chapter 12 wall and ceiling construction. frame wall construction sole plate (bottom plate) top...

11
Chapter 12 Wall and Ceiling Construction

Upload: eric-richards

Post on 05-Jan-2016

256 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Chapter 12

Wall and Ceiling

Construction

Page 2: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs

Wall Cripples Trimmers

Headers Solid Cripple

Bracing

Page 3: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers
Page 4: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Other Terms Rough Opening 16” On Center (O.C) Corner

Bracing Nailer (p.212) Blocking

Page 5: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Weather Board Placement

Page 6: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Rough Opening

• Tops of Doors and Windows are 6’-10”

• RO dimensioned to center of opening on Floor Plan

•Header Required

Page 7: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Headers

Sized for Span

Trussed?

Page 8: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Ceiling Joists Provides ceiling for interior rooms of house Can also be the floor joists of the above

floor Generally the same direction as rafters Size depends on:

Load to be supported Span distance Wood Species Spacing (OC) Grade of lumber

Page 9: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Ceiling Joist Span

Page 10: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Special Walls Bay / Bow Windows Other wide openings Masonry Construction

Bonding with metal ties or header course

Need for furring strips Firecut (P. 217) Brick ledge

Page 11: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers

Brick Wall Section (p.219)