1 Integrated oil Building on our success John Brannan Executive Vice-President and President, Integrated Oil Division Investor Day | Calgary - June 17 | New York - June 21 Borger TEXAS Wood River ILLINOIS Foster Creek Up to 12 months acceleration of phase F ~235,000 bbls/d (gross) of planned development Christina Lake Up to 12 months acceleration of phase E ~258,000 bbls/d (gross) of planned development Overview of our industry leading performance Update Wood River CORE project Integrated oil overview Cenovus land at Dec. 31, 2009. Christina Lake Region Foster Creek Region P&NG leases Oilsands leases Christina Lake proper Foster Creek proper ALBERTA Note: Timelines are subject to regulatory approvals.

Upload: mitch-anderson

Post on 07-Apr-2015

368 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Cenovus Presentation

1

Integrated oilBuilding on our success

John BrannanExecutive Vice-President and President, Integrated Oil Division

Investor Day | Calgary - June 17 | New York - June 21

BorgerTEXAS

Wood RiverILLINOIS

Foster Creek

�• Up to 12 months acceleration of phase F

�• ~235,000 bbls/d (gross) of planned development

Christina Lake

�• Up to 12 months acceleration of phase E

�• ~258,000 bbls/d (gross) of planned development

Overview of our industry leading performance

Update Wood River CORE project

Integrated oil overview

Cenovus land at Dec. 31, 2009.

Christina Lake

Region

Foster Creek Region

P&NG leasesOilsands leases

Christina Lake properFoster Creek proper

ALBERTA

Note: Timelines are subject to regulatory approvals.

Page 2: Cenovus Presentation

2

Growth strategyDriven by bitumen resource

�• Projects capable of supporting 20% CAGR through 2019

�• 56 Bbbls best estimate for discovered BIIP

�• 5.4 Bbbls best estimate for contingent resource

Supported by downstream heavy oil processing

�• 275,000 bbls/d post-CORE total heavy oil processing capacity

Fost

er C

reek

&

Chris

tina

Lake

Addi

tiona

l

Opp

ortu

nitie

s

Co

mm

erc

iality

Base growth plan

Growth

Long term plays

Currentproduction

0

30

60

90

120

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Q12010

Foster Creek Christina Lake

Mbbls/d

5 yr CAGR (2

005�–09) ~25%

Production is shown before royalties and on a gross basis.

Cenovus SAGD operating experience

Page 3: Cenovus Presentation

3

Foster Creek - leading the way

Volumes are shown on a 100% basis.

Foster Creek current phasesPilot project began in 1996

Became the industry�’s first commercial SAGD project in 2001

120,000 bbls/d of productive capacity (phases A - E)

�• Largest producing SAGD operation in Alberta

�• Currently producing more than 100,000 bbls/d from 160 wells

Pioneered use of wedge wells

Achieved royalty payout in Feb 2010

Top tier performance

�• 2.3 �– 2.5 SOR

�• Leading capital efficiencies

�• $12.50 - 13.50/bbl operating cost (2010F)

0

10,000

20,000

A 20Mbbls/d

B 10Mbbls/d

C 30Mbbls/d

D&E 60Mbbls/d

Capital efficiencyC$/bbl/d

Page 4: Cenovus Presentation

4

Foster Creek future developmentTotal planned capacity of ~235,000 bbls/d

Phases F, G & H

�• Staged plant expansion west of phases A - E

�• Each expansion adds 30,000 bbls/d of productive capacity

�• Regulatory approval anticipated second half 2010

�• Up to 12 months acceleration of phase F

�• Requires $76 million (gross) in 2010F

Phase I now planned

Timelines are subject to regulatory approvals. Volumes are shown on a 100% basis.

Christina Lake - top tier reservoir

Page 5: Cenovus Presentation

5

Christina Lake current phases

0

10,000

20,000

30,000

A&B 18Mbbls/d

CD&E 120Mbbls/d

Pilot project began in 2000

First production in 2002

18,000 bbls/d of productive capacity (phases A&B)

�• Currently producing approximately 15,000 bbls/dfrom 17 wells

Top tier performance

�• 2.1 �– 2.2 SOR

�• Leading capital efficiencies

�• $16.00 - 17.00/bbl operating costs (2010F)

Capital efficiencyC$/bbl/d

Volumes are shown on a 100% basis.

