A City Council Meeting April 23, 2012 Capital Improvement Projects Budget 1 FY13 MAYOR'S BUDGET PRESENTATION ‹#›

Post on 19-Oct-2014

4.030 views

Category:

Business


1 download

DESCRIPTION

City of Hyattsville's FY13 CIP presentation

TRANSCRIPT

Page 1: Cip presentation fy13

OPEB and Health Insurance

A

City Council Meeting

April 23, 2012

Capital Improvement Projects Budget

1 FY13 MAYOR'S BUDGET PRESENTATION

‹#›

Page 2: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Enterprise Resource Planning (ERP)

Expenditures

2013 2014 2015 2016 2017 Total

Other 200,000 200,000

Total 200,000 200,000

2

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance 200,000 200,000

Total 200,000 200,000

Page 3: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Enterprise Resource Planning (ERP) ERP software integrates all departments and functions across the City into a single system. An ERP will consolidate information and allow easy access. Needs assessment is completed and RFP will be issued before the end of FY12. Increased license/maintenance fees are approximately $32,000/year.

Page 4: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

IT Upgrades & Replacements

Expenditures

2013 2014 2015 2016 2017 Total

Other 15,000 15,000 15,000 15,000 15,000 75,000

Total 15,000 15,000 15,000 15,000 15,000 75,000

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance 15,000 15,000 15,000 15,000 15,000 75,000

Total 15,000 15,000 15,000 15,000 15,000 75,000

Page 5: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

IT Upgrades & Replacements Covers routine replacement & upgrade of City’s servers and other infrastructure. The average server costs $5,000 to $7,000 and there are nine in use in the City. If remote servers are chosen instead, those costs will need to be incorporated into the operating budget.

Page 6: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Vehicle Replacements

Expenditures

2013 2014 2015 2016 2017 Total

To be determined TBD TBD TBD TBD TBD

Total

Funding Sources

2013 2014 2015 2016 2017 Total

To be determined TBD TBD TBD TBD TBD

Total

Page 7: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Vehicle Replacements To be determined, following adoption of the Vehicle Replacement study. The only vehicle replacements in FY13 will be on an emergency basis.

Page 8: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Radar/Lidar Speed Units

Expenditures

2013 2014 2015 2016 2017 Total

Equip/Vehicles/Furnishings 10,200 6,800 10,800 10,800 38,600

Total 10,200 6,800 10,800 10,800 38,600

Funding Sources

2013 2014 2015 2016 2017 Total

General Fund Transfer 10,200 6,800 10,800 10,800 38,600

Total 10,200 6,800 10,800 10,800 38,600

Page 9: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Radar/Lidar Speed Enforcement Units

Radar units currently in use are several years old. Newer, lighter units are available. With the implementation of the Highway Safety Office Data Driven Approaches to Crime & Traffic Safety program, our goal is to have units available at all times. Annual calibration fee = $80/unit.

Page 10: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Mobile Data Terminals

Expenditures

2013 2014 2015 2016 2017 Total

Equip/Vehicles/Furnishings 14,450 14,750 15,025 15,325 15,650 75,200

Total 14,450 14,750 15,025 15,325 15,650 75,200

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance 14,450 14,450

General Fund Transfer 14,750 15,025 15,325 15,650 60,750

Total 14,450 14,750 15,025 15,325 15,650 75,200

Page 11: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Mobile Data Terminals (MDTs) As the HCPD implements more IT-based projects, staff should have appropriate tools to utilize the technology. Funds will purchase CF31 Panasonic Toughbooks for officers. Projects cost increase of 2% per year. Note: No units will be purchased until a replacement schedule is developed.

Page 12: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Enhancement of CCTV Program

Expenditures

2013 2014 2015 2016 2017 Total

Equip/Vehicles/Furnishings 40,000 40,000

Total 40,000 40,000

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance 40,000 40,000

Total 40,000 40,000

Page 13: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Enhancement of CCTV Program The police have identified additional locations in the City that would benefit from a CCTV/Call-box. Funds would allow one full camera set-up, including installation costs, or two cameras and one call-box. One location is the new hiker-biker/Trolley Trail. Note: These will not be purchased until the current program is evaluated for effectiveness.

Page 14: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

K-9 Unit

Expenditures

2013 2014 2015 2016 2017 Total

Other 9,900 9,900

Total 9,900 9,900

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance 9,900 9,900

Total 9,900 9,900

Page 15: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

K-9 Unit

This project is for a replacement K-9 Unit, including the dog, equipment kennel, cage, and cooling system. Aris has a spinal injury and must be retired. Because this is a replacement, there is no additional budget impact.

