concrete pavement construction crcp workshopcrcpavement.org/wp-content/uploads/2015/04/lankes... ·...

94
Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction) Feb 22, 2012 Gerald D. Lankes Texas Concrete Pavement Association

Upload: others

Post on 23-Mar-2020

9 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Concrete Pavement Construction

CRCP Workshop (A Guide for Quality Construction)

Feb 22, 2012

Gerald D. LankesTexas Concrete Pavement

Association

Page 2: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

17 Steps to be Discussed

• Mix Design• Rebar Placement• Temperature Control• Headers• Work in front of the

Spreader• Paver Operations• Mechanical Finishing• Hand Finishing

• Depth Verification• Timely Texture• Timely Curing• Timely Sawing• Opening to Traffic• Strength Testing• Strength Problems• Ride Quality• Small/Irregular

Placements

Page 3: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Mix Design

• 5 Sacks, up to maybe 5½ sacks, is all that is needed for most uses (470# to 517 #)

• Even more true with Optimized Gradation. • With higher cement content comes:

– increased heat of hydration– increased water demand– more shrinkage

Page 4: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Mix Design

• W/C– Of the total mix water added, about half is for

Hydration; the rest is for Workability only.– The Workability Water is just sitting there as

the Concrete reaches its Initial Set.– Results in interconnected voids, loss of

strength and increasing permeability, a durability issue!

Page 5: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Mix Design

• Use Pozzolans and/or other SCM’s• Benefits of Pozzolans and/or other SCM’s:

– Mitigates adverse chemical reactions– Increases Ultimate Strength– Improves Workability and reduces

permeability (reduces water demand)– Lowers Heat of Hydration– Economical!

Page 6: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Mix Design

• Use of Optimized Aggregate Gradation.– Eliminates gap grading in concrete.– Adds an intermediate aggregate– Will provide a denser concrete with more

aggregate, less cement and less water!

Page 7: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Mix Design

• Maximizing the Coarse Aggregate will improve performance because…………..– Coarse Aggregate is stronger than paste.– Paste has all the freeze-thaw liability.– Paste has all the permeability liability.– Paste is the only component that shrinks.

Page 8: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Controlling Total Water

• You must Control the W/C Ratio• You must control the Cementitious Content• And you must control any onsite added

water.– Onsite additions to concrete in a mixer truck

must not exceed Mix Design W/C.– Can’t add water to dump trucks, but…

Page 9: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 10: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

And then, there is this

Page 11: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Effect of Finishing Water

• Will raise the W/C ratio of the surface of the concrete!

• Higher W/C will reduce strength and durability.

• The surface is exactly where the most durability is needed because that is where the rubber meets the road.

Page 12: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Rebar Placement, CRCP

Page 13: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

CRCPPlan

Profile

Page 14: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Longitudinal Rebar

• Holds cracks tightly together, so that load transfer is provided by aggregate interlock.

• Does contribute to load transfer• 2003 CRCP Standards includes spacing

tolerances. Contractor provides needed control.

• Concentrate on proper number of bars and general conformance to tolerances.

• Also, staggered splices.

Page 15: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 16: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Function of Transverse Rebar

• With timely sawing, controls longitudinal cracking.

• As a support for the longitudinal steel.• Size (everything is a #6 bar with 2003

standard) and spacing is totally dependent on pavement thickness and width between free longitudinal Joints/Pav't edges.

• Spacing can change several times on an individual project!

Page 17: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Tie-bars, CRCP/CPCD• Tie-bars provide transverse continuity of

slab.• Also provides continuity of rebar for CRCP.• Multiple-piece tie-bars eliminate the

problems associated with bending of single-piece tie-bars.

Page 18: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Tie-Bar Installation Requirements

• Multi-piece tie-bars require careful completion of threaded connection before the second pour.

• Single-piece tie-bars require pull-out tests to verify successful installation prior to second placement.

