduction and Control

4

Cost control is concerned with keeping the expenditure within acceptable limits. Its major assumption is that costs are in control unless costs exceed budget or standard by an excessive amount.

DIFFERENCES BETWEEN-

COST CONTROL COST REDUCTION1. Controls costs towards Represents real and permanent achievement of predetermined decrease in costs. target or goals.2. It is a routine exercise. It is a planned process.3. It is a preventive function. It is a corrective function.

Page 5: Cost Reduction and Control

5

COST CONTROL IS EFFECTED THROUGHCOST CONTROL IS EFFECTED THROUGH

BUDGETING &

STANDARD COSTING

Budgeting:

A budget may be defined as a comprehensive and coordinated plan of action, expressed in monetary terms. It is prepared and approved prior to the budget period and may show income, expenditure and capital to be employed to attain the objective.

Standard costing:

In this, standards are set and actuals are compared with the standard. Corrective measures are undertaken for any discrepancy found between the standard and actuals.

Page 6: Cost Reduction and Control

6

TECHNIQUES OF COST REDUCTIONTECHNIQUES OF COST REDUCTION

1. VALUE ANALYSIS:

Value analysis is the identification of unnecessary cost i.e. cost that neither provides quality, nor use, nor life, nor appearance, nor customer satisfaction. Thus value analysis attacks costs at production stage.

2. ECONOMIC BATCH QUANTITY: (EBQ)

EBQ is that point where carrying costs equals set up cost approximately. At this point the total cost will also be minimum.

3. ECONOMIC ORDER QUANTITY: (EOQ) EOQ is the quantity fixed at a point where

total cost of ordering and the cost of carrying the inventory will be minimum.

Page 7: Cost Reduction and Control

7

ILLUSTRATION:

A publishing house purchases 2000 units of a particular item per year at a unit cost of Rs.20/-.

The ordering cost per order is Rs.50/- and the inventory carrying cost is 25%.

Find the optimal order quantity and the minimal total cost including purchase cost.

If 3% discount is offered by the supplier for purchase in lots of 1000 or more, should the publishing house accept the offer?

SOLUTION:

Optimal order quantity or EOQ =

2 x annual consumption x ordering cost per order

inventory carrying cost per unit

Page 8: Cost Reduction and Control

8

2 x 2000units x Rs.50

Rs.20 x 0.25

= 200units.

CALCULATION OF MINIMUM TOTAL COST WITHOUT DISCOUNT:

No. of orders to be placed for getting 2000units = 10orders

Average inventory (200units / 2) = 100 units

Purchase price of 2000units @ Rs.20/unit = Rs.40000

Ordering cost (10orders @ Rs.50/order) = Rs. 500

Carrying cost for 100uts (avg. inventory) (Rs.20*0.25) = Rs. 500

TOTAL COST = Rs.41000

Page 9: Cost Reduction and Control

9

CALCULATION OF TOTAL COST WITH 3% DISCOUNT WHEN PURCHASE ORDER QUANTITY IS 1000 UNITS:

Unit cost after 3% discount (Rs.20 – 3% of Rs.20) = Rs.19.40

Lot size = 1000 uts

No. of orders for 2000units @ 1000units / order = 2 orders

Avg. inventory (1000 uts per order / 2) = 500 uts

Purchase cost for 2000 uts @ Rs.19.40/ut. = Rs.38800

Ordering cost for 2 orders at Rs.50/order = Rs. 100

Carrying cost for avg. inventory (500 * 19.40 * 0.25) = Rs. 2425

TOTAL COST = Rs.41325

Page 10: Cost Reduction and Control

10

The above computation shows that supplier’s offer of 3% discount should NOT BE ACCEPTED because it will INCREASE COST by Rs.325/- as compared to the EOQ of 200 units.

Counter offer of higher discount should be made if the cost is to be less than Rs.41000/-.

Page 11: Cost Reduction and Control

11

4. ACTIVITY BASED COST MANAGEMENT:

ABC assumes that resource-consuming activities cause costs. Its aim is to directly control the activities that cause costs, rather than cost. By managing activities that cause costs, costs will be managed in the long run.

Cost causing activities – designing, engineering, manufacturing, marketing, etc.

Page 12: Cost Reduction and Control

12

A CASE STUDY IN ABC:

Under ABC in a direct mail printing firm, cost reduction occurred by developing plans to eliminate idle time and reduce the total set-up time rather than layoff employees.

