  • ConstructionSchedulingSeminarOctober18,2014

    RAAConsultingEngineerandAssociates

  • PreliminaryWorkshop Whatisconstruction? WhatisaProject? WhatisthePERT/CPM? WhySCurve?

  • Constructionisacomplicatedandtimeconsumingundertaking putting together different materialsthrutheuseofpeopleandequipmenttocomeupwithafinishPROJECT

    Formation Assembly Creation Erection Structure

  • WhatisProject Undertaking Endeavor Development Mission Venture JobThathasabeginningandend.AProjectisaproblemscheduledforsolutionJamesP.Lewis

  • Projectis Agroupofactivities,involvingTIME,COST,andRESOURCE,thatinteracttoachieveaspecificgoal.

    Aplanned&temporaryundertakingdesignedfromanideaorconceptutilizingandcontrollingalimitedresourcesthruwhichaspecificanduniqueobjectiveisproduced. Temporarybeginningandend Uniquesomethingnotdonebefore

  • PERT Program Evaluation and Review TechniqueCPM CriticalPathMethod

    The program (or project) evaluation and reviewtechnique, commonly abbreviated as PERT, is astatisticaltool,usedinprojectmanagement,whichwasdesignedtoanalyzeandrepresentthetasksinvolvedincompletingagivenproject.

    FirstdevelopedbytheUnitedStatesNavyinthe1950s,it is commonly used in conjunction with the CriticalPathMethod(CPM)

  • BasictechniqueinpreparationofPERT/CPM

    1. A list of all activities required to complete the project (typically categorized within a work breakdown structure),2. Thetime(duration)thateachactivitywilltaketo complete,3. Thedependenciesbetweentheactivitiesand,4. Logical end points such as milestones ordeliverable items.

    TheessentialtechniqueforusingCPMistoconstructamodeloftheprojectthatincludesthe following:

  • ThreePhaseofPERT

    Scheduling

    Planning

    ControlMonitor

    Determinetherelationshipbetweentheworkoperationandthesequenceinwhichtheyaretoperformed.Schedulingofworktimetoeachworkoperation,whentostartandwhentofinish

    Translatingtheplannedscheduleintoarrowdiagramandintotimetableofcalendar

    Updatingrecomputationbroughtbychangingconditions.

  • NetworkDiagram Thenetworkdescribessequentialrelationshipamongdifferentactivitiesonaproject.

    Example,activityCDcannotbestartedaccordingtothenetworkuntilactivityABhasbeencompleted.

    CcannotstartuntilbothA&Barecompleted

  • NetworkDiagram

    AmustbecompletedbeforeeitherBorC

    BothA&CmustbecompletedbeforeeitherBorD

    NodetoNodeiscalledevent

  • NetworkDiagram

    A&BmustbecompletedbeforeCcanstart.DdependsonlyonB&A

    NetworkDiagram:istoolindeterminingtheCriticalPathorthecriticaldurationoftheprojectcalledCPM.

  • SampleestimationofTaskduration

    Excavationworksnaturalsoil,Vol=120cu.m. Equipmentcapability:120cu.m./hr. DTcapacity=8.0cu.m. HaulingDistance=30km Ave.Haulingspeed=30kph LoadingTime=15mins. Unloadingtime=15mins.

    Haulingtime=30/30=1hrLoadingtime=15/60=0.25hrUnloadingtime=15/60=0.25hrReturntrip=30/60=0.5hrTotalCycletime=2.0hrs

    No.oftripperday=8hrs/2hrs=4

    Vol.perday=32cu.m./day

    Taskduration=120/32=3.75daysSay4days

  • SampleTask Duration

    (wk)a Mobilization 1b Exavation 2c Backfilling 2d Compaction 1e HaulingofSurplusexcavation 2f Fabricationofformsandinstallation 8g Rebarfabricationandinstallation 7h Concretepouring 4i Precastwallscasting 8j Precastwallsinstallation 7k Tilingworks 12l Ceilinginstallation 8m Electricalroughingin 2n Wiresandcables 4o EletricalFixturesanddevice 3p Plumbingroughingin 2q Plumbingfixtures 3

    TaskDescription

    Pleasecontinuethenetwork..eachgroup

  • CriticalPath:a,b,f,I,k,wq=32weeks

    Networkdiagram

  • Project :Location :Subject : Construction Schedule and S-Curve (CATCH-UP SCHEDULE)

