360-13 CFS Solid Hardwood Flooring Installation Instructions 1 CFS SOLID HARDWOOD FLOORING INSTALLATION GUIDELINES Please Inspect all Flooring prior to Installation Carefully confirm that the Color, Finish, Styling and Quality Fully meet the owner’s expectations. If you determine the product does not meet expectations DO NOT INSTALL and immediately contact your Place of Purchase. CFS will not assume any responsibility, including costs for removal or replacement, for flooring that has been installed that does not meet the owner’s expectations for any reason. CFS SOLID HARDWOOD FLOORING is INTENDED TO BE INSTALLED with approved full spread wood flooring adhesive and NWFA approved Solid wood flooring staplers and nailers. Installations over Radiant Heated Sub Floors are not approved by CFS. Light Commercial applications must be pre-approved and agreed to in writing by CFS only after an investigation of site conditions and limitations by manufacturer’s engineers to determine if it is possible to install the flooring at the specific site using these methods. Contact your retailer for additional information regarding the approval of Light Commercial jobs. PLEASE READ AND REVIEW THE ENTIRE INSTALLATION INSTRUCTIONS BEFORE PROCEEDING WITH THE ACTUAL INSTALLATION OWNER / INSTALLER RESPONSIBILITY Hardwood flooring is a beautiful and unique product of nature, and characterized by distinctive variations in grain and color. These natural variations in color and grain, (including filled knots, mineral streaks and scrapes), are not flaws, but are a part of the styling, natural beauty, and uniqueness of hardwood flooring. These inherent variations should be expected and serve to enhance the natural beauty, styling, and aesthetics of the flooring. The variations may be of a manufacturing or natural type. No two hardwood floors are completely alike. CFS Solid Hardwood Floors are manufactured in accordance with the accepted industry standards which allow a defect tolerance, (natural or manufacturing), of 5% of the total CFS Solid Hardwood Flooring purchase per job. CFS will warrant 95% of the total CFS Solid Hardwood Flooring purchase per job. The remaining 5% may be used at the owner’s discretion, but is subject to the industry standard 5% defect allowance. All flooring considered defective (outside of that listed in the Warranty Exclusions on the CFS Solid Hardwood Floor Warranties and Floor Care Guide), after proper inspection by the installer or homeowner, should be culled, or trimmed out prior to installation and must not be installed. If an individual piece is doubtful as to grade, color, or finish, the installer should not install that piece. CFS Warranties DO NOT cover materials that are installed with visible defects. If material in excess of 5% of the total job amount is found to be unacceptable, contact the place of purchase for your CFS Solid Hardwood Floor immediately. It should be realized that wood is a natural product that contains color variations, grain and characteristics, which are normal for all wood flooring products. Color changes may also occur when hardwood flooring is exposed to light sources. The installer and home owner must assume all responsibility for full inspection of product prior to the installation. Open and select planks from 3 or 4 cartons in order to blend color and grain characteristics, and to allow for staggering of end joints a minimum of 7 to 10 inches, carefully examining the flooring for color, finish, texture, and quality before installing it. Use reasonable selectivity, and use touch-up markers and putty sticks, as well as culling or cutting out pieces with visible defects. Before beginning the installation of any hardwood flooring product, the installer must determine that the environment of the job site, and the condition and type of the subfloor involved is acceptable, ensuring that it meets or exceeds all requirements specified in the CFS Solid Hardwood Floor installation RECOMMENDED SUB·FLOOR TYPES and PRE-INSTALLATION JOB SITE INSPECTION sections below. Hardwood flooring is a product of nature and is susceptible to damage when exposed to extreme changes in temperature or relative humidity. If environmental conditions and installation instructions listed below are not correctly followed, CFS Solid Hardwood Floors may suffer irreversible damage. CFS does not accept any responsibility for flooring failure resulting from or associated with inappropriate or improperly prepared subfloors or improper job site environmental conditions. The use of stain, wood touch up pens, filler or putty sticks for the correction of defects as well as cleaning of adhesives and residue during installation should be accepted as normal procedure. When

Upload: others

Post on 10-Jan-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CFS SOLID HARDWOOD FLOORING INSTALLATION GUIDELINES Please ... · 360-13 CFS Solid Hardwood Flooring Installation Instructions 3 approved suspended wood subfloors, although they are