Page 16: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Sidewalks Expenditures 2013 2014 2015 2016 2017 Total

Construction/Maintenance 50,000 209,000 50,000 50,000 50,000 409,000

Total 50,000 209,000 50,000 50,000 50,000 409,000

Funding Sources 2013 2014 2015 2016 2017 Total

Bond Issue(2010) 50,000 50,000

Bond Issue (Proposed) 75,000 50,000 50,000 225,000

Reimbursement 25,000 25,000

State Board of Public Works 109,000 109,000

Total 50,000 209,000 50,000 50,000 50,000 409,000

Page 17: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Sidewalks This project is the annual program of sidewalk repair/installation. FY14 includes grant-funded MD208 East Side Extension and Route 1 repair, to be partially funded through other sources. Funds will be used in conjunction with Safe Routes to Schools and ADA programs.

Page 18: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Roadway Improvements – General Expenditures

2013 2014 2015 2016 2017 Total

Planning/Design 85,000 85,000

Construction/ Maintenance 420,000 375,000 795,000

Total 505,000 375,000 880,000

Funding Sources 2013 2014 2015 2016 2017 Total

Bond Issue (Proposed) 420,000 375,000 795,000

CIP Fund Balance 85,000 85,000

Total 505,000 375,000 880,000

Page 19: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Roadway Improvements Includes drainage/roadway improvements in areas remaining from City’s 5-year paving program. 2013: Complete work beginning in FY12 on west side, plus 42nd/Oliver Street after WSSC is finished. Design for Buchanan Street.

2014: Buchanan Street, et al. 2015: Determined by pavement study. (Anticipated 2Q FY13.)

Page 20: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

University Hills Street Reconstruction Expenditures

2013 2014 2015 2016 2017 Total

To be determined TBD TBD TBD TBD TBD

Total

Funding Sources 2013 2014 2015 2016 2017 Total

To be determined TBD TBD TBD TBD TBD

Total

Page 21: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

University Hills Street Reconstruction

Construction of drainage and roadway improvements in the University Hills neighborhood. Council has previously approved construction, pending funding of the project.

Improvements in the neighborhood are necessary to improve the integrity of the streets and repair drainage problems. The project includes sidewalk installation, roadway realignment, and innovative stormwater management.

Page 22: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Crittenden & 40th Reconstruction Expenditures

2013 2014 2015 2016 2017 Total

Construction/ Maintenance 1,600,000 1,600,000

Total 1,600,000 1,600,000

Funding Sources

2013 2014 2015 2016 2017 Total

Bond Issue (2010) 1,600,000 1,600,000

Total 1,600,000 1,600,000

Page 23: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Crittenden & 40th Reconstruction

Improvements in roadway and drainage in the Crittenden/40th Place area. Project was started in FY09, and has been in design FY11/FY12. New state stormwater management requirements have delayed the project.

Page 24: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

ADA Improvements, City-wide Expenditures

2013 2014 2015 2016 2017 Total

Construction/ Maintenance 100,000 100,000 100,000 100,000 100,000 500,000

Total 100,000 100,000 100,000 100,000 100,000 500,000

Funding Sources

2013 2014 2015 2016 2017 Total

Bond Issue (Proposed) 100,000 100,000 100,000 100,000 100,000 500,000

Total 100,000 100,000 100,000 100,000 100,000 500,000

Page 25: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

ADA Improvements, City-wide

Areas of improvement will be identified through the City’s recently conducted ADA Transition plan, scheduled for Council adoption in April 2012.

Page 26: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Arcade Building – 4318 Gallatin Street Expenditures

2013 2014 2015 2016 2017 Total

Construction/ Maintenance 3,000,000 3,000,000

Total 3,000,000 3,000,000

Funding Sources

2013 2014 2015 2016 2017 Total

Bond Issue (Proposed) 2,925,000 2,295,000

State MHAA Grant 75,000 75,000

Total 3,000,000 3,000,000

Page 27: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Arcade Building – 4318 Gallatin Street Build-out of the Arcade at 4318

Gallatin Street to serve as a public function/amenities facility. Final costs are tied to the level of functionality and design options. Design will be complete by December 31, 2012. Additional grant funding may then be available. Annual operating costs are projected to increase by $152,100 in FY15 due to utilities, supplies, and maintenance. This may be offset by rental fees.

Page 28: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Magruder Park Recreation Center Expenditures

2013 2014 2015 2016 2017 Total

Construction/ Maintenance 285,000 285,000

Total 285,000 285,000

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance

285,000 285,000

Total 285,000 285,000

Page 29: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Magruder Park Recreation Center Based on the facilities study,

the Rec Center will be among the last City facilities to be upgraded. To keep the facility safe and operational for the next few years, some investment must be made.

