canadian airfield pavement technical group seminar - …€¦ · canadian airfield pavement...

37
Asphalt Case Study Rehabilitation of Runway 13R31L Boeing Field John I. Duval, P.E. Canadian Airfield Pavement Technical Group Seminar Marriott Hotel| Minneapolis, Minnesota | Sep 19, 2016

Upload: buikhanh

Post on 20-May-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

Asphalt Case StudyRehabilitation of Runway 13R‐31L

Boeing Field

John I. Duval, P.E.

Canadian Airfield Pavement Technical Group SeminarMarriott Hotel| Minneapolis, Minnesota | Sep 19, 2016

Page 2: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

Rehabilitation of Runway 13R‐31LBoeing Field

• Introduction to Boeing Field• Fact: Runway Closure is Expensive!• Planning and Coordination• Partnering Through Training

• Production/Placement/Compaction• Innovations• Success!

Page 3: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Acknowledgments• Funding—FAA Airport Improvement Program• Sponsor—King County International Airport

– Mr. Rick Renaud, P.E.• Engineer—URS Corporation

– Mr. Shammi Ratti, P.E.,– Ms. Cindy Hirsch, P.E.– Mr. Brian Rapalee, P.E.

• Contractor—ICON Materials (Oldcastle)– Mr. Dave Gent, P.E., Project Manager

• And many others who contributed to this project

Page 4: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Introduction to Boeing Field

Sea‐Tac

Boeing Field

4 Miles

5 Miles

Page 5: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Introduction to Boeing Field

• Runway 13L‐31R– 3,710 ft x 100 ft

• Runway 13R‐31L– 10,000 ft x 200 ft

Page 6: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Introduction to Boeing FieldScheduled and Charter Passenger Operations

Page 7: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Introduction to Boeing FieldAir Cargo Operations

Page 8: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Introduction to Boeing FieldBoeing B737 Commercial Delivery Center

Page 9: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Introduction to Boeing FieldBoeing K46 Testing

Page 10: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Introduction to Boeing FieldEconomic Impact Study

• $3.5B Annual Sales– 90% “New Money”

• 16,336 Jobs– 5,209 Jobs at Airport

• 150 Tenant Businesses• National Air Transport Assn “Top 100 Most‐Needed Airports” 

Page 11: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Introduction to Boeing FieldEconomic Impact Study

QuestionWhat is the impact of closing Runway 13R‐31L?

Answer$30,000 per hour 

Page 12: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Mountains of Material Required

• 106,000 tons of Hot Mix Asphalt needed– 6‐inch mill/inlay of entire runway– Deep repairs to taxiway connectors

• Nine alternatives were considered– Nighttime closures– Weekend closures– Combinations of nights and weekends– Full closure– Phased partial/full runway closure

Page 13: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Runway 13R‐31L RehabilitationPhased Partial/Full Runway Closure

Construction Phasing

123

110 hrs 240 hrs 110 hrs2,500 ft 5,000 ft 2,500 ft

Page 14: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 15: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 16: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 17: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 18: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 19: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 20: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 21: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 22: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 23: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 24: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 25: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 26: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 27: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 28: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 29: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 30: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 31: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 32: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 33: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 34: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 35: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Page 36: Canadian Airfield Pavement Technical Group Seminar - …€¦ · Canadian Airfield Pavement Technical Group Seminar Marriott Hotel ... • National Air Transport ... Asphalt Case

PAVEMENT SERVICES, INC.

Success!

• Full runway closure for only 10 days• Major construction operations completed within 20 day closure

• No accidents• 106,000 tons HMA meeting P‐401 specification

• Project came in within $24.5M budget