November 7, 2016 City of Clinton, Indiana – CSO Long Term Control Plan Phase I – WWTF Improvements Bids Thursday November 22, 2016 @ 3:00pm Indiana Department of Administration Minority & Women’s Business Enterprises Division Indiana Government Center South 402 W. Washington St., Room W469 Indianapolis, IN 46204 To Whom It May Concern: Thieneman Construction, Inc. has purchased plans and proposals to bid as a prime contractor for the project listed below. We are inviting quotations from MBE/WBE contractor/supplier firms that might be interested in working with us on this project.
PROJECT: City of Clinton, Indiana – CSO Long Term Control Plan Phase I – WWTF Improvements COUNTY: Vermillion The project consists of General Rehabilitation work at the existing Wastewater Treatment Facility, including installing a new water service connection backflow preventer within a new pre-fabricated structure, removal of an existing influent flow mechanical bar screen and installation of a new mechanical bar screen and compactor/washer, construction, of new catwalks, grating and railing at the existing grit removal structure, replacement of sluice gates and actuators within the existing headworks building replacement of airlifts, skimmer, air valves, air lifts and sludge valves within the aeration and digester tanks, general steel rehabilitation within the aeration tanks, and replacement of several process valves, fittings and pipe sections throughout the facility. Plans have been added to our FTP site for your viewing and consideration at no cost. You can find a link to our FTP site by visiting our website, thienemanconstruction.com, click on “Plan Room”, “Public Plan Room” Plans and Specifications are available for view at the office of Thieneman Construction, Inc. between the hours of 8am and 5pm Monday through Friday. We would request that quotations AND minority certifications from Subcontractors and Suppliers to be delivered to our office no later than Wednesday, November 16th, 2016 at 5:00 PM. If you require additional information, please contact our Estimating Department at 317-867-3462 AND by email to [email protected] as soon as possible.
Respectfully, Michelle Press
INVITATION TO BID
PROJECT NAME:
PROJECT LOCATION: Clinton, Indiana
OWNER: City of Clinton, In
ENGINEER: HWC Engineering
BID DATE:
BID TIME:
PRE BID INFORMATION:
LOCATION OF DOCUMENTS HWC Engineering City of Clinton
ON FILE AND/ OR AVAILABLE FOR 601 S 3rd Street 259 Vine Street
PUBLIC INSPECTION: Terre Haute, IN 47807 Clinton, IN 47842
AVAILABLE FOR PURCHASE AT:
COMPANY:
CONTACT NAME:
PHONE:
FAX:
EMAIL:
CERTIFICATIONS: CITY STATE INDOT N/A
MBE WBE VBE DBE
BIDDING? YES NO
CSO LONG TERM CONTROL PLAN PHASE I - WASTEWATER
TREATMENT FACILITY IMPROVEMENTS PROJECT
Thursday, November 22nd 2016
3:00 EST
www.hwcplanroom.com
PLEASE INCLUDE A COPY OF YOUR CURRENT CERTIFICATES WITH YOUR QUOTE
PLEASE COMPLETE THE INFORMATION BELOW AND FAX TO 317-867-3463
Plans and Specifications are also available to view in our Westfield office, or view and download on our website at
WWW.THIENEMANCONSTRUCTION.COM
DESCRIPTION OF WORK:
General Rehabilitation work at the existing Wastewater Treatment Facility, including installing a new water service
connection backflow preventer within a new pre-facbricated structure, removal of an existing influent flow mechanical bar
screen and installation of a new mechanical bar screen and compactor/washer, construction, of new catwalks, grating and
railing at the existing grit removal structure, replacement of sluice gates and actuators within the existing headworks building
replacement of airlifts, skimmer, air valves, air lifts and sludge valves within the aeration and digester tanks, general steel
rehabilitation within the aeration tanks, and replacement of serveral process valves, fittings and pipe sections throughout the
facility.
Wednesday, Nov 19, 2016 @ 3 PM, Clinton City Hall 259 Vine St, Clinton, IN 47842
THIENEMAN CONSTRUCTION, INC.
17219 Foundation Parkway
Westfield, IN 46074
Phone: 317-867-3462
Fax: 317-867-3463
1. Visit our website at : http://www.thienemanconstruction.com/
2. In the upper right hand corner click on:
3. Once in the Plan Room, click on:
4. Then click on :
5. Click on the Project you wish to bid.
If you have any questions regarding the locating the project on the website, or navigating the plan
room, please contact the Bid Coordinator at 317-867-3462.