Page 1: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

C A M P E R S H O PI N T E R I O R R E N O VAT I O N

VIA MONTENAPOLEONE - MILAN

F I N A L D D PA C K A G EK K A A - A p r i l 1 7 t h 2 0 1 4

Page 2: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

full height mirror

integrated counter

integrated wall bench

ceiling plywood panels

entrance door

shop window

0.1

Page 3: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

shop window hemp fabric doormatentrance door

0.2

Page 4: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

hemp fabric seats

exposed existing ceiling ceiling plywood panels

mirror fi nish door

wall integrated bench

shelves integrated counter

* The ceiling and the building services are left exposed; the shelves are extended up until reaching the real ceiling. The current design defi nes how to adapt the shelves top-end design to the real ceiling geometry that will be exposed only after construction starts.

0.3

Page 5: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

wall integrated bench

wall integrated bench

exposed existing ceiling

hemp fabric seats

* The ceiling and the building services are left exposed; the shelves are extended up until reaching the real ceiling. The current design defi nes how to adapt the shelves top-end design to the real ceiling geometry that will be exposed only after construction starts.

0.4

Page 6: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

shelves integrated counter

hemp fabric seatswood-burn logo

* The ceiling and the building services are left exposed; the shelves are extended up until reaching the real ceiling. The current design defi nes how to adapt the shelves top-end design to the real ceiling geometry that will be exposed only after construction starts.

0.5

Page 7: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

MATERIALS CHART

2014.04.17 GE-DD-CA-1.1

-

CAMPER Montenapoleone, Milanjavier

--detail design

--

-

CAMPER Montenapoleone, Milan

Page 8: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

PLANS - GROUND FLOOR

2014.04.17 GE-DD-CA-2.1

1/25@A1

CAMPER Montenapoleone, Milanjavier

--detail design

--

-

* Measures referencing to the existing space are orientative. They should be verified on site.

CAMPER Montenapoleone, Milan

Page 9: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

PLANS - GROUND FLOOR

2014.04.17 GE-DD-CA-2.1

1/25@A1

CAMPER Montenapoleone, Milanjavier

--detail design

--

-

CAMPER Montenapoleone, Milan

* Measures referencing to the existing space are orientative. They should be verified on site.

Page 10: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

1,59

y

517

34

4x

12

6,6

11

8,8

88,9

Existing structural ceiling exposed

Existing suspended ceiling

Hypothetical distance to structural ceiling

shop

Via

Montenapoleone

patio stairs

Height of shelves will be adapted to the height of the existingstructural ceiling as explained in document GE-DD-CA-4.5

45,5

0,95

(x50 single height displays)(x11 double height displays)

34

4x

602,5

Wall integrated bench

Existing suspended ceiling

Hypothetical distance to structural ceiling

y

Existing structural ceiling exposedHeight of shelves will be adapted to the height of the existingstructural ceiling as explained in document GE-DD-CA-4.5

602,5

137,594

,6

(x25 single height displays)(x4 double height displays)

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

INTERIOR ELEVATIONS - 1 AND 2

2014.04.17 GE-DD-CA-3.1

1/25@A1

javier

--detail design

--

- CAMPER Montenapoleone, Milan

Elevation 1

Elevation 2

Elevation 1

Elevation 2

Standard horizontal shelf (32cm depth)

Medium horizontal shelf (50cm depth)(benches and counter)

Big horizontal shelf (64cm depth)(show window displays)

Standard front vertical shelf (16cm depth)

Back vertical shelf (16cm depth)

Big front vertical shelf (36cm depth)(below benches)

* See attached Rhinoceros file for 3D model

CAMPER Montenapoleone, Milan

Page 11: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

10

6,2

34

4x

907,4

86,4

Mirror finish door Shelves integrated counter

cor.patio

Via

Montenapoleone

Existing suspended ceiling

Hypothetical distance to structural ceiling

shop

Shelves fixed to structural ceiling

Existing structural ceiling exposed

23

9,3

15

8,6

190,6

Shelves resting on floor

45,5

30.6x30.6x1.4 cmstructural plywood board

Camper logo.Support bars finish to be defined

(x21 single height half depth displays)(x15 single height displays)

517

34

41

00

80

,7

Shelves resting on floor

323,8

34

4x

Existing suspended ceiling

Hypothetical distance to structural ceiling

shop shop

Shelves integrated counter

Existing structural ceiling exposedExisting structural ceiling exposed

patio

Via

Montenapoleone

Camper logo.Support bars finish to be defined

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

INTERIOR ELEVATIONS - 3 AND 4

2014.04.17 GE-DD-CA-3.2

1/25@A1

javier

--detail design

--

- CAMPER Montenapoleone, Milan

Elevation 3

Elevation 4

Elevation 3

Elevation 4

* See attached Rhinoceros file for 3D model

Standard horizontal shelf (32cm depth)