360-13 CFSSolidHardwoodFlooringInstallationInstructions 1

CFSSOLIDHARDWOODFLOORING

INSTALLATIONGUIDELINESPleaseInspectallFlooringpriortoInstallation

CarefullyconfirmthattheColor,Finish,StylingandQualityFullymeettheowner’sexpectations.IfyoudeterminetheproductdoesnotmeetexpectationsDONOTINSTALLandimmediatelycontactyourPlaceofPurchase.CFSwillnotassumeanyresponsibility,includingcostsforremovalorreplacement,forflooringthathasbeeninstalledthatdoesnotmeettheowner’sexpectationsforanyreason.CFSSOLIDHARDWOODFLOORINGisINTENDEDTOBEINSTALLEDwithapprovedfullspreadwoodflooringadhesiveandNWFAapprovedSolidwoodflooringstaplersandnailers.InstallationsoverRadiantHeatedSubFloorsarenotapprovedbyCFS.LightCommercialapplicationsmustbepre-approvedandagreedtoinwritingbyCFSonlyafteraninvestigationofsiteconditionsandlimitationsbymanufacturer’sengineerstodetermineifitispossibletoinstalltheflooringatthespecificsiteusingthesemethods.ContactyourretailerforadditionalinformationregardingtheapprovalofLightCommercialjobs.PLEASEREADANDREVIEWTHEENTIREINSTALLATIONINSTRUCTIONSBEFOREPROCEEDINGWITHTHEACTUALINSTALLATIONOWNER/INSTALLERRESPONSIBILITYHardwoodflooringisabeautifulanduniqueproductofnature,andcharacterizedbydistinctivevariationsingrainandcolor.Thesenaturalvariationsincolorandgrain,(includingfilledknots,mineralstreaksandscrapes),arenotflaws,butareapartofthestyling,naturalbeauty,anduniquenessofhardwoodflooring.Theseinherentvariationsshouldbeexpectedandservetoenhancethenaturalbeauty,styling,andaestheticsoftheflooring.Thevariationsmaybeofamanufacturingornaturaltype.Notwohardwoodfloorsarecompletelyalike.CFSSolidHardwoodFloorsaremanufacturedinaccordancewiththeacceptedindustrystandardswhichallowadefecttolerance,(naturalormanufacturing),of5%ofthetotalCFSSolidHardwoodFlooringpurchaseperjob.CFSwillwarrant95%ofthetotalCFSSolidHardwoodFlooringpurchaseperjob.Theremaining5%maybeusedattheowner’sdiscretion,butissubjecttotheindustrystandard5%defectallowance.Allflooringconsidereddefective(outsideofthatlistedintheWarrantyExclusionsontheCFSSolidHardwoodFloorWarrantiesandFloorCareGuide),afterproperinspectionbytheinstallerorhomeowner,shouldbeculled,ortrimmedoutpriortoinstallationandmustnotbeinstalled.Ifanindividualpieceisdoubtfulastograde,color,orfinish,theinstallershouldnotinstallthatpiece.CFSWarrantiesDONOTcovermaterialsthatareinstalledwithvisibledefects.Ifmaterialinexcessof5%ofthetotaljobamountisfoundtobeunacceptable,contacttheplaceofpurchaseforyourCFSSolidHardwoodFloorimmediately.Itshouldberealizedthatwoodisanaturalproductthatcontainscolorvariations,grainandcharacteristics,whicharenormalforallwoodflooringproducts.Colorchangesmayalsooccurwhenhardwoodflooringisexposedtolightsources.Theinstallerandhomeownermustassumeallresponsibilityforfullinspectionofproductpriortotheinstallation.Openandselectplanksfrom3or4cartonsinordertoblendcolorandgraincharacteristics,andtoallowforstaggeringofendjointsaminimumof7to10inches,carefullyexaminingtheflooringforcolor,finish,texture,andqualitybeforeinstallingit.Usereasonableselectivity,andusetouch-upmarkersandputtysticks,aswellascullingorcuttingoutpieceswithvisibledefects.Beforebeginningtheinstallationofanyhardwoodflooringproduct,theinstallermustdeterminethattheenvironmentofthejobsite,andtheconditionandtypeofthesubfloorinvolvedisacceptable,ensuringthatitmeetsorexceedsallrequirementsspecifiedintheCFSSolidHardwoodFloorinstallationRECOMMENDEDSUB·FLOORTYPESandPRE-INSTALLATIONJOBSITEINSPECTIONsectionsbelow.Hardwoodflooringisaproductofnatureandissusceptibletodamagewhenexposedtoextremechangesintemperatureorrelativehumidity.Ifenvironmentalconditionsandinstallationinstructionslistedbelowarenotcorrectlyfollowed,CFSSolidHardwoodFloorsmaysufferirreversibledamage.CFSdoesnotacceptanyresponsibilityforflooringfailureresultingfromorassociatedwithinappropriateorimproperlypreparedsubfloorsorimproperjobsiteenvironmentalconditions.Theuseofstain,woodtouchuppens,fillerorputtysticksforthecorrectionofdefectsaswellascleaningofadhesivesandresidueduringinstallationshouldbeacceptedasnormalprocedure.When

Page 2: CFS SOLID HARDWOOD FLOORING INSTALLATION GUIDELINES Please ... · 360-13 CFS Solid Hardwood Flooring Installation Instructions 3 approved suspended wood subfloors, although they are

360-13 CFSSolidHardwoodFlooringInstallationInstructions 2

orderingHardwoodFlooring,awastefactorbetween5-10%,dependingonlayout,mustbeaddedtotheactualnumberofsquarefeetneeded.(DiagonalInstallationsmayrequiremore.)

AdditionalInstallationNotes:

• RefertotheCFSSolidHardwoodFlooringWarrantyandFloorCaredocumentforinformationonwarrantycoverageandexclusions.

• NOTE–CFS'WarrantyforSolidHardwoodFlooringdoesnotwarrantinstallationoverradiantheatsystems.

TOOLSAND/ORACCESSORIESNEEDED:Warning:CFSisnotresponsiblefordamagecausedbyusernegligencerelatedtoinstallationpracticesormisuseofinstallationandfasteningtools.

Broom Hammer/RubberMallet

Pencil-ChalkLineandChalk PryBar

TapeMeasure HardwoodFlooringCleaner

MoistureMeter(s) Trowel(ifgluedown)1/4"X1/4"VNotch

SafetyEquipment(GogglesandMask) CircularorHandSaw;MiterorTableSaw

PneumaticBrad-Nailerwith1-1/2”bradsORDrillBit6d-8dScrewShankNails

1/2”Crown16gaugeHardwoodFlooringStaplerdesignedspecificallyforprefinishedsolidflooringwith2”staples

HardwoodFlooringCleatNailerusing2”hardwoodflooringcleatsdesignedforprefinishedsolidhardwoodflooring.