Total planned capacity of ~258,000 bbls/d

Phases C �– G

�• Each expansion adds 40,000 bbls/d of productive capacity

�• Regulatory approval in place for phases C & D

�• Phase C construction ahead of schedule and on budget

�• Phase D under construction

�• Regulatory approval anticipatedfor phases E �– G in 2011

�• Up to 12 months acceleration of phase E

Phase H now planned

Christina Lake future development

Timelines are subject to regulatory approvals. Volumes are shown on a 100% basis.

Page 6: Cenovus Presentation

6

*Timelines are subject to regulatory approvals.

Project schedules

~258,000~2019F~2013FH

~235,000~2019F~2014FI

218,0002017FQ4 2009G

178,0002016FQ4 2009F

138,0002014FQ4 2009E

98,000Q2 2013FQ3 2007D

58,000Q3 2011FQ3 2007C

18,000Q4 2002Q3 1998A-B

Christina Lake

210,0002017FQ2 2009H

180,0002016FQ2 2009G

150,0002014FQ2 2009F

120,000Q1 2002Q1 1999A-E

Foster Creek

Expected cumulative production capacity (bbls/d)

First production target

Regulatory applicationsProject phase

On stream Under construction Submitted for regulatory approval* Planned no approvals*

0

50

100

150

200

250

300

350

2010F 2011F 2012F 2013F 2014F 2015F 2016F 2017F 2018F 2019F

Emerging Opportunities

Christina Lake (developing)

Foster Creek (developing)

Christina Lake (existing)

Foster Creek (existing)

Annualized production

Annualized production

Mbbls/d

SAGD development plans driving growth

Volumes are shown before royalties and net to CVE (50% basis).

Production capacity (year end rate)

Page 7: Cenovus Presentation

7

Timeline - illustrative SAGD phase

(1) Receipt of regulatory approval is variable. Assumes construction starts when approval is received.(2) Construction time is variable depending on several factors. Commissioning, steam and production would be timed

accordingly.

Prepare application

Regulatory approval(1)

Engineering

Procurement

Construction(2)

Commissioning

Steam

Production

Initial capital

Year 6Year 5Year 4Year 3Year 2Year 1

Capital profile - illustrative SAGD phase

Capital efficiency based on initial capital

~ 30 - 36 month construction timeline - starts after regulatory approval

Sustaining capital varies from year to year and may be affected by technological innovations

0%

10%

20%

30%

40%

50%

1 2 3 4 5 6 7 8

Well capital

Maintenance capital

Plant capital

% peak production

Sustaining capital

Engineering and procurement

Construction

Initial capital

Percent of peak production100%

0%

Percent of total initial capital

Years

Page 8: Cenovus Presentation

8

Top quality reservoirs

Manufacturing approach & project execution

Operational excellence

Technological innovations

Top quality people

Why we�’re successful �– how we do it

0

2

4

6

8

Peer Peer Peer Peer Peer Peer Peer Peer Peer Peer Peer CVEFC

Peer CVECL

Lower capital cost

Lower operating cost

Smaller surface footprint

Lower energy usage

Lower emissions

Less water usage

Low SOR means

Top quality reservoirs

Peers include: CNQ, COP, CLL, DVN, HSE, IMO, JACOS, MEG, NXY, RDS, SU.Source: ERCB public domain data, April, 2009 �– March, 2010.

Steam-to-oil ratio (bbl/bbl)

Page 9: Cenovus Presentation

9

Increasing efficiency is reducing execution timeline

Manufacturing process�• Staged development

�• Dedicated in-house construction management teams

�• Multiple small contractors

�• Standard designs

�• Assembly line drilling & completions

Module yard�• Enhanced safety

�• Minimize rework and cost over-runs

�• Cost savings and schedule certainty

�• Accessible labor

Manufacturing approach to development

Nisku module yard

Page 10: Cenovus Presentation

10

Pipe module

Christina Lake site construction

Page 11: Cenovus Presentation

11

0

20

40

60

80

100

120

1-Jun-09 1-Sep-09 1-Dec-09 1-Mar-10 1-Jun-10

Operational excellence - Foster CreekMbbls/d Record production

113 Mbbls/d March 1, 2010

Volumes are shown on a 100% basis.

