capability statement - novelesolutions€¦ · novelesolutions capability statement 308 montara dr....
TRANSCRIPT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
CAPABILITY STATEMENT
NOVELESOLUTIONS ENGINEERING | ENVIRONMENT | EARTH
NovelEsolutions, Inc. (NovelE) offers a full range of turnkey environmental engineering and consulting services utilizing innovative, but proven technologies, while maintaining a high level of client care. Personalized attention allows our customers to trust NovelE with competent completion of environmental services at an expedited rate. NovelE has the varied experience and expertise to streamline implementation of our environmental projects creating a “well-oiled machine” for our clientele. Our business model is based on sustainability in the products that we use, the people that we partner with and the strategies that we utilize. The key to NovelE’s success is our staff’s dedication to ethics and principles leading our clients to cost-effective solutions for their environmental needs. NovelE’s average staff technical experience is over 20 years.
Mission Statement:
To inspire sustainable solutions for our personnel, clients and business partners through innovative management, design and implementation.
Liza Grudin, PE | President
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
COMPANY SNAPSHOT
Founded: 2015 Headquarters: Seffner, FL CAGE Code: 7FBU0 DUNS Number: 07-974-8140
BUSINESS POINT OF CONTACT
Liza Grudin, PE, ME, ENV SP |
President
Email: [email protected]
Phone: 239.220.4138
Founder of NovelE
Our founder and Principal Engineer recognized a need for innovative, high quality environmental engineering and consulting services.
QUALIFIED NAICS CODES
Primary 541330 Engineering Services
Secondary 237110 Water and Sewer Line and Related Structures Construction
238990 All Other Specialty Trade Contractors
541310 Architectural Services
541340 Drafting Services
541360 Geophysical Surveying and Mapping Services
541611 General Management and Administrative
541620 Environmental Consulting Services
541690 Other Scientific and Technical Consulting Services
541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
541720 Research and Development in the Social Sciences and Humanities
541990 All Other Professional, Scientific, and Technical Services
562910 Remediation Services
611430 Professional and Management Development Training
CERTIFIED BUSINESS ENTERPRISE
NovelE welcomes the opportunity to become a part of your environmental management team. As an SDB, we are in a key position to provide engineering and field support to your team. We can also form partnerships with engineering and consulting firms that may require the expertise of our exceptional staff.
o Small Business Administration 8(a) Business Development Program o Economically Disadvantaged Women Owned Small Business (EDWOSB) o FDOT Disadvantaged Business Enterprise (DBE) Unified Certification Program (UCP) o State of Florida Office of Supplier Diversity and City of Orlando WBE o Hillsborough County, City of Tampa WBE and Small Business Enterprise (SBE) o Port Tampa Bay and South Florida Water Management District SBE
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
CORE SERVICES
o Planning, Permitting, and Compliance
o Contamination Assessment and Remediation
o CERCLA Remedial Investigations/Feasibility Studies
o Due Diligence/Environmental Site Assessments
o Water Supply Development
o Geophysical Surveying and Mapping Services
o Soil, Sediment, Groundwater, Surface Water, and Air Sampling
o Turbidity Monitoring
o Operation and Maintenance (O&M) and Monitoring
o NEPA Evaluations
o Risk Management, Risk Assessments
o Best Management Plans (BMPs)
o Sustainability Plans and Planning
o ISO Compliance and Management Systems
o Envision™ Sustainability Evaluations
CORE SERVICE DETAILS
WATER SUPPLY DEVELOPMENT
o Wellhead Protection Zone Determinations o Groundwater Supply Planning o Aquifer Storage and Recovery o Well Field Design o Groundwater Source Identification o Consumptive Use Permitting o Aquifer Performance Testing o Borehole Geologic and Geophysical Logging o Impact Analysis o Safe-Yield Analysis o Consumptive Use Permitting
o Groundwater Modeling
PERMITTING
o Mining and Construction Dewatering o Injection Well Design & Permitting o Aquifer Exemptions o Groundwater Flow Modeling
GROUNDWATER CONTAMINATION
o Contamination Assessment & Remediation o Fate and Transport Modeling o Exposure and Risk Assessment
DIFFERENTIATORS
o 30 Years Experience in Hydrogeology o Average staff technical experience >20 years o Client Focused o SBA certified 8(a) and EDWOSB o OSHA HAZWOPER & API Trained o Zero OSHA Reportable Injuries and Illnesses o Results Oriented
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
PERFORMANCE HISTORY HIGHLIGHTS
United States Department of Veteran’s Affairs
NovelEsolutions, Inc. (NovelE) was the Engineer-of-Record and Geologist-of-Record to the United States Department of Veteran’s Affairs for environmental consulting services at their Bay Pines Healthcare System. Liza Grudin, PE and David Smith, PG, respectively served as the registered professionals for this fast-tracked site rehabilitation. Gregory Aumann, Project Geologist, provided the primary project management and field oversight for site activities. NovelE conducted assessment for three open discharges at the facility. Assessment activities
included the installation of soil borings and monitoring wells, gauging and delineation of free product, sampling of monitoring wells, and evaluation of remedial alternatives.
