1 LONDON BOROUGH OF WALTHAM FOREST CABINET DAY/DATE/TIME VENUE: Tuesday, 20 January 2009 7.30 p.m. COUNCIL CHAMBER Town Hall, Forest Road, E17 4JF CONTACT: TEL./E-MAIL: Oliver Craxton Democratic Services 020 8496 4380 [email protected] Dear Member, This is formal notice advising you of the above meeting. The Agenda is set out below. Supplementary Items will only be added pursuant to the Council’s Constitution. Andrew Kilburn CHIEF EXECUTIVE MEMBERSHIP: Chair: Councillor Clyde Loakes (Council Leader) Councillors: Councillor John Macklin Deputy Leader and Portfolio Holder, Service Modernisation Councillor Afzal Akram Portfolio Holder, Community Safety, Enforcement and Protection Councillor Bob Belam Portfolio Holder, Environment Councillor Elizabeth Phillips Portfolio Holder, Health, Adult and Older People Councillor Marie Pye Portfolio Holder, Communities and Housing Councillor Keith Rayner Portfolio Holder, Finance, Risk and Governance Councillor Geraldine Reardon Portfolio Holder, Leisure, Arts and Culture Councillor Chris Robbins Portfolio Holder, Children and Young People Councillor Terry Wheeler Portfolio Holder, Enterprise and Investment

Upload: james-orourke

Post on 12-Nov-2014

341 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Cabinet Papers - St James St Library

1

LONDON BOROUGH OF WALTHAM FOREST

CABINET

DAY/DATE/TIME VENUE:

Tuesday, 20 January 2009

7.30 p.m.

COUNCIL CHAMBER Town Hall, Forest Road, E17 4JF

CONTACT: TEL./E-MAIL:

Oliver Craxton Democratic Services

020 8496 4380 [email protected]

Dear Member, This is formal notice advising you of the above meeting. The Agenda is set out below. Supplementary Items will only be added pursuant to the Council’s Constitution.

Andrew Kilburn CHIEF EXECUTIVE

MEMBERSHIP: Chair: Councillor Clyde Loakes (Council Leader) Councillors: Councillor John Macklin Deputy Leader and Portfolio Holder, Service Modernisation Councillor Afzal Akram Portfolio Holder, Community Safety, Enforcement and Protection Councillor Bob Belam Portfolio Holder, Environment Councillor Elizabeth Phillips Portfolio Holder, Health, Adult and Older People Councillor Marie Pye Portfolio Holder, Communities and Housing Councillor Keith Rayner Portfolio Holder, Finance, Risk and Governance Councillor Geraldine Reardon Portfolio Holder, Leisure, Arts and Culture Councillor Chris Robbins Portfolio Holder, Children and Young People Councillor Terry Wheeler Portfolio Holder, Enterprise and Investment

Page 2: Cabinet Papers - St James St Library

2

The following councillors have been appointed by the Council to assist Cabinet in proposing, formulating and advising upon Council policy under the guidance of the appropriate Portfolio-Holder. These councillors are not Members of the Cabinet and do not have any voting rights nor decision-making powers: Councillor Angie Bean Junior Lead Member, Children and Young People Councillor Jenny Gray Junior Lead Member, Communities and Housing Councillor Johar Khan Junior Lead Member, Environment Councillor Naheed Qureshi Junior Lead Member, Health, Adult and Older People

Page 3: Cabinet Papers - St James St Library

3

AGENDA 1. APOLOGIES FOR ABSENCE 2. DECLARATIONS OF INTEREST Members are asked to declare any personal or prejudicial interests they may have in

any matter that is to be considered at the meeting.

3. MINUTES OF CABINET (Pages 1 - 12)

Record of Decisions of the Cabinet meeting held on Tuesday 16th December 2008.

REFERENCES FROM OVERVIEW AND SCRUTINY MANAGEMENT COMMITTEE

If any.

FORWARD PLAN KEY DECISION REPORTS 4. Award of Council’s Design and Print Management Service

Contract (Pages 13 - 21)

5. Halls Service: Pricing Policy Review – 6 Month Review (Pages 22 -

40) 6. Waiver Request of Contracts Procedure Rules to Procure Local

Space to Purchase 50 Properties in the Leyton/Leytonstone Area (Pages 41 - 48)

7. Joint Local Authorities Regulatory Services Agreement (JLARS) (Pages 49 -

54) 8. Annual Review and Star Rating of Adults Social Care

Performance 2007/08 (Pages 55 - 73)

9. Delegation of Cabinet Powers to the Chief Executive for Council

Restructuring Arising from the Efficiency Review (Pages 74 - 78)

REPORTS TO COUNCIL 10. Policy and Resources Review 2009/10 - 2013/14 - Local

Government Settlement and Medium Term Financial Strategy TO FOLLOW

Page 4: Cabinet Papers - St James St Library

4

PERFORMANCE MONITORING REPORTS 11. Monthly Financial Monitoring Report (Pages 79 -

121) 12. Decent Homes: Quarter Two and Quarter Three Performance

Report July – December 2008 (Pages 122 - 136)

13. Annual Performance Assessment of Services for Children and

Young People in the London Borough of Waltham Forest - 2008 (Pages 137 - 145)

14. REPORTS OF PORTFOLIO HOLDERS (a) Report of the Leader

(Pages 146 - 147)

(b) Report of Portfolio Holder for Service Modernisation and

Deputy Leader

(Page 148)

(c) Report of Portfolio Holder for Community Safety,

Enforcement and Protection

(Pages 149 - 151)

(d) Report of Portfolio Holder for Environment

(Pages 152 - 153)

(e) Joint Report of Portfolio Holder and Junior Lead Member

for Health, Adult and Older People

(Pages 154 - 155)

(f) Report of Portfolio Holder for Communities and Housing

(Pages 156 - 157)

(g) Report of the Portfolio Holder, Finance, Risk and

Governance

(Page 158)

(h) Report of Portfolio Holder for Leisure, Arts and Culture

(Pages 159 - 161)

(i) Joint Report of Portfolio Holder and Junior Lead Member

for Children and Young People

(Pages 162 - 163)

(j) Report of Portfolio Holder for Enterprise and Investment

(Pages 164 - 165)

Page 5: Cabinet Papers - St James St Library

5

15. CONFIDENTIAL AND/OR EXEMPT REPORTS NOT TO BE

DISCLOSED TO THE PRESS AND PUBLIC

To pass a resolution to exclude the press and public from the meeting during

consideration of the following item in accordance with Section 100 (A) of the Local Government Act 1972 as amended on the grounds that it would involve the likely disclosure of exempt information as defined in paragraph 3 of Schedule 12A of the Act.

16. Award of Council’s Design and Print Management Service Contract - Appendix A

PLEASE NOTE THAT IF YOU REQUIRE A HARD COPY OF ANY OF THE ABOVE REPORTS, CONTACT OLIVER CRAXTON ON 020 8496 4380 OR E-MAIL HIM at: [email protected]

Page 6: Cabinet Papers - St James St Library

Pag

e 1

of 1

2

LON

DO

N B

OR

OU

GH

OF

WA

LTH

AM

FO

RES

T

CA

BIN

ET M

EETI

NG

– 1

6 D

ecem

ber 2

008

R

ECO

RD

OF

DEC

ISIO

NS

TAK

EN

This

doc

umen

t out

lines

the

deci

sion

s ta

ken

at th

e ab

ove

Cab

inet

mee

ting.

U

nles

s ot

herw

ise

indi

cate

d, e

xecu

tive

deci

sion

s lis

ted

in th

is d

ocum

ent w

ill co

me

into

forc

e an

d m

ay th

en b

e im

plem

ente

d 5

wor

king

day

s af

ter

publ

icat

ion

of th

is d

ocum

ent u

nles

s th

e O

verv

iew

and

Scr

utin

y M

anag

emen

t Com

mitt

ee c

alls

in a

dec

isio

n.

Dur

ing

that

per

iod

the

Dire

ctor

of G

over

nanc

e an

d La

w m

ay c

all-i

n a

deci

sion

for s

crut

iny

if so

requ

ired

by n

o le

ss th

an 4

Mem

bers

of t

he C

ounc

il.

(Par

agra

ph

11 o

f Par

t 6 o

f the

Cou

ncil’s

Con

stitu

tion;

Ove

rvie

w a

nd S

crut

iny

Pro

cedu

re R

ules

: Cal

l-in

Pro

cedu

res)

. D

ate

of P

ublic

atio

n:

Frid

ay 1

9th D

ecem

ber 2

008

Last

Dat

e fo

r Cal

l-In:

Tu

esda

y 30

th D

ecem

ber 2

008

Con

tact

: O

liver

Cra

xton

S

enio

r Com

mitt

ee M

anag

er

Dem

ocra

tic S

ervi

ces

Tel:

020

8496

438

0 E

mai

l: ol

iver

.cra

xton

@w

alth

amfo

rest

.gov

.uk

Agenda Item 3

Page 1

Page 7: Cabinet Papers - St James St Library

Pag

e 2

of 1

2

CA

BIN

ET M

EETI

NG

: TU

ESD

AY

16th

DEC

EMB

ER 2

008

(7.3

0pm

– 9

.15p

m)

PRES

ENT:

Cha

ir: C

ounc

illor C

lyde

Loa

kes

Cou

ncil

Lead

er

Cou

ncillo

r Joh

n M

ackl

in

Por

tfolio

Hol

der,

Ser

vice

Mod

erni

satio

n an

d D

eput

y Le

ader

C

ounc

illor B

ob B

elam

P

ortfo

lio H

olde

r, E

nviro

nmen

t C

ounc

illor L

iz P

hillip

s P

ortfo

lio H

olde

r, H

ealth

, Adu

lt an

d O

lder

Peo

ple

Cou

ncillo

r Mar

ie P

ye

Por

tfolio

Hol

der,

Com

mun

ities

and

Hou

sing

C

ounc

illor K

eith

Ray

ner

Por

tfolio

Hol

der,

Fina

nce,

Ris

k an

d G

over

nanc

e C

ounc

illor G

eral

dine

Rea

rdon

P

ortfo

lio H

olde

r, Le

isur

e, A

rts a

nd C

ultu

re

Cou

ncillo

r Chr

is R

obbi

ns

Por

tfolio

Hol

der,

Chi

ldre

n an

d Y

oung

Peo

ple

Cou

ncillo

r Ter

ry W

heel

er

Por

tfolio

Hol

der,

Ent

erpr

ise

and

Inve

stm

ent

O

ther

Cou

ncill

ors

Pres

ent:

Cou

ncillo

r Ang

ie B

ean,

Jun

ior L

ead

Mem

ber,

Chi

ldre

n an

d Y

oung

Peo

ple

Cou

ncillo

r Jen

ny G

ray,

Jun

ior L

ead

Mem

ber,

Com

mun

ities

and

Hou

sing

C

ounc

illor J

ohar

Kha

n, J

unio

r Lea

d M

embe

r, E

nviro

nmen

t C

ounc

illor

Nah

eed

Qur

eshi

, Jun

ior L

ead

Mem

ber,

Hea

lth, A

dult

and

Old

er P

eopl

e C

ounc

illor J

ames

O’R

ourk

e, C

hair

of C

hild

ren

and

Youn

g P

eopl

e O

verv

iew

and

Scr

utin

y S

ub-C

omm

ittee

C

ounc

illor R

icha

rd S

wed

en, C

hair

of H

ealth

, Adu

lts a

nd O

lder

Peo

ple

Ove

rvie

w a

nd S

crut

iny

Sub

-Com

mitt

ee

Cou

ncillo

r Sea

n M

eisz

ner,

Cha

ir of

the

Com

mun

ity S

afet

y an

d H

ousi

ng O

verv

iew

and

Scr

utin

y S

ub-C

omm

ittee

C

ounc

illor

Pet

er B

arne

tt C

ounc

illor L

aurie

Bra

ham

C

ounc

illor A

lan

Sig

gers

1

APO

LOG

IES

FOR

AB

SEN

CE

R

ecei

ved

from

Cou

ncillo

r A

fzal

Akr

am (

Por

tfolio

Hol

der

for

Com

mun

ity S

afet

y, E

nfor

cem

ent a

nd P

rote

ctio

n) a

nd C

olin

Moo

ne

(Hea

d of

Hou

sing

and

Nei

ghbo

urho

ods)

.

Page 2

Page 8: Cabinet Papers - St James St Library

Pag

e 3

of 1

2

2

D

ECLA

RA

TIO

NS

OF

INTE

RES

T

Non

e de

clar

ed.

3

MIN

UTE

S O

F C

AB

INET

The

min

utes

of t

he C

abin

et m

eetin

g he

ld o

n Tu

esda

y 25

th N

ovem

ber 2

008

wer

e co

nfirm

ed a

s a

corr

ect r

ecor

d an

d si

gned

by

the

Cha

ir, s

ubje

ct to

the

follo

win

g am

endm

ent:

item

num

ber 2

- D

ecla

ratio

ns o

f Int

eres

t; su

bstit

ute

the

wor

ds ‘N

on-E

xecu

tive’

for t

he

wor

d ‘E

xecu

tive’

in th

e se

cond

line

.