RecommendedInstallationProductsFlooringFasteners(StaplersandNailers):AllEquipmentandfastenersmustbeNWFAapprovedforinstallationsofSOLIDHARDWOODFLOORINGCFSrequirestheuseofNWFAapprovedStaplerswith15-16Gauge1/2"crownwith2"LegsorNWFAapprovedNailerswith2"NailsorCleatstoproperlyfastentheCFSSolidHardwoodFlooringwithmechanicalfasteners.Moststapleshave2legsthataretreatedwiththermaladhesivesthatheattheadhesivewhentheyareforcedquicklyintothefloorandsubstrateandbondaggressivelytothesubstrate.Theyalsohavedivergentpointsthatcauseaslightcurlattheendofthestapleleg,makingthemmuchmoredifficulttoloosenorremove.Itisbesttousebrandedstaplersornailersfromawell-knownmanufacturersuchasStanley-BostichorPowernail.TheBostichMIIIPneumaticStaplerwith16gaugestaplesandthePowernailPneumaticNailerwith2"PowerCleatsbothhaveadjustableFootAdaptorsandarepopularandreliable.

NWFAapprovedNailersandnailsdesignedforinstallingSolidFlooringmaybeusedbyqualifiedflooringprofessionalsatyourrisk.Donotuse16gaugeorlargerstaplestoinstallCFSSolidHardwoodFlooring.DonotusestaplersornailersspecificallydesignedforEngineeredHardwoodFlooringtoinstallCFSSolidHardwoodFlooring.CFSdoesnotwarrantflooringandacceptsnoliabilitywhenfastenersthataremisused,ornotdesignedforSolidFlooring,areusedtoinstallCFSSolidHardwoodFlooring.

STEP1:Pre-InstallationJobsiteInspection

WheninstallingSolidflooringinnewconstructionsites,CFSSolidHardwoodFlooringshouldbeoneofthelastitemsinstalled.Flooringshouldnotbedelivereduntilthepre-installationguidelineslistedbelowarecompleted.Afteralltheguidelinesaremet,theflooringshouldacclimateatthejobsiteatleast48hourspriortoinstallationoruntiltheflooringreachesthefinalroomtemperatureandmoisturecontentasrecommendedbytheNWFA.Donotopencartonsuntilthecolor,qualityandstyleoftheflooringhasbeeninspectedandapprovedbythepurchaser.SolidHardwoodCartonsmaybeunsealedandleftintheopenedcartonstoacclimateafterthematerialhasbeenapprovedbythepurchaserasreadytoinstall.Priortoinstallation,thebuildingmustbestructurallycompleteandenclosed.Allexteriorwindowsanddoorsmustbeinstalled.Any“wet”workinsidethehouse(masonry,drywall,andpaint)mustalsobecomplete–allowingadequatedryingtimetoeliminateunnecessarymoisturecontentwithinthebuilding.PermanentHVAC(heating/airconditioning)systemsmustbeoperatingforatleast14daysbeforeinstallation,maintainingaconstantroomtemperaturebetween60-78ºFandarelativehumidityof35%-55%.Exteriordrainage–includingguttersanddownspouts,mustbeinplaceanddrainawayfromthebuilding.CFSSolidHardwoodFloorscanbeinstalledonallNWFA

Page 3: CFS SOLID HARDWOOD FLOORING INSTALLATION GUIDELINES Please ... · 360-13 CFS Solid Hardwood Flooring Installation Instructions 3 approved suspended wood subfloors, although they are

360-13 CFSSolidHardwoodFlooringInstallationInstructions 3

approvedsuspendedwoodsubfloors,althoughtheyarenotrecommendedforfullbathroominstallations.Basementsandcrawlspacesmustbedry.Crawlspacesmustbeaminimumof18”fromthegroundtotheundersideofthejoistswithcrossventilationequalto1.5squarefeetofventopeningsper1000squarefeetoftheflooringarea.Avaporinhibitor(6-8milblackpolyethylenefilm)mustbeputincrawlspaceswithjointsoverlappedandtaped.Sub-floorsmustbecheckedformoisturecontentusingtheappropriatemeteringdeviceforwoodsubstrates.

PerformingMoistureTests:WOODSUBSTRATES:Testthemoistureofthewoodsub-floorusingacalibratedmoisturemeterapprovedfortestingwoodmoistureaccordingtothemetermanufacturer.Thereadingshouldnotexceed12%,orreadmorethan5%differentthanthemoisturecontentoftheproductbeinginstalled.

STEP2:StoringtheMaterialPriortoInstallationOncethebuildingmeetstheconditionsinStep1,thematerialcanbedeliveredtothesite.Handleandunloadtheflooringwithcareandstorewithintheareainwhichitisexpectedtoperform.Flooringstoredonconcretefloorsshouldbeelevatedatleastfourinchestoallowcirculationunderthecartons.Cartonsmustbestoredhorizontally(paralleltotheground).Neverstorethemstandingonend.Stackthecartons3-4hightoinsureefficientacclimation.Donotstoredirectlyuponongradeconcreteornexttooutsidewalls.Cartonsshouldbeplacedasclosetothecenteroftheinstallationareaaspossible,awayfromexteriorwalls,windows,anddoors.Keepoutofdirectsunlightandawayfromairvents.CFSSolidHardwoodflooringmustacclimateforaminimumof48hourspriortoinstallation.Extraprecautionsrequiringadditionalacclimationmaybenecessaryduringextremeweatherconditions.

