clear creek education village

13
Clear Creek Education Village League City, Texas Other-K-12 Project of Distinction-New Construction 2009 Exhibition of School Planning and Architecture

Upload: nichole-malone

Post on 03-Jan-2016

34 views

Category:

Documents


1 download

DESCRIPTION

2009 Exhibition of School Planning and Architecture. Clear Creek Education Village. League City, Texas Other-K-12 Project of Distinction-New Construction. Clear Creek Education Village. Elementary School. Intermediate School. High School. Exterior. “Define the area”. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Clear Creek  Education Village

Clear Creek Education Village

League City, TexasOther-K-12

Project of Distinction-New Construction

2009 Exhibition of School Planning and Architecture

Page 2: Clear Creek  Education Village

Clear Creek Education Village

Elementary School

Intermediate School

High School

Page 3: Clear Creek  Education Village

“Define the area”Community Environment:The Education Village is situated in a quadrant of the School District that is separated from the remaining parts of the District due to natural features, waterways and highways. This portion of the District is primarily residential and has the least amount of commercial business and economic vitality. This entire portion of the community is lacking a central focal point and needed a facility to "define the area" and serve as a beacon to the community.

Page 4: Clear Creek  Education Village

“Educational and community hub”

Community Environment: Continued…The Clear Creek ISD Education Village is an educational and community "hub". This unique multi-use complex houses an elementary school, an intermediate school and a high school in one synergistic multi-campus structure that also functions as a community center and as the "center-of-community".

Page 5: Clear Creek  Education Village

“Pods, houses & small learning communities”

Learning Environment: Overall, the Ed Village houses more than 4,600 students and stretches over 135 acres. To respond to educational goals established by the Planning Team, the architect tailored a combination of "pods", "houses" and "small learning communities" to each individual campus in order to create smaller, more personalized learning spaces for all students while still maintaining flexibility to accommodate future changes in educational delivery.

Page 6: Clear Creek  Education Village

“Pods”

Learning Environment: The elementary school is divided into three "pods" creating independent learning environments for different primary school age students. The intermediate school provides an interactive environment where all classroom spaces are commonly located in a two-story "house" that is arranged to accommodate inter-disciplinary teams. The high school utilizes small learning communities.

Page 7: Clear Creek  Education Village

“The whole is greater than the sum of its parts”

Physical Environment :The Ed Village offers three educational environments that synergize with the site in a manner that creates a very unique, comprehensive learning community where "the whole is greater than the sum of its parts".

Page 8: Clear Creek  Education Village

“Cohesive pathway of education”

Physical Environment:Both physically and functionally, each independent learning environment relies on the other to create a cohesive pathway of education for students, while at the same time providing efficient, cost-saving measures by taking advantage of shared use of common spaces like cafeterias, gymnasiums and courtyards, as well as a high school level auditorium and natatorium complex.

Page 9: Clear Creek  Education Village

“Interactive Charrette Process”

Planning Process:The architect utilized an interactive "charrette" process to involve students, parents, district administrators, city officials, community members and the contractor during the design phases for this unique campus.

Page 10: Clear Creek  Education Village

“Safe and Secure”

Planning Process:Through the programming and design phases, key objectives emerged: ensure a "safe and secure" campus; allow each campus to have its own identity; and make each campus feel like a small community within a larger village.

Page 11: Clear Creek  Education Village

Exhibition of School Planning and Architecture 2009 Project Data

Submitting Firm :Project Role Architect/DesignerProject Contact Rick Blan, AIA, LEEDTitle Principal-in-ChargeAddress 11 E Greenway Plaza, 22nd FloorCity, State or Province, Country Houston, TX 77046Phone

Additional Design Team Members: PBKDan Boggio, AIA, President/CEORichard Chi, PartnerMelodie Sun, Associate

Construction Firm:Project Role ContractorProject Contact Gilbane - Mike MatulaTitle Senior Project ManagerAddress 1331 Lamar Street, Ste. 1170City, State or Province, Country Houston, Texas 77010Phone 713-209-1873

Page 12: Clear Creek  Education Village

Exhibition of School Planning and Architecture 2009 Project Details

Project Name  Clear Creek Education Village

City  League City

State  Texas

District Name  Clear Creek Independent School District

Supt/President  Dr. Greg Smith

Occupancy Date Elementary School – August 2009Intermediate & High School – August 2010

Grades Housed  K-12

 

Capacity(Students)

 Elementary School – 900 StudentsIntermediate School – 1,200 StudentsHigh School – 2,500 Students

Site Size (acres)  135 acres

Gross Area (sq. ft.)

 Elementary School – 112, 000 sq ft.Intermediate School – 174,000 sq. ft.High School – 438,000 sq. ft.

Per Occupant(pupil) 124.44 (Elementary), 145.00 (Intermediate) 175.20 (High School) 157.39 (Total Campus)

gross/net please indicate  gross

 

Design and Build?  No

If yes, Total Cost:  

Includes:  

 

If no,  

Site Development:  $9,304,801

Building Construction:  $116,161,986

Fixed Equipment:  $6,500,000

Other:  $5,691,000 (Technology) + $10,050,053 (soft costs)

 

Total:  $147,707,840.00