4

REF

EREN

CES

FR

OM

OVE

RVI

EW A

ND

SC

RU

TIN

Y M

AN

AG

EMEN

T C

OM

MIT

TEE

4(a)

TAC

KLI

NG

KN

IFE

CR

IME

IN W

ALT

HA

M F

OR

EST

C

ounc

illor

Jam

es O

’Rou

rke,

Cha

ir of

Chi

ldre

n an

d Y

oung

Peo

ple

Ove

rvie

w a

nd S

crut

iny

Sub

-Com

mitt

ee,

pres

ente

d a

repo

rt un

der

item

4(a

) on

the

age

nda,

set

ting

out

the

reco

mm

enda

tions

of

the

Ove

rvie

w a

nd S

crut

iny

Man

agem

ent

Com

mitt

ee.

Cou

ncillo

r O

’Rou

rke

drew

atte

ntio

n to

the

spec

ial j

oint

mee

ting

of th

e C

hild

ren

and

You

ng P

eopl

e an

d C

omm

unity

Saf

ety

and

Hou

sing

Ove

rvie

w a

nd S

crut

iny

Sub

-Com

mitt

ees

that

took

pla

ce o

n 14

th O

ctob

er 2

008,

at w

hich

ther

e w

ere

appr

oxim

atel

y 60

at

tend

ees.

H

e w

ishe

d to

than

k fo

rmal

ly a

ll th

ose

who

atte

nded

the

mee

ting,

and

als

o C

ounc

illor

Sea

n M

eisz

ner,

Cha

ir of

the

Com

mun

ity S

afet

y an

d H

ousi

ng O

verv

iew

and

Scr

utin

y S

ub-C

omm

ittee

, for

his

wor

k on

this

mat

ter.

Cou

ncill

or C

hris

Rob

bins

, Por

tfolio

Hol

der

for

Chi

ldre

n an

d Y

oung

Peo

ple,

info

rmed

Cab

inet

that

the

polic

e ha

d in

crea

sed

the

num

ber

of o

ffice

rs u

nder

taki

ng s

choo

l vis

its in

the

bor

ough

.

He

said

tha

t th

is a

ctio

n, c

oupl

ed w

ith t

he w

ork

of t

he C

ounc

il’s

Saf

er N

eigh

bour

hood

s Te

ams,

was

mak

ing

a po

sitiv

e co

ntrib

utio

n to

war

d th

e re

duct

ion

of k

nife

crim

e in

the

boro

ugh.

C

abin

et A

GR

EED

to re

com

men

d th

e de

cisi

ons

in (a

) and

(b) b

elow

to F

ull C

ounc

il fo

r app

rova

l:

(a) T

o re

ques

t the

Met

ropo

litan

Pol

ice

Ser

vice

(MP

S);

the

Met

ropo

litan

Pol

ice

Aut

horit

y (M

PA

) and

or,

the

Por

tfolio

Hol

der f

or

Com

mun

ity S

afet

y, E

nfor

cem

ent

and

Pro

tect

ion,

as

appr

opria

te,

to p

rovi

de t

o th

e W

alth

am F

ores

t P

olic

e B

orou

gh

Com

man

d ad

ditio

nal r

esou

rces

, ov

er a

nd a

bove

the

cur

rent

min

imum

, in

ord

er t

o m

ake

war

d ne

ighb

ourh

ood

polic

ing,

sa

fer s

choo

ls, p

ropo

rtion

ate

to th

e di

ffere

nt re

quire

men

ts o

f ind

ivid

ual w

ards

, sch

ools

and

col

lege

s.

(b) T

o re

ques

t th

e Lo

cal S

trate

gic

Par

tner

ship

(LS

P)

Boa

rd t

o en

cour

age

loca

l bus

ines

s or

gani

satio

ns a

nd b

usin

esse

s to

im

prov

e th

e nu

mbe

r of

pro

per

appr

entic

eshi

ps w

ithin

the

Bor

ough

, th

ereb

y pr

ovid

ing

loca

l pe

ople

with

the

ski

lls a

nd

Page 3

Page 9: Cabinet Papers - St James St Library

Pag

e 4

of 1

2

co

nfid

ence

to a

chie

ve th

eir a

mbi

tions

and

effe

ctiv

ely

com

pete

in th

e jo

b m

arke

t. C

abin

et p

lace

d on

reco

rd it

s th

anks

to th

e O

verv

iew

and

Scr

utin

y M

anag

emen

t Com

mitt

ee fo

r its

wor

k on

this

mat

ter.

4(b)

REV

IEW

OF

THE

CA

SHIE

RS

SER

VIC

E

See

item

num

ber 7

bel

ow.

5

PRO

POSA

L TO

CLO

SE W

ALT

ON

HO

USE

RES

IDEN

TIA

L C

AR

E H

OM

E

Ms

Jean

Jam

es S

haw

, Cha

irper

son

of th

e W

alto

n H

ouse

Act

ion

Gro

up, a

ddre

ssed

Cab

inet

, obj

ectin

g to

the

prop

osed

clo

sure

of

Wal

ton

Hou

se re

side

ntia

l car

e ho

me.

M

s Je

an J

ames

Sha

w p

rese

nted

Cab

inet

with

a p

etiti

on w

ith 3

797

sign

ator

ies,

cou

ched

in

the

fol

low

ing

term

s: ‘W

e, t

he u

nder

sign

ed a

re a

gain

st t

he c

losu

re o

f W

alto

n H

ouse

, du

e to

the

stre

ss a

nd d

isru

ptio

n it

will

ca

use

to a

ll th

e re

side

nts

livin

g th

ere.

W

e re

ques

t tha

t the

hom

e sh

ould

rem

ain

open

unt

il th

e tw

o ne

w 9

0 be

dded

res

iden

tial

hom

es a

re b

uilt’

.

She

the

n re

ferr

ed t

o a

lette

r se

nt t

o al

l cou

ncill

ors,

opp

osin

g th

e pr

opos

al t

o cl

ose

Wal

ton

Hou

se,

whi

ch

cont

aine

d 10

poi

nts

she

wis

hed

mem

bers

to c

onsi

der b

efor

e ta

king

a d

ecis

ion

on th

e m

atte

r. M

r R

oger

Bel

l, a

resi

dent

of W

alto

nH

ouse

, the

n ad

dres

sed

Cab

inet

, als

o ob

ject

ing

to th

e pr

opos

ed c

losu

re o

f the

car

e ho

me.

H

e re

ques

ted

that

con

side

ratio

n of

the

mat

ter

be d

efer

red

to a

llow

res

iden

ts,

thei

r fa

mili

es a

nd s

taff

furth

er o

ppor

tuni

ty t

o di

scus

s an

d ag

ree

with

the

Cou

ncil

the

futu

re a

rran

gem

ents

for t

he h

ome

and

its re

side

nts.

C

ounc

illor

Ric

hard

Sw

eden

, C

hair

of H

ealth

, A

dults

and

Old

er P

eopl

e O

verv

iew

and

Scr

utin

y S

ub-C

omm

ittee

, pr

esen

ted

the

reco

mm

enda

tions

of

the

Sub

-Com

mitt

ee,

as d

etai

led

in A

ppen

dix

3 to

the

rep

ort

on t

he a

gend

a.

He

repo

rted

that

the

Sub

-C

omm

ittee

had

res

erva

tions

reg

ardi

ng t

he p

ropo

sed

clos

ure

of t

he h

ome,

and

in p

artic

ular

it h

ad a

sked

for

a r

evie

w o

f th

e re

venu

e an

d ca

pita

l im

plic

atio

ns in

the

light

of t

he c

urre

nt e

cono

mic

clim

ate

and

timin

g of

the

prop

osed

clo

sure

and

sal

e of

the

site

. C

ounc

illor

Liz

Phi

llips,

Por

tfolio

Hol

der

for

Hea

lth,

Adu

lt an

d O

lder

Peo

ple,

sai

d th

at t

he r

epor

t be

fore

Cab

inet

pro

pose

d th

e cl

osur

e of

Wal

ton

Hou

se R

esid

entia

l car

e H

ome,

and

tha

t th

is h

ad b

een

the

mos

t di

fficu

lt pr

opos

al s

he h

ad h

ad t

o br

ing

to

Cab

inet

dur

ing

her

thre

e ye

ars

as P

ortfo

lio H

olde

r.

She

info

rmed

Cab

inet

that

the

curr

ent e

cono

mic

situ

atio

n ha

d be

en ta

ken

into

acc

ount

in th

e dr

awin

g up

of t

he o

ffice

rs’ r

ecom

men

datio

ns.

She

ack

now

ledg

ed th

e w

ork

that

Jea

n Ja

mes

Sha

w a

nd th

e W

alto

n H

ouse

Act

ion

Gro

up h

ad d

one

in t

ryin

g to

per

suad

e th

e C

ounc

il no

t to

clo

se t

he h

ome.

C

ounc

illor

Phi

llips

dre

w

atte

ntio

n to

the

fact

that

the

polic

y re

view

pro

cess

iden

tifie

d a

need

to m

ake

savi

ngs

of £

1.5m

ove

r a tw

o ye

ar p

erio

d, c

onsi

sten

t w

ith th

e ca

re h

omes

repl

acem

ent p

roje

ct, a

nd th

is w

ould

be

achi

eved

by

the

clos

ure

of tw

o ca

re h

omes

. E

dith

Pea

rson

Lod

ge

Page 4

Page 10: Cabinet Papers - St James St Library

Pag

e 5

of 1

2

w

as t

he f

irst

care

hom

e to

be

clos

ed,

achi

evin

g sa

ving

s of

£70

6,00

0, a

nd n

ow,

follo

win

g co

nsul

tatio

n, s

he r

ecom

men

ded

Cab

inet

to a

gree

to c

lose

Wal

ton

Hou

se, s

ayin

g th

at th

is w

ould

ach

ieve

sav

ings

of £

850,

000.

T

he d

ecis

ion

to id

entif

y W

alto

n H

ouse

as

the

seco

nd c

are

hom

e fo

r cl

osur

e w

as b

ased

on

the

fact

tha

t it

coul

d no

t be

reg

iste

red

to a

ccep

t pe

ople

with

de

men

tia, w

hich

was

the

high

est p

rese

ntin

g ne

ed c

omin

g to

the

Soc

ial C

are

Pla

cem

ent P

anel

. A

n ap

plic

atio

n w

as m

ade

in

2005

to re

gist

er W

alto

n H

ouse

for d

emen

tia, a

nd c

onse

quen

tly th

ere

wer

e di

scus

sion

s w

ith C

SC

I who

resp

onde

d th

at th

e ho

me

was

not

sui

tabl

e fo

r co

ntin

ued

use

as it

wou

ld r

equi

re m

ajor

stru

ctur

al w

orks

, as

wel

l as

en-s

uite

fac

ilitie

s.

Sub

sequ

ently

in

2006

, CS

CI h

ad to

ld th

e C

ounc

il th

at n

one

of it

s ca

re h

omes

wer

e fit

for p

urpo

se, a

nd th

ey a

dvis

ed th

at th

ey s

houl

d al

l be

clos

ed

by 2

011-

12.

She

sai

d th

at in

the

even

t of C

abin

et d

ecid

ing

to c

lose

Wal

ton

Hou

se, a

ll re

side

nts

wou

ld b

e re

-ass

esse

d so

that

th

eir

heal

th a

nd s

ocia

l car

e ne

eds

wer

e ap

prop

riate

ly a

ddre

ssed

. S

he s

tress

ed th

at n

o st

aff c

urre

ntly

em

ploy

ed a

t the

hom

e w

ould

lose

thei

r jo

bs, a

s th

ey w

ould

be

re-d

eplo

yed

to w

ork

in o

ther

res

iden

tial c

are

hom

es.

Cou

ncill

or P

hilli

ps th

en s

aid

that

W

alto

n H

ouse

wou

ld n

ot b

e cl

osed

unt

il ne

w h

omes

wer

e fo

und

for t

he re

-loca

tion

of a

ll ex

istin

g re

side

nts.

In

resp

onse

to q

uest

ions

from

the

Lead

er o

f the

Cou

ncil,

Cou

ncill

or L

iz P

hilli

ps re

porte

d th

at th

ree

mee

tings

had

bee

n he

ld w

ith

rela

tives

of

resi

dent

s, a

nd t

hat

arra

ngem

ents

wou

ld b

e m

ade

for

Age

Con

cern

to

cont

inue

pro

vidi

ng a

n ad

voca

cy s

ervi

ce f

or

clie

nts

in W

alto

n H

ouse

bey

ond

the

curre

nt 1

6th D

ecem

ber 2

008

dead

line,

unt

il th

e la

st re

side

nt le

ft th

e ho

me.

