Chemical Grouting of Sanitary Sewers. Illinois Section CSWEA Collection System Seminar June 11, 2009 Derek J. Wold, P.E. Baxter & Woodman, Inc. Chemical Grouting of Sanitary Sewers Introduction. Rehabilitation Alternatives Why use Chemical Grout Chemical Grout Overview Specifications - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary SewersSewers

Illinois Section CSWEAIllinois Section CSWEACollection System Seminar Collection System Seminar

June 11, 2009June 11, 2009

Derek J. Wold, P.E. Derek J. Wold, P.E. Baxter & Woodman, Inc.Baxter & Woodman, Inc.

Page 2: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Sewers Introduction

• Rehabilitation Alternatives– Why use Chemical Grout

• Chemical Grout Overview

• Specifications

• Costs

• Case Studies

Page 3: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers IntroductionSewers Introduction

Purpose of RehabilitationPurpose of Rehabilitation Structural RepairStructural Repair Infiltration / Inflow (I/I) RemovalInfiltration / Inflow (I/I) Removal Extend Service LifeExtend Service Life

Page 4: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers IntroductionSewers Introduction

RehabilitatioRehabilitation Alternativesn Alternatives Lining (CIPP, Lining (CIPP,

Slip Lining)Slip Lining) Pipe BurstingPipe Bursting Open Cut Open Cut

ReplacementReplacement Chemical Chemical

GroutingGrouting

Page 5: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers OverviewSewers Overview

Why utilize chemical groutWhy utilize chemical grout Less expensive than other rehabilitation Less expensive than other rehabilitation

methodsmethods Extends service lifeExtends service life Remove I/IRemove I/I

When to use chemical groutWhen to use chemical grout No structural defectsNo structural defects Joint leaks or root intrusionJoint leaks or root intrusion No sagsNo sags

Page 6: Chemical Grouting of Sanitary Sewers
Page 7: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers Mainline Sewer GroutingSewers Mainline Sewer Grouting

Equipment Equipment PackerPacker TV CameraTV Camera GaugesGauges WinchWinch

Types of groutTypes of grout

Page 8: Chemical Grouting of Sanitary Sewers
Page 9: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers Sewers

Service Connection and Lateral Service Connection and Lateral GroutingGrouting

Equipment usedEquipment used AccessAccess

Page 10: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers Sewers

SpecificationsSpecifications StandardsStandards

Rehabilitation of Sewers ASTM 2304.Rehabilitation of Sewers ASTM 2304. Sealing Sewer Manholes ASTM 2414.Sealing Sewer Manholes ASTM 2414.

SpecificationsSpecifications Preparatory Cleaning and TelevisingPreparatory Cleaning and Televising Grout MaterialGrout Material Joint TestingJoint Testing

3 psi greater than groundwater pressure, or3 psi greater than groundwater pressure, or ½ psi per foot½ psi per foot Maximum of 10 psiMaximum of 10 psi Maximum pressure loss = 1 psi per 15 sec.Maximum pressure loss = 1 psi per 15 sec.

Page 11: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers Sewers

SpecificationsSpecifications Joint SealingJoint Sealing

½ gallon per inch diameter½ gallon per inch diameter Pump to “refusal”Pump to “refusal” DocumentationDocumentation

Joint Sealing VerificationJoint Sealing Verification Repeat Joint TestingRepeat Joint Testing

WarrantyWarranty Retest after 3 yearRetest after 3 year

Page 12: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers Sewers

SpecificationsSpecifications Service Connection GroutingService Connection Grouting

Test and Seal SpecificationsTest and Seal Specifications 3 gal per connection3 gal per connection

Lateral groutingLateral grouting

Page 13: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers Sewers CostsCosts

MainlineMainline Service TeeService Tee LateralLateral ManholesManholes

Page 14: Chemical Grouting of Sanitary Sewers

Chemical Grouting of Sanitary Chemical Grouting of Sanitary Sewers Sewers

Case StudiesCase Studies Downers Grove Sanitary DistrictDowners Grove Sanitary District

