construction/temporary water service charge

1
Monthly Rate Effective Monthly Rate Effective Monthly Rate Effective Monthly Rate Effective Monthly Rate Effective 1/1/13 1/1/14 1/1/15 1/1/16 1/1/17 5/8” $23.53 $24.24 $24.96 $25.12 $25.91 ¾$23.53 $24.24 $24.96 $25.12 $25.91 1” $39.08 $40.26 $41.46 $41.73 $43.03 1-1/2” $77.95 $80.31 $82.70 $83.24 $85.83 2” $124.60 $128.37 $132.19 $133.05 $137.19 3” $233.44 $240.52 $247.66 $249.28 $257.04 4” $388.93 $400.72 $412.62 $415.33 $428.24 6” $777.65 $801.24 $825.03 $830.44 $856.27 Meter Size

Upload: rowland-water-district

Post on 09-Mar-2016

213 views

Category:

Documents


1 download

DESCRIPTION

Rate description chart

TRANSCRIPT

Page 1: Construction/Temporary Water Service Charge

Monthly Rate

Effective

Monthly Rate

Effective

Monthly Rate

Effective

Monthly Rate

Effective

Monthly Rate

Effective 1/1/13 1/1/14 1/1/15 1/1/16 1/1/17

5/8” $23.53 $24.24 $24.96 $25.12 $25.91 ¾” $23.53 $24.24 $24.96 $25.12 $25.91 1” $39.08 $40.26 $41.46 $41.73 $43.03

1-1/2” $77.95 $80.31 $82.70 $83.24 $85.83 2” $124.60 $128.37 $132.19 $133.05 $137.19 3” $233.44 $240.52 $247.66 $249.28 $257.04 4” $388.93 $400.72 $412.62 $415.33 $428.24 6” $777.65 $801.24 $825.03 $830.44 $856.27

Meter Size