C

ounc

illor

Mar

ie P

ye,

Por

tfolio

Hol

der

for

Com

mun

ities

and

Hou

sing

, po

inte

d ou

t to

Cab

inet

tha

t a

full

Equ

ality

Im

pact

A

sses

smen

t (E

IA)

had

been

car

ried

out

and

that

the

ass

essm

ent

was

tha

t th

ere

was

som

e sh

ort

term

neg

ativ

e im

pact

. H

owev

er, t

his

was

bei

ng m

itiga

ted

by th

e de

taile

d ac

tion

plan

, and

the

long

-term

impa

ct o

f the

re-p

rovi

sion

was

a p

ositi

ve o

ne.

Cou

ncillo

r Phi

llips

said

that

the

com

preh

ensi

ve e

qual

ity im

pact

ass

essm

ent w

ould

be

impl

emen

ted

and

adhe

red

to.

Cou

ncill

or

Phi

llips

conc

lude

d by

giv

ing

an u

nder

taki

ng to

hol

d fo

rtnig

htly

mee

tings

to o

vers

ee th

e pr

ovis

ion

of a

ssis

tanc

e to

res

iden

ts o

f W

alto

n H

ouse

with

the

ir m

ovin

g, a

nd a

lso

to t

ake

up a

ny c

ases

of

indi

vidu

al r

esid

ents

who

wer

e ha

ving

diff

icul

ty in

fin

ding

al

tern

ativ

e ac

com

mod

atio

n.

Cab

inet

AG

REE

D:

(a

) To

note

the

outc

ome

of c

onsu

ltatio

n.

(b) T

o th

e cl

osur

e of

Wal

ton

Hou

se R

esid

entia

l car

e H

ome

by 3

1 M

arch

200

9.

(c

) To

del

egat

e to

Exe

cutiv

e D

irect

or A

dult

and

Com

mun

ity S

ervi

ces,

the

pow

er to

ent

er in

to a

ny fi

nal a

gree

men

t, or

take

an

y ot

her

actio

n in

con

sulta

tion

with

the

Por

tfolio

Hol

der

for

Soc

ial C

are

and

Hea

lth, a

nd o

n th

e ad

vice

of t

he S

trate

gic

Dire

ctor

of

Fina

nce

and

the

Dire

ctor

of

Gov

erna

nce

and

Law

, to

giv

e ef

fect

to

the

deci

sion

at

(b)

abov

e, f

ollo

win

g th

e

Page 5

Page 11: Cabinet Papers - St James St Library

Pag

e 6

of 1

2

ou

tcom

e of

the

cons

ulta

tion.

6

OU

TSO

UR

CIN

G T

HE

CO

UN

CIL

'S IN

TER

NA

L A

UD

IT S

ERVI

CE

C

abin

et r

ecei

ved

an o

ral r

epre

sent

atio

n at

the

mee

ting

from

Joh

n W

eeke

s, a

mem

ber

of W

alth

am F

ores

t UN

ISO

N, s

peak

ing

agai

nst t

he re

com

men

datio

ns c

onta

ined

in th

e re

port.

H

e sa

id th

at U

NIS

ON

wer

e of

the

opin

ion

that

the

offic

ers’

find

ings

wer

e no

t ba

sed

on c

orre

ct f

inan

cial

info

rmat

ion

and

he t

here

fore

ask

ed C

abin

et t

o de

fer

the

repo

rt fo

r th

e fin

anci

al c

ase

to b

e re

-co

nsid

ered

and

for t

he in

-hou

se p

rovi

sion

to b

e re

-ass

esse

d.

Cou

ncillo

r K

eith

Ray

ner,

Por

tfolio

Hol

der

for

Fina

nce,

Ris

k an

d G

over

nanc

e, s

tate

d th

at U

NIS

ON

’s s

ubm

issi

on h

ad b

een

give

n fu

ll co

nsid

erat

ion

but i

t con

tain

ed s

ome

fund

amen

tal e

rror

s an

d di

d no

t ref

lect

the

true

cost

of r

unni

ng a

full

Inte

rnal

Aud

it se

rvic

e an

d de

liver

y of

a fu

ll A

nnua

l Aud

it P

lan.

H

e co

nfirm

ed th

at th

e fin

anci

al in

form

atio

n in

the

offic

ers’

repo

rt w

as c

orre

ct.

Cab

inet

AG

REE

D:

(a

) Tha

t the

Cou

ncil

join

the

Sou

th L

ondo

n A

udit

and

Ant

i-Fra

ud P

artn

ersh

ip fr

om 1

st A

pril

2009

by

way

of a

3 y

ear c

ontra

ct

with

the

Lond

on B

orou

gh o

f Cro

ydon

whi

ch is

the

lead

bor

ough

in th

e pa

rtner

ship

. (b

) To

agr

ee th

at th

e S

outh

Lon

don

Aud

it an

d A

nti-F

raud

Par

tner

ship

pro

vide

s al

l Int

erna

l Aud

it S

ervi

ces

for

the

Cou

ncil

for

the

dura

tion

of th

e co

ntra

ct.

(c

) To

not

e th

at th

e fo

ur fu

ll-tim

e In

tern

al A

udito

rs c

urre

ntly

em

ploy

ed b

y th

e co

unci

l will

tran

sfer

to th

e em

ploy

men

t of t

he

Lond

on B

orou

gh o

f Cro

ydon

.

7

REV

IEW

OF

THE

CA

SHIE

RS

SER

VIC

E

Cou

ncill

or J

ames

O’R

ourk

e, C

hair

of C

hild

ren

and

You

ng P

eopl

e O

verv

iew

and

Scr

utin

y S

ub-C

omm

ittee

, pr

esen

ted

a re

port

unde

r ite

m 4

(b) o

n th

e ag

enda

, set

ting

out t

he re

com

men

datio

n of

the

Ove

rvie

w a

nd S

crut

iny

Man

agem

ent C

omm

ittee

. C

ounc

illor

John

Mac

klin

, Por

tfolio

Hol

der

for

Ser

vice

Mod

erni

satio

n an

d D

eput

y Le

ader

, res

pond

ed to

Cou

ncill

or O

’Rou

rke

by

sayi

ng th

at a

lthou

gh s

ympa

thet

ic to

the

reco

mm

enda

tion

of th

e O

verv

iew

and

Scr

utin

y M

anag

emen

t Com

mitt

ee, h

e co

uld

not

unde

rtake

to

guar

ante

e th

e de

lete

d po

st h

olde

rs w

ere

rede

ploy

ed s

peci

fical

ly w

ithin

Wal

tham

For

est

Dire

ct,

but

he g

ave

a gu

aran

tee

that

they

wou

ld b

e re

depl

oyed

with

in th

e C

ounc

il as

a w

hole

.

Page 6

Page 12: Cabinet Papers - St James St Library

Pag

e 7

of 1

2

C

abin

et A

GR

EED

:

(a)

In p

rinci

ple,

to

clos

e th

e C

hurc

h H

ill C

ash

Offi

ce b

y 30

th J

une

2009

, su

bjec

t to

con

sulta

tion

and

outc

ome

of f

urth

er

equa

litie

s im

pact

ass

essm

ent w

ork,

as

set o

ut in

App

endi

x 7

to th

e re

port.

(b

) Th

at a

fter

the

com

plet

ion

of t

he c

onsu

ltatio

n, i

t w

ill b

e de

lega

ted

to t

he E

xecu

tive

Dire

ctor

for

Env

ironm

ent

and

Reg

ener

atio

n, in

con

sulta

tion

with

the

Por

tfolio

Hol

der

for

Ser

vice

Mod

erni

satio

n, to

mak

e th

e fin

al d

ecis

ion

whe

ther

or

not t

o cl

ose

Chu

rch

Hill

Cas

h O

ffice

.

(c)

To n

ote

that

Wal

tham

For

est D

irect

(WFD

) sho

ps w

ill h

andl

e de

bit/c

redi

t car

d pa

ymen

ts, a

nd th

at c

usto

mer

s w

ho w

ish

to

pay

by c

hequ

e fo

r C

ounc

il Ta

x, H

ousi

ng R

ent,

Bus

ines

s R

ates

and

SA

P In

voic

es w

ill ha

ve to

sen

d th

eir

paym

ents

by

post

to th

e To

wn

Hal

l Cas

h O

ffice

.

(d)

To c

entra

lise

the

cash

iers

bac

k of

fice

func

tion

at th

e To

wn

Hal

l and

the

cash

ier’s

face

-to-fa

ce fr

ontli

ne s

taff,

whi

ch w

ill be

com

e pa

rt of

the

Fina

nce

Dire

ctor

ate.

(e)

To n

ote

that

the

cash

ier’s

face

-to-fa

ce s

taff

in th

e To

wn

Hal

l will

onl

y pr

ovid

e se

rvic

e to

the

follo

win

g cu

stom

ers:

inte

rnal

co

unci

l sta

ff, R

ecei

vers

hip,

Bui

ldin

g R

egul

atio

ns (w

ith e

xem

ptio

n to

thos

e cu

stom

ers

who

hav

e re

ceiv

ed a

fina

l sum

mon

s no

tice

to th

e B

ailif

fs fo

r Cou

ncil

Tax

and

Hou

sing

Ren

t).

(f)

To

not

e ch

eque

and

cas

h pa

ymen

ts to

oth

er c

hann

els,

as

set o

ut a

t App

endi

x 2

to th

e re

port.

(g)

To a

gree

fun

ding

of

£59,

000

to c

over

cos

ts a

ssoc

iate

d w

ith t

he c

losu

re o

f th

e ex

istin

g se

rvic

e, t

he c

ost

of m

arke

ting,

pu

blic

ity, t

he r

ollo

ut o

f add

ition

al O

neC

ards

and

the

cost

of t

he e

xist

ing

Cap

ita c

ontra

ct, w

hich

wou

ld th

en b

e re

cove

red

from

the

2009

/10

and

2010

/11

savi

ngs

asso

ciat

ed w

ith th

e cl

osur

e.

(h

) Th

at th

e 2.

4 de

lete

d po

sts

are

guar

ante

ed re

depl

oym

ent w

ithin

Wal

tham

For

est C

ounc

il.

Cab

inet

pla

ced

on re

cord

its

than

ks to

the

Ove

rvie

w a

nd S

crut

iny

Man

agem

ent C

omm

ittee

for i

ts w

ork

on th

is m

atte

r.

8

AR

CA

DE

SITE

– V

AR

IATI

ON

S TO

LEG

AL

AG

REE

MEN

T

Cou

ncillo

r B

ob B

elam

, P

ortfo

lio H

olde

r fo

r E

nviro

nmen

t, w

elco

med

the

rev

ised

sch

eme

and

was

kee

n to

see

pro

gres

s m

ade

rega

rdin

g th

e A

rcad

e si

te.

How

ever

, he

was

con

cern

ed th

at s

houl

d th

e re

vise

d sc

hem

e co

me

into

bei

ng, a

nd th

e ex

istin

g P

ool

Page 7

Page 13: Cabinet Papers - St James St Library

Pag

e 8

of 1

2

an

d Tr

ack

oper

atio

n ce

ased

, the

Poo

l and

Tra

ck s

ite s

houl

d be

red

evel

oped

as

soon

as

poss

ible

and

not

allo

wed

to b

ecom

e de

relic

t.

The

Lead

er o

f the

Cou

ncil

wel

com

ed th

e re

vise

d sc

hem

e w

hich

incl

uded

sw

imm

ing

pool

faci

litie

s.

Cab

inet

AG

REE

D:

(a

) Tha

t offi

cers

be

auth

oris

ed to

pro

gres

s di

scus

sion

s w

ith S

t Mod

wen

with

a v

iew

to th

e in

clus

ion

of s

wim

min

g po

ol a

nd

othe

r lei

sure

faci

litie

s w

ithin

the

Arc

ade

deve

lopm

ent.

(b) T

o au

thor

ise

offic

ers

to n

egot

iate

app

ropr

iate

var

iatio

ns to

the

exis

ting

lega

l agr

eem

ents

with

St M

odw

en.

Cab

inet

NO

TED

: Th

at f

ull

deta

ils o

f pr

opos

als

will

be r

epor

ted

back

for

con

side

ratio

n by

Cab

inet

in

Febr

uary

/Mar

ch 2

009,

tog

ethe

r w

ith

info

rmat

ion

on h

ow a

ny n

ew fa

cilit

ies

coul

d be

fund

ed, a

nd a

n up

date

on

prop

osal

s fo

r fut

ure

impr

ovem

ent a

nd m

anag

emen

t of

the

Trac

k fa

cilit

ies.

9

CH

IEF

EXEC

UTI

VE’S

UPD

ATE

- LO

CA

L ST

RA

TEG

IC P

AR

TNER

SHIP

Cab

inet

NO

TED

the

resp

onse

of t

he L

ocal

Stra

tegi

c P

artn

ersh

ip B

oard

(LS

P)

to th

e pr

opos

als

aris

ing

from

the

revi

ew o

f LS

P

gove

rnan

ce.