STEP3:ApprovedSubfloorTypesRadiantHeatSubfloorsareNotApprovedByCFSandinstallationsofCFSSolidHardwoodFloorsarenotwarrantedoverRadiantHeatedSubstrates.

Itisthesoleresponsibilityofthepurchasertodeterminethatallsubfloortypesmeettherequiredspecifications.

WoodPanelSubfloors

(Truss/joistspacingwilldeterminetheminimumacceptablethickness.

• Ontruss/joistspacingof16”oncenterorless,useaminimum5/8”CDXorbettergradeplywoodpanelor23/32”APAE1PS2ratedNWFAapprovedOSBpanel.

• Ontruss/joistspacingofmorethan16”upto19.2”oncenter,useaminimum3/4”TongueandGrooveCDXorbettergradeplywoodpanel,gluedandmechanicallyfastened,oraminimum¾”APAE1PS2ratedNWFAapprovedOSBpanel,gluedandmechanicallyfastened.

• Truss/joistsystemsspacedovermorethan19.2”uptoamaximumof24”oncenterrequireaminimum7/8”TongueandGrooveCDXorbettergradeplywoodpanel,gluedandmechanicallyfastened,oraminimum7/8”APAE1PS2ratedNWFAapprovedOSBpanelgluedandmechanicallyfastened.

• WARNING:DonotusestaplesorgluemethodtoinstallCFSSolidHardwoodFlooringdirectlyoverparticle-boardorunapprovedOSB

STEP4:PreparingtheSub-floorForwoodpanelsubfloors:

• Ensurethatthereisproperexpansionspace(1/8”)betweenthepanels.Ifthepanelsarenottongueandgrooved,andifthereisnotsufficientexpansionspace,useacircularsawtocreatethenecessaryspace.DonotsawthroughtongueandgroovejointsonT&Gsubfloors.

• Ensuretheyarestructurallysound:Replaceanywater-damaged,swollenordelaminatedsub-flooringorunderlaymentthatisunabletoproperlyholdfasteners.Whenpossible,plywoodsheetsshouldbelaidwithgrainedouterpliesatrightanglestojoists;adjacentrowsstaggeredfourfeetandnailedevery6"alongeachjoistwith7dorlargernails.Leavea1/8"gapattheedgesandnailwith7dorlargernailsevery6"attheedgesandevery12"inbothdirectionsandthroughtheinteriorofeachsheetofplywood.Itisnormalformechanically(staple/nail/cleat)fastenedfloorstomakeminoroccasionalnoisessuchaspopping,squeaking,orcracklingwhichcanchangeasenvironmentalchangesoccur.NoisefromsubfloorsisnotconsideredamanufacturingrelatedissueandisnotwarrantedbyCFS.Youcanhelpreducepopping,squeaking,orcracklingbybeingsurethatthesubfloorissecuredproperly(asexplainedabove)andisstructurallysound,thatthereisnoloosejoistsordecking,andissweptverythoroughlypriortoinstallation.

AllSub-floorsmustbe:

• CLEAN:scraped,sanded,orswept;freeofwax,grease,paint,oil,andotherdebris.• SMOOTH/FLAT:within3/16”over10’and/or1/8”over6’.Sandhighareasorjoints.Filllowareas(nomorethan1/8”)with

acementtypefiller.

Page 4: CFS SOLID HARDWOOD FLOORING INSTALLATION GUIDELINES Please ... · 360-13 CFS Solid Hardwood Flooring Installation Instructions 3 approved suspended wood subfloors, although they are

360-13 CFSSolidHardwoodFlooringInstallationInstructions 4

• DRY:Moisturecontentofsub-floormustnotexceed12%priortoinstallationofwoodflooring.Allmoisturetestingmustbedonebeforewoodhasbeenacclimatedforaminimumof72hoursandjob-siterequirementsmet.

CAUTION:WOODDUSTTheInternationalAgencyforResearchonCancerhasclassifiedwooddustasanasalcarcinogenaswellasaneyeandskinirritant.Incaseofirritation,flusheyesorskinwithwaterforatleast15minutes.Incaseofsevereirritation;seekimmediatemedicalattention.

ATTENTIONCALIFORNIAINSTALLERSANDCONSUMERSWARNING!

InstallationofthisproductmaycreatewooddustwhichisknowntotheStateofCaliforniatocauseCancer.Sawing,sanding,and/ormachiningofwoodproductscanproducewooddustthatcancauserespiratory,eye,andskinirritations.Equipmentshouldbeequippedwithadustcollectortoreduceairbornewooddust.WearanappropriateNIOSHdesignateddustmasktoreduceexposuretoairbornewooddust.Avoidwooddustcontactwitheyes.

STEP5:InstallingtheFloor• Openseveraldifferentcartonsandmixthepiecestomaximizethecolorandshadevariations.• Installtheproductparalleltothelongestwalltoprovidethemostappealingvisualeffect.• Staggertheendsoftheboardsatleast10”inadjacentrowstoinsurearandomvisualeffect.• Allowfora½”minimumexpansiongaparoundallfixedverticalobjectsthatreachthesubstrate.SolidWoodaswellasthe

housingstructureexpandsandcontractswithchangesinhumidity.Woodwillbuckleandbreaklooseifanadequateexpansionspaceisnotprovided.ALWAYSprovideforexpansionspacewhenfittingflooringadjacenttoverticalobjects(i.e.walls,baseboards,doorframesandfacings,pipes,etc.).

