commercial office fit-out working drawings

15
110508 The builder shall check and verify all Drawing No.: Checked By: dimensions and verify all errors and omissions to the Architect. Do not scale the drawings. Drawings shall not be used for construction purposes until issued by the Architect for construction. Scale: Date: Status: Project Name Client Plot Date: Antennae Proposal Project No: Drawing Title: 15/01/2013 C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln 595 Little Collins St Melbourne 3000 CATC as noted PRELIMINARY 6.8.1 Proposed Floor Plan - First Floor KATIE SARGENT - PROPOSED - PROPOSED FLOOR PLAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DW RG 1 2 3 4 5 1 2 3 4 5 N E S W 21,600 300 300 11,300 11,600 1,800 300 1200 3,003 300 1,500 90 4,210 90 1,320 90 1,310 90 2,300 300 300 5,716 4,408 3,871 3,651 500 400 500 400 500 400 500 3,191 1,500 1,499 1,087 90 2,668 100 1,038 100 1,251 90 2,912 300 90 899 1,010 1,000 300 1,200 300 4,505 100 1,061 9,552 90 1,200 90 300 8,000 2,011 989 300 300 21,000 300 S/3 S/1 S/4 S/2 Toilet Bathroom Kitchen Reception Conference Executive Director Creative Director Viewing Room Proposed Floor Plan - First Floor 1:100

Upload: katie-sargent

Post on 16-Apr-2015

272 views

Category:

Documents


10 download

DESCRIPTION

Here you will find a selection of working drawings designed on ArchiCAD 15.

TRANSCRIPT

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.1

    Proposed Floor Plan - First FloorKATIE SARGENT - PROPOSED - PROPOSEDFLOOR PLAN

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    1617181920

    DW

    RG

    12345

    1

    2

    3

    4

    5

    NE

    SW

    21,600

    300

    300

    11,3

    00

    11,6

    00

    1,800 3001200

    3,003

    300

    1,50

    090

    4,21

    090

    1,32

    090

    1,31

    090

    2,30

    030

    0

    300 5,716 4,408 3,871 3,651

    500400

    500400

    500400

    500 3,191 1,500

    1,49

    91,

    087

    902,

    668

    100

    1,03

    8100

    1,25

    190

    2,91

    230

    0

    9089

    91,

    010

    1,00

    030

    0

    1,20

    0

    300 4,505 100 1,061 9,552 90 1,200 90

    300

    8,00

    02,

    011

    989

    300

    300 21,000 300

    S/3

    S/1

    S/4

    S/2

    Toilet

    Bathroom

    Kitchen

    Reception

    Conference

    Executive Director

    Creative Director

    Viewing Room

    Proposed Floor Plan - First Floor1:100

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.2

    Proposed Floor Plan - MezzanineKATIE SARGENT - PROPOSED - PROPOSEDFLOOR PLAN - MEZZANINE