10

H

OM

ECA

RE

CO

NTR

AC

T A

WA

RD

Cab

inet

AG

REE

D to

the

awar

d of

con

tract

s to

the

3 pr

efer

red

orga

nisa

tions

: Leo

nard

Che

shire

Dis

abili

ty, H

ousi

ng 2

1, a

nd A

llied

H

ealth

care

, as

list

ed in

App

endi

x A

to

the

repo

rt, f

or a

n in

itial

per

iod

of 3

yea

rs,

with

the

opt

ion

to e

xten

d th

e co

ntra

cts

by a

fu

rther

per

iod

of 2

yea

rs.

Cou

ncillo

r Li

z P

hillip

s, P

ortfo

lio H

olde

r fo

r H

ealth

, Adu

lts a

nd O

lder

Peo

ple,

wis

hed

to p

lace

on

reco

rd h

er th

anks

to J

onat

han

Car

r, In

terim

Com

mis

sion

ing

Sup

port

Man

ager

, for

his

wor

k on

this

mat

ter.

Page 8

Page 14: Cabinet Papers - St James St Library

Pag

e 9

of 1

2

11

CO

NTR

AC

T A

WA

RD

: BA

RC

LAY

PRIM

AR

Y SC

HO

OL

EXTE

NSI

ON

Cab

inet

AG

REE

D to

the

awar

d of

the

build

ing

cont

ract

, for

wor

ks to

pro

vide

a n

ew c

entra

l ent

ranc

e, d

inin

g ha

ll an

d ki

tche

n an

d re

furb

ishm

ent o

f the

exi

stin

g K

1 bl

ock,

to B

olt a

nd H

eeks

.

12

SO

UTH

GR

OVE

DEV

ELO

PMEN

T O

PPO

RTU

NIT

Y

Cab

inet

AG

REE

D to

aut

horis

e of

ficer

s to

ent

er in

to d

iscu

ssio

ns w

ith S

ains

bury

s fo

r the

dev

elop

men

t of t

he s

ites

at S

outh

Gro

ve

on th

e ba

sis

that

suc

h de

velo

pmen

t will

be in

kee

ping

with

the

rece

ntly

agr

eed

Inte

rim P

lann

ing

Pol

icy

Fram

ewor

k (IP

PF)

for t

he

Tow

n C

entre

, an

d w

ill in

clud

e an

app

ropr

iate

red

evel

opm

ent

of t

he H

igh

Stre

et s

tore

and

car

par

k si

te c

urre

ntly

occ

upie

d by

S

ains

bury

s.

13

C

HIL

D P

OVE

RTY

STR

ATE

GY

2009

-202

0

The

Lead

er o

f the

Cou

ncil

drew

atte

ntio

n to

the

fact

that

an

inco

rrec

t ver

sion

of t

he C

hild

Pov

erty

Stra

tegy

had

bee

n in

clud

ed in

th

e ve

rsio

n of

the

agen

da s

ent t

o C

abin

et m

embe

rs, a

nd s

ubse

quen

tly a

n up

date

d ve

rsio

n of

the

Chi

ld P

over

ty S

trate

gy h

ad

been

circ

ulat

ed.

H

e th

anke

d th

e C

hild

ren

and

You

ng P

eopl

e O

verv

iew

and

Scr

utin

y S

ub-C

omm

ittee

for

the

ir in

put

on t

his

mat

ter,

and

requ

este

d th

at th

e S

ub-C

omm

ittee

con

tinue

to s

crut

inis

e th

is im

porta

nt a

rea

of th

e C

ounc

il’s w

ork.

H

e in

form

ed

Cab

inet

that

he

had

aske

d M

iche

le M

olon

ey, H

ead

of S

ervi

ce a

nd P

erfo

rman

ce Im

prov

emen

t, to

pro

duce

a fr

amew

ork

timet

able

th

e C

ounc

il to

mon

itor i

ts im

plem

enta

tion

of th

e S

trate

gy, a

nd w

hich

cou

ld b

e us

ed b

y th

e C

hild

ren

and

You

ng P

eopl

e O

verv

iew

an

d S

crut

iny

Sub

-Com

mitt

ee.

Cab

inet

AG

REE

D:

(a

) The

Chi

ld P

over

ty S

trate

gy a

nd A

ctio

n P

lan,

atta

ched

at A

ppen

dix

A to

the

repo

rt.

(b) T

o de

lega

te a

utho

rity

to th

e S

trate

gic

Dire

ctor

of P

eopl

e, P

olic

y an

d P

erfo

rman

ce to

mak

e m

inor

cha

nges

to th

e S

trate

gy

prio

r to

publ

icat

ion,

in c

onsu

ltatio

n w

ith th

e Le

ader

and

Dep

uty

Lead

er o

f the

Cou

ncil.

(c)

That

the

Chi

ldre

n an

d Y

oung

Peo

ple

Ove

rvie

w a

nd S

crut

iny

Sub

-Com

mitt

ee b

e re

ques

ted

to c

ontin

ue to

scr

utin

ise

this

im

porta

nt a

rea

of th

e C

ounc

il’s w

ork.

Th

at it

be

note

d th

at th

e H

ead

of S

ervi

ce a

nd P

erfo

rman

ce Im

prov

emen

t had

bee

n as

ked

prod

uce

a fra

mew

ork

timet

able

the

Cou

ncil

to m

onito

r its

impl

emen

tatio

n of

the

Chi

ld P

over

ty S

trate

gy.

Page 9

Page 15: Cabinet Papers - St James St Library

Pag

e 10

of 1

2

14

HO

USI

NG

STR

ATE

GY

C

ounc

illor

Sea

n M

eisz

ner,

Cha

ir of

the

Com

mun

ity S

afet

y an

d H

ousi

ng O

verv

iew

and

Scr

utin

y S

ub-C

omm

ittee

, in

form

ed

Cab

inet

that

the

Sub

-Com

mitt

ee h

ad c

onsi

dere

d th

e dr

aft H

ousi

ng S

trate

gy.

He

then

hig

hlig

hted

som

e of

the

area

s th

at th

e S

ub-C

omm

ittee

had

iden

tifie

d as

bei

ng o

f par

ticul

ar im

porta

nce

in re

latio

n to

the

Stra

tegy

. C

ounc

illor M

arie

Pye

, Por

tfolio

Hol

der f

or C

omm

uniti

es a

nd H

ousi

ng, i

ntro

duce

d th

e ite

m b

y sa

ying

that

the

Cou

ncil

now

had

a

very

det

aile

d H

ousi

ng S

trate

gy,

whi

ch h

ad b

een

prod

uced

fol

low

ing

exte

nsiv

e co

nsul

tatio

n an

d en

gage

men

t, in

clud

ing

cons

ider

atio

n by

the

Ove

rvie

w a

nd S

crut

iny

Man

agem

ent

Com

mitt

ee,

and

on t

wo

occa

sion

s by

the

Com

mun

ity S

afet

y an

d H

ousi

ng O

verv

iew

and

Scr

utin

y S

ub-C

omm

ittee

.

In r

espo

ndin

g to

the

poi

nts

rais

ed b

y C

ounc

illor

Mei

szne

r, sh

e pa

rticu

larly

st

ress

ed th

at th

e S

trate

gy a

ckno

wle

dged

the

impo

rtanc

e of

des

ign

qual

ity, a

nd r

elat

ed to

this

the

Cou

ncil

wou

ld c

omm

issi

on a

D

esig

n G

uide

from

the

Com

mis

sion

for A

rchi

tect

ure

and

the

Bui

lt E

nviro

nmen

t (C

AB

E) a

nd w

ould

be

setti

ng u

p a

Des

ign

Pan

el.

She

con

clud

ed b

y th

anki

ng J

ames

Gou

ld, N

atio

nal G

radu

ate

Trai

nee,

for h

is w

ork

in h

elpi

ng to

dev

elop

the

Stra

tegy

. C

ounc

illor

Jenn

y G

ray,

Jun

ior

Lead

Mem

ber

for

Com

mun

ities

and

Hou

sing

, hi

ghlig

hted

the

com

preh

ensi

ve c

onsu

ltatio

n an

d en

gage

men

t th

at h

ad t

aken

pla

ce in

the

for

mul

atio

n of

the

Stra

tegy

and

tha

nked

Cou

ncill

or M

arie

Pye

for

her

wor

k on

thi

s im

porta

nt d

ocum

ent.

Cab

inet

AG

REE

D:

(a

) The

dra

ft H

ousi

ng S

trate

gy, a

ttach

ed a

t App

endi

x A

to th

e re

port,

and

to re

com

men

d it

to fu

ll C

ounc

il fo

r app

rova

l. (b

) To

dele

gate

aut

horit

y to

the

Stra

tegi

c D

irect

or o

f P

eopl

e, P

olic

y an

d P

erfo

rman

ce,

to m

ake

any

nece

ssar

y m

inor

ch

ange

s to

the

Stra

tegy

follo

win

g co

nsul

tatio

n w

ith th

e po

rtfol

io h

olde

r prio

r to

Full

Cou

ncil.

15

ES

TAB

LISH

MEN

T O

F R

OLE

OF

DEP

UTY

CH

IEF

EXEC

UTI

VE

C

abin

et A

GR

EED

to a

men

d th

e C

ounc

il’s s

enio

r m

anag

emen

t stru

ctur

e, a

s se

t out

in th

e re

port,

to c

reat

e th

e ro

le o

f Dep

uty

Chi

ef E

xecu

tive.

C

abin

et N

OTE

D:

(a

) Th

at t

he G

over

nanc

e C

omm

ittee

is

requ

este

d to

rec

omm

end

to F

ull

Cou

ncil

the

appr

oval

of

the

cons

titut

iona

l am

endm

ents

set

out

in th

e re

port,

to c

reat

e th

e ro

le o

f Dep

uty

Chi

ef E

xecu

tive.

Page 10

Page 16: Cabinet Papers - St James St Library

Pag

e 11

of 1

2

(b

) Th

at F

ull C

ounc

il is

req

uest

ed t

o ag

ree

the

cons

titut

iona

l am

endm

ents

, as

set

out

in t

he r

epor

t, to

cre

ate

the

role

of

Dep

uty

Chi

ef E

xecu

tive.

16

M

ON

THLY

FIN

AN

CIA

L M

ON

ITO

RIN

G R

EPO

RT

C

abin

et A

GR

EED

:

(a) T

o no

te th

e fin

anci

al m

onito

ring

for m

onth

8.

(b

) To

note

the

capi

tal p

rogr

amm

e bu

dget

has

no

re-a

lloca

tions

for m

onth

8, a

s sh

own

in A

ppen

dix

C to

the

repo

rt.

(c

) To

rele

ase

the

Dire

ctor

ate

rese

rves

and

pro

visi

ons

tota

lling

£1.0

86 m

illion

, as

deta

iled

in p

arag

raph

4.1

0 of

the

repo

rt, to

su

ppor

t the

200

8/09

bud

get.

17

Q

UA

RTE

RLY

PER

FOR

MA

NC

E M

ON

ITO

RIN

G R

EPO

RT

- 2N

D Q

UA

RTE

R 2

008/

09

C

abin

et N

OTE

D t

he p

erfo

rman

ce in

form

atio

n an

d an

alys

is c

onta

ined

in t

he r

epor

t, an

d th

e ac

tion

take

n to

add

ress

are

as o

f un

der p

erfo

rman

ce.

18

R

EPO

RTS

OF

POR

TFO

LIO

HO

LDER

S

Cou

ncillo

r Li

z P

hillip

s, P

ortfo

lio H

olde

r fo

r H

ealth

, A

dults

and

Old

er P

eopl

e, w

as p

leas

ed t

o re

port

that

the

Cou

ncil’s

Adu

lts

Soc

ial C

are

Ser

vice

s ha

d ac

hiev

ed a

2 s

tar

ratin

g.

The

ser

vice

had

bee

n ra

ted

on s

even

out

com

es, o

f whi

ch fi

ve w

ere

rate

d ‘g

ood’

and

tw

o ra

ted

‘exc

elle

nt’.

S

he s

aid

that

a le

tter

had

been

sen

t to

all

staf

f th

anki

ng t

hem

all

for

thei

r ha

rd w

ork

and

dedi

catio

n on

ce a

gain

this

yea

r. C

ounc

illor

Kei

th R

ayne

r, P

ortfo

lio H

olde

r fo

r Fi

nanc

e, R

isk

and

Gov

erna

nce,

rep

orte

d th

at t

he C

ivil

Con

tinge

ncie

s U

nit,

had

rece

ntly

laun

ched

a B

usin

ess

Res

ilienc

e P

rogr

amm

e an

d th

e ‘Z

Car

d’, w

hich

con

tain

ed a

dvic

e on

wha

t to

do in

an

emer

genc

y.