E1-014 Flow BasinE1-014 Flow Basin IM-12A Flow BasinIM-12A Flow Basin

Village of LisleVillage of Lisle

Page 15: Chemical Grouting of Sanitary Sewers

Downers Grove Sanitary District Background

• Special unit of local government• Responsible for wastewater collection and treatment• Operates 237 miles of public sewers• Operates 9 pumping stations• Operates one WWTF rated at 11 MGD• 20 square mile service area• Western suburbs of Chicago, Illinois• 21,062 building connections• Serves approximately 62,000 people

Page 16: Chemical Grouting of Sanitary Sewers

mapmap

Downers Grove Sanitary District35 miles west of Chicago

Page 17: Chemical Grouting of Sanitary Sewers

Downers Grove Sanitary Downers Grove Sanitary DistrictDistrict

Sewer Rehab Policy – I/I Sewer Rehab Policy – I/I ReductionReduction

Select Target Rehabilitation BasinSelect Target Rehabilitation Basin Develop Criteria / Scoring System based on:Develop Criteria / Scoring System based on:

Frequency of SSOsFrequency of SSOs Frequency of Basement BackupsFrequency of Basement Backups Flow Monitoring DataFlow Monitoring Data System AgeSystem Age

Page 18: Chemical Grouting of Sanitary Sewers

Downers Grove Sanitary Downers Grove Sanitary DistrictDistrict

Target I/I Rehabilitation BasinTarget I/I Rehabilitation Basin Select I-H-9 Flow Basin as Select I-H-9 Flow Basin as

first target basinfirst target basin 188 Building connections188 Building connections Approx. 8,300 LF of Approx. 8,300 LF of

sewer and 32 manholessewer and 32 manholes Flow Data Flow Data

60 gpm ADF to 1,200 60 gpm ADF to 1,200 gpm peak flowgpm peak flow

Preliminary SSES work and Preliminary SSES work and resultsresults Flood testingFlood testing Smoke testingSmoke testing Small amount of I/I Small amount of I/I

identifiedidentified Inadequate storm drainageInadequate storm drainage

Manhole I-H-9 8/21/02 Rainfall Event

0

200

400

600

800

1000

1200

1400

0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00

Time of Day

Flow

(gpm

) Wet Weather Flow

Dry Weather Flow

Page 19: Chemical Grouting of Sanitary Sewers

Downers Grove Sanitary Downers Grove Sanitary DistrictDistrict

IH-9 Flow BasinIH-9 Flow Basin Total Cost – Approx $1,500,000Total Cost – Approx $1,500,000

Line 100% of mains - $418,000Line 100% of mains - $418,000 Grout or Replace 100% Manholes - $47,000Grout or Replace 100% Manholes - $47,000 Line or replace 96% Services - $1,013,000Line or replace 96% Services - $1,013,000

ResultsResults I/I reduced by 60-80 percentI/I reduced by 60-80 percent No overflows in I-H-9 flow basinNo overflows in I-H-9 flow basin Unable to produce air tight systemUnable to produce air tight system Impact of I/I Removal on inadequate Impact of I/I Removal on inadequate

storm drainagestorm drainage

Page 20: Chemical Grouting of Sanitary Sewers

Downers Grove Sanitary DistrictFlow Meter Data Summary - 1-H-9 Flow Basin

I/I Comparison2.

852.

781.

033.

145.

396.

175.

111.

871.

033.

544.

861.

384.

804.

162.

171.

170.

902.

860.

811.

490.

841.

343.

153.

890.

625.

191.

200.

954.

944.

681.

097.

315.

443.

56

1.45

1.42

2.86

2.17

4.05

3.14

2.21

3.02

0.97

0.69

4.01

1.15

3.02

2.42

3.92

0.31 0.39 0.

530.

25 0.37

1.19

3.84 4.

111.

432.

182.

581.

300.

950.

82

0.42

0.38

2.10

3.00

1.10

0.70

3.20

3.70

2.20

0.30

4.20 4.

401.

400.

942.

382.