    3,400 1,350 3,400 1,350 3,400 1350 3,4003,

    400

    2400

    3,40

    0

    300 5,743 9,515 2,891 2,851 300

    2,686 50 1,78917

    270

    0 Freelance & Hotdesk Area

    Relaxation & Dining

    Proposed Floor Plan - Mezzanine1:100

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.3

    Reflected Ceiling Plan - FirstKATIE SARGENT - PROPOSED - RCP - FIRST

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    1617181920

    W

    123451

    2

    3

    4

    5

    T

    A

    T

    T

    T

    T

    T T

    T

    AAA

    A A

    Legend Halogen Downlight

    E27 Pendant

    Electrical Cabling

    General Power Outlet

    Light Switch

    Aerial Outelt

    Telephone Outlet

    AV Projector

    Executive Director

    Conference Viewing Room Reception

    Kitchen

    Toilet

    Creative Director

    Bathroom

    Reflected Ceiling Plan - First1:100

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.4

    Reflected Ceiling PLan - MezzanineKATIE SARGENT - PROPOSED - RCP -MEZZANINE

    T T

    T T

    T T

    T T

    T

    A

    Freelance & Hotdesk Area

    Relaxation & Dining Legend Halogen Downlight

    E27 Pendant

    Electrical Cabling

    General Power Outlet

    Light Switch

    Aerial Outelt

    Telephone Outlet

    AV Projector

    Reflected Ceiling PLan - Mezzanine1:100

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.5

    Section 1KATIE SARGENT - PROPOSED - Section 1Section 1

    200

    865

    630

    790

    100

    1,81

    085

    010

    03,

    052

    200

    2,29

    010

    02,

    660

    100

    8,40

    0

    200

    2,39

    086

    550

    4,80

    050

    01,

    763

    1,13

    7

    3,00

    010

    0

    Executive Director

    Mezzanine/Freelance Mezzanine Walkway

    Executive Director Photocopy/storage

    Section 11:100

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.6

    Section 2KATIE SARGENT - PROPOSED - Section 2Section 2

    200

    2,40

    050

    010

    01,

    800

    3,38

    8

    8001

    0891

    31,

    379

    100

    1,50

    040

    03,

    000

    201

    1,39

    210

    72,

    648

    100

    552

    3,40

    0

    200

    852

    418

    1,02

    298

    2,61

    020

    03,

    000

    5,00

    03,

    388

    8,40

    0

    900

    2,29

    0

    2,29

    02,

    600

    Bathroom

    Kitchen Reception Viewing Room Conference

    Freelance/Mezzanine

    Section 21:100

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.7

    Section 3KATIE SARGENT - PROPOSED - Section 3Section 3

    200

    2,29

    010

    02,

    650

    100

    3,07

    7

    200

    8,20

    0

    860 1,50

    02,

    700

    850

    3,16

    7

    1,24

    01,

    0201

    001,

    180

    1,48

    0

    Conference Executive Director

    Freelance/Mezzanine

    Section 31:50

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.8

    Section 4KATIE SARGENT - PROPOSED - Section 4Section 4

    899

    1,09

    51,

    205

    9085

    8100

    552

    500

    2,91

    7

    200

    8,20

    0

    8,40

    0

    1,49

    777

    7111

    916

    1,49

    53,

    417

    Viewing Room Mezzanine/Freelance

    Photocopy/storageReceptionSection 4

    1:50

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.9

    Reception ElevationKATIE SARGENT - PROPOSED - ReceptionElevation

    180180

    180

    180

    180

    750

    5099

    865

    511,

    385

    724

    3034

    130

    900

    2,30

    0

    150

    Schiavello Green WallH: 29300mm W2850D: 125mm

    Reception Elevation1:20

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.10

    Viewing Room ElevationKATIE SARGENT - PROPOSED - Viewing RoomElevation

    450

    100

    350 10

    01,

    458

    2,64

    8

    2,54

    550

    55

    Viewing Room Elevation1:50

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.11

    Executive Director Elevation, Conference ElevationKATIE SARGENT - PROPOSED - ExecutiveDirector Elevation

    1,49

    579

    4

    845

    2066

    050

    780

    794

    2290

    996

    8188

    158

    810

    1,44

    4

    Executive Director Elevation1:50

    Conference Elevation1:50

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.12

    Creative Director Elevation, Photocopy & Storage

    Area Elevation

    KATIE SARGENT - PROPOSED - CreativeDirector Elevation

    6655

    078

    079

    0

    852

    50826

    0 2502

    50

    170

    2,29

    0

    900

    5030

    730

    0 739

    2,29

    0

    2082

    0220

    7 232

    1851

    9019

    0 215

    176

    176

    176

    176

    176

    Mezzanine stairs

    Photocopy machine

    Creative Director Elevation1:50

    Photocopy & Storage Area Elevation1:50

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.13

    Mezzanine Walkway ElevationKATIE SARGENT - PROPOSED - MezzanineWalkway Elevation

    5,92

    586

    550

    1,49

    51,

    073

    50

    915

    2,41

    0

    3510

    0

    2,35

    5

    Mezzanine Walkway Elevation1:50

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.14

    Freelance/Mezzanine ElevationKATIE SARGENT - PROPOSED -Freelance/Mezzanine Elevation

    1,81

    282

    8

    2,41

    240

    01,

    044

    414

    1,55

    9

    947

    5564

    241,

    302

    2,64

    03,

    189

    Freelance/Mezzanine Elevation1:50

  • 110508

    The builder shall check and verify all

    Drawing No.:

    Checked By:

    dimensions and verify all errors and omissions to theArchitect. Do not scale the drawings. Drawings shallnot be used for construction purposes until issuedby the Architect for construction.

    Scale: Date:

    Status:

    Project Name

    Client

    Plot Date:

    Antennae Proposal

    Project No:

    Drawing Title:

    15/01/2013

    C:\Users\kay\Documents\Interior Design\Term 3\Commercial Design & Processes\Assessment Tasks\Job Folder\Documentation\CAD Drawings\CAD - A1 - Katie Sargent - 110113.pln

    595 Little Collins St Melbourne3000

    CATC

    as noted

    PRELIMINARY

    6.8.15

    Bathroom Elevation, Kitchen ElevationKATIE SARGENT - PROPOSED - Kitchen &Bathroom Elevation

    1,12

    270

    370

    5039

    110

    0

    912

    400

    1,10

    050

    0

    1,99

    991

    3

    3,00

    0

    5050

    700

    5096

    6

    1,99

    091

    2

    209

    7741

    0041

    4

    2,30

    0

    166

    9077

    4 180

    Bathroom Elevation1:50

    Kitchen Elevation1:50

    6.8 KATIE SARGENT - PROPOSED6.8.1 PROPOSED FLOOR PLAN6.8.2 PROPOSED FLOOR PLAN - MEZZANINE6.8.3 RCP - FIRST6.8.4 RCP - MEZZANINE6.8.5 Section 1 Section 16.8.6 Section 2 Section 26.8.7 Section 3 Section 36.8.8 Section 4 Section 46.8.9 Reception Elevation6.8.10 Viewing Room Elevation6.8.11 Executive Director Elevation6.8.12 Creative Director Elevation6.8.13 Mezzanine Walkway Elevation6.8.14 Freelance/Mezzanine Elevation6.8.15 Kitchen & Bathroom Elevation