He

said

tha

t bo

th o

f th

ese

initi

ativ

es h

ad r

ecei

ved

natio

nal

publ

icity

, an

d he

tha

nked

Joh

n H

ethe

ringt

on,

Hea

d of

Civ

il C

ontin

genc

ies,

and

his

col

leag

ues

in th

e C

ivil

Con

tinge

ncie

s Te

am fo

r the

ir w

ork

on th

ese

proj

ects

. C

ounc

illor

Terry

Whe

eler

, P

ortfo

lio H

olde

r fo

r E

nter

pris

e an

d In

vest

men

t, up

date

d C

abin

et o

n th

e N

orth

ern

Oly

mpi

c Fr

inge

M

aste

rpla

n.

The

Lead

er o

f the

Cou

ncil

wel

com

ed th

e op

enin

g of

the

new

WFD

sho

p in

Chi

ngfo

rd.

Page 11

Page 17: Cabinet Papers - St James St Library

Pag

e 12

of 1

2

19

CO

NFI

DEN

TIA

L A

ND

/OR

EXE

MPT

REP

OR

TS N

OT

TO B

E D

ISC

LOSE

D T

O T

HE

PRES

S A

ND

PU

BLI

C

C

abin

et r

esol

ved

to e

xclu

de t

he p

ublic

and

pre

ss f

rom

the

mee

ting

durin

g th

e co

nsid

erat

ion

of it

em n

umbe

rs 2

0, 2

1 an

d 22

be

low

, in

acc

orda

nce

with

Sec

tion

100

(A)

of t

he L

ocal

Gov

ernm

ent

Act

197

2, a

s am

ende

d, o

n th

e gr

ound

s th

at t

hey

wou

ld

invo

lve

the

likel

y di

sclo

sure

of

exem

pt i

nfor

mat

ion

as d

efin

ed i

n pa

ragr

aphs

3,

4 an

d 5

of S

ched

ule

12A

of

the

Act

, an

d di

sclo

sure

wou

ld n

ot b

e in

the

publ

ic in

tere

st.

20

C

ON

FID

ENTI

AL

MIN

UTE

S O

F TH

E C

AB

INET

MEE

TIN

G H

ELD

ON

25T

H N

OVE

MB

ER 2

008

Th

e ex

empt

ann

ex to

the

Rec

ord

of D

ecis

ions

of t

he C

abin

et m

eetin

g he

ld o

n Tu

esda

y 25

th N

ovem

ber 2

008

was

con

firm

ed a

s a

corr

ect r

ecor

d.

21

C

ON

TRA

CT

AW

AR

D: B

AR

CLA

Y PR

IMA

RY

SCH

OO

L EX

TEN

SIO

N -

APP

END

IX A

Cab

inet

NO

TED

the

info

rmat

ion

cont

aine

d in

the

conf

iden

tial A

ppen

dix

A, s

ubje

ct to

the

figur

e in

par

agra

ph 1

.1 b

eing

am

ende

d to

read

£2,

542,

961.

22

C

ON

TRA

CT

FOR

TH

E SU

PPLY

OF

IT P

ERIP

HER

ALS

Cab

inet

AG

REE

D t

he a

war

d to

Kel

way

UK

Ltd

. of

the

con

tract

to

prov

ide

the

2008

-201

2 IT

Per

iphe

rals

, co

mm

enci

ng 2

2nd

Dec

embe

r 200

8.

C

HA

IR'S

AN

NO

UN

CEM

ENT

- MIM

I KO

NIG

SBER

G

Th

e Le

ader

of t

he C

ounc

il re

porte

d th

at th

is w

as th

e la

st C

abin

et m

eetin

g th

at w

ould

be

atte

nded

by

Mim

i Kon

igsb

erg,

Exe

cutiv

e D

irect

or, A

dult

and

Com

mun

ity S

ervi

ces,

as

she

was

leav

ing

the

Cou

ncil

to ta

ke u

p an

app

oint

men

t with

the

Lond

on B

orou

gh o

f H

ouns

low

. H

e w

ishe

d to

pla

ce o

n re

cord

his

than

ks, a

nd th

ose

of C

abin

et, t

o M

imi f

or h

er v

alua

ble

cont

ribut

ion

to th

e w

ork

of

the

Cou

ncil,

and

to th

e im

prov

emen

ts th

at h

ad b

een

mad

e in

the

deliv

ery

of s

ervi

ces

with

in h

er r

espo

nsib

ility.

H

e w

ishe

d he

r go

od lu

ck in

her

new

app

oint

men

t. M

imi K

onig

sber

g th

anke

d th

e Le

ader

of t

he C

ounc

il fo

r his

com

men

ts, a

nd s

aid

that

she

had

enj

oyed

wor

king

for t

he a

utho

rity.

Cha

ir……

……

……

……

……

……

……

……

Page 12

Page 18: Cabinet Papers - St James St Library

1

LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Cabinet: 20th January 2009

Title: Halls Service: Pricing Policy Review – 6 Month Review

Council Priority: Create wealth and opportunity for our residents Retain wealth in the Borough

Directorate: Adult and Community Services

Report of: Jim Crook – Interim Executive Director, Adult and Community Services

Contact: Clive Morton, Head of Culture and Leisure Services

Phone: 020 8496 3506

E.Mail: [email protected]

Action required: For Decision

Wards affected: All

Appendices: Appendix A: Comparative Pricing Appendix B: Use of Halls by Community Groups Appendix C: Marketing Model Assessment Appendix D: Analysis of Income

Status: Open 1. SUMMARY

1.1 On 18th March 2008 Cabinet considered a report setting out the impact of the Halls pricing policy on community groups. The report set out the findings of a survey of user groups and an assessment of future bookings and concluded that the pricing policy had brought about a significant reduction in the use of the two Assembly Halls by community organisations.

1.2 Cabinet agreed a new charging policy for community groups to

be introduced involving application for reduction against advertised rates. It was agreed that the reduced charge to community groups be limited to a total ‘opportunity cost’ of £50,000 annually. Cabinet further agreed a 10% increase in charges (inclusive of inflation).

1.3 The application for reduction in hire charge is now operational

and this report provides an update on community use. Additionally the report provides further consideration of halls pricing and income achievement and makes further recommendations for improvement.

Agenda Item 4

Page 13

Page 19: Cabinet Papers - St James St Library

2

2. RECOMMENDATION 2.1. For Cabinet Decision

2.1.1. Cabinet is requested to note the progress made in attracting back community arts use of the two venues.

2.1.2 Cabinet is requested to agree: (a) That the cost of hiring of Chingford and Walthamstow

Assembly Halls on Fridays for arts and entertainment use be reduced by 50%, and that this reduction includes both non-commercially and commercially provided arts and entertainment.

(b) That officers be authorised to negotiate reduced price agreements with Council departments to ensure that Council spend on events, conferences, meetings and other activities contributes to the best economical use of these Council venues.

3. REASON FOR DECISION 3.1 The 2007/08 pricing structure was introduced to address an

ongoing deficit within the halls service. A consequence of higher pricing was a reduction in cultural and community use. Whilst the introduction of targeted reduced rates has assisted community groups in accessing the halls, officers consider that further flexibility on pricing is required in order to develop use of the venues.

4. PROPOSAL 4.1 Members have expressed a desire for maximisation of use and

income in the delivery of Halls Services and to ensure that within the profile of users there is a sustainable cultural and community dimension.

4.2 Indications are that the introduction of an “application for reduction” on current prices has achieved the desired outcomes of:

• Limiting the public subsidy to community and cultural use to £50,000 annually.

• Permitting the Council to consider the cultural and community benefit of a proposed use.

• The inclusion of cultural activities at the respective venues, which contribute to the LAA indicator N1 11, measuring public engagement in the arts.

4.4 Officers have undertaken a marketing model assessment of the

service since its transfer to Cultural Services and have identified the need for further adjustments. The assessment takes account of product development, pricing, promotion and people. A summary of this analysis is provided in Appendix C.

Page 14

Page 20: Cabinet Papers - St James St Library

3

4.5 Impact of Application for reduction to community groups. The application for reduction system has resulted in most groups who used it previously returning to the Chingford Assembly Hall and has supported retention of community arts use at the Walthamstow Assembly Hall. Appendices A and B provide further details of the price structure and the community use of the Halls by groups awarded a reduction.

5. ALTERNATIVES CONSIDERED 5.1. Officers have considered a return to full concessionary price

structure for community groups. However this option would risk the income improvement gains already achieved and undermine the achievement of further improvement. Officers have proposed further adjustments that give additional opportunities for development of arts and entertainment use but do not present the same risk.

6. CONSULTATION 6.1. As part of the review of pricing policy conducted in 2007

community users indicated their intention not to hire the halls for reasons of price. The introduction of the application for reduction has provided the opportunity for officers to discuss proposed uses and to award reductions. In the main, groups have received the new system positively and have now returned to use of the venues.

7. IMPLICATIONS 7.1. Financial

7.1.1. The Halls Service in the period 2008/9 is anticipated to incur a deficit of £50,000 against its planned operational budget.

7.1.2. In period 2008/9 applications for reduction have been awarded to the value of £19,114.50 in subsidy. This has resulted in additional income of £7,011 from community use as at December 2008. It is anticipated that these figures will continue to increase but the annual allowance of £50,000 will not be fully used in 2008/09. A detailed analysis of income since the introduction of the reduced charges in April 2008 is attached at Appendix D.

7.1.3. The proposed reduction of rates on Fridays should not have an adverse effect on income generation, and may encourage further participation from Arts and Entertainment groups.

7.2. Legal 7.2.1 Section 145 of the Local Government Act 1972

empowers the Council to make provision for entertainment and to charge for the use of premises

Page 15

Page 21: Cabinet Papers - St James St Library

4

provided by the Council for such entertainment. Also, Section 19 of the Local Government (Miscellaneous Provisions) Act 1976 stipulates where these premises are provided for or in connection with recreational facilities the Council may charge for such use of facilities.

7.2.3 Section 93 (5) of the Local Government Act 2003 allows

the Council to set charges as it thinks fit and may, in particular, in relation to charging different persons different amounts for the provision of a service.

7.2.4 The Council may also use its well being powers under

Section 2 of the Local Government Act 2000 or powers under Section 132 of the Local Government Act 1972 to provide premises for the public and community use.

7.2.5 The proposed hall charges are made in accordance with

the legislative provisions described above and should be made in accordance with the Councils Fees and Charges policy. This policy provides for a differential pricing scheme where justifiable and must be reasonable. The service must take legal advice in relation to the criteria to be applied.

7.3. Human Resources

7.3.1. Consultation on the proposed restructure will be conducted in line with the Council’s Fairness at Work procedure.

7.4 Health Impact Assessment

7.4.1 The venues offer a facility for hire that can provide for a range of social and cultural opportunities contributing to physical and mental well-being.

7.5 Equalities Impact Assessment

7.5.1 An Equality Impact Assessment has been carried out on

the recommendations in this report. This indicates that the proposed reduction in price for arts and entertainments purposes specific to Friday evenings is in itself equalities neutral. However to develop the desired diversity in the cultural offer presented through our venues the arts and events service will actively engage in partnerships with a range of promoters reflective of the Borough’s demographics.

7.6 Climate Change Impact Assessment

7.6.1 None specific.

Page 16

Page 22: Cabinet Papers - St James St Library

5

8 CONCLUSION 8.1 The pricing for peak time private commercial use has proved

market sustainable.

8.3 The introduction of reduction by application ensures that valued cultural and community activities for peak time use can be offered at an affordable cost. However the evidence of Council services relocating conferences to alternative venues suggests that at least within this market, the halls remain overpriced.

8.4 The service needs to achieve the most effective pricing policy

across peak and off peak and across use types. This report seeks to further correct the pricing policy in line with performance information gathered since April 08.

Background Information

Equality Impact Assessment document

Approval by the Portfolio-Holder (before inclusion on the Cabinet agenda) I have cleared this report for inclusion on the Cabinet agenda.

Signed: Date 07 January 2009 Portfolio Member for Leisure, Arts and Culture

Page 17

Page 23: Cabinet Papers - St James St Library

6

Appendix A Hall Hire Prices for 2006/07 – 2008/09

Walthamstow Assembly Hall

2007/08 8 Hour Charge

2008/09 8 Hours

Fri £2688

£2960 (Proposed 50%off this figure for public entertainments activities)

Sat and Sun £2688 £2960 Mon – Thurs. £1080 £1200

Chingford Assembly Hall

Fri £1400

£1600 (Proposed 50% reduction off this figure for public entertainments activities)

Sat and Sun £1400 1600 Mon to Thurs

£568

£640 (Now also available as a minimum 4 hours for community use*)

*Subject to proposed activity and cost implications for staff resource.

