CIKARANG DRY PORT CIKARANG DRY PORT Integrated PORT & LOGISTICS Facilities www.cikarangdryport.com Ver. Oct 2013

Upload: others

Post on 17-Jul-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

CIKARANG DRY PORTCIKARANG DRY PORTIntegrated PORT & LOGISTICS Facilities

www.cikarangdryport.comVer. Oct 2013

Page 2: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Background

2

� Estimated more than 60% troughput of Tanjung Priok Port come from Corridor

Toll Road Bekasi-Cikampek, a significant contribution to the nation and

effective to build facilities for export and import.

� Alignment with Government of Indonesia, ie. CATS (Customs Advance Trade System),

KPPT (Kawasan Pelayanan Pabean Terpadu) initiatives to streamline inefficiencies in

the current logistics landscape and to relieve congestion in Jakarta

� To participate in a profitable business through provision of integrated logistics

services in a growing market : Improve competitiveness , Requirement on

Integrated Logistics System (Fast and efficient distribution system, Achieve zero inventory,

Deliver security system (24/7), Fast container handling clearance system, Efficient warehousing

service management system; Delivery of goods (Timely, not costly, accountable, predictable,

No congestion)

Page 3: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Bringing Port to Industrial Neighborhood

HUB (Tj. Priok Port)

SPOKE (Cikarang Dry Port)

JBBK1

Distance = 50 kms

JBBK2MM2100

Hyu

EJIPLippo

BIEE KIIC

SC

KIM

KBI KIKC

Surrounded by 12 Industrial Estate and

More than 3000 manufacturer company

Port Code: IDJBK

Page 4: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Concept

• Integrated Port-Services, Logistics Services & Bonded Zone as One-Stop-Services

• Bringing Port, Customs, and Quarantine Services to Industrial Estate and Industrial Zone

• Supported by Real Time Monitoring System

• Security and Safety comply to International Standard

4

Page 5: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Concept

5

EXISTING

TrucksMT Depot Shipping LineForw arder

T A N J U N G P R I O K

INDUSTRIES

CY

Customs

SEA PORT

INDUSTRIES Cikarang Dry Port

KPPT-Cikarang Dry Port

CYTrucks

MT DepotCustoms

Forw arder

Carrier Logistics

Systematically connected

CY

Integrated / One Stop Services TANJUNG PRIOK

SEA PORT

Quarantine

Quarantine

Page 6: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Sea Port & Dry Port Connectivity

6

at Sea Port

Page 7: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Government Approval

7

Ministry of Transportation

• Location Permit by Minister of Transportation, No:KP.131 Year 2004,

• Construction Permit by Directorate General of Sea Transportation,

No:PU60/3/8/DJPL.06,19 June 2006

• Operation Permit by Minister of Transportation, No. 527, Year 2009

• International Port Code, ID JBK, 2010

Ministry of Finance, cq. Customs

• Permit for Temporary Storage Area (TPS), as implementation of Customs

Advance Trade System (CATS), KM-07/WBC.08/2010

• Kawasan Pelayanan Pabean Terpadu (KPPT), KEP-706/KM.4/2010

• Manifest Sarana Pengangkut melalui KPPT Cikarang Dry Port, Perdirjen No

5/BC/2011

Ministry of Agriculture, cq. Quarantine

• Place of Entering Point for Import and Export of Animal and Plantation

Product, Ministry of Agriculture Regulation No. 94/Permentan/OT.140/12/2011

The National Agency of Drug and Food Control (BPOM)

• Online Services at e-BPOM (web base, http:// http://e-bpom.pom.go.id) for

permitting import-export with International Port Code “IDJBK”.

