comprehensive bicycle plan for pune

16
Comprehensive Bicycle Plan for Pune CREATING A BICYCLE FRIENDLY CITY

Upload: ranjit-gadgil

Post on 20-Aug-2015

289 views

Category:

Government & Nonprofit


5 download

TRANSCRIPT

Comprehensive Bicycle Plan for PuneCREATING A BICYCLE FRIENDLY CITY

National Urban Transport Policy

Equitable allocation of road space -

focus on people rather than

vehicles

Non-Motorized Transport is

environmentally friendly and must be given their due share

Have to address safety

concerns of pedestrians and

cyclists

Features such as safe bicycle parking, shade,

landscaping, drinking &

resting stations needed

NUTP – Challenges

Lack of safe crossing at

busy intersections

Badly designed pedestrian

paths and cycle tracks

Encroachments

Design and Encroachments

Design Flaws Unused Cycle Tracks Encroachments

NUTP – Prescriptions

Designs based on

open debate with experts

and users

Strict enforcement with public

participation

Explore Public Bicycle

Systems

Area Plans in congested areas with exclusive zones for

NMT

Comprehensive Mobility Plan

Cycle Track Network

Quality of Cycle Tracks

Law College Road

Old Canal Road

Aundh Road

Dr. Ambedkar Road

Sinhagad Road

Satara Road

Deccan College Road

Ganeshkhind Road

Swami Vivekananda (Bibwewadi) Road

Paud Road

Karve Road

Sahasrabuddhe Road

Solapur Road

Vishrantwadi-Airport Road

0 10 20 30 40 50 60 70 80 90 100

16

32

45

54

57

57

59

61

62

63

66

67

71

88

Cycle Track Scores

Score

 

Good to WorseLow scores indicate a good cycle track, higher the score, worse the cycle track.

Bicycle Plans

Plan Components

Creation of a city-wide cycle track network and cycle-safe streets

A city-wide Public Bicycle Scheme with a detailed project report for a pilot project

Bicycle Parking Facilities

Integration with Public Transport

Cycling Promotion

Adoption and use of Design Guidelines for planning and implementing cycle-friendly infrastructure

Institutional Mechanisms, Capacity-building and Financial Planning for implementing the plan

Awareness and Education Campaigns

Public Consultations

Ward-level meetings

Key stakeholder interviews to be conducted

Media strategy for dissemination of information

Public meetings and stakeholder interactions should use audio/visual materials, presentations, panel displays and other innovative methods. Bilingual materials (English and Marathi) required

All materials should be available on a website

The plan summary, draft plan, final plan, maps, charts should be available as print copies. The plan summary should be easy to understand and be available in

English and Marathi.

Proposal

Project lead

Team

Methodology

Issues and Approach

Opportunities and Creative Solutions

Requirements from PMC

Gantt Chart for project

Evaluation

Overall Experience (30 points)

Experience in a developing country and/or in India (10 points)

Composition and diversity of the team (10 points)

Qualifications and relevant experience of overall project leader and team leads (20 points)

Quality of the proposal (30 points)

Minimum qualifying score = 70

Score

Technical Score

Commercial Score = 100* P0/P, where P is the price quoted in the bid, P0 is lowest bid price

Composite Score = 0.80*technical score + 0.20*commercial score

Highest composite score proposal awarded contract

Payment Schedule

Stage Payment Deliverable Timelin

e

Preparation Phase Planning Documents

10% Upon submission plan document structure, survey details and methodology and public consultation details

1 month

Preparation Phase Completed

Upon submission of the preparation phase of the plan (including state-level inception meeting and the first round of ward level consultations)

2 months

DPR for the pilot Public Bicycle Scheme

Upon submission of the DPR for the pilot public bicycle scheme

1 month

Draft Bicycle Plan 45% Upon submission of the draft bicycle plan 3 months

Final Bicycle Plan 45% Upon submission of the final bicycle plan (including the second round of ward level consultations)

1 month

Bicycle Advisory Committee

Key city officials, technical persons and cycling representatives.

The firm will interact with the Committee on a regular basis, submit the details of the activities to be undertaken (including survey forms, stakeholder lists etc.) for feedback, update it on the progress of the plan, raise issues, and discuss any modifications in the plan or process.

The Committee will play the role of both assisting the firm to prepare a high quality plan and also ensure that the terms and conditions of the contract are being met.

The Advisory Committee is expected to have 6-8 members and will meet once a month to review the progress of the plan and review and provide feedback on the intermediate deliverables.