Page 18

Page 24: Cabinet Papers - St James St Library

7

Appendix B Community use at Chingford Assembly Hall. The introduction of the application for reduction method has supported the following organisations who have now returned to use of the Assembly Hall. Chingford Village Festival New Direction Dance Forest School of Dance Waltham Forest Drama Festival Negotiations are in progress with the Scout Association Gang Show. Groups that have not returned are: Chapel End Savoy Players Oakleigh Antique Fair- (not a community activity) Community use at Walthamstow Assembly Hall. The size and associated cost of WAH encourages a different type of community use, more commonly paid for directly by the Council, for example through its Arts & Events and Music Services. At Walthamstow Assembly Hall the following organisations have thus far benefited from reductions Forest Philharmonic British Legion Bengali International Miss Deaf UK Kreative Culture Klub-in progress The scheme has been promoted to Apex Arts membership, Voluntary Action Waltham Forest and information is available on the Council’s web site. In response to booking enquires community groups are advised as to the reduction scheme. The application process has been beneficial in identifying the work of community groups and has enabled officers to consider other ways in which they might be engaged in the Olympic cultural programme. Groups have in the main responded positively to the invitation for wider involvement in Council initiatives around the Olympics. The funding of most arts organisations in the borough is low and many local groups do not have the resources to book the halls even at a 75% reduction. The difficult balance between economy and community benefit means that not all groups can be given public subsidy. However, the Council is currently updating a directory of other locally available venues.

Page 19

Page 25: Cabinet Papers - St James St Library

8

Appendix C Marketing Model Assessment Product Ensuring that buildings are maintained to a high standard to meet health

and safety standards and customer expectations associated with hosting prestige public and private events.

The loss of business during and after the refurbishment of Chingford

Assembly Hall, has resulted in a continued deficit and the service is not presently in a position to invest in improvements to furnishing and facilities. It is essential to achieve a balanced budget to support spend on basic product improvement.

Capital investment to WAH will be necessary within the next five years in

order to maintain health and safety requirements as well as general improvements.

Pricing The crude application of % price increases does not reflect the variation in

user markets. For example, the increased price has not reduced wedding hires, the main commercial use. However for cultural and conference use, price has continued to act as a deterrent.

Saturday and Sunday have proved sustainable at the “peak pricing”, but

the pattern of use does not support the continued categorisation of Friday as “peak” time. In order to further support the development of arts and entertainment use at the venues it is recommended that Friday is offered at 50% of the advertised rates for both community and commercial hires for arts and entertainment events.

The increased cost of “off-peak” use (Mon-Thurs) has deterred types of

use that could contribute to income generation. Notably there is a drift of Council conferences away from use of the CAH towards venues of similar capacity but lower cost. It is recommended that officers be authorised to negotiate price agreements with council departments and the not-for-profit sector on planned repeated non-cultural use. Such negotiated reductions would not be attributed against the £50,000 subsidy allocation for community cultural hire.

Promotion Historically the Halls Services has had no dedicated promotions budget or

staff resource.

Page 20

Page 26: Cabinet Papers - St James St Library

9

Where low booking rates can be attributed to product and pricing there is no evidence that promotion alone can persuade more potential customers to use the venues.

Promotions will be focused on joining with opportunities afforded by other promotional campaigns undertaken across Cultural Services. Improvement of on-line information including virtual tours also presents a relatively low cost promotional opportunity.

The Arts and Events Service will undertake the promotion of a number of

events linked to engagement in the Cultural Olympiad and specifically the 5 Borough arts festival ‘Create’. This exercise will secure through the Create promotional campaign a reach of 100,000 individuals across the 5 boroughs.

In order to further assist the development of entertainment promotions it is

recommended that Friday be offered at a new lower rate for both community and commercial led arts and entertainment productions. This will enable the arts service to pursue co-promotion of arts and entertainment product at reduced risk. For example where WAH is presently advertised at £2960 on Fridays it would be made available for arts and entertainments purposes at a rate of approximately £1500. A community organisation may benefit from a reduction on this advertised price through the application for reduction scheme.

People As part of the Efficiency Review the Service is required to deliver a saving

on staff costs of £30,000. It is anticipated that additional savings of up to £60,000 will be necessary

to bring the budget plan in line with actual performance. A key part of the proposed reorganisation is the creation of staff capacity

and responsibilities focused on the delivery of a public events and promotions programme across the two venues to achieve a high-quality and diverse cultural programme.

Page 21

Page 27: Cabinet Papers - St James St Library

1

LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Cabinet: 20th January 2009

Title: Halls Service: Pricing Policy Review – 6 Month Review

Council Priority: Create wealth and opportunity for our residents Retain wealth in the Borough

Directorate: Adult and Community Services

Report of: Jim Crook – Interim Executive Director, Adult and Community Services

Contact: Clive Morton, Head of Culture and Leisure Services

Phone: 020 8496 3506

E.Mail: [email protected]

Action required: For Decision

Wards affected: All

Appendices: Appendix A: Comparative Pricing Appendix B: Use of Halls by Community Groups Appendix C: Marketing Model Assessment Appendix D: Analysis of Income

Status: Open 1. SUMMARY

1.1 On 18th March 2008 Cabinet considered a report setting out the impact of the Halls pricing policy on community groups. The report set out the findings of a survey of user groups and an assessment of future bookings and concluded that the pricing policy had brought about a significant reduction in the use of the two Assembly Halls by community organisations.

1.2 Cabinet agreed a new charging policy for community groups to

be introduced involving application for reduction against advertised rates. It was agreed that the reduced charge to community groups be limited to a total ‘opportunity cost’ of £50,000 annually. Cabinet further agreed a 10% increase in charges (inclusive of inflation).

1.3 The application for reduction in hire charge is now operational

and this report provides an update on community use. Additionally the report provides further consideration of halls pricing and income achievement and makes further recommendations for improvement.

Agenda Item 5

Page 22

Page 28: Cabinet Papers - St James St Library

2

2. RECOMMENDATION 2.1. For Cabinet Decision

2.1.1. Cabinet is requested to note the progress made in attracting back community arts use of the two venues.

2.1.2 Cabinet is requested to agree: (a) That the cost of hiring of Chingford and Walthamstow

Assembly Halls on Fridays for arts and entertainment use be reduced by 50%, and that this reduction includes both non-commercially and commercially provided arts and entertainment.

(b) That officers be authorised to negotiate reduced price agreements with Council departments to ensure that Council spend on events, conferences, meetings and other activities contributes to the best economical use of these Council venues.

3. REASON FOR DECISION 3.1 The 2007/08 pricing structure was introduced to address an

ongoing deficit within the halls service. A consequence of higher pricing was a reduction in cultural and community use. Whilst the introduction of targeted reduced rates has assisted community groups in accessing the halls, officers consider that further flexibility on pricing is required in order to develop use of the venues.

4. PROPOSAL 4.1 Members have expressed a desire for maximisation of use and

income in the delivery of Halls Services and to ensure that within the profile of users there is a sustainable cultural and community dimension.

4.2 Indications are that the introduction of an “application for reduction” on current prices has achieved the desired outcomes of:

• Limiting the public subsidy to community and cultural use to £50,000 annually.

• Permitting the Council to consider the cultural and community benefit of a proposed use.

• The inclusion of cultural activities at the respective venues, which contribute to the LAA indicator N1 11, measuring public engagement in the arts.

4.4 Officers have undertaken a marketing model assessment of the

service since its transfer to Cultural Services and have identified the need for further adjustments. The assessment takes account of product development, pricing, promotion and people. A summary of this analysis is provided in Appendix C.

Page 23

Page 29: Cabinet Papers - St James St Library

3

4.5 Impact of Application for reduction to community groups. The application for reduction system has resulted in most groups who used it previously returning to the Chingford Assembly Hall and has supported retention of community arts use at the Walthamstow Assembly Hall. Appendices A and B provide further details of the price structure and the community use of the Halls by groups awarded a reduction.

5. ALTERNATIVES CONSIDERED 5.1. Officers have considered a return to full concessionary price

structure for community groups. However this option would risk the income improvement gains already achieved and undermine the achievement of further improvement. Officers have proposed further adjustments that give additional opportunities for development of arts and entertainment use but do not present the same risk.

6. CONSULTATION 6.1. As part of the review of pricing policy conducted in 2007

community users indicated their intention not to hire the halls for reasons of price. The introduction of the application for reduction has provided the opportunity for officers to discuss proposed uses and to award reductions. In the main, groups have received the new system positively and have now returned to use of the venues.

7. IMPLICATIONS 7.1. Financial

7.1.1. The Halls Service in the period 2008/9 is anticipated to incur a deficit of £50,000 against its planned operational budget.

7.1.2. In period 2008/9 applications for reduction have been awarded to the value of £19,114.50 in subsidy. This has resulted in additional income of £7,011 from community use as at December 2008. It is anticipated that these figures will continue to increase but the annual allowance of £50,000 will not be fully used in 2008/09. A detailed analysis of income since the introduction of the reduced charges in April 2008 is attached at Appendix D.

7.1.3. The proposed reduction of rates on Fridays should not have an adverse effect on income generation, and may encourage further participation from Arts and Entertainment groups.

7.2. Legal 7.2.1 Section 145 of the Local Government Act 1972

empowers the Council to make provision for entertainment and to charge for the use of premises

Page 24

Page 30: Cabinet Papers - St James St Library

4

provided by the Council for such entertainment. Also, Section 19 of the Local Government (Miscellaneous Provisions) Act 1976 stipulates where these premises are provided for or in connection with recreational facilities the Council may charge for such use of facilities.

7.2.3 Section 93 (5) of the Local Government Act 2003 allows

the Council to set charges as it thinks fit and may, in particular, in relation to charging different persons different amounts for the provision of a service.

7.2.4 The Council may also use its well being powers under

Section 2 of the Local Government Act 2000 or powers under Section 132 of the Local Government Act 1972 to provide premises for the public and community use.

7.2.5 The proposed hall charges are made in accordance with

the legislative provisions described above and should be made in accordance with the Councils Fees and Charges policy. This policy provides for a differential pricing scheme where justifiable and must be reasonable. The service must take legal advice in relation to the criteria to be applied.

7.3. Human Resources

7.3.1. Consultation on the proposed restructure will be conducted in line with the Council’s Fairness at Work procedure.

7.4 Health Impact Assessment

7.4.1 The venues offer a facility for hire that can provide for a range of social and cultural opportunities contributing to physical and mental well-being.

7.5 Equalities Impact Assessment

7.5.1 An Equality Impact Assessment has been carried out on

the recommendations in this report. This indicates that the proposed reduction in price for arts and entertainments purposes specific to Friday evenings is in itself equalities neutral. However to develop the desired diversity in the cultural offer presented through our venues the arts and events service will actively engage in partnerships with a range of promoters reflective of the Borough’s demographics.

7.6 Climate Change Impact Assessment

7.6.1 None specific.

Page 25

Page 31: Cabinet Papers - St James St Library

5

8 CONCLUSION 8.1 The pricing for peak time private commercial use has proved

market sustainable.

8.3 The introduction of reduction by application ensures that valued cultural and community activities for peak time use can be offered at an affordable cost. However the evidence of Council services relocating conferences to alternative venues suggests that at least within this market, the halls remain overpriced.

8.4 The service needs to achieve the most effective pricing policy

across peak and off peak and across use types. This report seeks to further correct the pricing policy in line with performance information gathered since April 08.

Background Information

Equality Impact Assessment document

Approval by the Portfolio-Holder (before inclusion on the Cabinet agenda) I have cleared this report for inclusion on the Cabinet agenda.

Signed: Date 07 January 2009 Portfolio Member for Leisure, Arts and Culture

Page 26

Page 32: Cabinet Papers - St James St Library

6

Appendix A Hall Hire Prices for 2006/07 – 2008/09

Walthamstow Assembly Hall

2007/08 8 Hour Charge

2008/09 8 Hours

Fri £2688

£2960 (Proposed 50%off this figure for public entertainments activities)

Sat and Sun £2688 £2960 Mon – Thurs. £1080 £1200

Chingford Assembly Hall

Fri £1400

£1600 (Proposed 50% reduction off this figure for public entertainments activities)

Sat and Sun £1400 1600 Mon to Thurs

£568

£640 (Now also available as a minimum 4 hours for community use*)

*Subject to proposed activity and cost implications for staff resource.

Page 27

Page 33: Cabinet Papers - St James St Library

7

Appendix B Community use at Chingford Assembly Hall. The introduction of the application for reduction method has supported the following organisations who have now returned to use of the Assembly Hall. Chingford Village Festival New Direction Dance Forest School of Dance Waltham Forest Drama Festival Negotiations are in progress with the Scout Association Gang Show. Groups that have not returned are: Chapel End Savoy Players Oakleigh Antique Fair- (not a community activity) Community use at Walthamstow Assembly Hall. The size and associated cost of WAH encourages a different type of community use, more commonly paid for directly by the Council, for example through its Arts & Events and Music Services. At Walthamstow Assembly Hall the following organisations have thus far benefited from reductions Forest Philharmonic British Legion Bengali International Miss Deaf UK Kreative Culture Klub-in progress The scheme has been promoted to Apex Arts membership, Voluntary Action Waltham Forest and information is available on the Council’s web site. In response to booking enquires community groups are advised as to the reduction scheme. The application process has been beneficial in identifying the work of community groups and has enabled officers to consider other ways in which they might be engaged in the Olympic cultural programme. Groups have in the main responded positively to the invitation for wider involvement in Council initiatives around the Olympics. The funding of most arts organisations in the borough is low and many local groups do not have the resources to book the halls even at a 75% reduction. The difficult balance between economy and community benefit means that not all groups can be given public subsidy. However, the Council is currently updating a directory of other locally available venues.

