Corpus Christi Liquefaction, LLC Cheniere Corpus Christi Pipeline, L.P. Stage 3 Project DRAFT Resource Report 1 — General Project Description Docket No. PF15-26-000 July 2015

Upload: dotu

Post on 15-Feb-2018

229 views

Category:

Documents


1 download

TRANSCRIPT

  • Corpus Christi Liquefaction, LLC Cheniere Corpus Christi Pipeline, L.P.

    Stage 3 Project

    DRAFT Resource Report 1 General Project Description Docket No. PF15-26-000

    July 2015

  • RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION

    STAGE 3 PROJECT

    Corpus Christi Liquefaction, LLC i July 2015

    Cheniere Corpus Christi Pipeline, L.P.

    TABLE OF CONTENTS

    Section Page

    TABLE OF CONTENTS ............................................................................................................................... i

    LIST OF APPENDICES ............................................................................................................................... ii

    LIST OF TABLES ........................................................................................................................................ ii

    LIST OF FIGURES ...................................................................................................................................... ii

    ACRONYMS AND ABBREVIATIONS .................................................................................................... iii

    CHECKLIST OF FILING REQUIREMENTS ............................................................................................. v

    1.0 PROJECT DESCRIPTION ........................................................................................................... 1-1

    1.1 INTRODUCTION ........................................................................................................... 1-1

    1.2 PURPOSE AND NEED ................................................................................................... 1-1

    1.3 LOCATION AND DESCRIPTION OF PROPOSED FACILITIES ............................... 1-2 1.3.1 LNG Facilities ................................................................................................. 1-2 1.3.2 Pipeline Facilities ............................................................................................ 1-7

    1.4 PROJECT MAPS AND DRAWINGS ............................................................................. 1-8

    1.5 LAND REQUIREMENTS............................................................................................. 1-13 1.5.1 LNG Facilities ............................................................................................... 1-13 1.5.2 Pipeline Facilities .......................................................................................... 1-15

    1.6 CONSTRUCTION SCHEDULE AND WORKFORCE ............................................... 1-18

    1.7 CONSTRUCTION PROCEDURES .............................................................................. 1-18 1.7.1 Stage 3 LNG Facilities .................................................................................. 1-19 1.7.2 Pipeline Facilities .......................................................................................... 1-21

    1.8 OPERATIONS AND MAINTENANCE ....................................................................... 1-26 1.8.1 Stage 3 Project LNG Facilities ...................................................................... 1-26 1.8.2 Pipeline .......................................................................................................... 1-27

    1.9 FUTURE PLANS AND ABANDONMENT ................................................................ 1-28 1.9.1 Future Plans ................................................................................................... 1-28 1.9.2 Abandonment of Facilities............................................................................. 1-28

    1.10 PERMITS AND APPROVALS ..................................................................................... 1-28

    1.11 AFFECTED LANDOWNERS ...................................................................................... 1-30

    1.12 NONJURISDICTIONAL FACILITIES ........................................................................ 1-30 1.12.1 Identified Nonjurisdictional Facilities ........................................................... 1-30 1.12.2 Determination of the Need for FERC to Conduct an Environmental

    Review ........................................................................................................... 1-30

    1.13 CUMULATIVE EFFECTS ........................................................................................... 1-31 1.13.1 Other Projects Potentially Contributing to Cumulative Effects ..................... 1-33 1.13.2 Potential Cumulative Effects ......................................................................... 1-37

    1.14 REFERENCES AND CONTACTS ............................................................................... 1-40

  • RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION

    STAGE 3 PROJECT

    Corpus Christi Liquefaction, LLC ii July 2015

    Cheniere Corpus Christi Pipeline, L.P.