101.

700.

801.

302.

300.

260.

900.

373.

203.

631.

161.

991.

442.

050.

651.

061.

892.

191.

82

1.34

2.31

2.22

2.56

2.61

1.88

1.90

1.77

1.81

1.47

1.47

2.71

0

1

2

3

4

5

6

7

8

3/8/

1998

3/31

/199

8

4/20

/199

8

2/24

/200

1

4/15

/200

1

6/5/

2001

 

8/25

/200

1

9/23

/200

1

4/8/

2002

5/11

/200

2

7/9/

2002

8/22

/200

2

3/28

/200

3

5/5/

2003

7/15

/200

3

9/1/

2003

11/4

/200

3

5/30

/200

4

8/3/

2004

11/2

7/20

04

1/13

/200

5

5/13

/200

5

9/24

/200

5

1/13

/200

6

4/30

/200

6

6/26

/200

6

8/28

/200

6

9/13

/200

6

10/3

/200

6

11/1

0/20

06

7/18

/200

7

8/19

/200

7

10/1

/200

7

12/1

1/20

07

5/2/

2008

5/26

/200

8

6/13

/200

8

Rainfall Event

I/I N

um

ber

Completion of Main Sewer Lining

Start of Service Sewer Lining

Pre-Lining Post-LiningPre-Lining

Main Average

Post-Lining Service Average

Completion of Service Sewer Lining

Post-Lining Main Average

Pre-Lining Post-Lining

Page 21: Chemical Grouting of Sanitary Sewers
Page 22: Chemical Grouting of Sanitary Sewers

Downers Grove Sanitary Downers Grove Sanitary DistrictDistrict

E-1-014 Flow BasinE-1-014 Flow Basin Basin CharacteristicsBasin Characteristics

8,021 LF of 8-inch VCP 8,021 LF of 8-inch VCP sewersewer

165 services165 services 28 manholes28 manholes

Flow dataFlow data ADF = 25 gpmADF = 25 gpm Peak Flow = 750 gpmPeak Flow = 750 gpm

WetlandsWetlands

E-1-014 10/2/05 Rainfall Event

0

100

200

300

400

500

600

700

800

0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00

Time of Day

Flow

(gpm

) Wet Weather Flow

Dry Weather Flow

Page 23: Chemical Grouting of Sanitary Sewers
Page 24: Chemical Grouting of Sanitary Sewers

Downers Grove Sanitary Downers Grove Sanitary DistrictDistrict

E-1-014 Flow BasinE-1-014 Flow Basin Grout 100% of mains Grout 100% of mains

and manholesand manholes ResultsResults

Peak flow reduction of Peak flow reduction of 45%45%

CostsCosts $300,000$300,000

Page 25: Chemical Grouting of Sanitary Sewers
Page 26: Chemical Grouting of Sanitary Sewers
Page 27: Chemical Grouting of Sanitary Sewers

Downers Grove Sanitary Downers Grove Sanitary DistrictDistrict

I-M-012A Flow BasinI-M-012A Flow Basin Basin CharacteristicsBasin Characteristics

9,442 LF of sewer9,442 LF of sewer 211 services211 services 34 manholes34 manholes

Flow dataFlow data 50 gpm to 1200 gpm50 gpm to 1200 gpm

Compliance Commitment Agreement with Compliance Commitment Agreement with IEPAIEPA

Page 28: Chemical Grouting of Sanitary Sewers
Page 29: Chemical Grouting of Sanitary Sewers

Village of LisleVillage of LisleBeau Bien AreaBeau Bien Area

Project AreaProject Area 6,314 LF of 8-inch sewer6,314 LF of 8-inch sewer 97 services97 services

RehabilitationRehabilitation 3,314 LF of grouting3,314 LF of grouting 3,080 LF of CIPP3,080 LF of CIPP 88 services grouted88 services grouted 9 laterals lined9 laterals lined

CostsCosts

Page 30: Chemical Grouting of Sanitary Sewers
Page 31: Chemical Grouting of Sanitary Sewers

Questions?Questions?