    Item No. %Wt 26-27 28-29 30-31 2-7 9-14 16-21 23-28 30 1-5 7-12 14-19 21-26 28-31 1-2 3 4 5 6I General Requirements/Prelimenaries

    a Mob./Demob. 0.62% 0.62b Tempfacil 1.85% 1.85c Temporary Enclosure 0.21% 0.21d Water and Powere Bonds and Permits (jobsite requirements only) 1.03% 1.03

    II Earth Works (Sump pit, Baffle, Aerator, Settling and Effluent Tank) a Clearing and Grubbing 0.62% 0.62b Bulk Excavation 11.66% 11.66c Backfilling and Compaction 2.29% 2.29d Disposal of Surplus Excvation 3.66% 0.366 0.366 0.366 0.366 0.366 0.366 0.366 0.366 0.366 0.366e Influent and Effluent structure 0.56% 0.56

    III Civil/Structural Works ((Sump pit, Baffle, Aerator, Settling and Effluent Tank) a Wall Footings 6.59% 3.3 2.29 1b Bottom Slab 5.70% 1.5 2.1 2.1c RC Walls (Precast and Cast in Place) 31.40% 7.85 8.4 2 8.4 4.75d Top Slab 1.19% 0.6 0.59e Inlet/Efluent 2.28% 1.145 1.135f Outlet/Effluent 2.62% 1.31 1.31g Causeway/Catwalk 1.24% 1.24

    IV Plumbing Works 1.93% 0.65 0.64 0.64V Electromechanicals

    a Installation of Pump (3hp) 3.66% 1.83 1.83b Installation of Blower (5hp) 7.20% 2.6 3.6 1c Aerator Disk 3.33% 1.665 1.665d Circuit Breaker 0.33% 0.33e Wires and Cables 0.51% 0.17 0.17 0.17f Conduit PVC Pipes 0.321% 0.107 0.107 0.107g Electrical Boxes 0.19% 0.095 0.095h Service Entrance Termination 0.62% 0.62i Consumables 1.41% 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.09

    VII Site Improvementa CHB Fencing (see plan) 3.04% 0.76 0.76 0.76 0.76b Equipment Housing (see plan) 2.72% 1.36 1.36c Fabrication and Installation of Gate 0.99% 0.232 0.198 0.19 0.19 0.18d Consumables 0.22% 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.01

    Total 100.00%Estimated Physical Accomplishment:

    Weekly Physical Accomplishment 16.356 0.366 0.366 0.366 2.426 14.505 14.13 4.34 10.428 9.153 7.002 10.587 5.324 3.02 0.322 0.31 0.91 0.09Cumulative Physical Accomplishment 16.36 16.72 17.09 17.45 19.88 34.39 48.52 52.86 63.28 72.44 79.44 90.03 95.35 98.37 98.69 99.00 99.91 100.00

    Actual Physical AccomplishmentWeekly Physical AccomplishmentCumulative Physical Accomplishment

    Prepared by: Checked and Reviewed by: Approved by:

    ENGR. RUEL AYAG DR. DANILO T. JAQUE GAUDIOSO LUARDO, JR. RAFAEL DE LARA SANVIVTORESProject Engineer Managing Director Project Director VP- CMTHydronet Consultant Inc. Hydronet Consultant Inc. Aboitizland Aboitizland

    Description

    Proposed Waste Water Treatment FacilityCanduman, Mandaue City

    May 26 - 31, 2014 June 1- 30, 2014 July 1- 31, 2014 August 1 - 6, 2014

  • CostVariance

  • CostVariance

  • ScheduleVariance

  • ScheduleVariance

  • SampleVerticalChartMEPFMEPF

    9F

    8F

    7F

    6F LEGEND: Roughingin

    5F FittingandStubout

    Fixtureinstallation4F

    3F

    2F

    GF

  • SampleVerticalChartStructuralSTRUCTURALWORKS

    9F

    8F

    7F

    6F LEGEND: FormsandScaffoldings

    5F RebarInstallation

    Concreting/ConcretePouring4F

    3F

    2F

    GF

  • SubstantialCompletionWhentheprojectis90%completed

    Readyforownersuse.

  • Thankyou

    Amanwhograduatetodayandstoplearningtomorrowwillbecomeuneducatedmanthedayafter