DOORWAY/WALLPREPARATION:• Undercutalldoorcasings,includingalldoorframes,andallfixedverticalstructures,1/16”higherthanthethicknessofthe

floorbeinginstalledwherequarterroundorsurfacetrimcannotbeused.• Removeexistingbaseandshoemoldingonwallaswellasdoorwaythresholds.Trimmaybereappliedaftertheinstallation

iscomplete.

PREPARINGTHEINSTALLATION:

Beforestarting,measurethewidthoftheroom,anddividetheroom’swidthbythewidthoftheplank.Ifthismeansthatthelastrowofplankswillbenarrowerthan2”,youwillneedtocutthefirstandlastrowofplankstobeinstalledinsuchawaythatthefirstandlastrowsofplankswillhavethesameapproximatewidthforanoverallcontinuouslook.Tocuttheboards,alwayssawwiththesawteethrotatingorcuttingdownintothefaceortopoftheboard.Cuttingfromthetopdownhelpsprotectthesurfacefromexcesschipping.Useacarbidetipbladetoensuresmoothcuts.

AlwaysinstallCFSSolidHardwoodFlooringwiththegroovesideoftheplankfacingthewall,andwiththeinstallerpositionedoffthefloorwhenpossible.

Begintheinstallationatthecorneroftheroomsothatthegroovesidecanbeplacedagainstthestartingwall.Besuretoleaveanexpansiongapofapproximately1/2.Ifthestartingwallisnotstraight,itmaybenecessarytocreateastraightchalklinefrommarksateachendoftherow,atadistancefromthewallbasedonthewidthoftheboardsonthefirstrowplus1/2",allowingtheoppositesideoftherowtopresentatruesquarelinefortheinstallationofrestofthefloor.Oncetheinstallationofthefirstrowiscomplete,therewillbeanextrapiecefromthelastplankwhich,iflongenough,maybeusedtobeginthenextrow.Tolocatethebeststartingpoint,anexteriorwallisusuallythestraightestandbestreferencelinetostarttheinstallationfrom.Ifpossible,thedirectionoftheflooringbeinginstalledshouldbeatrightanglestothefloorjoists.Establishastartinglinebyleavingaminimum½”expansiongaparoundallverticalobstructions.InatLEAST2places,measureoutequaldistancesfromthestartingwallequaltothewidthofthestartingplankcalculatedearlierinthissectionregardingtheroomwidthandplankwidth.Allowforalldoorsandopeningsaswellasthe1/2"expansionspaceneededatallfixedverticalstructures.Markthesepointsandsnapaworkingchalklineparalleltothestartingwallallowingtherequiredexpansionspacebetweenthestartingwallandtheedgeofthefirstrowofflooring.Planthefloorlayout(width-wise)soyoudon’thavetorip(whichiscuttingtheboardlengthwisetomakeitnarrower)thelastrowNARROWERthan2”.YoumayhavetomeasureandcalculatethewidthoftheFIRSTrowtoensurethattheLASTrowisatLEAST2”wide.

INSTALLINGTHEFIRSTROWS:

• Establishyourstartingrow(SEEESTABLISHASTARTINGPOINTABOVE).• Usingapneumaticbradnailer,face-nailthegroovesideoftheboards(firstrowonly)½”fromtheedgeat6”intervalsand

1”–2”fromeachend;thenata45degreeangledownthroughthenailingpocketontopofthetongue.Anotheroptionistopre-drilltheface-nailholes½”fromthegrooveedgeofthefirstrow,1”–2”fromeachend,andat6”intervals.Pre-drillatthesameintervalsata45degreeangledownthroughthenailingpocketontopofthetongue.Face-nailthegroovesidewhereitispre-drilled.Whentheface-nailingiscomplete,blind-nailata45degreeangleusing4dor6dnails.Countersink

Page 5: CFS SOLID HARDWOOD FLOORING INSTALLATION GUIDELINES Please ... · 360-13 CFS Solid Hardwood Flooring Installation Instructions 3 approved suspended wood subfloors, although they are

360-13 CFSSolidHardwoodFlooringInstallationInstructions 5

allnailstoensurethenextboardsinstallsmoothly.Makesuretouseanailsettocountersinkthenails–failuretodosocandamagethesurfaceofthewood.Keepblind-nailingthefollowingrowsuntilthenailercanbeused.

• REMINDER:Takeboardsfrom5to7boxeswhileinstalling.Donotinstall2piecesfromthesameboxsidebysideorinthesamerow–rackormixthecolorsandshadeswhileinstallingtoachievethepropervisualeffect.Staggertheend-jointsofadjacentrowsatleast10”toaddstructuralstabilityandcreateamoreappealinglookforthefloor.

• Lineuptheedgeofthefirstrowagainstthetemporarystarterboard.InstallCFSSolidHardwoodFlooringwiththegroovesideoftheplankfacingthewallwiththeinstallerpositionedoffthefloorwhenpossible.Thetongueoftheboardsshouldalwaysbefacingtheinstallerexceptwherespecialcircumstancesexist.

• Makesuretheend-jointsofadjacentrowsarestaggeredatleast10”across4to6rowstoestablisharandomvisualandavoididentifiablepatternsformingintheinstallation,(stair-stepappearance).