Page 28

Page 34: Cabinet Papers - St James St Library

8

Appendix C Marketing Model Assessment Product Ensuring that buildings are maintained to a high standard to meet health

and safety standards and customer expectations associated with hosting prestige public and private events.

The loss of business during and after the refurbishment of Chingford

Assembly Hall, has resulted in a continued deficit and the service is not presently in a position to invest in improvements to furnishing and facilities. It is essential to achieve a balanced budget to support spend on basic product improvement.

Capital investment to WAH will be necessary within the next five years in

order to maintain health and safety requirements as well as general improvements.

Pricing The crude application of % price increases does not reflect the variation in

user markets. For example, the increased price has not reduced wedding hires, the main commercial use. However for cultural and conference use, price has continued to act as a deterrent.

Saturday and Sunday have proved sustainable at the “peak pricing”, but

the pattern of use does not support the continued categorisation of Friday as “peak” time. In order to further support the development of arts and entertainment use at the venues it is recommended that Friday is offered at 50% of the advertised rates for both community and commercial hires for arts and entertainment events.

The increased cost of “off-peak” use (Mon-Thurs) has deterred types of

use that could contribute to income generation. Notably there is a drift of Council conferences away from use of the CAH towards venues of similar capacity but lower cost. It is recommended that officers be authorised to negotiate price agreements with council departments and the not-for-profit sector on planned repeated non-cultural use. Such negotiated reductions would not be attributed against the £50,000 subsidy allocation for community cultural hire.

Promotion Historically the Halls Services has had no dedicated promotions budget or

staff resource.

Page 29

Page 35: Cabinet Papers - St James St Library

9

Where low booking rates can be attributed to product and pricing there is no evidence that promotion alone can persuade more potential customers to use the venues.

Promotions will be focused on joining with opportunities afforded by other promotional campaigns undertaken across Cultural Services. Improvement of on-line information including virtual tours also presents a relatively low cost promotional opportunity.

The Arts and Events Service will undertake the promotion of a number of

events linked to engagement in the Cultural Olympiad and specifically the 5 Borough arts festival ‘Create’. This exercise will secure through the Create promotional campaign a reach of 100,000 individuals across the 5 boroughs.

In order to further assist the development of entertainment promotions it is

recommended that Friday be offered at a new lower rate for both community and commercial led arts and entertainment productions. This will enable the arts service to pursue co-promotion of arts and entertainment product at reduced risk. For example where WAH is presently advertised at £2960 on Fridays it would be made available for arts and entertainments purposes at a rate of approximately £1500. A community organisation may benefit from a reduction on this advertised price through the application for reduction scheme.

People As part of the Efficiency Review the Service is required to deliver a saving

on staff costs of £30,000. It is anticipated that additional savings of up to £60,000 will be necessary

to bring the budget plan in line with actual performance. A key part of the proposed reorganisation is the creation of staff capacity

and responsibilities focused on the delivery of a public events and promotions programme across the two venues to achieve a high-quality and diverse cultural programme.

Page 30

Page 36: Cabinet Papers - St James St Library

Inco

me

by M

onth

and

Usa

ge T

ypes

(Apr

il 08

- M

arch

09

- Boo

king

to d

ate)

Halls

Cate

gorie

sAp

rMa

yJu

neJu

lyAu

gSe

ptOc

tNo

vDe

cJa

nFe

bMa

rGr

and

Tota

lCh

ingf

ord

Priva

te Fu

nctio

n£1

,500

£668

£12,1

29£1

0,252

£7,23

6£1

,700

£2,65

0£3

6,135

Publi

c Arts

and E

nterta

inmen

t£1

,400

£1,40

0£2

,559

£2,11

6£5

,800

£3,08

0£4

,753

£5,57

8£1

,990

£28,6

75Co

nfere

nces

/ Mee

tings

£456

£718

£425

£1,70

9£4

00£6

85£1

,530

£200

£355

£6,47

8Ot

her C

ommu

nity

£3,90

6£5

68£7

18£3

,680

£8,87

2Ch

ingf

ord

Tota

l£1

,856

£7,52

4£3

,652

£16,5

22£1

0,252

£6,20

0£1

1,719

£11,6

63£5

,778

£4,99

5£8

0,159

Walt

ham

stow

Priva

te Fu

nctio

n£1

9,824

£24,6

06£2

4,981

£34,9

23£5

0,901

£12,0

33£1

9,882

£25,3

63£1

9,665

£15,1

53£3

0,320

£16,5

60£2

94,21

2Pu

blic A

rts an

d Ente

rtainm

ent

£7,78

8£2

,838

£5,37

6£4

,231

£2,85

6£3

,934

£2,14

8£1

6,520

£3,33

0£3

,650

£1,97

5£5

4,646

Confe

renc

es / M

eetin

gs£3

,246

£5,30

5£4

,170

£4,04

0£2

,620

£4,51

7£1

,755

£4,85

0£7

,048

£37,5

51Ot

her C

ommu

nity

£8,74

5£0

£6,70

1£2

,960

£3,57

9£9

,337

£3,44

4£3

,550

£0£3

8,315

Walt

ham

stow

Tot

al£3

9,603

£32,7

49£3

7,058

£39,1

55£5

5,071

£21,8

89£3

0,015

£41,3

65£4

1,384

£22,0

33£3

8,820

£25,5

83£4

24,72

4To

tal

Priva

te Fu

nctio

n£1

9,82

4£2

6,10

6£2

5,64

9£4

7,05

2£6

1,15

3£1

2,03

3£2

7,11

8£2

7,06

3£1

9,66

5£1

5,15

3£3

0,32

0£1

9,21

0£3

30,3

46

Publi

c Arts

and E

nterta

inmen

t£9

,188

£4,2

38£7

,935

£6,3

47£0

£8,6

56£7

,014

£6,9

01£2

2,09

8£3

,330

£3,6

50£3

,965

£83,

321

Confe

renc

es / M

eetin

gs£3

,702

£6,0

23£4

25£1

,709

£4,1

70£4

,440

£3,3

05£6

,047

£1,9

55£0

£4,8

50£7

,403

£44,

029

Othe

r Com

munit

y£8

,745

£3,9

06£6

,701

£568

£0£2

,960

£4,2

97£1

3,01

7£3

,444

£3,5

50£0

£0£4

7,18

7Gr

and

Tota

l£4

1,459

£40,2

73£4

0,710

£55,6

76£6

5,323

£28,0

89£4

1,734

£53,0

27£4

7,162

£22,0

33£3

8,820

£30,5

78£5

04,88

3

Tota

l Inc

ome

by m

onth

(Chi

ngfo

rd +

Wal

tham

stow

)

£41,459

£40,273

£40,710

£55,676

£65,323

£28,089

£41,734

£53,027

£47,162

£22,033

£38,820

£30,578

£0

£10,

000

£20,

000

£30,

000

£40,

000

£50,

000

£60,

000

£70,

000

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Page 31

Page 37: Cabinet Papers - St James St Library

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Hal

ls In

com

e by

mon

th (2

008-

09)

£1,856

£7,524

£3,652

£16,522

£10,252

£6,200

£11,719

£11,663

£5,778

£4,995

£39,603

£32,749

£37,058

£39,155

£55,071

£21,889

£30,015

£41,365

£41,384

£22,033

£38,820

£25,583

£0

£10,

000

£20,

000

£30,

000

£40,

000

£50,

000

£60,

000

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Chi

ngfo

rdW

alth

amst

ow

Page 32

Page 38: Cabinet Papers - St James St Library

Page 33

Page 39: Cabinet Papers - St James St Library

Page 34

Page 40: Cabinet Papers - St James St Library

£25,583

rPage 35

Page 41: Cabinet Papers - St James St Library

Page 36

Page 42: Cabinet Papers - St James St Library

Inco

me

by D

ay a

nd U

sage

Typ

es(A

pril

08 -

Mar

ch 0

9 - B

ooki

ng to

dat

e)

Halls

Usag

e Typ

esMo

nTu

eW

edTh

uFr

iSa

tSu

nGr

and

Tota

lCh

ingf

ord

Priva

te Fu

nctio

n£2

,156

£1,33

6£1

,480

£24,9

63£6

,200

£36,1

35Pu

blic A

rts an

d Ente

rtainm

ent

£568

£5,22

6£2

,144

£2,25

0£1

5,688

£2,80

0£2

8,675

Confe

renc

es / M

eetin

gs£2

,941

£856

£949

£1,21

5£5

17£6

,478

Othe

r Com

munit

y£3

,446

£1,52

0£2

,056

£1,85

0£8

,872

Chin

gfor

d To

tal

£5,09

7£6

,206

£7,69

5£6

,895

£4,61

7£4

0,650

£9,00

0£8

0,159

Walt

ham

stow

Priva

te Fu

nctio

n£2

2,745

£23,4

90£1

4,674

£3,98

7£2

8,924

£91,6

43£1

08,74

9£2

94,21

2Pu

blic A

rts an

d Ente

rtainm

ent

£4,52

5£7

,495

£588

£0£1

3,138

£19,8

78£9

,022

£54,6

46Co

nfere

nces

/ Mee

tings

£9,03

4£1

,080

£5,89

5£6

,684

£0£3

,188

£11,6

70£3

7,551

Othe

r Com

munit

y£9

,884

£7,07

4£9

,745

£4,74

0£1

,074

£5,79

8£0

£38,3

15W

altha

mst

ow T

otal

£46,1

88£3

9,139

£30,9

02£1

5,411

£43,1

36£1

20,50

7£1

29,44

1£4

24,72

4To

tal

Priva

te Fu

nctio

n£2

4,90

1£2

4,82

6£1

4,67

4£5

,467

£28,

924

£116

,606

£114

,949

£330

,346

Publi

c Arts

and E

nterta

inmen

t£4

,525

£8,0

63£5

,814

£2,1

44£1

5,38

8£3

5,56

6£1

1,82

2£8

3,32

1

Confe

renc

es / M

eetin

gs£1

1,97

5£1

,936

£6,8

44£7

,899

£517

£3,1

88£1

1,67

0£4

4,02

9

Othe

r Com

munit

y£9

,884

£10,

520

£11,

265

£6,7

96£2

,924

£5,7

98£0

£47,

187

Gran

d To

tal

£51,2

85£4

5,345

£38,5

97£2

2,306

£47,7

53£1

61,15

7£1

38,44

1£5

04,88

3

Tota

l Inc

ome

by d

ay (C

hing

ford

+ W

alth

amst

ow)

£51,285

£45,345

£38,597

£22,306

£47,753

£161,157

£138,441

£504,883

£0

£100

,000

£200

,000

£300

,000

£400

,000

£500

,000

£600

,000

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Gra

nd T

otal

Page 37

Page 43: Cabinet Papers - St James St Library

Tota

l Inc

ome

by U

sage

Typ

e (C

hing

ford

+ W

alth

amst

ow)

£330,346

£83,321

£44,029

£47,187

£0

£50,

000

£100

,000

£150

,000

£200

,000

£250

,000

£300

,000

£350

,000

Priv

ate

Func

tion

Publ

ic A

rts

and

Ente

rtai

nmen

tC

onfe

renc

es /

Mee

tings

Oth

er C

omm

unity

Gra

nd T

otal

Hal

ls In

com

e by

day

(200

8-09

)

£5,097

£6,206

£7,695

£6,895

£4,617

£40,650

£9,000

£46,188

£39,139

£30,902

£15,411

£43,136

£120,507

£129,441

£0

£20,

000

£40,

000

£60,

000

£80,

000

£100

,000

£120

,000

£140

,000

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Chi

ngfo

rdW

alth

amst

ow

Oth

er

Com

mun

ity9%

Con

fere

nces

/ M

eetin

gs9%

Priv

ate

Func

tion

65%

Pub

lic A

rts

and

Ent

erta

inm

ent

17%

Page 38

Page 44: Cabinet Papers - St James St Library

Priv

ate

Func

tion

Publ

ic A

rts

and

Ente

rtai

nmen

tC

onfe

renc

es /

Mee

tings

Oth

er C

omm

unity

Hal

ls In

com

e by

Usa

ge T

ype

(200

8-09

)

£36,135

£28,675

£6,478

£8,872

£294,212

£54,646

£37,551

£38,315

£0

£50,

000

£100

,000

£150

,000

£200

,000

£250

,000

£300

,000

£350

,000

Priv

ate

Func

tion

Publ

ic A

rts

and

Ente

rtai

nmen

tC

onfe

renc

es /

Mee

tings

Oth

er C

omm

unity

Chi

ngfo

rdW

alth

amst

ow

Chi

ngfo

rd

Confe

renc

es /

Meeti

ngs

8%

Othe

r Co

mmun

ity11

%

Priva

te Fu

nctio

n45

%

Publi

c Arts

and

Enter

tainm

ent

36%

Wal

tham

stow

Publi

c Arts

and

Enter

tainm

ent

13%

Confe

renc

es /

Meeti

ngs

9%

Othe

r Co

mmun

ity9%

Priva

te Fu

nctio

n69

%

Page 39

Page 45: Cabinet Papers - St James St Library

Priv

ate

Func

tion

Publ

ic A

rts

and

Ente

rtai

nmen

tC

onfe

renc

es /

Mee

tings

Oth

er C

omm

unity

Page 40

Page 46: Cabinet Papers - St James St Library

- - 1

LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Cabinet – 20th January 2009

Title: Waiver Request of Contracts Procedure Rules to Procure Local Space to Purchase 50 Properties in the Leyton/Leytonstone Area

Council Priority: 1. Manage population growth and change 2. Improving housing quality and choice 3. Support and empower our most vulnerable

residents to live independent, active and enjoyable lives

Directorate: Adult and Community Services

Report of: Interim Executive Director, Adults and Community Services

Contact: Colin Moone

Phone: 020 8496 5401

E.Mail: [email protected]

Action required: For Decision

Wards affected: Leyton and Leytonstone

Appendices: Appendix 1 – About Local Space

Status: Open 1. SUMMARY

1.1. This report seeks Cabinet approval to waive the contracts procedure rules to contract on a single tender basis with Local Space to carry out, on a pilot basis, the purchase of 50 properties in the Leyton/Leytonstone area in order to improve their conditions and the area. Single tender action is recommended because officers believe Local Space have a unique approach and experience, which other organisations currently cannot match.

