corrective action flow chart
TRANSCRIPT
Corrective ActionFlow Chart
Rev: 0.0 CA Flow Charts
CA Process Flowchart
A diagram that uses graphic symbols to depict the nature and flow of the steps in a process.
Benefits of Using This Flowchart
Promotes understanding of a CA process Identifies problem areas and opportunities for
process improvement Provides a way of training employees
Symbols Used In This Flowchart
Start / End
Process Step
Decision
Connector
Termination
Brief Description• List of problem areas identified in Area
• The objective is to prevent similar incidents happening
Again globally
• Pro-active steps taken to enable prevention of such
incidents
• Involves identification of fundamental parameters
which need attention.
• Identification of Corrective Action which are globally actionable and
measurable
Step-I
RCA AnalysisReceipt of RCA
Check for the Rtop no, capability and client affected
Study the Executive Summary to understand the problem statement
Check the key finding & key action to eliminate and the work around .
Study the Incident History & the action list
Study in detail the RCA analysis
Cont.
Link
Step-I Cont.
RCA Analysis
Note the RCA owner, Problem mang for further correspondence.
Check the cause category for vendor, responsibility etc
Check Section 6 of RCA “Lessons learnt from this RCA (Advice to others)”
Is the Action as per RCA global ?
No Yes
NOTES: RCA is the Input documents for CADetail study & Analysis of RCA is done to determine the CA CA is further checked if it is global, actionable and measurable.Based on the answer of global in nature or not, further course of action is decided explained in subsequent slides
Step-II
Deep Dive Analysis
Receipt of Deep Dive
Check for the Rtop no and client based on RCA
Check the columns 1. “How could we have detected this quicker?” 2. “How do we prevent this from happening
again?”
Check the columns 1. “Failed to Follow Documented Process “ 2.”
Actual Change Issue”
Cont.
Link
Study the columns 1. “Initial Documented RC Error “ 2. “ROOT
CAUSE STATEMENT (Following Deep Dive)”
Step-II Cont.
Deep Dive Analysis
Check for the column “Avoidable”
Check the column” What help do we need from Capability Owner?”
Check the column “Is this relevant to a broader community?”
Link
Is the Action as per
Deep Dive global ?No Yes
NOTES: Deep Dive enables to finalize the CA based on the answers from the columns like 1. ” What help do we need from Capability Owner?” 2. “How do we prevent this from happening again?”Deep Dive help to understand if the issue is avoidable and is global in nature.
Step-III
Option-I Step I (RCA Analysis) decision Box answer is NO Step II (Deep Dive Analysis) decision Box answer is NO
“Inform all the stake holders that the Issue is client specific and there is no
Global Action”
Step-III
Option-II Step I (RCA Analysis) decision Box answer is YES Step II (Deep Dive Analysis) decision Box answer is YES
CA Review:
Freezing the CA based on RCA & Deep dive
Expert Review of the CA
Review of the CA by SPOCs
Is the CA approved by
SPOCs based on global action?
No Yes
Go to Step-III Option-I
Go to Step-IV
Step-III
Option-III Step I (RCA Analysis) decision Box answer is NO Step II (Deep Dive Analysis) decision Box answer is YES
CA Review:
Freezing the CA based on RCA & Deep dive
Expert Review of the CA
Review of the CA by SPOCs
Is the CA approved by
SPOCs based on global action?
No Yes
Go to Step-III Option-I
Go to Step-IV
Step-III
Option-IV Step I (RCA Analysis) decision Box answer is YES Step II (Deep Dive Analysis) decision Box answer is NO
“Inform all the stake holders that the Issue is client specific and there is no
Global Action”
Step-IV
Posting CA in Intranet
Check for the responses in posted Flash
Check if all the capability have responded for the posted Message within 5 days.
Reconcile the data of the responses from Capability leads.
Compile the data, for the clients were CA has to be implemented.
Have all the capability
responded for the flash message
NoFollow Up with capability leaders for
response
Yes
Initiate the Project
NOTES: As the CA is Global, it is assumed that there will be clients were CA has to be implemented. Still if the response from Capability shows no clients, we have to close the posted message after informing all the stake holders.
Project Flow
NOTES: The Project Flow attached is a draft Schedule. Based on the scope of the project the schedule will be prepared. Duration of the activities are assumed. Actual duration will be discussed with team and finalized.