The firm was reporting decreasing profit although operating at capacity. Its short-run solution was to reduce the labour force, which is a cost the company can control in short run. A study of activities in the printing process, however, indicated a set-up time of 35 hours on complex orders with employees being idle 25% of the time during set-up.

ABC demonstrated that this idle time was costing the firm approximately US$.41000 in wages per complex order.

Page 13: Cost Reduction and Control

13

5. JUST-IN-TIME APPROACH: (JIT)

The aims of JIT are to produce the required items, at the required quality and in the required quantities, at the precise time they are required.

JIT helps in cost reduction by –

a. elimination of non-value-added activities,

b. zero inventory,

c. zero defects,

d. zero breakdowns,

e. single batch ordering.

Though the above goals are unlikely to be achieved, it represent targets and create a climate for continuous improvement and excellence.

Page 14: Cost Reduction and Control

14

6. TOTAL QUALITY MANAGEMENT: (TQM)

TQM works on the philosophy that all business functions are involved in a process of continuous quality improvement.

TQM reduces cost by producing the products correctly the first time rather than wasting resources making substandard items and incurring additional expenditure on inspection, rework and scrapping.

It helps organisations to achieve their quality goals by providing reports and measures that will improve quality.

TQM aims at a customer-oriented process of continuous improvement that focuses on delivering products or services of consistent high quality in a timely fashion.

Page 15: Cost Reduction and Control

15

7. SUPPLY CHAIN MANAGEMENT: (SCM)

SCM attempts to build a cost effective chain beginning with the ultimate customer and links all the previous suppliers under one platform.

An effective SCM eliminates most of the activities in between customers and raw material suppliers along with associated costs. Most of the non-core activities are outsourced and hence fixed costs are kept minimal.

Close interaction between the corporate R&D and the suppliers facilitates continuous improvements in product design, process methodologies, etc. resulting in customer value enhancement and cost reduction.

A rupee spent on the supply chain can give more value than a rupee spent on marketing. The supply chain is part of the service offering.

Page 16: Cost Reduction and Control

16

A CASE STUDY:

ESCORTS TRACTORS FARMS – BPR resulted to target cost reduction per tractor by 20 %. Introduced in process involving the manufacturers of rear axles, one that required maximum movement of materials across the halls. Pre-reengineering, the manufacture involved 9 changes in ownership, had 21 workers in any given shift, and lead-time of 19 days. Today the process requires only 12 workers per shift, and lead-time has fallen to 8 hours.

“The physical resources are easy to change. The key to success lies in motivating employees up to the grass root level to initiate change, not just accept it.”

Farm Tract has extended its efforts to SCM and reduced the number of vendors and brought down the total acquisition cost by 5%.

Page 17: Cost Reduction and Control

17

8. PERT ANALYSIS:

Programme Evaluation Review Technique (PERT) reduces cost by giving an optimum schedule for the activities necessary to complete a project.

SOME OTHER COST REDUCTION TECHNIQUES ARE

9. Simplification and Standardisation

10. Design analysis

11. Substitute material utilisation

12. Production planning and control

13. Technological forecasting

14. Market research etc.

8. PERT ANALYSIS:

Programme Evaluation Review Technique (PERT) reduces cost by giving an optimum schedule for the activities necessary to complete a project.

SOME OTHER COST REDUCTION TECHNIQUES ARE

9. Simplification and Standardisation

10. Design analysis

11. Substitute material utilisation

12. Production planning and control

13. Technological forecasting

14. Market research etc.

Page 18: Cost Reduction and Control

18

Non-Conventional Approach

• Material Cost

• Manpower Cost

• Cost Management Initiatives

– Selling and Distribution

• Funding Cost

Page 19: Cost Reduction and Control

19

Non-Conventional Approach (Contd)

• Material cost – Cost reductions thru’

– E-sourcing

• Discovery of new sources

• Competitive pressures

• Rationalisation of suppliers

– Thrust on Value Engineering

• Re-Visiting Designs

• Application oriented engineering

– Product Life Cycle Management

Page 20: Cost Reduction and Control

20

Non-Conventional Approach (Contd.)

• Manpower Cost– Right-sizing of Employees – VRS Schemes– Optimum utilisation of Manpower

• Transition from Machine engagement time to Man-Engagement time.