Page 19: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 20: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 21: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Temperature Control Methods

1. Using Pozzolans (“F” Fly Ash, Slag, etc.)2. Paving at night/very early morning3. Using Liquid Nitrogen4. Cooling aggregate at Batch Plant5. Chilled water6. Using Ice

Page 22: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Headers

Page 23: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Important Items for Headers

• Careful, Deliberate Hand Vibration!• There is a lot of hand finishing work.• Careful transitions from previous

placement or adjacent bridge.• There are forms for the transverse joint

and (usually) a short section of longitudinal forms.

Page 24: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 25: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 26: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Failure to properly hand vibrate the concrete at headers can lead to the following

problems:

Page 27: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 28: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 29: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 30: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Concrete Placement

• Concrete can be delivered in either Transit Mix trucks or Dump Trucks.

• In either case, the concrete is placed as near as possible to its final location.

• Spreader augers or laborers with shovels are the only way to move the concrete (no rakes, vibrators, etc.)

Page 31: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

• It is important to keep the base wet immediately in front of the paver, this helps keep the water you put in the concrete in the concrete.

Page 32: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 33: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 34: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Sampling concrete for testing with Dump Truck Delivery

Page 35: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Paver Operation

Page 36: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Slipform Paver

• Extrudes the Concrete Mix placed in front of the Spreader into the Pavement.

• Properly Consolidates the Concrete.• Properly forms the Concrete at the proper

Line and Grade.• A somewhat technical but efficient and

effective machine.

Page 37: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Remember Ride Quality Issues

You need to match batching rates with production rates in order to keep the paver moving at a constant speed, an

important element to getting a good ride quality.

Page 38: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 39: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 40: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 41: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Mechanical Finishing

Page 42: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

• The Mechanical Finisher completes the work of the Paver.

• Eliminates any small bump that might be present.

• Finds, but does not necessarily fix, any small low spot that might be present. (concrete may need to added by hand)

• There are many types of Transverse Finish Machines.

Page 43: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 44: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 45: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 46: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Hand Finishing

Page 47: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

• Most hand finishing is unnecessary and detrimental!

• Slipform Pavers do a very good job of providing a smooth riding surface.

• Excessive hand finishing negates the work of a good Paver, esp. if adding water.

• Hand finish what is needed, but only what is needed! (should be very minimal)

• After all, someone is getting ready to provide texture to the surface!

Page 48: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 49: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 50: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

And then, there is this

Page 51: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Depth Verification

Page 52: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Importance

• Depth of Concrete Pavement is important to the pavement’s long-term life!

• Test can be performed from a work bridge or from other contractor’s equipment.

Page 53: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 54: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Timely Texture

Page 55: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

• Micro-texture is needed to provide skid resistance to the surface.

• Tine texture is currently used as a means to remove water from the surface.

• To be effective, this needs to be done while the concrete is plastic enough to obtain the depth required.

• Mechanical methods are the norm for Tine Texture application, but hand applications can be used with smaller placements.

Page 56: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 57: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Insufficient Tine Texture

Page 58: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Timely Curing

Page 59: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

• Proper curing is considered to be the one area needing the most improvement statewide!!!

• Water needed for hydration starts to evaporate from the surface as soon as it is placed.

• The surface is the area where proper hydration of the cement is needed the most!!!!!!!!

• Wind speed & relative humidity are the main factors that determine the rate of evaporation.

Page 60: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

This chart is for“normal” concretemixes with no Pozzolans. Using Concrete with Pozzolans will have different results.

From ACI & C-1Manuals

Page 61: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Environment vs. Evaporation

Air Temp R.H. Conc Temp Wind Evap. Loss75 F 50% 80 F 5 mph .10 (BL #1)75 F 50% 80 F 20 mph .28 (280%)75 F 20% 80 F 20 mph .40 (400%)90 F 50% 95 F 5 mph .11 (110%)75 F 80% 80 F 5 mph .06 (BL #2)75 F 20% 80 F 25 mph .50 (833%)

Page 62: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Environment vs. Evaporation

• The environmental factors that add the most to evaporation rates are:1. High Wind Speed and2. Low Relative Humidity

• Air and Concrete Temperature are minor environmental factors to evaporation rates.