Contract: 36C24818D0152, $4.166M
United States Department of Agriculture
NovelE provided tank closure services for the USDA ARS Field Station in Canal Point, Florida. Ms. Grudin served as the Engineer-of-record and Mr. Pitts served as the field specialist for this project. Two 2,000-gallon aboveground storage tanks (ASTs) were removed from the site within 30 days of Notice to Proceed and one 500-gallon Convault AST was delivered within 60 days of NTP. Soil borings and a
temporary well were installed for assessment of environmental impacts. Tank closure was documented in a formal submittal and no further assessment was approved with no regulatory comments. This project was an 8(a) sole source award to NovelE.
Contract: AG-32SC-P-17-0548, $62,440
Florida Department of Environmental Protection (FDEP) Petroleum Restoration Program (PRP)
NovelE provides subcontracted environmental engineering, field support and consulting services for the assessment and remediation of petroleum impacted sites. Assessment activities include soil boring installation, oversight of piezometer and monitoring well installation, as well as soil, groundwater, and air sampling. System designs include pin piling, LDA, and sheet piling excavations, dewatering, AS/SVE systems, dual phase extraction systems, bioremediation and chemical oxidation. Field remediation activities include pilot testing for various technologies, remediation well installation oversight, remediation system installation, excavation and sheet piling installation oversight, monthly episodic in situ remediation, operation & maintenance (O&M), and system repair.
Select Contracts: GC807, $198,866, GC751, $117,444, GC782, $304,712
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
PERFORMANCE HISTORY HIGHLIGHTS
Hillsborough Area Transit Authority (HART)
Liza Grudin, PE, Principal Engineer for NovelE, served as the Engineer-of-record, Remediation Lead and Sustainability Lead for the contract providing management and technical support for comprehensive environmental assessment and remediation activities for HART’s 19.34-acre maintenance facility. Ms. Grudin developed Work Plans and technical reports and provided third party QA/QC for assessment
activities including abandonment of monitor wells and an oil/water separator, installation of soil borings and monitor wells, soil, groundwater and free product sampling, and free product recovery. NovelE was the first onsite providing Emergency Response consulting for an approximate 500-gallon diesel spill and led the Corrective Action investigation to follow. NovelE worked hand-in-hand with HART’s Environmental, Project Management Operations, and Facilities Maintenance Departments on AST and RCRA compliance, BMPs, SOPs, and Waste Minimization Plans, staff training, and SPCC and SWPPP documents within the framework of ISO 14001 and HART’s internal Environmental and Sustainability Management System (ESMS).
Contract: VC-14308C, $1.7 Million Port Everglades Environmental Corporation (PEECO)
NovelEsolutions’ (NovelE’s) Principal Engineer, Ms. Liza Grudin, PE was the Project Manager and Engineer-of-Record for environmental petroleum cleanup activities for the Port Everglades Environmental Corporation (PEECO). Environmental issues associated with the common area are coordinated by PEECO. PEECO is a non-profit organization, comprised of the terminal property owners at the Port (e.g., Chevron, Motiva, TransMontaigne, etc.), acting as the primary contact for historical petroleum
releases at the common areas of Port Everglades. The common area is described as Berths 1 through 27 and the pipeline rights-of-way from the common berths to individual company property lines. PEECO consulting work requires close interaction with the property owner’s representatives, the Broward County Port Everglades Department, the regulatory lead, FDEP, and the Broward County Environmental Protection and Growth Management Department. Portions of this scope were completed with another firm. This scope of work included assessment of free product, soil and groundwater; design, installation and construction of free product recovery systems; GIS mapping of the Port facility and all historical and current contaminant plumes; and consulting on FDEP funding mechanisms. Ms. Grudin was instrumental in equipment modifications to the historical systems increasing free product recovery and decreasing water intake. Ms. Grudin obtained funding from FDEP to double the frequency of maintenance visits in order to protect the inland waterways. Based upon the success of her free product trench design, FDEP expanded the current system and is utilizing Ms. Grudin's design on other sites within the Port.
