competitive bidding

30
z COMPETITIVE BIDDING Donald W. Gregory Ohio Prosecuting Attorneys Association December 3, 2015

Upload: kegler-brown-hill-ritter

Post on 15-Apr-2017

317 views

Category:

Law


0 download

TRANSCRIPT

Page 1: Competitive Bidding

z

COMPETITIVE BIDDING

Donald W. GregoryOhio Prosecuting Attorneys Association

December 3, 2015

Page 2: Competitive Bidding

z

What is Happening in the Construction Industry?

+Less Work and Lower Margins

+Desperation for Contractors, Good Value for Owners

+Many More Bid Disputes

Page 3: Competitive Bidding

z

Why a Requirement for Competitive Bidding?

“To provide for open and honest competition in bidding for public contracts and to save the public harmless, as well as bidders themselves, from any kind of favoritism or fraud in its varied forms.”

Cedar Bay Constr., Inc. v. Fremont (1990), 50 Ohio St.3d 19, 21

Page 4: Competitive Bidding

z

What Exceptions Exist?

Professional Services- architect, engineer, construction manager

Less than $50,000

Real and present danger declared by unanimous vote

Page 5: Competitive Bidding

z

New County Bidding Threshold

$50,000 9-28-12

R.C. §307.86

Page 6: Competitive Bidding

z

What Advertising is Required?

Once a week for not less than 2 weeks(2nd can be avoided by posting online)

Page 7: Competitive Bidding

z

What Standard Applies to Counties?

“LOWEST AND BEST” BIDDER(more subjective)

UNLESS “LOWEST, RESPONSIVE & RESPONSIBLE” BIDDER standard adopted(more objective)

Page 8: Competitive Bidding

z

What Standard Applies to Municipalities?

“LOWEST AND BEST” BIDDER

UNLESS DIFFERENT STANDARD ADOPTEDUNDER HOME RULE

Page 9: Competitive Bidding

z

What Standard Applies to Most State Agencies?

“LOWEST, RESPONSIVE & RESPONSIBLE” BIDDER(more objective)

Page 10: Competitive Bidding

z

What is “Responsive”?

Satisfies the bid instructions in all MATERIAL respects

and

Does not give the bidder a COMPETITIVE ADVANTAGE (i.e. price)

[Can WAIVE MINOR IRREGULARITIES]

Page 11: Competitive Bidding

z

What is “Responsible”?

Apply 9.312 factors including:

+Experience

+Management skills

+Financial resources

+Facilities

+Conduct & performance on previous contracts

+Ability to execute the contract properly

Page 12: Competitive Bidding

z

What is “Best”?

May depend on the criteria in the bid solicitation

but basically who can perform best for the price

[Can consider previous dealings, references, etc.]

Page 13: Competitive Bidding

z

Must Announce Bid Criteria

If base award on unannounced criteria, the award is subject to attack.

Page 14: Competitive Bidding

z

NON-COLLUSIVE AFFIDAVITS

+Promise no agreement on price or terms with competitors

+Must be notarized

Page 15: Competitive Bidding

z

BID MAY BE WITHDRAWN IF MISTAKE

+Particularly if math or clerical mistake

WITHIN 48 HOURS OF BID OPENING

Page 16: Competitive Bidding

z

What discretion is vested with the Public Owner?

Cannot act in arbitrary or unreasonable fashion.

Heavy burden to prove an abuse of discretion.

Courts reluctant to substitute their judgment.

Page 17: Competitive Bidding

z

LOW BIDDER ENTITLED TO BID PROTEST MEETING

If Pubic Owner adopts “lowest, responsive and responsible” bidder standard

or promise this in bid criteria

IF REQUESTED by low bidder within 5 days of notice of rejection.

Page 18: Competitive Bidding

z

WHAT HAPPENS AT THE BID PROTEST MEETING?

Opportunity to be heard (the contractor’s opportunity to tell “his side of the story”)

But no guaranteed due process or constitutional rights such as cross-examination

Page 19: Competitive Bidding

z

WHAT “DISCOVERY” IS PERMITTED?

Owners should expect a public records request and unilateral discovery in advance of the bid protest meeting and suit

Page 20: Competitive Bidding

z

WHEN IS A REBID PERMITTED?

ANYTIME for any reason

REQUIRED IF COST (OF PROJECT) EXCEEDS PUBLISHED ESTIMATE BY MORE THAN 10%

Page 21: Competitive Bidding

z

WHAT MUST A DISGRUNTLED BIDDER PROVE TO OBTAIN AN INJUNCTION?

1. Strong likelihood of success on the merits;

2. Irreparable injuries (no adequate remedy at law);

3. Injunction would not cause substantial harm to others; and

4. Injunction would serve the public interest.

Page 22: Competitive Bidding

z

What Can A Public Owner Do if Injunction Granted?

+Proceed Anyway and Take Chances(Automatic Stay upon Appeal without Bond)

+Re-bid

+Go with Successful Challenger

Page 23: Competitive Bidding

z

Can a Contractor Recover Money Damages?

Generally, No.

No Lost Profits: Cementech

But Bid Preparation Costs May Be Recovered:Meccon v. Akron U.

Page 24: Competitive Bidding

z

What about “Quality Contracting” Standards?

Have been enforced when the criteria is expressly referenced in the bid instructions.

Subject to much gamesmanship on labor issues.

Courts reluctant to second-guess even if only minor deviations (i.e. minor prevailing wage violations)….until Associated Builders.

Page 25: Competitive Bidding

z

Associated Builders: Huntington Ballpark

+TPC was low bidder but rejected due to prevailing wage “violations”.

+ Injunctions denied and ballpark completed before case arrived in Supreme Court.

+Supreme Court found abuse of discretion by Commissioners – substituted their judgment?

+TPC pursued bid preparation costs and fees.

Page 26: Competitive Bidding

z

CONSTRUCTION REFORM

+Eliminated the requirement of multiple prime bidders (MEP trades)

+Authorized General Contracting (with no MEP bidding to compare costs)

+Authorized Design-Build and Construction-Manager (at risk) on “Best Value” basis

Page 27: Competitive Bidding

z

+ Lower Claim Cost

+ Single Source Responsibility

+ Less Coordination

+ Lower Bid Cost

+ More Cost Certainty Upfront

SINGLE PRIME v. MULTIPLE PRIMEAdvantages

Page 28: Competitive Bidding

z

“Best Value” Selection+ Determined through RFQ & RFP process

(like A/E selection)

+ Factors include:- Competence- Past Performance- Financial Responsibility- Workload- Diversity

+Contracted on Open-book “cost-plus” basis

+Guaranteed Maximum Price (“GMP”)

Page 29: Competitive Bidding

z

Contract and Bond Forms

+Can Use as Prime Contract:- AIA- ConsensusDOCS- State DAS- DBIA or EJDC (design – build)- CMAA (construction – manager)

+ Subcontract must include:- State form

+ 100% bonds are still required.

Page 30: Competitive Bidding

z

Questions?

Don GregoryKegler Brown Hill + Ritter