Page 63: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Curing

• Provide independent curing equipment when required to meet requirements of Item 360.

• Prevent surface drying before application of the curing system.

• Immediately following carpet drag, if needed, apply an of evaporation retardant as per manufacturers recommendations.

Page 64: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Curing

• Provide metal-tine finish immediately after concrete has set enough for consistent tines.

• Do not allow the concrete surface to dry before applying the curing compound.

Page 65: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 66: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 67: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 68: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 69: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 70: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

What is Wrong with this Picture?

Page 71: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Timely Sawing

Page 72: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Why Saw Timely?• Freshly placed concrete develops stress

faster than it develops strength.• When stress exceeds strength, a stress

relief crack occurs. Sawing needs to be complete before this happens.

• You need to be sawing just as soon as you can walk on the pavement and…….

• Should saw with possible minor raveling of cut to increase your ability to avoid the uncontrolled cracking (Maximize window of opportunity).

Page 73: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 74: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 75: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 76: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Opening to Traffic

Page 77: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Construction Traffic, 2004 Specs

• Pavement must be 48 hours old.• Pavement must have 450 psi strength.• Maturity method can be used.• Keep Delivery equipment 2’ from edge.• Keep track of paver 1’ from edge.• Repairs to curing and/or texture ASAP

Page 78: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

All Traffic

• Pavement must be 7 days old and have 450 psi strength.

• Clean the pavement.• Shoulder up the edges if needed.• Seal Joints.• Perform all safety related work.

Page 79: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Emergency Opening

• Written Permission is required.• Pavement must be 72 hours old.• Clean the pavement.• Shoulder up the edges if needed.• Perform all safety related work.

Page 80: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Strength Testing

Page 81: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

“Failing” Strength Tests

• Strength, for pavements, is not as important as:– Depth– Impermeability– Durability– Ride Quality– Rigid support underneath

Page 82: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Production Strength Problems

Page 83: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Low Production Strength Causes(concrete design was previously ok, then problems developed)

1. High Entrained Air Content2. High Water/Cement Ratio3. Testing Problems4. Dirty Aggregates5. Batching Errors6. Incompatibilities with Ingredients7. Adding cement is not be the solution!!!

Page 84: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Requirements for Good Ride

• Consistent Concrete Mix• Consistent Delivery of Sufficient Quantity• Consistent Movement of Paver• Paver needs Track line on which to operate• Stringline supported at close enough

intervals• No excessive hand finishing

Page 85: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Formed Concrete Pavements

• Small Irregular Sections– Intersections– U-turns– Short variable width widening– Others

• A lot of what has been discussed is still pertinent.

• Differences do exist.

Page 86: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Differences Include

• Careful grading of forms is required.• Wooden forms are common for curves.• Small self-propelled screeds are common.• Hand vibrate everything.• Higher slump is needed due to handwork.• Much more hand finishing is required.• Hand Texturing & Hand Curing is

common.

Page 87: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Typical Steel Form (defines ride)Form Lock

Page 88: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Form Placement

• Clean and oil forms• Forms must be within 2” of pavement depth.• Provide stable support such that forms will

support screed w/o deflection or movement.• Secure forms to base.• Pin every form section at ends and middle.• Carefully grade form to ensure pavement has

required ride quality (straightedge, eyeball, etc.)

Page 89: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 90: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Forming Curved Sections

• Use flexible, curved wood or metal forms for curves of 100 foot radius or less.

• Special attention must be made to the weight of screed used in these areas.

Page 91: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)

Form Removal

• Avoid damage while removing forms.• Repair damaged & Honeycombed areas

within 24 hours.• If forms are removed before 72 hours

after placement, cure the sides of Pav't.

Page 92: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 93: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)
Page 94: Concrete Pavement Construction CRCP Workshopcrcpavement.org/wp-content/uploads/2015/04/Lankes... · Concrete Pavement Construction CRCP Workshop (A Guide for Quality Construction)