Private Contract and Multiple FDEP Contracts: $980,000
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
PERFORMANCE HISTORY HIGHLIGHTS
Citrus Combined Cycle Plant, Duke Energy, Crystal River
NovelE prepared the initial Best Management Practices/Pollution Prevention Plan (BMP3 Plan) for stormwater controls at this newly activated energy plant. The CCC is a natural gas-fired, combined cycle combustion turbine generator (CTG) facility with a total of 1,640 Megawatt (MW) electrical power generating capacity. Four stormwater detention ponds, surrounding the main buildings, are utilized to collect and treat stormwater runoff. An Industrial Wastewater (IWW) Percolation Pond is located northwest of the combined cycle power
blocks. Process IWW is treated by an oil/water separator system prior to discharge to the percolation pond. Domestic Wastewater (DWW) is also processed and sent via sumps to the percolation pond. The IWW Percolation Pond contains an emergency overflow structure to isolated wetlands. The percolation pond is designed to contain permitted wastewater flows plus rainfall generated by a 25-year/24-hour storm event. Overall onsite activities encompass approximately 193 acres of the property with the remainder as undeveloped land. The purpose for the development of this BMP3 Plan was to maintain and monitor stormwater discharges at the CCC Station and minimize potential adverse impacts to the onsite and surrounding soil, surface water, groundwater, and ecosystems. This BMP3 Plan consisted of the development and implementation of best management practices, and the establishment of provisions, protocols, and responsibilities for maintaining and monitoring the stormwater at the CCC Station. Ms. Grudin was the Engineer-of-record for the BMP3 Plan and prepared training materials to accompany the new Plan.
Purchase Order: 6945274
Private Client, Port Tampa Bay Industrial Property Phase I and Phase II Environmental Site Assessments
NovelE conducted a Phase I Environmental Site Assessment (ESA) on this 7-acre property originally developed in the 1960’s. Former uses of the property included bulk fuel storage and truck maintenance. A Phase II ESA was conducted to evaluate onsite RECs including the service bays, truck wash area, oil/water separator, and septic tank. Remediation alternatives included Initial Remedial Actions using source removal with closure using Risk Management Option II with engineering and institutional controls. Funding mechanisms for cleanup activities included application of the Brownfields Tax Credit and State of Florida Low-Scored Site Initiative (LSSI).
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
PERFORMANCE HISTORY HIGHLIGHTS
Private Client, Exxon Sifford’s former petroleum station, Vero Beach
NovelE provides environmental consulting and general compliance support on redevelopment of this site into a Verizon Wireless. Site activities included removal of the four (4) onsite underground storage tanks (USTs), dispensers, and underground petroleum piping. NovelE provided oversight for the procurement of the subcontractors and supervised all work on behalf of the site developer. During the tank removal, compliance issues were noted with one of the 10,000-gallon USTs and NovelE coordinated with the new property owner to submit a new Discharge Report Form. Key stakeholders include the Florida Department of Environmental Protection (FDEP) and Brevard County Natural Resources Management Department for the eligible discharge and the Crum & Forster insurance company and their consultant Vertex Companies, Inc. NovelE is responsible for conducting the forensic analysis of the eligible PLIPR discharge in relation to a new non-eligible petroleum discharge.
Private Client, Siena Cove Development (former Quail Hollow Golf and Country Club)
NovelEsolutions (NovelE) provides key engineering and field support on the environmental assessment and remediation activities at this 175-acre former golf and country club set to be redeveloped as a gated community of ±380 single-family residences. In addition to clubhouse and maintenance facilities, the championship golf course consisted of 18 holes and measures approximately 6,800 yards from the professional tees. Preliminary assessment activities are ongoing at the site and include the use of the incremental sampling methodology (ISM). Mr. Aumann provides field support including soil and groundwater sampling, and aquifer testing. Ms. Grudin is the Engineer-of-record for the remediation activities with an ultimate goal to achieve the necessary approvals from the FDEP resulting in a No Further Action (NFA) status for the property. The regulatory strategy contemplated for this site at the current time will be to seek an alternative closure in accordance with Chapter 62-780, Florida Administrative Code (FAC) using engineering and institutional controls to maintain the aggressive timeline established for this significant redevelopment project by the client. Soil management options include soil blending, capping under roadways, parks/recreational areas, and utilization of clean fill in conjunction with the existing grading plan. Groundwater remediation options include utilization of planned drainage structures, soil amendments and natural attenuation monitoring.