– Productivity-linked wage settlements– Adopting new concepts

• MOST

• CELL Layout

Page 21: Cost Reduction and Control

21

IMPORTANCE OF COST CONTROL AND COST

REDUCTION FOR CORPORATE TURNAROUND

The importance of cost control and reduction in a manufacturing organisation can never be overemphasized. These phrases that were mere clichés not too long ago, have now come to acquire a new meaning in the last few years.

In fact, it may not be an overstatement to say that the revival and subsequent boom in the corporate sector in the last couple of years was primarily driven by the conscious efforts towards controlling costs.

Page 22: Cost Reduction and Control

22

Whether it be manpower reduction, controlling overheads, reducing input costs or bringing down finance charges, Corporate India has done it all in the effort to stay profitable in the new milieu.

There have been basically two drivers behind this emergence of cost consciousness in the corporate sector.

First is the compulsion to stay profitable, which is the basic instinct of any company.

Page 23: Cost Reduction and Control

23

As the demand cycle goes through a dip and sales begins to shrink, companies typically look inward to keep afloat. And the time-tested way of doing this is by slashing at the cost structure and save money.

However, it is the second reason that is the more significant one. In a highly competitive market place increasingly populated by multinationals, the best way for Indian companies to survive and grow is by offering better quality products at cheaper price.

The only way to do this is by constantly chipping away at the cost structure to eliminate unproductive expenditure so that the company will have the pricing freedom in the marketplace.

Page 24: Cost Reduction and Control

24

The old equation of

COST + MARGIN = SELLING PRICE

has now been turned on its head to mean that

MARGIN = SELLING PRICE – COST.

Of this, only one variable, cost, is under the control of the company while the market dictates selling price. Margin therefore is a function of how efficient the company is in controlling costs.

Page 25: Cost Reduction and Control

25

CHANGING PERSPECTIVE OF PROFIT

COST + PROFIT = SALESIn a sellers market cost and profits are reimbursed by the customer.

SALES - COST = PROFITWith more players in the market place, Selling price is determined by the market forces ; having locked to a level of cost , focus is on cost control and reduction . Cost information is for tactical decision making.

SALES -PROFIT = COSTSelling price is determined by market forces: Profit is determined by the risk/return profile of business with a focus on cost management to achieve the targeted results.

Page 26: Cost Reduction and Control

26

ROLE OF COST REDUCTION IN TATA MOTORS’ TURNAROUND – FROM A Rs.500 CRORE LOSS TO Rs.500 CRORE PROFIT IN 2 YEARS!

Tata Motors presents a classic case study of how studious efforts at cost control can pay rich dividends.

The company reported a historic loss of Rs.500 crore in 2000-01 when doomsayers said that the company would be history soon.

But the company bounced back and proved them wrong by registering a Rs.510 crore profit in 2002-03 literally rising like Phoenix from the ashes.

How did the company manage this?

Of course, the business environment improved and sales of commercial vehicles, its primary product, began to grow.

Page 27: Cost Reduction and Control

27

But there was also some silent work done in the background that helped the turnaround in Tata Motors’ fortunes.That was cost control. The company managed to eliminate as much as Rs.900 crore in costs in just two years’ time.

Instead of concentrating on any one aspect of cost, the company slashed them across the board. Thus, there was a reduction in material costs, staff costs through VRS, interest costs and in other expenditure.

Of course, it did help that interest rates during the period were low but there can be no doubt that the company showed exceptional financial management skills to overcome the dark phase.

Page 28: Cost Reduction and Control

28

EMERGING BUSINESS MODELS

In the Present Scenario, the very nature of competitionwill change. Increasingly customers will demand Ever-greater choice, so that products and services are customised for market segments of one customer.

Procurement will find new ways of working with suppliers and new ways of working internally. New business models will emerge that organisations must learn to recognise and understand. The key issues - the driving forces, the charactistics of new business models , the keys to success and the challenges companies face.

Page 29: Cost Reduction and Control

29

• Globalisation of both markets and sources.

• Open for business 24 x 7.

• The rapid expansion of internet.

• Continued evolution of transport services.

• Service economy.

FIVE FORCES OF NEW ECONOMY

Page 30: Cost Reduction and Control

30

CHARACTERISTICS OF NEW MODELS

• Focus on core activities.

• Automation/integration.

• Complexity of relationship.

• Ubiquitous and real-time information.

• Organisational structure.

Page 31: Cost Reduction and Control

31

• The Supply Chain

• The Balance of Power

• The Competitive Landscape

• Service not Product

• Future Cast

KEYS TO SUCCESS

Page 32: Cost Reduction and Control

32