    LIST OF APPENDICES

    Appendix 1A Agency Correspondence

    Appendix 1B Adjacent and Affected Landowners (Privileged and Confidential)

    LIST OF TABLES

    Table 1.3-1 Summary of Proposed Stage 3 Pipeline and Appurtenant Facilities................................ 1-7 Table 1.5-1 Land Requirements for the Stage 3 Project Liquefaction Facilities .............................. 1-13 Table 1.5-2 Land Requirements for the Stage 3 Pipeline and Associated Facilities ......................... 1-17 Table 1.10-1 Permits and Consultations for the Stage 3 Project ......................................................... 1-29 Table 1.13-1 Other Projects Potentially Contributing to Cumulative Impacts.................................... 1-34 Table 1.13-2 Cumulative Impacts of the Stage 3 and Other Projects in the Project Area .................. 1-38

    LIST OF FIGURES

    Figure 1.3-1 Artist Impression of Stage 3 Project (view to the South) ................................................ 1-3 Figure 1.3-2 Artist Impression of Stage 3 Project (foreground) and Liquefaction Project

    (background) (view to the South) .................................................................................... 1-6 Figure 1.4-1 Project Location Map ....................................................................................................... 1-9 Figure 1.4-2 Terminal Site Plan ......................................................................................................... 1-10 Figure 1.4-3 LNGC Transit Route ...................................................................................................... 1-11 Figure 1.4-4 Stage 3 Pipeline Route ................................................................................................... 1-12 Figure 1.5-1 Land Requirements for Stage 3 Project LNG Facilities ................................................ 1-14 Figure 1.5-2 Stage 3 Pipeline Right-of-Way ...................................................................................... 1-16

  • RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION

    STAGE 3 PROJECT

    Corpus Christi Liquefaction, LLC iii July 2015

    Cheniere Corpus Christi Pipeline, L.P.

    ACRONYMS AND ABBREVIATIONS

    AEP American Electric Power

    API American Petroleum Institute

    AQCR air quality control regions

    ASME American Society of Mechanical Engineers

    ATWS additional temporary workspace

    Bcf/d billion standard cubic feet per day

    BTEX benzene, toluene, ethylbenzene, and xylene

    CEII critical energy infrastructure information

    CEQ Council on Environmental Quality

    CFR Code of Federal Regulations

    CCL Corpus Christi Liquefaction, LLC

    CCPL Cheniere Corpus Christi Pipeline, L.P.

    CI Chief Inspector

    CMMS computerized maintenance management system

    CO2 carbon dioxide

    Commission Federal Energy Regulatory Commission

    DLE dry low emissions

    DMPA Dredged Material Placement Area

    DRI Direct Reduced Iron

    EI Environmental Inspector

    ESD emergency shutdown

    EPA U.S. Environmental Protection Agency

    FERC Federal Energy Regulatory Commission

    GOM Gulf of Mexico

    H2S hydrogen sulfide

    HDD horizontal directional drill

    hp horsepower

    HUC Hydrologic Unit Code

    LNG liquefied natural gas

    LNGC LNG carrier

    m3

    cubic meters

    M&R meter and regulation

    MAOP maximum allowable operating pressure

    MLV mainline valve

    MMcf/d million cubic feet per day

    MP milepost

    MW megawatts

    NFPA National Fire Protection Association

    NGA Natural Gas Act

    NGL Natural Gas Liquids

  • RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION

    STAGE 3 PROJECT

    Corpus Christi Liquefaction, LLC iv July 2015

    Cheniere Corpus Christi Pipeline, L.P.

    NPDES National Pollution Discharge Elimination System

    OEP Office of Energy Projects

    O&M operations and maintenance

    PCB polychlorinated biphenyls

    PERC powered emergency release coupling

    POCCA Port of Corpus Christi Authority

    Plan FERCs Upland Erosion Control, Revegetation, and Maintenance Plan

    Procedures FERCs Wetland and Waterbody Construction and Mitigation Procedures

    Project Stage 3 Project and Stage 3 Pipeline

    psig pounds per square inch gauge

    Stage 3 Pipeline 22-mile-long, 42-inch-diameter pipeline

    Stage 3 Project proposed expansion of the Corpus Christi Liquefaction Project

    T&E threatened and endangered

    TCEQ Texas Commission on Environmental Quality

    TEU twenty-foot equivalent unit

    USACE U.S. Army Corps of Engineers

    USCG U.S. Coast Guard

    USDOT U.S. Department of Transportation