Ms. Grudin completed statistical analysis in coordination with the University of Florida to complete the ISM sampling and assessment approach. In the first of its kind analysis, Ms. Grudin extrapolated the Coefficient of Variation for replicate ISM sampling to single (r=1) and duplicate (r=2) results. This is a new approach based on FDEP statistical analysis of ISM data resulting in a more accurate determination of onsite impacts. A UCL was then calculated from the resulting extrapolation and compared to the SCTLs for arsenic and dieldrin.
Private Contract: $1,000,000+
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
REPRESENTATIVE STAFF EXPERIENCE
Linc Energy Underground Coal Mine Permitting
o Injection Well Permitting o Aquifer Exemption Permitting o SMCR Act Permitting o Aquifer Testing o Groundwater Modeling o Impact Assessment o Capture Zone Determination o Recovery Well System Design o Remedial Costs Estimation for Bonding
Keystone Heights, FL Sand Mine Permitting o Consumptive Use Permitting o Aquifer Testing o Groundwater Modeling o Expert Testimony
Southwest Florida Water Management District Water Supply Plan o Database Management
o Irrigation Well Inventory
o Irrigation Well GIS Database Development
o Determination of Geographic Distribution of Irrigation Water Use
St Johns River Water Management District Water Supply Plan o Peer Review o Groundwater Modeling o Delineation of Areas of Self-Supply Wells o GIS Database Development o Regional Depth to Groundwater Assessment o Identification of Areas Where Self-Supply
Wells Will Experience Significant Reduction and Loss of Service from Regional Groundwater Level Decline
Villages of Seminole Forest, FL Development of Regional Impact Permitting o Aquifer Testing o Groundwater Modeling o Well Field Design o Safe-Yield Analysis o Consumptive Use Permitting
Naval Sea Systems Station Command Panama City (NAVSEA) o Environmental assessment and remediation o Soil boring installation and sampling o Well installation and sampling o Free product recovery
Florida Department of Environmental Protection (FDEP) Petroleum Restoration Program (PRP) o Prime and Subcontracted environmental
engineering and consulting services o Environmental assessment and remediation o Soil boring installation and sampling o Well installation and groundwater sampling o Air sampling o Episodic remediation, O&M, and pilot testing o 500+ sites
City of Homestead Gordon P. Ivey Power Plant o Assessment and remediation o Free product recovery o Water Use Permitting o NPDES Permitting BP Amoco o Risk Assessment o Emergency Response o Assessment and Remediation o Soil boring installation and sampling o Well installation and groundwater sampling o 100+ sites
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
FEDERAL AND MUNICIPAL CONTRACTING
CONTRACTING VEHICLES
o A-E Short Selection Database USDA Forest Service, Southern Research Station/Pacific Northwest Research Station/Pacific Southwest Research Stations. All States, NAICS 541330, 541360, 541620, and 541690, Prime: NovelE
o City of Tampa Professional Services IDIQ, 2018- Current, Prime
o Unites States Department of Veteran’s Affairs – IDIQ Environmental Remediation Services, 2018-2023, Prime: ACT SAFE, LLC
o Greater Orlando Aviation Authority – Continuing Environmental Consulting Services, 2017-current, Prime: Intertek PSI
o City of Orlando – Continuing Environmental Consulting Services, 2019-current, Prime: Intertek PSI
o
Acquisition Options
o Purchase Card (Micro-purchases) o 8a Sole Source o EDWOSB or WOSB Sole Source o Blanket Purchase Agreements via 8a o Blanket Purchase Agreements via WOSB
Joint Ventures o NovelE-QRI JV, 8(a) o QRI-NovelE JV, WOSB
KEY PAST PERFORMANCE CONTRACT REFERENCES
Linc Energy Environmental Permitting and
Expert Witness, $30,000,000
Role: Project Manager | Geologist-of-Record
Reference: Brian Deurloo, 307-439-9570
Quail Hollow Dry Cleaners / The Grove, $1,300,000
Role: Lead Field Geologist
Reference: William Marcus, 904.373.9264
Port Everglades, Multiple, $980,000
Role: Project Manager | Engineer-of-Record
Reference: Robert Wells, 305.670.9955
BP Amoco, Multiple, $6,117,526
Role: Project Manager | Engineer-of-Record
Reference: Randal Coil, [email protected]
PROFESSIONAL CERTIFICATIONS
State of Florida Licensed Professional Engineer and Professional Geologist
Certificate of Authorization 31022 – Engineering, Florida
Certificate of Authorization GB822 – Geology, Florida
Envision Qualified Company
Florida Department of Environmental Protection (FDEP)
