Coach No. :NW02117 Type : WGACCN Built Year : 2002 Make : RCF Form No. F/BR/ICF/002 Valid From: 02/04/2015 Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of Corrosion Repair Rotary Side Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per% Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100% Aux. Head stock 4 100% Sole Bar 9 53% Draft Gear Bracket 2 100% Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100% Bottom Wall Part 9 53% Body panel/patch 100% Door Top/Roof Patch 100% Window Module 0% Window Sill 0 0% Window Bar 0 0% Seat piller/lav. Partition 0% UIC end construction 0% End Drooping: Rotery End - EAST : -10, WEST : -10 Other End - EAST : 8, WEST : 10 Start Date : 21-Jun-2017, Completion Date : 30-Jun-2017, Net Repair Days : 9, Total Man Hours : 1540 NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Upload: others

Post on 29-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW02117 Type : WGACCN Built Year : 2002 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 9 53% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 9 53% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 0 0% Window Bar 0 0%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : -10 Other End - EAST : 8, WEST : 10Start Date : 21-Jun-2017, Completion Date : 30-Jun-2017, Net Repair Days : 9, Total Man Hours : 1540

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 2: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW03704 Type : GSLRD Built Year : 2003 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 14 88% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 14 88% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 14 74% Window Bar 38 45%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -8, WEST : -7 Other End - EAST : -4, WEST : -5Start Date : 04-May-2017, Completion Date : 15-May-2017, Net Repair Days : 10, Total Man Hours : 1796

S K SHARMA - SSE PANKAJ KU SINGH - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 3: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW04221 Type : WGSCN Built Year : 2004 Make : BEML

Form No. F/BR/BEML/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 0 0% Diagonal 4 100% Logitudinal Channel Structure 2 100%Aux. Head stock 0 0% Sole Bar 0 0% Draft Gear Bracket 0 0%Trough floor 2 40% Bottom Wall Part 0 0% Body panel/patch 100%Door Top/Roof Patch 0% Seat Bracket Rail 0% Window Sill 0 0%Window Bar 0 0% Seat piller/lav. Partition 100% UIC end construction 0%Body Pillar Part 0 100%

End Drooping: Rotery End - EAST : -10, WEST : -10 Other End - EAST : -10, WEST : -8Start Date : 11-Nov-2017, Completion Date : 17-Nov-2017, Net Repair Days : 6, Total Man Hours : 852

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 4: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW04231 Type : WGSCN Built Year : 2004 Make : BEML

Form No. F/BR/BEML/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 0 0% Diagonal 4 100% Logitudinal Channel Structure 2 100%Aux. Head stock 0 0% Sole Bar 0 0% Draft Gear Bracket 0 0%Trough floor 2 40% Bottom Wall Part 0 0% Body panel/patch 100%Door Top/Roof Patch 0% Seat Bracket Rail 0% Window Sill 0 0%Window Bar 0 0% Seat piller/lav. Partition 100% UIC end construction 0%Body Pillar Part 0 100%

End Drooping: Rotery End - EAST : -3, WEST : -5 Other End - EAST : -3, WEST : -7Start Date : 16-Mar-2018, Completion Date : 24-Mar-2018, Net Repair Days : 8, Total Man Hours : 912

S K SHARMA - SSE PANKAJ KU SINGH - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 5: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW04246 Type : WGSCN Built Year : 2004 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 4 25% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 4 25% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 14 35% Window Bar 74 42%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 2, WEST : 9 Other End - EAST : -10, WEST : -5Start Date : 19-Aug-2017, Completion Date : 24-Aug-2017, Net Repair Days : 5, Total Man Hours : 1368

PANKAJ KU SINGH - JE S K SHARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 6: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW04408 Type : GS Built Year : 2004 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 7 41% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 7 41% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 28 70% Window Bar 70 39%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : 3 Other End - EAST : 10, WEST : 10Start Date : 25-Aug-2017, Completion Date : 31-Aug-2017, Net Repair Days : 6, Total Man Hours : 1256

NISHANK VERMA - JE P S RATHORE - JE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 7: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW04707 Type : SLRD Built Year : 2004 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 7 37% Window Bar 22 26%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -2, WEST : -7 Other End - EAST : -7, WEST : 5Start Date : 26-Sep-2017, Completion Date : 07-Oct-2017, Net Repair Days : 11, Total Man Hours : 1704

MAYANK PRAJAPATI - JE R KU KHARE - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 8: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW04709 Type : GSLRD Built Year : 2017 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 12.5 78% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 12.5 78% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 10 53% Window Bar 24 29%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 2, WEST : -6 Other End - EAST : -3, WEST : 2Start Date : 04-Oct-2017, Completion Date : 12-Oct-2017, Net Repair Days : 8, Total Man Hours : 1960

OM PRAKASH SAHU - JE R PILLAI - SSE T K PANJA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 9: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05202 Type : WGSCN Built Year : 2005 Make : BEML