0

5

10

15

20

1-Jun-09 1-Sep-09 1-Dec-09 1-Mar-10 1-Jun-10

Operational excellence - Christina LakeMbbls/d Record production

18 Mbbls/d May 20, 2010

Tu

rnaro

un

d

Volumes are shown on a 100% basis.

Page 12: Cenovus Presentation

12

Electric Submersible Pumps (ESP)ESPs reduce SOR through use of lower operating pressures

~20% improvement in run life�• Cumulative Meantime to Failure

(MTTF) increased from 10.5 to 12.7 months

Down time for a pump change�• 75% reduction

�• 24 hour service rig operations

Effect of reducing pump change time 15 days:

More than 1,000,000 bbls/yr*

ESP run life cumulative MTTF in months

9

10

11

12

13

Dec-08 Mar-09 Jun-09 Sep-09 Dec-09

0

10

20

30

2003 2004 2005 2006 2007 2008 2009

Days down on pump change

*Based on plant production of 100 Mbbls/d and 1 pump change per well per year.

Standard SAGD well pair

Wedge wellproducer

Steam chambers coalesce

Technology �– improving recovery

Wedge wells

�• < 0.1 average SOR

�• 600 �– 800 bbls/d average production rate at Foster Creek

�• Acceleration of production

�• 10% potential increase in recovered oil

�• Foster Creek �– 36 wells drilled

�• Christina Lake �– evaluating pilot

Page 13: Cenovus Presentation

13

0%

20%

40%

60%

80%

0 1 2 3 4 5 6 7 8 9 10 11 12 13

Increased recovery with wedge wells

Percent recovery*

Illustrative well performance

*Percent recovery of exploitable bitumen in place.

Incremental recovery with wedge wells

Accelerated recovery with wedge wells

Percent recovery without wedge wells

Year

Technology - improving efficienciesElectric drilling rigs

�• 3 rigs at Foster Creek & Christina Lake�• In use since 2005�• Improves efficiency, reduces operating

costs�• Lower emissions

�– Greater than 65% reduction in CO2 vs. a typical diesel powered rig

Blowdown boiler�• Blowdown water from one boiler used

as feed water for second boiler�• Generates more steam from the same

water�• Less waste water disposal�• Improved heat recovery lowers

operating costs and emissions

Page 14: Cenovus Presentation

14

Canadian & US crude oil pipeline proposals

TransCanada Keystone XL

700 Mbbls/d 2013

BP/Enbridge GAP reversal Flanagan-Cushing

300-400 Mbbls/d 2012+

Enbridge Gateway500 Mbbls/d TBD

Muskeg Expansion38 Mbbls/d TBD

Sunoco to USGC300 Mbbls/d TBD

Sunoco Buffalo to Philadelphia New Line

400 Mbbls/d TBDMarysville to Toledo

Expansion190-288 Mbbls/d TBD

Kinder Morgan TMX Northern Leg

400 Mbbls/d 2015+

Kinder Morgan TMX2 Expansion80 Mbbls/d 2015+

TMX3 Expansion320 Mbbls/d 2015+

ExxonMobil/Enbridge Pegasus Expansion30 Mbbls/d June 2009

Texas Access New Line445 Mbbls/d TBD

TransCanada Louisiana Access

Scope TBD

TransCanada Keystone435 Mbbls/d June

Cushing Extension155 Mbbls/d 2011

Heartland Extension600 Mbbls/d 2013+

Enbridge Alberta Clipper450 Mbbls/d July 2010

Southern Access Expansion800 Mbbls/d TBD

Southern Access Extension400+ Mbbls/d TBD

Enbridge Ohio Access20-180 Mbbls/d TBD

Enbridge Line 9 Reversal (Trailbreaker)215 Mbbls/d TBD

Portland Pipeline Reversal200 Mbbls/d TBD

Source: CAPP

Top quality refinery assets

Wood River (Post-CORE)�• 356 Mbbls/d crude throughput

�• 240 Mbbls/d heavy crude capacity

�• ~89% clean product yield

Borger�• 146 Mbbls/d crude throughput

�• 35 Mbbls/d heavy crude capacity

�• ~89% clean product yield

Integration strategy�• Capture full value chain - bitumen to transportation fuels

�• Minimize risk - reduce exposure to light / heavy differential

�• Continue to optimize Wood River and Borger to increase heavy processing capacity

Downstream overview

Volumes are shown on a 100% basis.