Petroleum Restoration Program (PRP) Qualified Contractor, 01418
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
PERFORMANCE HISTORY AT-A-GLANCE
SECURE FACILITIES
o Naval Sea Systems Command
Panama City (NAVSEA)
o Naval Air Station Whiting Field
(NAS Whiting Field)
o United States Coast Guard
Station, Fort Myers Beach, Florida
o Cape Canaveral Air Force Station
o Bay Pines VA Healthcare System
o BP Terminal, Port of Tampa
o Amoco Terminal, Port Tampa Bay
o Motiva Terminal, Port of Tampa
o Motiva Terminals, Port
Everglades
o Common Areas (Fueling and
Berthing Piers), Port Everglades
o Lockheed Martin, Orlando
PUBLIC SECTOR CLIENTELE
o United States Army Corp of
Engineers
o United States Air Force
o United States Coast Guard
o United States Navy Civil
Engineer Corp
o United States Department of
Veteran’s Affairs
o United States Department of
Agriculture
o Florida Department of
Environmental Protection
o Florida Department of
Transportation
o Florida Turnpike Enterprise
o Lockheed Martin
o Amtrak
o Orlando Utilities Commission
o South Florida Water
Management District (SFWMD)
o St Johns River Water
Management District (SJRWMD)
o Southwest Florida Water
Management District
(SWFWMD)
o Hillsborough Area Transit
Authority (HART)
o Tampa International Airport
o City of Tallahassee
o Leon County Solid Waste
Authority
o Palm Beach County Solid Waste
Authority
o City of Homestead Public
Services
o Duke Energy of Florida
o ARCHITECTURE AND ENGINEERING CLIENTELE
o ACT Safe o AECOM o Alliant Environmental Solutions o Apex Companies o ERMI o Environmental Assessments +
Consulting (EAC) o GHS Environmental o H2O Environmental Services o Intertek PSI o MSE Group o NOVA Environmental &
Engineering o NV5 o PACSCON GeoEnvironmental o Petroleum Resources &
Development (PR&D) o RNA Consulting o Value Environmental Services
NOVELESOLUTIONS CAPABILITY STATEMENT
308 Montara Dr. | Seffner | FL 33584 | [email protected] | www.novelEsolutions.com
KEY PERSONNEL
NovelEsolutions, Inc. (NovelE) team members include geologists, engineers, subcontractors, subconsultants, and vendors with a strong background in environmental consulting. NovelE encourages green engineering design and implementation for each project. The overall goal is to minimize the environmental impact of the cleanup activities at each stage of the project through modified life cycle assessment (LCA) or “cradle to grave” evaluations. NovelE's technical staff has worked in the environmental industry for an average of over 20 years.
Liza Grudin, PE, ME, ENV SP | Principal Engineer Ms. Grudin is the founder of NovelE and has over 25 years of experience in the environmental field. As Project Manager and Engineer-of-Record, her experience includes large WUP and NPDES permits, NEPA EAs, remediation modeling and design, implementation, and O&M, ISO compliance, and environmental management system consulting at Federal, State, privately funded, and consent order sites for Fortune 500, federal, State and local municipality clients. Liza is a licensed Professional Engineer in Alabama, Delaware, Florida, Georgia, Louisiana, New Jersey, and Texas.
David L. Smith, PG | Principal Geologist Mr. Smith has over 30 years of experience including RCRA compliance and corrective actions, CERCLA RI/FS, aquifer classification, and hydrogeologic characterization. David’s technical expertise in groundwater modeling, resource evaluations, GIS, and community outreach extends to projects across the United States. David is a licensed Professional Geologist in Florida, Georgia, North Carolina, and Wyoming.
Gregory L. Aumann | Project Geologist Mr. Aumann worked for AECOM for 19 years before coming on board at NovelE. Greg has worked on a variety of long-term projects including PD&E studies, Emergency Response and contamination assessment and remediation, AST/UST removal and installation, free product recovery, and bioassessment and ISM sampling. Our Founder, Liza Grudin, PE and Project Geologist, Greg Aumann, began their journey in the environmental field together in the late 1990's.
Ronald “Steve” Pitts | Remediation Specialist Mr. Pitts has over 25 years of experience pilot testing, dewatering, and providing technical expertise for the operation & maintenance (O&M) of remediation systems including equipment repair, electrical modifications, and remediation system optimization. Our Senior Field Specialist, Steve Pitts began working with our President in 2011 and was the first technical staff employee to join NovelE. Steve has worked on over 500 sites in his career aiding in his diagnostic skills.