Page 8: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,
Page 9: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Operational Scheme

9

CY-TjPriok(IDJKT)

CY- CDP(IDJBK)

Import Process

By Consignee / Forwarder

By CDP using BC 1.2 as requested by consignee & approved by Customs

Flow Chart

CIF/CNF@IDJKT

Shipper / Consignee

Non Multimodal B/LB/L @ Tj Priok

Multimodal B/LB/L @ CDP“Place of Delivery” CIF/CNF

@IDJBK

By Carrier

Export Process

Multimodal B/LBL @ CDP“Place of Receipt”

On Truck/Train On Board@IDJBK

By Carrier

By Consignee / Forwarder

By Shipper / Forwarder

Page 10: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Value Proposition

10

•Predicted Lead time

and Cost using

Multimodal B/L

• Export : Closing Time

and transfer

responsibility at CDP

• Import : Avoid

Overbrengen

• Transfer of

responsibility at CDP

•Reduced risk

•Managed bonded

transportation with

Electronic Seal for

better security &

monitoring

•Better planning,

inventory reduction

and increasing

productivity

• Streamlined process,

time & cost

• Storage & demurrage

start counting at CDP(Multimodal B/L)

CERTAINTY TRACEABILITY PROFITABILITY

(Source: World Bank Study, 2011)

Page 11: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Terminal Cost Comparison

11

More details please visit www.cikarangdryport.com

Penalty Penalty

Page 12: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

`

Port / Terminal( 70 Ha)

Logistics Park(130 Ha)

Kawasan Industri

AREA MASTERPLAN

200 Ha

12

Quarantine

TPP

Page 13: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Bird Eye View

13

Total Area 200 Ha

Port Code:IDJBK

Port :

• 70 Ha

• Customs

• Quarantine

• CY

• Reefer

• CFS

• Empty Depo

Logistics

Park:

•130 ha

• Warehouse

• TPP

Railway

• Domestics

•Internasional

Page 14: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Facility Development

14

Access Road

OfficeEmpty Container &

Truck Pool

Legend :Already built = 21 Ha

Under construction = 15 Ha

Container YardCFS

Gate

Rail Emplacement

Domestic CY

Empty Container

Container Yard & Reefer Plug

Bonded Warehouse

Logistics Park

Page 15: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Facilities

Starting Operation since 18 Aug 2010(24 / 7)

Page 16: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

16

Main Office & Administration

Empty Container DepotWeight Bridge

Page 17: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

17

Activity at Gate CDP

Export Import Operation (night)Export Import Operation (day)

Page 18: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Logistics Park (upcoming)

18

Page 19: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

www.cikarangdryport.com

Tracking

Export

Import

Page 20: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,
Page 21: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Strategic Partnership with Other Stakeholders

21

Terminal Operators

(4)

Shipping Liners (14)

Logistics Service Provider (20+)

IndustryCustomers

(70+)

PT Mustika

Alam Lestari

JICT

Land Transporter

(3)

Page 22: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Customers Testimony

22

“Cikarang Dry Port prove the commitment on night delivery to meet factory operation”PT. Kraft Indonesia | Buyer

“Customs response (PEB/NPE) is fast”PT. Yamaha Music Manufacturing Asia | Logistics

“Avoid OverbrengenMavoid high cost”PT. Cargill Indonesia | Supply Chain

“Increase truck feeder efficiency by returning empty container near factory”PT. SGL Indonesia | Operation

“Customs very cooperative and supportive !”PT. Damco Indonesia | Dispatcher

“Managed delivery to factory”PT. Tekpak Indonesia.

Page 23: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Infrastructure Development

CDPRailway

Legend :

New Toll Road (km 29,2 and 34,7)New Industrial Estate Connecting Road

Existing Industrial EstConnecting RoadJababeka Existing road 23

Exit toll km 24

Exit toll km 31

Exit toll Km 29

Exit toll km 34.7

2

1

6

5

4

3

Page 24: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Access Road (Toll Road Km 29 to CDP)

24

Page 25: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated Logistics Facilities and Services

Access Road (Toll Road Km 29 to CDP)

25

Page 26: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,
Page 27: CIKARANG DRY PORTKPPT-Cikarang Dry Port –IntegratedPORT & LOGISTICSFacilities Background 2 Estimated more than 60% troughput of Tanjung Priok Port come from Corridor Toll Road Bekasi-Cikampek,

KPPT-Cikarang Dry Port – Integrated PORT & LOGISTICS Facilities

Contact Us

27

For further information:

PT. Cikarang Inland PortJl. Dry Port Raya, Kota Jababeka, Cikarang, Bekasi17530, West Java, Indonesia

Phone(62-21) 2908 2908; Fax (62-21)2908 2503

Website : www.cikarangdryport.com

E-mail : [email protected]

End of Presentation

THANK YOU