Page 15: Cenovus Presentation

15

Bitumen value chain �– net margin

0%

100%

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

Downstream net margin

Upstream net margin

History of margin sharing

Total net margin available for one bbl of bitumen refined into transportation fuels. Downstream margin based on Purvin & Gertz PADD II heavy refining margin. Upstream margin based on Purvin & Gertzbitumen field price and average SAGD opex assuming a 2.5 SOR. Source: Purvin & Gertz, CVE.

Share of bitumen value chain margin

Bitumen integration strategy

0

50

100

150

200

250

300

350

2008 2009 2010F 2011F 2012F 2013F 2014F 2015F 2016F 2017F 2018F 2019F

Downstream bitumen equivalent processing capacity

Annualized bitumen production

Mbbls/d Post 2012 �– long bitumen

Volumes are shown before royalties and net to CVE (50% basis).

Page 16: Cenovus Presentation

16

Wood River CORE project

Increases overall capacity�• 50 Mbbls/d of increased crude

throughput

�• 130 Mbbls/d of increased heavy crude capacity

- lowers crude input costs

�• ~10% increase in clean product yield

~$4.00/bbl margin improvement

Completion mid-2011 (Coker)�• 9 of 21 scope areas already

complete

Final cost forecast to be within 10% of budget

Volumes are shown on a 100% basis.

Offloading modules

Page 17: Cenovus Presentation

17

CORE project - new units area

High quality refinery assets

US refining infrastructure

Bak

er O

�’Brien

com

ple

xity

index

CORE ProjectWood River post-CORE

Borger

Wood River pre-CORE

0

5

10

15

20

25

30

35

Page 18: Cenovus Presentation

18

Building valueTop quality assets

�• Foster Creek and Christina Lake are recognized as best in industry

Significant growth opportunity

�• Potential for greater than 245,000 bbls/d (net) of production capacity at Foster Creek and Christina Lake

Experienced SAGD operator

�• A proven track record

�• Low cost capital and operating structures

�• Technology leader

Full value chain integration

�• Natural gas - heavy oil production - refining

�• CORE on-stream mid-2011

Supplemental information

Page 19: Cenovus Presentation

19

Foster Creek summary

40 �– 50Supply cost US$/bbl(3)

2.3 �– 2.52.5SOR

15 �– 202.7Average royalty (%)

36,000

Acreage (year end, net acres)

Proper/Core area

12.50 �– 13.50 11.87Operating costs ($/bbl)

550 �– 700585Operating cash flow(2) ($ MM)

250 �– 300262Capital ($ MM)

3121Net wells drilled(1)

46,000 �– 50,00037,725Production (bbls/d)

2010F2009

(1) Includes well pairs and wedge wells, excludes strat wells.(2) Operating cash flow is a non-GAAP measure. Numbers shown include hedges.(3) Average WTI or NYMEX price required for an after-tax cost of capital return of 9%.

0

10

20

30

40

50

60

2008 2009 2010F 2011F 2012F 2013F 2014F

Mbbls/d �– Net before royalties

Foster Creek overview

Producing formation: McMurray

Multiple stacked channels

~450 m reservoir depth

Up to 40 m+ net pay (average 25 m)

High permeability (5 - 10 Darcies)

High oil saturation (~80%)

9 �– 11° API bitumen

No significant gas caps or formation water

Cenovus land at Dec. 31, 2009.

ALBERTA

P&NG leases

Oilsands leases

Foster Creek proper

Page 20: Cenovus Presentation

20

Christina Lake summary

(1) Includes well pairs plus wedge wells, excludes strat wells.(2) Operating cash flow is a non-GAAP measure. Numbers shown include hedges.(3) Average WTI or NYMEX price required for an after-tax cost of capital return of 9%.

45 �– 55Supply cost US$/bbl(3)

2.1 �– 2.22.1SOR

4 �– 62.3Average royalty (%)

12,000

Acreage (year end, net acres)

Proper/Core area

16.00 �– 17.0016.31Operating costs ($/bbl)

100 �– 15078Operating cash flow(2) ($ MM)

300 �– 350224Capital ($ MM)

250Net wells drilled(1)

7,200 �– 7,7006,698Production (bbls/d)

2010F2009

0

10

20

30

40

50

2008 2009 2010F 2011F 2012F 2013F 2014F

Christina Lake overview

Producing formation: McMurray

Multiple stacked channels

Reservoir depth ~375 m

Up to 47 m+ net pay (average 25 �– 30 m)

High permeability (5 - 10 Darcies)

High oil saturation (~80%)

7.5 �– 9.5° API bitumen

Gas cap and bottom water present

Cenovus land at Dec. 31, 2009.