Medium horizontal shelf (50cm depth)(benches and counter)

Big horizontal shelf (64cm depth)(show window displays)

Standard front vertical shelf (16cm depth)

Back vertical shelf (16cm depth)

Big front vertical shelf (36cm depth)(below benches)

CAMPER Montenapoleone, Milan

Page 12: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

86,2

90

279,7

34

4x

Existing suspended ceiling

Hypothetical distance to structural ceiling

Existing structural ceiling exposed

Height of mirror will be adapted to height ofexisting structural ceiling

455,9Shelves fixed to structural ceiling

46

,2

15

8,6

34

41

00

254,6

118,8

14

8,8

Full height mirrorWall integrated bench

shopcor. patio

Via

Montenapoleone

Existing suspended ceiling

Hypothetical distance to structural ceiling

y

Existing structural ceiling exposedHeight of shelves will be adapted to the height of the existingstructural ceiling as explained in document GE-DD-CA-4.5

932,7

(x52 single height displays)(x25 double height displays)

94

,6

94

,6

158,7

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

INTERIOR ELEVATIONS - 5 AND 6

2014.04.17 GE-DD-CA-3.3

1/25@A1

javier

--detail design

--

- CAMPER Montenapoleone, Milan

Elevation 5

Elevation 6

Elevation 6

Elevation 5

* See attached Rhinoceros file for 3D model

Standard horizontal shelf (32cm depth)

Medium horizontal shelf (50cm depth)(benches and counter)

Big horizontal shelf (64cm depth)(show window displays)

Standard front vertical shelf (16cm depth)

Back vertical shelf (16cm depth)

Big front vertical shelf (36cm depth)(below benches)

CAMPER Montenapoleone, Milan

Page 13: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

34

4x

32

131,9 366,2101,6

Existing glass door.Possible adjustment necessary depending on floor height

Existing glass window

Existing suspended ceiling

Hypothetical distance to structural ceiling

Existing structural ceiling exposed

Shelves fixed to structural ceiling

Shelves resting on floor Shelves integrated bench

126,6

15

8,6

(x21 single height displays)(x3 double height displays)

Camper logo.Support bars finish to be defined

Frames finish to be defined

Existing structural ceiling exposed

Shelves fixed to structural ceiling

Shelves resting on floor

34

4x

Existing suspended ceiling

Hypothetical distance to structural ceiling

375,3

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

INTERIOR ELEVATIONS - 7 AND 8

2014.04.17 GE-DD-CA-3.4

1/25@A1

javier

--detail design

--

- CAMPER Montenapoleone, Milan

Elevation 7

Elevation 8

Elevation 8Elevation 7

* See attached Rhinoceros file for 3D model

Standard horizontal shelf (32cm depth)

Medium horizontal shelf (50cm depth)(benches and counter)

Big horizontal shelf (64cm depth)(show window displays)

Standard front vertical shelf (16cm depth)

Back vertical shelf (16cm depth)

Big front vertical shelf (36cm depth)(below benches)

CAMPER Montenapoleone, Milan

Page 14: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

32

03

20

32

03

20

32

03

20

32

03

20

32

03

20

32

03

20

32

01

60

320 40

360

73

73

500

Wall integrated bench

36x39.3cm structural plywoodpanel fixed to wall and bench

39

3

Floor light "13x8" 13x8mmto be provided by Viabizzuno

Display light "arco LED" 17.5x11mmto be provided by Viabizzuno

320

500

640

40 40

40

40

32

03

20

32

03

20

32

03

20

32

03

20

32

03

20

32

03

20

32

01

60

73

Metal profile embebed in plywood andattached to structural ceiling

Double size shelf

Display light "arco LED" 17.5x11mmto be provided by Viabizzuno

160 160 160 16080 80

Floor light "13x8" 13x8mmto be provided by Viabizzuno

20

32

03

20

32

03

20

32

03

20

32

03

20

32

03

20

32

03

20

32

01

60

160 40 160 160 160

500

466

30

6

73

73

32040 320

Shelves integrated counter

30.6x30.6x1.4cmstructural plywood board

Metal profile embebed in plywood andattached to structural ceiling

Display light "arco LED" 17.5x11mmto be provided by Viabizzuno

Floor light "13x8" 13x8mmto be provided by Viabizzuno

Acidified stone (ST-01)

Protecting membrane. To be specified by stone pavement provider

Original pavement

L shape steel profile e=2mm. Finish to be defined

Protecting membrane same color as crashed stone.To be specified by provider

Crashed stone (ST-02)

20

Floor light "13x8" 13x8mmto be provided by Viabizzuno

L shape steel profile e=2mm. Finish to be defined

Waterproof layer

Crashed stone (ST-02)

Crashed stone (ST-02)

Protecting membrane to bespecified by provider.

