Corrigendum Details Corrigendum No 1 Corrigendum Publish Date 20/03/2017 18:47 Tender Details Tender No MRVC-W2-TNA-DIVA- 2017-102 (Open Tender ) Closing Date/Time 06/04/2017 15:00 Name Of Work Construction of Railway Flyover from Ch. 4900 to Ch. 6700 between Kalwa - Mumbra section at existing Km 38 of Dn Local line for crossing NH4 near Kharigaon Reti bundar in Thane District in connection with Proposed 5th & 6th Lines between Thane & Diva stations. Items Modified NIT Header Field Name Existing Value Modified Value Tender Closing Date Time 06/04/2017 15:00 06/04/2017 15:00 Bidding Start Date 07/04/2017 23/03/2017 Earnest Money (INR) 5651430.00 14003000.00 New Items Added Documents S.No Document Description File Name 1 PRE BID MEETING MINUTES PREBIDMINUTES09032017.pdf Close

Upload: others

Post on 07-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Corrigendum Details Corrigendum No 1 Corrigendum 20/03/2017 … · It was stressed that time is essence for this work since commissioning of 5th & 6th line of Thane-Diva double line

Corrigendum Details

Corrigendum No 1CorrigendumPublish Date

20/03/2017 18:47

Tender Details

Tender NoMRVC-W2-TNA-DIVA-2017-102 (Open Tender )

Closing Date/Time 06/04/2017 15:00

Name Of Work

Construction of Railway Flyover from Ch. 4900 to Ch. 6700 between Kalwa -Mumbra section at existing Km 38 of Dn Local line for crossing NH4 nearKharigaon Reti bundar in Thane District in connection with Proposed 5th & 6thLines between Thane & Diva stations.

Items Modified

NIT Header

Field Name Existing Value Modified Value

Tender ClosingDate Time

06/04/2017 15:00 06/04/2017 15:00

Bidding Start Date 07/04/2017 23/03/2017

Earnest Money(INR)

5651430.00 14003000.00

New Items Added

Documents

S.No Document Description File Name

1PRE BID MEETINGMINUTES

PREBIDMINUTES09032017.pdf

Close

Page 2: Corrigendum Details Corrigendum No 1 Corrigendum 20/03/2017 … · It was stressed that time is essence for this work since commissioning of 5th & 6th line of Thane-Diva double line

Digitally signed byKULKARNI ANANDVASANTDate: 2017.03.2018:46:52 ISTReason: IREPS-CRISLocation: New Delhi

Signature NotVerifiedDigitally signed byKULKARNI ANANDVASANTDate: 2017.03.2018:46:52 ISTReason: IREPS-CRISLocation: New Delhi

Signature NotVerifiedDigitally signed byKULKARNI ANANDVASANTDate: 2017.03.2018:46:52 ISTReason: IREPS-CRISLocation: New Delhi