ALBERTA

P&NG leases

Oilsands leases

Christina Lake proper

Mbbls/d �– Net before royalties

Page 21: Cenovus Presentation

21

Western Canadian Sedimentary Basin pipelines

Proposed projects illustrate number of pipelines competing for next expansion

Existing and

approved projects

Proposed projects

Existing and Planned Pipeline Project Capacity (Unrisked)

318 318 318 318 318 318 318 318 318 318 318

300 300 300 300 300 300 300 300 300 300 300

1,935 1,870 1,870 1,870 1,870 1,870 1,870 1,870 1,870 1,870 1,870

210 450 450 450 450 450 450 450 450 450 450218

435 435 435 435 590 590 590 590 590 590

350700

700 700 700 700 700 700

200400 400 400 400 400

100 200 200 200 200175

525 525 525200

400 400 400

150350

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

5,500

6,000

6,500

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Mbbl/d

Alberta Clipper Expansion

TMX Northern Leg(Kitimat)

Enbridge NorthernGateway

Keystone XL (Expansion)

TMX-2 & 3 (Vancouver)

Keystone XL (Base)

Keystone Legacy &Expansion

Enbridge Alberta Clipper(Base)

Enbridge (Base)

TMPL (Land)

Express Pipeline

CAPP supply forecast

(June 2009)

2,980

6,100

WRB refinery statistics

35

240

110

Heavy crude

processing Mbbls/d

25

83

18

Coking capacity, Mbbls/d

15.720146Borger

15.0130356Wood River

post-CORE

10.050306Wood River

pre-CORE

Baker O�’Brien

complexity

Bitumen processing equivalent,

Mbbls/d

Crude throughput,

Mbbls/d

Figures represent 100% of the Wood River and Borger refinery operations.

Page 22: Cenovus Presentation

22

0%

25%

50%

75%

100%

WR current WR post-CORE Borger

Heavy Medium sour Light sweet

WR current WR post-CORE Borger

Other products Other clean products

Distillates * Motor fuels**

Refinery inputs - % crude slate Refinery output - % yield

Representative crude slates & yields

*Distillates include diesel and jet fuel.

**Motor fuels includes all blends of gasoline.

$-

$1

$2

$3

$4

$0 +$1 +$2 +$3 +$4

Base +$1 +$2

Wood River (pre-CORE) and Borger

3-2-1 crack spread ($/bbl)

Downstream margin sensitivity

WCS differential ($/bbl)

Net margin ($/bbl)

Page 23: Cenovus Presentation

23

$-

$1

$2

$3

$4

$0 +$1 +$2 +$3 +$4

Base +$1 +$2

Downstream margin sensitivity

Wood River (post-CORE) and Borger

3-2-1 crack spread ($/bbl)

WCS differential ($/bbl)

Net margin ($/bbl)

The resources estimates were prepared effective December 31, 2009 by McDaniel & Associates Consultants Ltd., an independent qualified reserves evaluator (IQRE), and other than as disclosed herein are based on definitions contained in the Canadian Oil and Gas Evaluation Handbook (COGEH). For further discussion regarding our economic contingent resources and our total bitumen initially-in-place and all subcategories thereof, see our April 22, 2010 news release and our June 16, 2010 news release, respectively, available at www.cenovus.com. Actual resources may be greater than or less than the estimates provided. Total Bitumen Initially-In-Place (BIIP) (equivalent to �“total resources�”) is that quantity of bitumen that is estimated to exist originally in naturally occurring accumulations. It includes that quantity of bitumen that is estimated, as of a given date, to be contained in known accumulations, prior to production, plus those estimated quantities in accumulations yet to be discovered. BIIP estimates include unrecoverable volumes and are not an estimate of the volume of the substances that will ultimately be recovered. Discovered Bitumen Initially-In-Place (equivalent to �“discovered resources�”) is that quantity of bitumen that is estimated, as of a given date, to be contained in known accumulations prior to production.The recoverable portion of discovered bitumen initially-in-place includes production, reserves, and contingent resources; the remainder is categorized as unrecoverable. There is no certainty that it will be commercially viable to produce any portion of the estimate. Undiscovered Bitumen Initially-In-Place (equivalent to �“undiscovered resources�”) is that quantity of bitumen that is estimated, on a given date, to be contained in accumulations yet to be discovered. The recoverable portion of undiscovered bitumen initially-in-place is referred to as �“prospective resources,�” the remainder as �“unrecoverable�”. There is no certainty that any portion of the estimate will be discovered. If discovered, there is no certainty that it will be commercially viable to produce any portion of the resources. Exploitable Bitumen Initially-In-Place is the estimated volume of bitumen, before any production has been removed, which is contained in a subsurface stratigraphic interval that meets or exceeds certain reservoir characteristics considered necessary for the commercial application of known recovery technologies. Examples of such reservoir characteristics include continuous net pay, porosity, and mass bitumen content. This definition was derived from and is consistent with current draft proposed COGEH terminology. Contingent resources �– those quantities of bitumen estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but which are not currently considered to be commercially recoverable due to one or more contingencies. Contingencies may include such factors as economic, legal, environmental, political and regulatory matters or a lack of markets. It is also appropriate to classify as contingent resources the estimated discovered recoverable quantities associated with a project in the early evaluation stage. For Cenovus, the contingencies which must be overcome to enable the classification of bitumen contingent resources as reserves include regulatory application submission with no major issues raised, access to markets and intent to proceed by the operator and partners as evidenced by major capital expenditures planned within five years. The estimate of contingent resources has not been adjusted for risk based on the chance of development. There is no certainty that it will be commercially viable to produce any portion of the resources. Economic contingent resources �– those contingent resources that are currently economically recoverable based on specific forecasts of commodity prices and costs. The IQRE used the same commodity price assumptions that were used for the 2009 reserves evaluation, which were determined in accordance with U.S. Securities and Exchange Commission requirements. Prospective resources are those quantities of bitumen estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by application of future development projects. Prospective resources have both an associated chance of discovery and a chance of development. Prospective Resources are further subdivided in accordance with the level of certainty associated with recoverable estimates assuming their discovery and development and may be subclassified based on project maturity. Unrecoverable is that portion of discovered or undiscovered BIIP quantities which is estimated, as of a given date, not to be recoverable by future development projects. A portion of these quantities may become recoverable in the future as commercial circumstances change or technological developments occur; the remaining portion may never be recovered due to the physical/chemical constraints represented by subsurface interaction of fluids and reservoir rocks. Best estimate is considered to be the best estimate of the quantity of resources that will actually be recovered. It is equally likely that the actual remaining quantities recovered will be greater or less than the best estimate. Those resources that fall within the best estimate have a 50% confidence level that the actual quantities recovered will equal or exceed the estimate. Proved reserves are those quantities of bitumen, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible from a given date forward, from known reservoirs and under existing economic conditions, operating methods and government regulations. Probable reserves are those additional reserves of bitumen that are less certain to be recovered than proved reserves, but which, together with proved reserves, are as likely as not to be recovered. Our disclosure of annual reserves data is made in accordance with U.S. disclosure requirements pursuant to an exemption received from the Canadian Securities Administrators. Accordingly, the proved plus probable reserves data may differ from corresponding information prepared in accordance with NI 51-101. See �“Note Regarding Reserves Data and Other Oil and Gas Information�” in Cenovus�’s 2009 Annual Information Form (AIF). Certain natural gas volumes have been converted to barrels of oil equivalent (BOE) on the basis of one barrel (bbl) to six thousand cubic feet (Mcf). BOE may be misleading, particularly if used in isolation. A conversion ratio of one bbl to six Mcf is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent value equivalency at the well head.

Oil & gas information

Page 24: Cenovus Presentation

24

This presentation contains certain forward-looking statements and information about our current expectations, estimates and projections about the future, based on certain assumptions made by the Company in light of its experience and perception of historical trends. Although we believe that the expectations represented by such forward-looking statements are reasonable, there can be no assurance that such expectations will prove to be correct.