Form No. F/BR/BEML/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 0 0% Diagonal 4 100% Logitudinal Channel Structure 2 100%Aux. Head stock 0 0% Sole Bar 0 0% Draft Gear Bracket 0 0%Trough floor 2 40% Bottom Wall Part 0 0% Body panel/patch 100%Door Top/Roof Patch 0% Seat Bracket Rail 0% Window Sill 14 35%Window Bar 76 43% Seat piller/lav. Partition 100% UIC end construction 0%Body Pillar Part 0 100%

End Drooping: Rotery End - EAST : -7, WEST : -8 Other End - EAST : -10, WEST : -8Start Date : 31-Jul-2017, Completion Date : 04-Aug-2017, Net Repair Days : 5, Total Man Hours : 968

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 10: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05211 Type : WGSCN Built Year : 2005 Make : BEML

Form No. F/BR/BEML/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 0 0% Diagonal 4 100% Logitudinal Channel Structure 2 100%Aux. Head stock 0 0% Sole Bar 0 0% Draft Gear Bracket 0 0%Trough floor 2 40% Bottom Wall Part 0 0% Body panel/patch 100%Door Top/Roof Patch 100% Seat Bracket Rail 0% Window Sill 7 18%Window Bar 74 40% Seat piller/lav. Partition 100% UIC end construction 0%Body Pillar Part 0 100%

End Drooping: Rotery End - EAST : -7, WEST : -10 Other End - EAST : -10, WEST : -10Start Date : 27-Jul-2017, Completion Date : 01-Aug-2017, Net Repair Days : 5, Total Man Hours : 920

R KU KHARE - SSE MAYANK PRAJAPATI - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 11: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05278 Type : WGSCN Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 4.5 28% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 4.5 28% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 72 39%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 10, WEST : 3 Other End - EAST : -10, WEST : -10Start Date : 05-Dec-2017, Completion Date : 13-Dec-2017, Net Repair Days : 8, Total Man Hours : 1480

R KU KHARE - SSE MAYANK PRAJAPATI - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 12: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05401 Type : GS Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6 38% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 6 38% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 0 0% Window Bar 70 39%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : 0 Other End - EAST : -2, WEST : 0Start Date : 15-Sep-2017, Completion Date : 23-Sep-2017, Net Repair Days : 8, Total Man Hours : 1364

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 13: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05402 Type : GS Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6 38% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 6 38% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 35 88% Window Bar 70 39%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 6, WEST : 6 Other End - EAST : 3, WEST : 3Start Date : 21-Sep-2017, Completion Date : 28-Sep-2017, Net Repair Days : 7, Total Man Hours : 1411

R PILLAI - SSE OM PRAKASH SAHU - JE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 14: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05403 Type : GS Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6 38% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 6 38% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 84 47%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : 2 Other End - EAST : 10, WEST : 10Start Date : 30-Nov-2017, Completion Date : 12-Dec-2017, Net Repair Days : 11, Total Man Hours : 1696

HAMANT JADAV - JE OM PRAKASH SAHU - JE T K PANJA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 15: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05405 Type : GS Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 4.5 28% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 4.5 28% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 33 83% Window Bar 76 43%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 5, WEST : 6 Other End - EAST : 5, WEST : 6Start Date : 27-Sep-2017, Completion Date : 07-Oct-2017, Net Repair Days : 10, Total Man Hours : 1297

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 16: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05410 Type : GS Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 4.5 28% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 4.5 28% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 34 85% Window Bar 48 27%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -2, WEST : -7 Other End - EAST : -4, WEST : -7Start Date : 20-Feb-2018, Completion Date : 24-Feb-2018, Net Repair Days : 5, Total Man Hours : 1407

M L KOLI - JE OM PRAKASH SAHU - JE T K PANJA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 17: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05415 Type : GS Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6 38% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 6 38% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 22 55% Window Bar 56 31%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 8, WEST : -2 Other End - EAST : 8, WEST : 8Start Date : 01-Jan-2018, Completion Date : 11-Jan-2018, Net Repair Days : 10, Total Man Hours : 1304

R KU KHARE - SSE MAYANK PRAJAPATI - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 18: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05418 Type : GS Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 7.5 47% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 7.5 47% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 70 38%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : 4 Other End - EAST : -9, WEST : -8Start Date : 11-Dec-2017, Completion Date : 19-Dec-2017, Net Repair Days : 8, Total Man Hours : 1440

R KU KHARE - SSE MAYANK PRAJAPATI - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 19: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05427 Type : GS Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 7 44% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 7 44% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 23 57% Window Bar 54 30%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -7, WEST : -5 Other End - EAST : 2, WEST : 5Start Date : 17-Mar-2018, Completion Date : 26-Mar-2018, Net Repair Days : 8, Total Man Hours : 1336

S K SHARMA - SSE PANKAJ KU SINGH - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 20: Coach Rehabilitation Workshop, WC Railway, Bhopal · Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of

Coach No. :NW05429 Type : GS Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6 38% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 6 38% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 54 30%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -3, WEST : 0 Other End - EAST : -5, WEST : -5Start Date : 22-Feb-2018, Completion Date : 27-Feb-2018, Net Repair Days : 5, Total Man Hours : 1216

P S RATHORE - JE NISHANK VERMA - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge