camargo associates, llc

29
Chris Luther Camargo Associates, LLC www.CamargoAssociates .com TM How Effective Project Planning & Implementation Impacts an Operating Company’s Market Value

Upload: sage-design-group

Post on 21-Aug-2015

316 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Camargo Associates, LLC

Chris LutherCamargo Associates, LLC

www.CamargoAssociates.com© 2013-2014. All Rights Reserved

TM

How Effective Project Planning & Implementation

Impacts an Operating Company’s Market Value

Page 2: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

COMPELLING STATEMENTS

► Many define those ambitions with compelling statements like:

“Our capital effectiveness must be in the top quintile.”

“Our capital predictability must be in the top quintile”

“There will be no accidents

or incidents, period”

Page 3: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

FOCUSING ON

“Capital Effectiveness”

Equals

Project Actuals

Industry Benchmark

(Where 1.0 is the Average)

Page 4: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

CAPITAL EFFECTIVENESS

QuintilesCapital Plan

$

Capital EffectivenessMeasurement

(SAY)

# Of Companies Benchmarked(1000 SAY)

5th 1.6 B 1.6 50

4th 1.2 50

3rd 1.0 B 1.0 50

2nd 0.9 50

1st .7 B 0.7 50

Capital Effectiveness

Page 5: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

WHAT DOES THIS MEAN?

► If capital effectiveness = 1.6► 60% more costly than “peer” group

► If capital effectiveness = 0.85► 15% less costly than “peer” group

Page 6: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

CAPITAL PROJECT WORK PROCESS

Planning Execution

Project Authorization

Concept Options PreliminaryDesign

Detail Engineering Construction Start-Up

Procurement

2% 1½% 3.5% 93%

Effective Project Cost Distribution (Normal Distribution)

1 2 3 4 4 5

Page 7: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

WHAT IS THE MAIN THING?

► Using Interviews

► Complex Problem Analysis

► System Dynamics Analysis

► Lean Analysis

C O N C L U S I O N

Page 8: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

Page 9: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

Page 10: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

OWNER INPUT & DECISION MAKING

Reasons for NOT Achieving Top Quintile Performance

Quality OfOwner’s InputAnd DecisionMaking

Page 11: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

Pre-existing corp.

alignment is strong

Top QuintilePerformance

I actively lead in project communication

I maintain a strong, trusting relationship with

project group

CorporateStrategy

Fear of decision failing

Contractual issues

Understanding the of impact

of poor communication

My other accountabilities keep me busy

No-one holds me

accountable

Effective re-occurring

communication between groups

Require detailed

information on decisions

timing

Current priorities trivialize projects

Lack of corporate funding to work on projects

Communication metrics should

be in place

If work slows down we’ll have

more time

I will have to win them over with a reluctant

engineering group

I believe my input is critical

Individual and/or group who is responsible

SYSTEM MODEL COMMUNICATION

Page 12: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

MAIN ISSUE

“Lack of critical decision making and obtaining critical information to co-ordinate and create synergy with fast moving decisions”

Page 13: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

CAPITAL PROJECT WORK PROCESS

► Quality of Critical Owner’s Input / Decisions

1 2 3 4 4 5

Page 14: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

CAPITAL PROJECT WORK PROCESS

1 2

34

45

Waves of Critical Owner’s

Input and Decisions

Page 15: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

CAPITAL PROJECT WORK PROCESS

► Quality of Critical Owner’s Input / Decisions

1% 0.5% 2% Grows from 93% to 110% or more

Project Cost Distribution 4th and 5th Quintile Owners

1 2 3 4 4 5

Cost andScheduleGrowth

Page 16: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

PREMISE:

► “No one knows their business better than the owner”

► Major owner’s sources of input / knowledge

Business Unit

Operations / Production

Maintenance

Engineering

Projects

Health, Safety, Environment

More

Page 17: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

IT TAKES TWO…

Owner’s Expertise Partner’s Expertise

Page 18: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

“THE DOUBLE BET”

Company Owner

Understanding Of What They

Need

HiBias

SolutionTOTAL JOINT

SOLUTION

Low Low ValueOne Sided

Solution

Low Hi

Partner Understanding of What the Operating Company Needs

Page 19: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

KnowledgeSharing

InnovationNewTechnology

Page 20: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

OWNER’S CRITICAL INPUT

► Scope of Work

► P&IDs

► Process Description

► Process Flow Description

► Control Strategies

► Hazard Review

Page 21: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

DIFFICULTY GETTING OWNER’S INPUT

► Lack of Resources

► Lack of Time

► Uptime

► Urgent vs. Important

► Junior vs. Senior

Expertise

► Poor Engagement

► Wasteful Meetings

Page 22: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

HOW DOES “NETPOINT” HELP?

► More detailed scheduling around input / review

► Allows smaller meeting schedules to break down details

► “Slicing the Salami”

► Improves process safety input / reviews

► Process ► Hazards

► PFDs ► Control & Safety

► P&IDs ► Others

Page 23: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

FINANCIAL IMPACT TO COMPANY “A”

Real Company “A”

Market Cap$13.4 B

Revenue $16.6 B

Net Income $1.3 B

Capital Project Spending $ 1.2 B

PP&E $ 4.4 B

Depreciation $ 0.5 B

Share Price 1-1-14 $90

# of Shares Outstanding 149 MM

Average PE 10.2 x

Page 24: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

CAPITAL PROJECT DELIVERY IMPROVEMENT

► Using CAPM – Capital Asset Pricing Model to determine the Intrinsic value of the stock assuming a “capital effectiveness” of 1.4

► Reassessed the value using a capital effectiveness of 1.0 changing the capital spending over a two year period (2014 thru 2015)

► Analysis variables:► Capital Spending► Free cash flow► Depreciation► Earnings

► Assumptions of the future performance based on past:► Revenue Growth of 10% per yr. (conservative) over 10 years,► Then a terminal growth of 4% (very conservative) for the next 10 years► NPV of 12%

Page 25: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

CAPITAL PROJECT DELIVERY IMPROVEMENT

Current Stock Price Intrinsic value (1.4) Intrinsic value (1.0)0

20

40

60

80

100

120

140

160

180

200

90

144

183

Company "A"

Company "A"

Page 26: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

IMPACT

► Company “A”- Private sector ► Capital Expenditures Savings over 20 years

► - $ 26.4 B► NPV (12%) -$ 17.2 B

► Public Sector – Benefit Cost Ratio► $ 1.2 B capital spending ( annual)

► NPV (4%) -$ 18.5 B Savings ► BCR = 1.34, means that the benefits

outweigh the costs by 34%

Page 27: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

IT TAKES TWO…

Page 28: Camargo Associates, LLC

© Camargo Associates, LLC. All Rights Reserved. | How Effective Project Planning & Implementation Impacts an Operating Company’s Market ValueTM

Groups of

Knowledge

Coming

Together

Process

HSE

ControlSystems

Startup

Sustainability

Construction

Page 29: Camargo Associates, LLC

Chris LutherCamargo Associates, LLC

www.CamargoAssociates.com© 2013-2014. All Rights Reserved

TM

How Effective Project Planning & Implementation

Impacts an Operating Company’s Market Value