INSTALLINGTHERESTOFTHEFLOOR:

• Makesuretousethestraightest,longestboardsavailablewheninstallingthefirsttworows.• Continuetotakeboardsfrom5to7boxeswhileinstalling.Donotinstall2piecesfromthesameboxinarow–mixthe

colorsandshadeswhileinstallingtogetamorefavorableoveralllook.• Staggertheend-jointsofadjacentrowsatleast10”toaddstructuralstabilityandcreateamoreappealinglookforthe

floor.• Wheninstallingindividualpieces,connecttheend-jointsfirstasclosetothelongtongueandgrooveaspossible.Thenslide

(push)thelongtongueandgroovetogetherastightlyaspossible.Youmayneedtouseascrappieceofthesameflooringproductasatappingblocktohelpaligntheproduct,usecautionandtaponlyintothetongue,neverthefinishededgeoftheflooring.

• Doublechecktheedgesandendsofyourinstalledplanks–alljointsshouldfittightlytogether.• Continuewiththismethodwhileinstallingtherestofthefloor.Insomecases,itmaybenecessarytocuttheflooring

lengthwiseinthelastrow.Inordertodoso,placethelastboardoverthenext-to-lastrow(RefertoPreparingtheInstallation),markingtheexactcutandtakingintoaccountthe1/2“gapwithregardtotheexpansionspace.

• Oncetheflooringinstallationiscomplete,proceedtoinstallthebaseboardsandtrimprofiles,whichwillcovertheexpansiongapwithoutobstructingit.Fastenalltrimintowallbase.Donotnailorstapletrimintoorthroughtheflooringsurface.

SpecialCircumstances

• Doorways:Attemptingtocontinueinstallingrowsthroughadoorwayintoanotherroomcanbedifficultbecausethenarrowopeningisaverysmallbaseuponwhichtocontinueconsistent,evenrowsintothenextroom.Tocorrectlyalignplankrowsfromroomtoroom,itisbesttouseamasterreferencelinethatrunsthroughthedoorwaytothefarendsofeachroominvolved.Positionthelinesothatitisperpendicularfromthecorrespondingwallandparalleltothesidewalls.Usethislinetoaligntheplankrowsfromroomtoroom.

• Pipes,ventsandotherfixedobjects:Eachinstanceoftheseitemscanbeunique,butthegeneralruleistomeasureverycarefullybeforeyoucutandremembertoleavea1/2”expansiongapbetweentheobjectandtheflooring.Youwillcovertheexpansiongapswithmolding,ventcoversorpiperingswhentheflooriscomplete.

• InstallationonStairs:Workingfromthetopstepdown,flooringandnosingsshouldbeinstalledusingapremiumgradewoodflooringadhesiveandscrewtypefastenersornailsforalltrimpieces.Allstairnosemoldingsmustbegluedandnailed/screwedevery6”,asasafetyprecaution.

INSTALLINGWITHSTAPLES/Nails/Cleats(MechanicalFasteners):

Followallguidelinesoutlinedearlierregardingpreinstallationandthegeneralinstallationprocess.

CFSrequirestheuseofNWFAapprovedStaplerswith15-16Gauge1/2"crownwith2"LegsorNWFAapprovedNailerswith2"NailsorCleatstoproperlyfastentheCFSSolidHardwoodFlooringwithmechanicalfasteners.Moststapleshave2legsthataretreatedwiththermaladhesivesthatheattheadhesivewhentheyareforcedquicklyintothefloorandsubstrateandbondaggressivelytothesubstrate.Theyalsohavedivergentpointsthatcauseaslightcurlattheendofthestapleleg,makingthemmuchmoredifficulttoloosenorremove.Itisbesttousebrandedstaplersornailersfromawell-knownmanufacturersuchasStanley-BostichorPowernail.TheBostichMIIIPneumaticStaplerwith16gaugestaplesandthePowernailPneumaticNailerwith2"PowerCleatsbothhaveadjustableFootAdaptorsandarepopularandreliable.

NWFAapprovedNailersandnailsdesignedforinstallingSolidFlooringmaybeusedbyqualifiedflooringprofessionalsatyourrisk.DonotusestaplersornailersspecificallydesignedforEngineeredHardwoodFlooringtoinstallCFSSolidHardwoodFlooring.CFSdoesnotwarrantflooringinstallations,andacceptsnoliabilityproblemsthatmayarise,includingbutnotlimitedtolooseflooring,dimplingordistortionoftheface,breakageofthecoreortongue,andnoisewhenfastenersthataremisused,andarenotapprovedordesignedforSolidFlooring,areusedtoinstallCFSSolidHardwoodFlooring.

• UseonlyStaplingandNailingEquipmentandFastenersdesignedforSolidHardwoodFlooringPlanksoverNWFAapprovedAPAStampedE1-PS2UnderlaymentGradeSubfloors

Page 6: CFS SOLID HARDWOOD FLOORING INSTALLATION GUIDELINES Please ... · 360-13 CFS Solid Hardwood Flooring Installation Instructions 3 approved suspended wood subfloors, although they are

360-13 CFSSolidHardwoodFlooringInstallationInstructions 6

• StaplesandNailsshouldbeofsufficientlengthtoallowaminimumof3/4"ofthefastenertopenetrateandholdintothesubfloor.TheStaplesorNailsshouldbeplacedinthetopofthetongue,about2inchesfromeachend,andspacedalongthelengthoftheboardevery6"to8".