The plan includes upgrading the exterior toilet rooms for ADA accessibility, improving shelving/lighting in garage/storage areas and capturing storage space to be used as a concession stand. Resurfacing/repairing brick may also be necessary.

Page 30: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

3505 Hamilton Street Expenditures

2013 2014 2015 2016 2017 Total

Planning/Design 420,000 500,000 920,000

Construction/ Maintenance 1,000,000 2,600,000 3,600,000

Total 420,000 1,500,000 2,600,000 4,520,000

Funding Sources

2013 2014 2015 2016 2017 Total

Speed Camera Revenue 420,000 1,500,000 2,600,000 4,520,000

Total 420,000 1,500,000 2,600,000 4,520,000

Page 31: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

3505 Hamilton Street This project will install required

improvements at 3505 Hamilton, based on the facilities study, ADA requirements, and Council determination of use. The building requires renovation to be usable.

3505

Page 32: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

4310 Gallatin Street Expenditures

2013 2014 2015 2016 2017 Total

Planning/Design 350,000 350,000 700,000

Construction/ Maintenance 4,500,000 4,500,000

Total 350,000 350,000 4,500,000 5,200,000

Funding Sources

2013 2014 2015 2016 2017 Total

Bond Issue (Proposed) 4,500,000 4,500,000

CIP Fund Balance 350,000 350,000 700,000

Total 350,000 350,000 4,500,000 5,200,000

Page 33: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

4310 Gallatin Street This represents a series of major repairs that have been scheduled & budget, including: • Upgrade of roof: $120,000 • HVAC replacement: $250,000 • Mansard roof repair: $106,000 • Installation of natural gas line: $40,000 • Conversion to natural gas $68,000

Page 34: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Vehicle Replacements – Solid Waste

Expenditures

2013 2014 2015 2016 2017 Total

Equip/Vehicles/ Furnishings 200,000 200,000

Total 200,000 200,000

Funding Sources

2013 2014 2015 2016 2017 Total

Lease 200,000 200,000

Total 200,000 200,000

Page 35: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Vehicle Replacements – Solid Waste This is the replacement of SWV9860 , a 1998 GM refuse truck. Three trucks are used on a daily basis, with a fourth as a back-up, and a fifth expected to be sold as surplus. Repairs from FY10-FY12 (to date) have cost $49,059.84. Replacing this refuse truck will save on repair costs and keep equipment up-to-date with modern safety features.

Page 36: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Vehicle Replacements – Maintenance Work Truck

Expenditures 2013 2014 2015 2016 2017 Total

Equip/Vehicles/ Furnishings 60,000 60,000

Total 60,000 60,000

Funding Sources 2013 2014 2015 2016 2017 Total

Lease 60,000 60,000

Total 60,000 60,000

Page 37: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Vehicle Replacements – Maintenance Work Truck

This is the replacement of an older unit MO9838, a 1998 Chevrolet Work Truck. Repairs from FY10-FY12 (to date) have cost $16,473.37. The cost includes a snow plow, salt spreader, light package, and radio. Replacing this work truck will save on repair costs and keep equipment up-to-date with modern safety features.

Page 38: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

King Park Retaining Wall

Expenditures

2013 2014 2015 2016 2017 Total

Construction/ Maintenance 32,000 32,000

Total 32,000 32,000

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance 32,000 32,000

Total 32,000 32,000

Page 39: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

King Park Retaining Wall The retaining wall at King Park is crumbling. We do not have an original construction date, but it appears to many years past its replacement date. Replacement will require removal of small trees that are growing into the wall, as well as replacing the chain link fence, currently a magnet for growth of invasive species. This will prevent emergency repairs and impacts to neighbors’ yards.

Page 40: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Melrose Access Trail

Expenditures

2013 2014 2015 2016 2017 Total

Construction/ Maintenance 100,000 100,000

Total 100,000 100,000

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance 100,000 100,000

Total 100,000 100,000

Page 41: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Melrose Access Trail Construction of a 300 linear foot ADA accessible trail head from Crittenden Street to 41st Street. Based upon DER’s project design and permitting schedule it appears that no work will occur until FY13.

Page 42: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Solar Display Board

Expenditures

2013 2014 2015 2016 2017 Total

Equip/Vehicles/ Furnishings 17,500 17,500

Total 17,500 17,500

Funding Sources

2013 2014 2015 2016 2017 Total

Lease 17,500 17,500

Total 17,500 17,500

Page 43: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Solar Display Board This is the purchase of a 3-line solar powered LED display message board, typically trailer-mounted and displayed to advise of road conditions, etc. The City rents these signs for large special events and it would be utilized for a wide range of traffic and safety reasons.

