Cleveland National Forest Potrero Morena Village Cameron Substation Campo Indian Reservation AFS-7 Campo Fireshed AFS-7 Campo Fireshed AFS-7 Campo Fireshed Modified Route D Pacific Crest Trail Option C/D Morena Reservoir Campo 8 1 94 94 MRD-5 BCDS-5 MRD-15 MRD-10 0 0 1 1 0.5 0.5 Miles Miles N Forester's Co-Op Professional Forestry F C O & GIS Services (530) 273-8326 www.forco-op.com Modified Route D Alternative Alternative Route Milepost Existing Substation (69/12kV) Sunrise Powerlink Project E.4 MODIFIED ROUTE D ALTERNATIVE Final EIR/EIS Sunrise Powerlink Project Figure E.4.15-15a October 2008 South Buckman Springs Option Existing 69kV Transmission Line Wildfire Containment Conflict Model Low Moderate Very High High Campo Fireshed Modified Route D Alternative Revisions Wildfire Containment Conflict Model BCD Alternative and BCD South Option Revised Modified Route D Alternative Revised AFS-7 Campo Fireshed State Park Land U.S. Forest Service Land Tribal Land Bureau of Land Management Land Campo - Modified Route D Percentage Wildfire Containment Conflict Moderate 29% High 38% Very High 33%

Upload: others

Post on 06-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cleveland National BCDS-5 Forest Morena MRD-5 Reservoir Morena · Morena Village Barette Lake Cameron Substation Campo Indian Reservation AFS-7 Campo Fireshed AFS-7 Campo Fireshed

ClevelandNational

Forest

Potrero

Morena Village

Barette Lake

CameronSubstation

Campo IndianReservation

AFS-7 Campo Fireshed

AFS-7 Campo Fireshed

AFS-7 Campo FireshedModified Route DPacific Crest Trail

Option C/D

MorenaReservoir

Campo

8

1

94

94

MRD-5

BCDS-5

MRD-15

MRD-10

00 110.50.5MilesMiles

NForester's Co-Op

Professional ForestryFC O

& GIS Services(530) 273-8326

www.forco-op.com

Modified Route D Alternative

Alternative Route MilepostExisting Substation (69/12kV)

Sunrise Powerlink ProjectE.4 MODIFIED ROUTE D ALTERNATIVE

Final EIR/EIS

Sunrise Powerlink ProjectFigure E.4.15-15a

October 2008

South Buckman Springs OptionExisting 69kV Transmission Line

Wildfire Containment Conflict ModelLowModerate

Very HighHigh Campo Fireshed Modified Route D

Alternative Revisions Wildfire Containment Conflict Model

BCD Alternative and BCD South Option RevisedModified Route D Alternative Revised AFS-7 Campo Fireshed

State Park Land

U.S. ForestService Land

Tribal Land

Bureau of Land Management Land

Campo - Modified Route D Percentage Wildfire Containment Conflict

Moderate 29% High 38%

Very High 33%