Corpus Christi Liquefaction, LLC Cheniere Corpus Christi Pipeline, L.P.
Stage 3 Project
DRAFT Resource Report 1 General Project Description Docket No. PF15-26-000
July 2015
RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION
STAGE 3 PROJECT
Corpus Christi Liquefaction, LLC i July 2015
Cheniere Corpus Christi Pipeline, L.P.
TABLE OF CONTENTS
Section Page
TABLE OF CONTENTS ............................................................................................................................... i
LIST OF APPENDICES ............................................................................................................................... ii
LIST OF TABLES ........................................................................................................................................ ii
LIST OF FIGURES ...................................................................................................................................... ii
ACRONYMS AND ABBREVIATIONS .................................................................................................... iii
CHECKLIST OF FILING REQUIREMENTS ............................................................................................. v
1.0 PROJECT DESCRIPTION ........................................................................................................... 1-1
1.1 INTRODUCTION ........................................................................................................... 1-1
1.2 PURPOSE AND NEED ................................................................................................... 1-1
1.3 LOCATION AND DESCRIPTION OF PROPOSED FACILITIES ............................... 1-2 1.3.1 LNG Facilities ................................................................................................. 1-2 1.3.2 Pipeline Facilities ............................................................................................ 1-7
1.4 PROJECT MAPS AND DRAWINGS ............................................................................. 1-8
1.5 LAND REQUIREMENTS............................................................................................. 1-13 1.5.1 LNG Facilities ............................................................................................... 1-13 1.5.2 Pipeline Facilities .......................................................................................... 1-15
1.6 CONSTRUCTION SCHEDULE AND WORKFORCE ............................................... 1-18
1.7 CONSTRUCTION PROCEDURES .............................................................................. 1-18 1.7.1 Stage 3 LNG Facilities .................................................................................. 1-19 1.7.2 Pipeline Facilities .......................................................................................... 1-21
1.8 OPERATIONS AND MAINTENANCE ....................................................................... 1-26 1.8.1 Stage 3 Project LNG Facilities ...................................................................... 1-26 1.8.2 Pipeline .......................................................................................................... 1-27
1.9 FUTURE PLANS AND ABANDONMENT ................................................................ 1-28 1.9.1 Future Plans ................................................................................................... 1-28 1.9.2 Abandonment of Facilities............................................................................. 1-28
1.10 PERMITS AND APPROVALS ..................................................................................... 1-28
1.11 AFFECTED LANDOWNERS ...................................................................................... 1-30
1.12 NONJURISDICTIONAL FACILITIES ........................................................................ 1-30 1.12.1 Identified Nonjurisdictional Facilities ........................................................... 1-30 1.12.2 Determination of the Need for FERC to Conduct an Environmental
Review ........................................................................................................... 1-30
1.13 CUMULATIVE EFFECTS ........................................................................................... 1-31 1.13.1 Other Projects Potentially Contributing to Cumulative Effects ..................... 1-33 1.13.2 Potential Cumulative Effects ......................................................................... 1-37
1.14 REFERENCES AND CONTACTS ............................................................................... 1-40
RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION
STAGE 3 PROJECT
Corpus Christi Liquefaction, LLC ii July 2015
Cheniere Corpus Christi Pipeline, L.P.
LIST OF APPENDICES
Appendix 1A Agency Correspondence
Appendix 1B Adjacent and Affected Landowners (Privileged and Confidential)
LIST OF TABLES
Table 1.3-1 Summary of Proposed Stage 3 Pipeline and Appurtenant Facilities................................ 1-7 Table 1.5-1 Land Requirements for the Stage 3 Project Liquefaction Facilities .............................. 1-13 Table 1.5-2 Land Requirements for the Stage 3 Pipeline and Associated Facilities ......................... 1-17 Table 1.10-1 Permits and Consultations for the Stage 3 Project ......................................................... 1-29 Table 1.13-1 Other Projects Potentially Contributing to Cumulative Impacts.................................... 1-34 Table 1.13-2 Cumulative Impacts of the Stage 3 and Other Projects in the Project Area .................. 1-38
LIST OF FIGURES
Figure 1.3-1 Artist Impression of Stage 3 Project (view to the South) ................................................ 1-3 Figure 1.3-2 Artist Impression of Stage 3 Project (foreground) and Liquefaction Project
(background) (view to the South) .................................................................................... 1-6 Figure 1.4-1 Project Location Map ....................................................................................................... 1-9 Figure 1.4-2 Terminal Site Plan ......................................................................................................... 1-10 Figure 1.4-3 LNGC Transit Route ...................................................................................................... 1-11 Figure 1.4-4 Stage 3 Pipeline Route ................................................................................................... 1-12 Figure 1.5-1 Land Requirements for Stage 3 Project LNG Facilities ................................................ 1-14 Figure 1.5-2 Stage 3 Pipeline Right-of-Way ...................................................................................... 1-16
RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION
STAGE 3 PROJECT
Corpus Christi Liquefaction, LLC iii July 2015
Cheniere Corpus Christi Pipeline, L.P.
ACRONYMS AND ABBREVIATIONS
AEP American Electric Power
API American Petroleum Institute
AQCR air quality control regions
ASME American Society of Mechanical Engineers
ATWS additional temporary workspace
Bcf/d billion standard cubic feet per day
BTEX benzene, toluene, ethylbenzene, and xylene
CEII critical energy infrastructure information
CEQ Council on Environmental Quality
CFR Code of Federal Regulations
CCL Corpus Christi Liquefaction, LLC
CCPL Cheniere Corpus Christi Pipeline, L.P.
CI Chief Inspector
CMMS computerized maintenance management system
CO2 carbon dioxide
Commission Federal Energy Regulatory Commission
DLE dry low emissions
DMPA Dredged Material Placement Area
DRI Direct Reduced Iron
EI Environmental Inspector
ESD emergency shutdown
EPA U.S. Environmental Protection Agency
FERC Federal Energy Regulatory Commission
GOM Gulf of Mexico
H2S hydrogen sulfide
HDD horizontal directional drill
hp horsepower
HUC Hydrologic Unit Code
LNG liquefied natural gas
LNGC LNG carrier
m3
cubic meters
M&R meter and regulation
MAOP maximum allowable operating pressure
MLV mainline valve
MMcf/d million cubic feet per day
MP milepost
MW megawatts
NFPA National Fire Protection Association
NGA Natural Gas Act
NGL Natural Gas Liquids
RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION
STAGE 3 PROJECT
Corpus Christi Liquefaction, LLC iv July 2015
Cheniere Corpus Christi Pipeline, L.P.
NPDES National Pollution Discharge Elimination System
OEP Office of Energy Projects
O&M operations and maintenance
PCB polychlorinated biphenyls
PERC powered emergency release coupling
POCCA Port of Corpus Christi Authority
Plan FERCs Upland Erosion Control, Revegetation, and Maintenance Plan
Procedures FERCs Wetland and Waterbody Construction and Mitigation Procedures
Project Stage 3 Project and Stage 3 Pipeline
psig pounds per square inch gauge
Stage 3 Pipeline 22-mile-long, 42-inch-diameter pipeline
Stage 3 Project proposed expansion of the Corpus Christi Liquefaction Project
T&E threatened and endangered
TCEQ Texas Commission on Environmental Quality
TEU twenty-foot equivalent unit
USACE U.S. Army Corps of Engineers
USCG U.S. Coast Guard
USDOT U.S. Department of Transportation