Similar color as crashed stoneOriginal pavement Protecting membrane.To be specified by provider

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

DETAILS - SECTIONS

2014.04.17 GE-DD-CA-4.1

1/10@A1

javier

--detail design

--

- CAMPER Montenapoleone, Milan

Section 1 ::: e 1/10

Section 2Section 3

Section 2 ::: e 1/10 Section 3 ::: e 1/10

Section 1

Section 3 ::: e 1/5

Section 4 ::: e 1/5

Section 4

CAMPER Montenapoleone, Milan

Page 15: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

Projection horizontal shelf

Shelves light "13x8" 13x8mmto be provided by Viabizzuno

Shelves light "13x8" 13x8mmto be provided by Viabizzuno

44

Display light "arco LED" 17.5x11mmto be provided by Viabizzuno

Projection vertical shelf

43

10

18

,5

10

43

11

18

,5

8

Display light "arco LED" 17.5x11mmto be provided by Viabizzuno

Projection vertical shelf

73 14

320 32080 80

32

03

20

80

80

160

14

32

0

73

14

43

14

8

13

10

0

Metal plate e=1mm

Metal plate e=1mm

14

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

2014.04.17 GE-DD-CA-4.2

1/5@A1

javier

--detail design

--

- CAMPER Montenapoleone, Milan

Example horizontal shelf Example vertical shelf

DETAILS - SHELVES ASSEMBLY SYSTEM AND LIGHT INTEGRATION

CAMPER Montenapoleone, Milan

Page 16: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

32

0

80

32

03

20

32

03

20

32

03

20

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80

320 320 320 320 320320 320 320

80

80

80

80

80

80

80

80

32

0

80

80

80

80

32

0

80

80

80

80

32

0

80

80

80

80

32

0

80

80

80

80

32

0

80

80

80

80

32

0

80

80

80

80

Shelves light "13x8" 13x8mmto be provided by Viabizzuno

14

8

13

Vertical shelf

320 40

73Floor light "13x8" 13x8mm

to be provided by Viabizzuno

80

Horizontal shelf

14

11

18,5 Display light "arco LED" 17.5x11mmto be provided by Viabizzuno

Metal plate e=1mm

61

4

10

Horizontal shelf

10

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

2014.04.17 GE-DD-CA-4.3

1/5@A1

javier

--detail design

--

- CAMPER Montenapoleone, Milan

Example shelves elevation Floor light - detail section ::: e 1/2

Display light - detail section ::: e 1/2

Shelves light - detail section ::: e 1/2

DETAILS - SHELVES ASSEMBLY SYSTEM AND LIGHT INTEGRATION

CAMPER Montenapoleone, Milan

Page 17: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

64

1,4

50

0

1195,1

809,1

1611,5 1151,5

11

84

,8

80

6,2

High density poliestiren base (to be confirmed)

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

DETAILS - SEATS

2014.04.17 GE-DD-CA-4.4

1/10@A1

javier

--detail design

--

- CAMPER Montenapoleone, Milan

Hemp seats views Small seatBig seat

Hemp fabric

CAMPER Montenapoleone, Milan

Page 18: CAMPER SHOP INTERIOR RENOVATION · camper shop interior renovation via montenapoleone - milan final dd package kkaa - april 17th 2014

hypothetical existing structural ceiling

hypothetical shelves cutting line

10

80

80

80

80

----jaimecheckedapprovedbyRevision DescriptionNo.DatecheckedapprovedbyRevision DescriptionNo.Date

T. +81 3 3401 7721F. +81 3 3401 7778

2-24-8 minamiaoyama minato-kuTokyo 107-0062

DETAILS - SHELVES ADJUSTMENT TO CEILING

2014.04.17 GE-DD-CA-4.5

-

javier

--detail design

--

- CAMPER Montenapoleone, Milan

structural ceiling line

shelves cutting line

The shelves must be cut at 80 mm from the joints axis and

should be as close as possible to the existing structural ceiling

2

The top part of the shelves will adapt to

the shape of the structural ceiling

behing the existing suspended ceiling.

Given that this shape will be unknown

until the construction works begin, the

shelves have been drawn 1 meter higher

than the existing suspended ceiling and

they will be cut on site to adapt to the

structural ceiling shape.

When cutting the shelves, the 3

following conditions must be fulfilled:

1

Adjustment of shelves to existing

structural ceiling

The back boards must keep a distance

of 10mm to the structural ceiling

A board must be connected to at least 2 perpendicular

boards

3

structural ceiling line

shelves cutting line

(2x) back board

The boards do not connect 2or more perpendicular boards,so they are cut off

The boards are connected toat least 2 perpendicular boards,so they are kept

Shelves adjustment example

CAMPER Montenapoleone, Milan