Cedarvale-Forest Hill CLC January 29, 2020

Page 2: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

Agenda

• Cedarvale Station

• Forest Hill Station

Page 3: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

Cedarvale Construction Updates

Page 4: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

Cedarvale Station Look Ahead

ACTIVITY AREA APPROX. DATE/DURATION

Deep Excavation & Extended Hours – Hauling

Under Eglinton Ave W Underway through till March 2020

6:00 a.m. – 11:00 p.m.

Tieback Installation Throughout all areas Underway through till March 2020

Major Concrete Pours In select areas Underway throughout 2020 into

2021

Geotechnical Monitoring Eastbound curb lane of Eglinton Ave

between Winnett Ave and Allen Rd N January 2020 – September 2020 Every Tuesday between 11:00 a.m. – 2:00 p.m.

Eglinton West Station SOE and

Underpinning Works Eglinton West Station Underway throughout 2020

Temporary Traffic Deck Removal

and Permanent Utility Installation Eglinton Avenue West March 29, 2020 till early 2021

Page 5: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

Traffic Configuration – Current Phase

Stage 6A – Crane Installation

Until approximately late March 2020

Page 6: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

Construction Progress Photos

Wall Demolition- East Ventilation Shaft

Bulk Excavation – East of the TTC Box

Page 7: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

Forest Hill Construction Updates

Page 8: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

8

Forest Hill Station Construction Look-ahead

Activity Location Approx. Date and Duration

Hilltop-Bathurst Laneway Closure Closure of Hilltop-Bathurst laneway behind Secondary Entrance; closed to vehicles only

Closed September 2019 for approx. six (6) months

Extended Hours for Deep Excavation North Station Box

Monday – Saturday, 6:00 a.m. – 4:00 a.m. Note: extended hours are expected to resume Monday, February 10, 2020

Manhole Construction

• SW corner of Bathurst St and Eglinton Ave inside work zone

• West side of Secondary Entrance on Eglinton Ave, inside of the work zone

Underway into winter 2020

Sidewalk and Laneway Closure for Concrete Pour

Closure of the Hilltop-Bathurst laneway behind the Secondary Entrance and closure of the pedestrian route around the Secondary Entrance

Wednesday, January 29, 2020 for approx. six (6) hours. • February 03, 2020 • February 13, 2020 • March 10, 2020

Page 9: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

9

Current Construction Configuration

Until January 2020

Page 10: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

10

Upcoming Traffic Configuration

Beginning February 2020

Page 11: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

11

Concrete Pour Traffic Configuration

January 29, 2020 from 8:00 a.m. for approx. six (6) hours

Page 12: Cedarvale-Forest Hill CLC January 29, 2020 · Cedarvale-Forest Hill CLC January 29, 2020 . Agenda •Cedarvale Station •Forest Hill Station . ... resume Monday, February 10, 2020

12

Construction Progress Photos

Waterproofing – North Roof Slab

Formwork installation – Secondary Entrance