• FollowallinstructionsprovidedbytheManufacturerofthespecificfasteningequipment.• MakecertaintheFastener’sairpressureisset,andguideangleanddepthsettingsontheadapterfootarecorrectinorder

toallowthestaplecrownornailheadtorecessthefastenerflushinthetopoftheflooringtongue(notprotrudingaboveorrecessedbelow)thetonguesonodamageorbreakageofthecoreortongueoccurs.Occasionalnoiseisinherentlycommontostapleandnailedinstallationsandisnotconsideredamanufacturingdefect.Inherentnoisemaybeminimizedbymaintainingrecommendedindoorclimatecontrol.

• WARNING:DonotusemechanicalfastenersorgluemethodtoinstallCFSSolidHardwoodFlooringdirectlyoverparticle-boardorunapprovedOSB.

• WhenusingMechanicalFasteners:Usingimproperadaptersandpressuresettingscancauseseveredamagetotheflooringwhileusingthestaple/nail/cleatinstallationmethod.Usingthecorrectadapterandpressurewillsetthestaple/nail/cleatcorrectlyinthetongue.Itisvitalthatthetoolisadjustedproperlysothestaples/nails/cleatsarebeingpositionedattheproperangle.Airpressuressettoohighcancausedamagetothetongue,puttingblistersontheface(dimpling)oftheflooringandmakingitdifficulttoinstalladjoiningboards.Airpressurenecessarytoattachfastenersproperly(PSI)onthecompressorisusuallyaround80PSI.ApropertestistosettheStapler/Nailerpressureinitiallyat70PSIandadjustituntilthestaple/nail/cleatproperlysetsinthetongue.Testthestaplerornaileronascrappieceofmaterialfirst.Ifthetongueisbeingdamagedwhenstapling/nailingorthestaple/nail/cleatisdrivingtoodeeplyintothenailchannel,lowerthepressure.Ifthestaples/nails/cleatsdonotsetdeepenough,raisethepressure.StaplesorNailsshouldbeplacedalongthelengthoftheplank,intothetongue,within2"(inches)oftheendofeachplankandspacedalongthelengthevery6"to8"(inches).CFSisnotresponsiblefordamagecausedbymechanicalfasteners.Ifyouneedtoremoveastaple/nail/cleatthathasgoneincrooked,donotpullstraightupfromthetongue.Thiswilldamagethesurfaceoftheboard.Instead,pulloutthestaple/nail/cleatfromthetongueatthefrontoftheboardwithallpressurefromthehammer’sheaddirectedtoafulcrumboardonthesub-floor.CFSisnotresponsiblefordamagecausedbynegligentinstallationpractices,themisuseofMechanicalFasteners,hammersorotherinstallationtools.

GENERALTIPS:FLOORREPAIR

• 1.Minordamagetoyourhardwoodfloormayberepairedbyusingacolorfillputtystickorfeltstainmarker.Thisspecialproductshouldbematchedtothecolorofyourfloorand,whenproperlyused,willmakethedamagedareavirtuallyinvisible.

• 2.AqualifiedhardwoodflooringinstallershouldrepairextensivedamagetotraditionalSolidhardwoodflooring.• 3.Forsplintersandlooseedges,brokenawayorstillattached,DONOTPULL,carefullyglueinplacewithclearCA

Cyanacrylate(SuperGlue),carefullytrimsmallsprigsorraisededgeswithachiselpointrazorandtouchupwithamatchingcolorpenorputtystickavailableatmosthomecenters.

• 4.ContactyourretailerforinformationregardinglocatingmatchingTrimPieces,boardreplacements,cleaningandmaintenance,touch-upandminorrepair,orotherassistance.

HARDWOODFLOORINGCARE&MAINTENANCECFSdoesnotwarrantfloorsthatarenotproperlymaintained.RoutineMaintenance

1. Useadampclothtoblotupspillsassoonastheyhappen.Neverallowliquidstostandonyourfloor.2. Fortoughspots,suchasoil,paint,markers,lipstick,ink,tar,orincidentaltopicalresiduefrommanufacturingprocesses,use

MineralSpirits,DenaturedAlcohol(ClearHandSanitizercontainingEthanol)onacleanwhitecloth,thenwipetheareawithadampclothtoremoveanyremainingresidue.IMPORTANT!NeveruseLacquerThinner,ofCitrusBasedSolventstoCleanCFSSolidHardwoodFlooring.Testallcleaningchemicalsonaninconspicuousareaorloosepieceoftheflooringbeforeuse.

3. Sweep,dust,orvacuumthefloorregularlywithaproperhardsurfacenon-motorizedattachment(notthebeaterbar)ormicrofiberdustingpad(suchasavailableintheBonafloorcarekit),topreventaccumulationofdirtandgritthatcanscratchordullthefloorfinish.DonotUseSwiffertypedustmops,steamcleaningequipmentorSwifferTypesteamorwetmopsofanykindonthehardwoodflooringsurface.

4. PeriodicallycleanthefloorwithCFSSolidHardwoodFloorapprovedcleaningproducts,oraBonaHardwoodFloorCleanerKit,madespecificallyforprefinishedhardwoodfloorcare.Applycleaningliquidtodampen(notdripping),asoftcleanclothorterryclothmopcap.Drythefloorimmediatelyaftercleaningwithadryterryclothtoweltoremoveexcesscleanerresidueandavoidstreaking.

5. Donotapplyliquidcleanersdirectlytotheflooringsurface,neverwashorwetmopthefloorwithsoap,water,oil-soaps,detergents,vinegar,oranyotherliquidcleaningmaterial.Thiscancauseswelling,warping,delamination,orjoint-lineseparation,andwillvoidthewarranty.

6. Donotusesteelwool,abrasivecleaners,orstrongammoniatedorchlorinatedtypecleaners.7. Donotuseanytypeoffinishrestorer,coatingstoenhanceshine,floorwax,orpolishes.8. Forspotssuchascandlewaxorchewinggum,hardenthespotwithiceinaplasticbag,immediatelydry,andthengently

scrapewithaplasticscraper,suchasacreditcard.Becarefulnottoscratchtheflooringsurface.Wipecleanwithadampcloth.

9. Fortoughstains,youmayneedtouseaheavy-dutystainremovermadespecificallyforhardwoodfloors.10. Amorefrequentdust-moppingorvacuumingschedulemayberequiredinverysandyareassuchasabeachhome.

Page 7: CFS SOLID HARDWOOD FLOORING INSTALLATION GUIDELINES Please ... · 360-13 CFS Solid Hardwood Flooring Installation Instructions 3 approved suspended wood subfloors, although they are

360-13 CFSSolidHardwoodFlooringInstallationInstructions 7

11. Maintaina35%-55%airhumidityand60-78ºFtemperatureatalltimeswithintheroom.

OnSiteProtection

1. Entrymatswillhelpcollectthedirt,sand,grit,andothersubstancessuchasoil,asphalt,ordrivewaysealerthatmightotherwisebetrackedontoyourfloor.

2. Whenplacingarug,donotuserubberorfoambackedplasticmatsdirectlyontheflooringastheymaydiscolortheflooringfinish.Topreventslippage,useanapprovedvinylrugunderlayment.

3. Use1"minimumdiameterfeltfloorprotectors.Asarule,theheaviertheobject,thewiderthefloorprotector.ProperFloorProtectors”onfeetofallfurnitureisdefinedasanysoft,cushionedproductthatwillcoverthefeet/postsentirely.MetalorPlasticgliders,cardboard,oranyotherhardsurfaceorpadstoosmallforthefeetarenotconsidered“properfloorprotectors”.

4. Maintainanormalindoorrelativehumiditylevelbetween35%and55%throughouttheyeartominimizethenaturalexpansionandcontractionofthewood.

a. Heatingseason(Dry):Ahumidifierisrecommendedtopreventexcessshrinkageduetolowhumiditylevels.Woodstovesand/orelectricheattendtocreateverydryconditions.

b. NonHeatingSeason(Wet):Anairconditioner,dehumidifier,orperiodicallyturningonyourheatingwillhelptomaintainhumiditylevelsduringsummermonths.

5. Avoidexcessiveexposuretowaterduringperiodsofinclementweather.6. Donotwalkonyourfloorwithstilettoheels,spikedgolfshoes,orothertypesofsportscleats.7. Donotallowsharp,pointed,orroughtexturedobjectstobeexposedtothehardwoodflooring.8. Keepyourpet’snailstrimmedtopreventthemfromscratchingyourfloor.9. Periodicallyrearrangingyourarearugsandfurniturewillallowthefloor’sfinishtoageevenlyandthecolortoremain

uniform.UVsunlightwillchangethecolorofhardwoodtovaryingdegreesbasedonexposureandspeciestype.10. Useadollywhenmovingheavyfurnitureorappliances;butfirst,putdownapieceofquarterinchplywoodorMasoniteto

protectthefloor.NeveruseCardboardtoprotectthefloorwhenmovingorrollingheavyobjects.Nevertrytoslideorrollheavyobjectsacrossthefloor.

11. Ahard,smoothbottomedprotectivematdesignedforHardwoodFlooringshouldbeusedforfurnitureorchairswithcasters.

GENERALTIPS:HARDWOODMAINTENANCEANDANNUALSEASONS

Woodfloorswillbeslightlyaffectedbyvaryinglevelsofhumiditywithinyourbuilding.Tomakesurethefloorsareprotectedforaslongaspossible,itisnecessarytokeeptherelativehumiditylevelsbetween35%-55%andmaintainthetemperaturebetween60and78ºFthroughoutthelifeofthefloor.Belowaresomerecommendationsonhowtoachieveproperindoorenvironmentconditionsthroughouttheyear.

• Wet/HumidSeasons(Woodmayexpand):Heatersarenotgenerallyusedduringthesemonths.Thereforethefloorholdsinthehumidityandexpands.Tomaintainaproperhumiditylevel,theuseadehumidifierorairconditionermayberequired.

• DrySeasons(Woodmaycontractorshrink):Wood-burningstoves,gasandelectricheatingsystems,andforcedairheatingsystemsareusedoftenduringwintermonths–creatingverydryconditionsindoors.Lowindoorrelativehumiditycausesthewoodlosemoistureandsubsequentlycontractandchangeshape,(cupping),resultingingaps,misshapenboards,andpermanentdamagefromcrackingoftheflooringsurface,delaminatingofthecore.Theuseahumidifiertokeepthehumiditylevelbetween35%-55%mayberequired.Inwintermonths,ForcedairHeatSystemsarecapableofremoving15gallonsormoreofwaterfromindoorairperdayin1000squarefeetofheatedspace.

• OtherInstallationMethodsandWarrantyInformation