client/stakeholder letters of recommendation

10
DEPARTlvffiNT OF THE ARMY PORTLAND DISTRICT, CORPS OF ENGINEERS PO BOX 2946 PORTLAND, OREGON 97208-2946 March 7, 2013 SUbject: Letter of Appreciation Bonneville Dam Spillway Stilling Basin Erosion Repair Lamprey Flume Installation J.E. McAmis, Inc. 25 Jan Court, STE 120 Chico, CA 95928-7148 Dear SirlMadame: Congratulations on the completion of the Bonneville Spillway Stilling Basin Erosion Repair at the Bonneville Lock & Dam. The project was completed more than a month ahead of schedule with no lost time accidents despite several field challenges and contract changes. Success on the project can be attributed to a combination of outstanding equipment, highly skilled workers, a proactive and innovative field management staff, and an excellent partnering relationship with Corps of Engineers personnel. Your thoughtful approach to planning this project, including hiring experienced subcontractors, skilled craftsmen and quality control expertise translated to the successful completion with high satisfaction of all stakeholders. This project is an excellent example of successful partnering at the field level. Your staff exhibited exceptional flexibility and willingness to do what was best for the project. When field challenges and operational constraints were encountered, your staff worked closely with Government personnel to develop "Project First" solutions and then adapted to the changes with a "can do" attitude and approach. The professionalism and commitment of the McAmis staff was unparalleled. You are also recognized for your contributions to the success of the Bonneville Lamprey Flume project as a subcontractor. When powerhouse operations and environmental constraints dictated the need for a floating plant, you altered your schedule and operations in the stilling basin to make your floating crane available for installation of the lamprey flume. This project involved several critical lifts of heavy flume components with diver installation. Your proactive planning and careful consideration of complex critical crane operations with safety as apriority, contributed to the successful completion of this project with no accidents. The McAmis' team's commitment to safety, quality, on-time delivery, customer satisfaction and partnering reflects great credit upon the culture of your company. It has truly been a pleasure to work with the J.E. McAmis staff. Sincerely, W. Eisenhauer, P. E. olonel, Corps of Engineers District Commander

Upload: svandegrift

Post on 01-Jul-2015

260 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Client/Stakeholder Letters of Recommendation

DEPARTlvffiNT OF THE ARMY PORTLAND DISTRICT, CORPS OF ENGINEERS

PO BOX 2946 PORTLAND, OREGON 97208-2946

March 7, 2013

SUbject: Letter of Appreciation Bonneville Dam Spillway Stilling Basin Erosion Repair Lamprey Flume Installation

J.E. McAmis, Inc. 25 Jan Court, STE 120 Chico, CA 95928-7148

Dear SirlMadame:

Congratulations on the completion of the Bonneville Spillway Stilling Basin Erosion Repair at the Bonneville Lock & Dam. The project was completed more than a month ahead of schedule with no lost time accidents despite several field challenges and contract changes. Success on the project can be attributed to a combination of outstanding equipment, highly skilled workers, a proactive and innovative field management staff, and an excellent partnering relationship with Corps of Engineers personnel. Your thoughtful approach to planning this project, including hiring experienced subcontractors, skilled craftsmen and quality control expertise translated to the successful completion with high satisfaction of all stakeholders.

This project is an excellent example of successful partnering at the field level. Your staff exhibited exceptional flexibility and willingness to do what was best for the project. When field challenges and operational constraints were encountered, your staff worked closely with Government personnel to develop "Project First" solutions and then adapted to the changes with a "can do" attitude and approach. The professionalism and commitment of the McAmis staff was unparalleled.

You are also recognized for your contributions to the success of the Bonneville Lamprey Flume project as a subcontractor. When powerhouse operations and environmental constraints dictated the need for a floating plant, you altered your schedule and operations in the stilling basin to make your floating crane available for installation of the lamprey flume. This project involved several critical lifts of heavy flume components with diver installation. Your proactive planning and careful consideration of complex critical crane operations with safety as apriority, contributed to the successful completion of this project with no accidents.

The McAmis' team's commitment to safety, quality, on-time delivery, customer satisfaction and partnering reflects great credit upon the culture of your company. It has truly been a pleasure to work with the J.E. McAmis staff.

Sincerely,

tJ~ W. Eisenhauer, P.E.~olonel, Corps of Engineers

District Commander

Page 2: Client/Stakeholder Letters of Recommendation
Page 3: Client/Stakeholder Letters of Recommendation
Page 4: Client/Stakeholder Letters of Recommendation
Page 5: Client/Stakeholder Letters of Recommendation
Page 6: Client/Stakeholder Letters of Recommendation
Page 7: Client/Stakeholder Letters of Recommendation
Page 8: Client/Stakeholder Letters of Recommendation
Page 9: Client/Stakeholder Letters of Recommendation
Page 10: Client/Stakeholder Letters of Recommendation