Forward-looking statements are typically identified by words such as �“anticipate�”, �“believe�”, �“expect�”, �“plan�”, �“intend�”, �“forecast�” or �“F�”, �“target�”, �“project�”, �“objective�”, �“could�”, �“focus�”, �“goal�”, �“proposed�”, �“scheduled�”, �“outlook�”, �“potential�”, �“may�” or similar expressions suggesting future outcomes or statements regarding an outlook, including statements about our strategy, our projected future value or net asset value, schedules, land positions, production, including, without limitation, the stability or growth thereof, reserves and resources estimates, material properties, uses and development of our technology, risk mitigation efforts, commodity prices, shareholder value, cash flow, funding alternatives, costs and expected impact of future commitments in respect of our ongoing operations generally and with respect to certain properties and interests held by Cenovus. Readers are cautioned not to place undue reliance on forward-looking statements and information as our actual results may differ materially from those expressed or implied.

Forward-looking statements involve a number of assumptions, risks and uncertainties, some of which are specific to Cenovus and others that apply to the industry generally. The risk factors and uncertainties that could cause actual results to differ materially, and the factors or assumptions on which the forward-looking information is based, include, among other things: volatility of and assumptions regarding oil and gas prices; assumptions inherent in our current guidance; our projected capital investment levels, the flexibility of capital spending plans and the associated source of funding; the effect of our risk management program, including the impact of derivative financial instruments and our access to various sources of capital; accuracy of cost estimates; fluctuations in commodity, currency and interest rates; fluctuations in product supply and demand; market competition, including from alternative energy sources; risks inherent in our marketing operations, including credit risks; success of hedging strategies; maintaining a desirable debt to cash flow ratio; accuracy of our reserves, resources and future production estimates; estimates of quantities of oil, bitumen, natural gas and liquids from properties and other sources not currently classified as proved; our ability to replace and expand oil and gas reserves; the ability of us and ConocoPhillips to maintain our relationship and to successfully manage and operate the North American integrated heavy oil business and to obtain necessary regulatory approvals; the successful and timely implementation of capital projects; reliability of our assets; refining and marketing margins; potential disruption or unexpected technical difficulties in developing new products and manufacturing processes; potential failure of new products to achieve acceptance in the market; unexpected cost increases or technical difficulties in constructing or modifying manufacturing or refining facilities; unexpected difficulties in manufacturing, transporting or refining synthetic crude oil; risks associated with technology and its application to our business; our ability to generate sufficient cash flow from operations to meet our current and future obligations; our ability to access external sources of debt and equity capital; the timing and the costs of well and pipeline construction; our ability to secure adequate product transportation; changes in royalty, tax, environmental, greenhouse gas, carbon and other laws or regulations, or the interpretations of such laws or regulations, as adopted or proposed, the impact thereof and the costs associated with compliance; the expected impact and timing of various accounting pronouncements, rule changes and standards on us, our financial results and our consolidated financial statements; changes in the general economic, market and business conditions; the political and economic conditions in the countries in which we operate; the occurrence of unexpected events such as war, terrorist threats, hostilities, civil insurrection and instability affecting countries in which we operate; risks associated with existing and potential future lawsuits and regulatory actions made against us; our financing plans and initiatives; the historical financial information pertaining to our assets as operated by Encana prior to November 30, 2009 may not be representative of our results as an independent entity; our limited operating history as a separate entity and other risks and uncertainties described from time to time in the filings we make with securities regulatory authorities. The forward-looking statements and information contained in this presentation, including the assumptions, risks and uncertainties underlying such statements, are made as of the date of this presentation.

Many of these risk factors are discussed in further detail in our 2010 First Quarter Report to Shareholders, our 2009 AIF/Form 40-F and our MD&A for the year ended December 31, 2009, each as filed at www.sedar.com and www.sec.gov, and available at www.cenovus.com. The Cenovus 2010 Corporate Guidance, including the assumptions on which it is based, is available at www.cenovus.com.

Non-GAAP measures (Operating Earnings, Operating Cash Flow, Cash flow, Free Cash Flow, Capitalization and Adjusted EBITDA) have been described and presented in order to provide shareholders and potential investors with additional information regarding Cenovus�’s liquidity and its ability to generate funds to finance its operations. Please see our 2010 First Quarter Report to Shareholders for a full discussion of the use of each measure.

Forward-looking information