Page 44: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Cable TV Upgrades

Expenditures

2013 2014 2015 2016 2017 Total

Equip/Vehicles/ Furnishings 15,000 15,000 15,000 15,000 15,000 75,000

Total 15,000 15,000 15,000 15,000 15,000 75,000

Funding Sources

2013 2014 2015 2016 2017 Total

P.E.G. Fees 15,000 15,000 15,000 15,000 15,000 75,000

Total 15,000 15,000 15,000 15,000 15,000 75,000

Page 45: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Cable TV Upgrades The City’s cable channel is an underutilized asset. These upgrades will move us towards implementing the capacity to run additional programming. In addition to routine upgrades, projects will include the ability to film remotely, improving storage and content, etc.

Page 46: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Field Renovations Expenditures 2013 2014 2015 2016 2017 Total

Engineering 50,000 50,000 100,000

Construction/ Maintenance 400,000 300,000 300,000 1,000,000

Total 400,000 50,000 300,000 50,000 300,000 1,100,000

Funding Sources

2013 2014 2015 2016 2017 Total

Bond Issue (2008) 203,291 203,291

Bond Issue (Proposed) 196,709 300,000 300,000 796,709

CIP Fund Balance 50,000 50,000 100,000

Total 400,000 50,000 300,000 50,000 300,000 1,100,000

Page 47: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Field Renovations The City has a longstanding goal of renovating the playing fields and surfaces at Magruder Park. The project will provide drainage and irrigation plans and construction services for the soccer and football fields at Magruder Park, and eventually the soccer field at Melrose Park. Correct drainage will allow for more playing time, safer conditions, and reduced maintenance costs.

Page 48: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Court Resurfacing

Expenditures

2013 2014 2015 2016 2017 Total

Construction/ Maintenance 20,000 20,000

Total 20,000 20,000

Funding Sources

2013 2014 2015 2016 2017 Total

CIP Fund Balance 20,000 20,000

Total 20,000 20,000

Page 49: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Court Resurfacing This project provides for resurfacing of the Magruder Park tennis courts. It will prolong their life and make them safer to use.

Page 50: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Parking Meters

Expenditures

2013 2014 2015 2016 2017 Total

Equip/Vehicles/ Furnishings 90,000 90,000

Total 90,000 90,000

Funding Sources

2013 2014 2015 2016 2017 Total

Bond Issue (Proposed) 90,000 90,000

Total 90,000 90,000

Page 51: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Parking Meters This project is for the purchase and installation of new parking meters in locations to be considered and approved by Council. Areas being considered include Ager Road and Editors Park Drive. Because they will be smart meters, we will incur monthly charges for communication fees.

Page 52: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Bike & Pedestrian Enhancements

Expenditures

2013 2014 2015 2016 2017 Total

Equip/Vehicles/ Furnishings 55,000 55,000

Total 55,000 55,000

Funding Sources

2013 2014 2015 2016 2017 Total

State DHCD Grant 55,000 55,000

Total 55,000 55,000

Page 53: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Bike & Pedestrian Enhancements This project is the creation of bike lanes and the installation of bike racks. The scope is limited to funding awarded through the State of Maryland Department of Housing and Community Development Sustainability Grant Program.

Page 54: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Parking Facilities Expenditures

2013 2014 2015 2016 2017 Total

Construction/ Maintenance 500,000 500,000

Other 1,500,000 1,500,000

Total 2,000,000 2,000,000

Funding Sources

2013 2014 2015 2016 2017 Total

Bond Issue (Proposed) 2,000,000 2,000,000

Total 2,000,000 2,000,000

Page 55: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

Parking Facilities This project will provide for land acquisition and clearing for parking. Additional grant/bond funds are anticipated from the current State budget, so the Proposed Bond issue may be less than what is contemplated in this scenario. Parking is needed in the Route 1 corridor to support economic development.

Page 56: Cip presentation fy13

OPEB and Health Insurance Capital Improvement Projects FY13 through FY17

SUMMARY OF SOURCES Source Amount

2008 Bond Issue $203,291

2010 Bond Issue 1,650,000

Calendar year 2012 Bond Issue 2,000,000

Calendar year 2013 Bond Issue 3,731,709

CIP Fund Balance 701,350

Lease 260,000

PEG Fees 15,000

Speed Camera Revenue 420,000

Dept of Housing & Community Development Grant 55,000

Maryland Heritage Area Authority Grant 75,000

Total $9,111,350