1.2. This initiative will assist Waltham Forest in managing some of the worst housing standards in the borough by buying empty properties or Houses in Multiple Occupation (HMOs).

1.3. The overall project will cost over £12m and the bid to the London Development Agent is for nearly £4m. The funding, if received, is one off. Given that the bid had to be accompanied by an organisation with a track record of delivering these types of outcomes, Local Space are being recommended as the preferred partner, for this purpose only.

Agenda Item 6

Page 41

Page 47: Cabinet Papers - St James St Library

- - 2

2. RECOMMENDATION 2.1. For Cabinet Decision

2.1.1 Cabinet is requested to agree that Contracts Procedure Rules are waived to enable the procurement of Local Space, a Registered Social Landlord, to purchase 50 properties in the Leyton/Leytonstone area, if matched funding is obtained as outlined in paragraph 4.1 below.

3. REASON FOR DECISION 3.1. This is a key decision as agreement is needed from Cabinet to

waive the Contracts Procedure Rules. Rule 1.7.2 allows the contracts procedure rules to be waived if it can be shown that the Council’s overall interests, including best value, are met by waiving all or part of the rules and the agreement of the Director of Governance and Law and the Head of Procurement is obtained.

4. PROPOSAL 4.1 Under the GLA Targeted Funding Programme, Settled Homes

Initiative, the Council made a bid for £3.875m to facilitate the purchase of 50 homes in the Leyton / Leytonstone area. These units will primarily be street properties, targeting those private rented properties currently poorly run, poorly maintained HMOs or properties at risk of becoming HMOs. These properties will be brought up to a decent homes standard and let to tenants, during the two years of the pilot, at a market rent for a period of 10 -15 years. At the end of that period 40 - 50% of the properties are sold to pay off the mortgage and the rest will be owned outright by the RSL. The tenants in these properties will become assured tenants on a social rent, thus assisting the council in reducing the number of households in temporary accommodation.

4.2 Local Space is an RSL with whom the Council has been holding, ‘without prejudice’ discussions. They have successfully developed a delivery model for other Councils where poorly maintained HMOs are an issue. They have approximately 1,500 units in their ownership and have built up a specialist position in this area of work. Validation of the Local Space Business Plan Model has been undertaken by KPMG and by the Housing Corporation who registered Local Space as a specialist Temporary to permanent (T2P) / Settled Homes / Market Renting RSL in early 2006.

4.3 The proposal set out by Local Space is a unique product that

currently only they can provide. Alternatives have been considered as outlined in paragraph 5.1, however, the proposal from Local Space best meets the Council’s needs and offers best overall value.

Page 42

Page 48: Cabinet Papers - St James St Library

- - 3

4.4 The Council has applied for a grant of £3,875m from the London Development Agency (LDA) to match fund resources from Local Space. The bid has progressed into the second stage but it is unlikely that a decision will be made before January 2009 at the earliest.

5. ALTERNATIVES CONSIDERED

5.1 The other alternative considered would involve the Council working with an RSL partner to buy 50 street properties in the South of the borough. Although the scheme would be similar in design to the preferred option, it requires a higher level of public subsidy and RSLs delivering similar schemes within the sub-region offer less assurance of delivery. Therefore, this option was discounted on the grounds of deliverability and costs.

6. CONSULTATION 6.1. The Sustainable Communities Strategy Consultation programme

delivered a clear message on the Leyton and Leytonstone areas of the borough. Residents and other stakeholders identified that this part of the borough has become less attractive because of the increased numbers of buy-to-lets and poor quality HMOs. There is a general desire to see the area remain an area for family housing. This initiative is designed to assist in delivering that agenda.

7. IMPLICATIONS 7.1. Financial

7.1.1. The total value of the project is anticipated to be £12,125m. Local Space has budgeted up to £8,250m to carry out the project and the Council has submitted a bid for £3,875m. The start of the project is reliant on the success of this bid.

7.2. Legal 7.2.1 The Council’s Constitution provides that all contracts

must comply with its Contract Procedure Rules. However, rule 1.7.2 allow the contracts procedure rules to be waived if it can be shown that the Council’s overall interests, including best value, are met by waiving all or part of the rules and the agreement of the Director of Governance and Law and the Head of Procurement is obtained. The Director of Governance and Law agrees to the waiver based on the evidence provided in this report.

7.2.2 The contract is considered as a transaction of Land and is therefore exempt from EU Procurement Directives.

Page 43

Page 49: Cabinet Papers - St James St Library

- - 4

7.3. Human Resources 7.3.1. There are no specific human resources issues arising

from this report.

7.4. Health Impact Assessment 7.4.1. A number of properties targeted by this project are likely

to fail the Housing Health and Safety Rating System (HHSRS), thereby putting the health of these residents at a higher risk of ill health or injury. As part of the programme of ensuring all properties are brought up to a decent standard all category one hazards will be removed, reducing the health risks to the residents.

7.4.2 Providing settled homes for 50 households will remove

one of the barriers homeless families have to accessing GP and other primary health care services.

7.5 Equality Impact Assessment

7.5.1. This project will target the north Olympic Fringe focusing on E10 and E11 postcodes. Both areas have a high proportion of minority and excluded groups on which homelessness in the area impacts disproportionately. Both postcodes have high levels of poverty and deprivation generally as recently identified in the borough’s Housing Need and Market Assessment. This includes inequalities in housing, which this project will in part help to address.

7.5.2. An equality impact assessment (EIA) has not been undertaken specifically on the decision of waiving the contract procedures for this proposal. It is recognised that this will be a lost opportunity for other organisations to be able to bid for this work, however, given that Local Space is uniquely positioned in having the experience and approach which other organisations are currently unable to match, it is unlikely that there will be a particular negative impact on any of the equality groups.

7.5.3. A detailed EIA will be carried out once the funding to deliver this project has been secured to ensure the subsequent work delivers benefits for the equality groups as well as identifying any particular areas for improvement.

7.6 Climate Change Impact Assessment 7.6.1. Properties will be improved to a high level of thermal

comfort. Officers will also consider how these properties will comply with the Eco-Homes standards which look at replacing hard surfaces in front gardens to permeable surfaces.

Page 44

Page 50: Cabinet Papers - St James St Library

- - 5

8. CONCLUSION 8.1. Cabinet is requested to agree the necessary waiver to allow

LBWF to contract with Local Space to carry out this important project subject to obtaining funding.

Background Information

• Targeted Funding Initiative bid to the London Development Agency for a Temporary to Permanent Scheme July 2008

This report has been cleared after discussion with the Portfolio Member.

Approval by the Portfolio-Holder (before inclusion on the Cabinet agenda) I have cleared this report for inclusion on the Cabinet agenda.

Signed Date 6.1.2009 Portfolio Member for Communities and Housing

Page 45

Page 51: Cabinet Papers - St James St Library

- - 6

APPENDIX 1

ABOUT LOCAL SPACE

The Association buys ten properties a week on the open housing market with a Royal Bank of Canada loan of £200 million and a Housing Corporation grant of £25 million. The homes are brought up to the Government's Decent Homes Standard before they are let to tenants nominated by Newham.

Housing Benefit services the loan through tenants' rents. Providing extra permanent homes makes more sense than paying huge sums of public money to private landlords in Housing Benefit (£600 million a year in London alone) for temporary accommodation with no long-term social benefits.

Local Space supports the Government's sustainable communities agenda by developing mixed-tenure communities, filling empty homes and contributing to neighbourhood regeneration.

A registered not for profit charity, the Association's activities are monitored by the Housing Corporation and the Audit Commission. Savills, a leading property services group with many years' experience of working with housing associations, independently monitors all Local Space property buying activities to ensure probity and value for money is achieved. To date, it has given the Association a clean bill of health.

How the Local Space financial model works

• Newham leased 450 homes used as temporary accommodation and valued at £50 million to the Association for a 125-year period while retaining the freehold.

• Local Space leased the homes back to Newham under a 15-year partnering agreement.

• The Royal Bank of Canada provided the Association with a loan facility of £200 million against the value of the lease.

• The loan is serviced by the Association's rental income, which is paid by Housing Benefit. Rents are the same as those paid for short-term private sector temporary accommodation thanks to a grant from the Housing Corporation, which committed £25 million of Social Housing Grant towards the purchase of the first 1,000 homes.

• After 15 years of mortgage repayments, Local Space may have to sell off a small percentage of the homes to raise money to pay down the outstanding loans to convert the homes it retains into permanent housing. The homes purchased are then added to Newham's permanent housing stock and transformed from temporary to permanent accommodation.

• Other local authorities can use the model.

Page 46

Page 52: Cabinet Papers - St James St Library

- - 7

How we buy the homes Local Space buys houses and flats using a clearly identified and transparent process:

• Local property companies identify potential properties. Local Space carries out initial 'drive-by' surveys.

• If a property is suitable, Local Space commissions a survey from a local firm of chartered surveyors.

• Where the survey is positive, Local Space provides the property company with an 'Oven Ready Price' for buying the house or flat and carrying out the works needed to bring it up to the Decent Homes Standard.

• If Local Space approves the purchase, the property company pays a 10 per cent deposit on the house or flat.

• Local Space pays the 90 per cent balance on the sale price.

• The property company carries out the necessary works to bring the house or flat up to the Decent Homes Standard within an agreed works period.

• A Local Space technical officer inspects the property to ensure the standard has been achieved, asking for more work where necessary.

• The property is handed over to Local Space, with gas and electricity safety certificates. It is re-inspected by a chartered surveyor who provides an Available for Letting certificate.

• Local Space collates all the paper work and its lawyers prepare the lease for the local authority.

• Local Space pays the balance of 'Oven Ready Price' to the property company.

• The house or flat is let to a homeless household.

• Local Space sends monthly invoices to the local authority for rent payments. How the homes are managed

• Newham's Temporary Accommodation Management Team manages the 450 homes transferred by the borough to Local Space. The two organisations have agreed a protocol that satisfies the Housing Corporation's housing management standards.

• The property companies who acquire and improve homes for Local Space manage and maintain the properties for the first three years on behalf of the council. Their work is covered by the housing management protocol and is monitored closely.

• The management and maintenance arrangements will be reviewed regularly to ensure continuous improvement.

Page 47

Page 53: Cabinet Papers - St James St Library

- - 8

...and maintained to high standards Local Space has a duty to maintain high standards in the accommodation it provides. It does this by:

• Ensuring annual gas safety checks and periodical electrical inspections are made.

• Establishing a planned and cyclical maintenance programme.

• Setting aside reserves for future major stock improvements to ensure all homes not only continue to meet the Decent Homes Standard but also achieve the full Housing Corporation 30-year life Scheme Development Standards at conversion.

• Supporting a customer-driven programme of continuous improvements, informed by resident surveys and focus groups.

Page 48

Page 54: Cabinet Papers - St James St Library

- 1 -

LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Cabinet: 20 January 2009

Title: Joint Local Authorities Regulatory Services Agreement (JLARS)

Council Priority: Create wealth and opportunity for residents

Directorate: Environment and Regeneration

Report of: Robin Tuddenham, Assistant Director of Safe and Strong Communities

Contact: Gavin Douglas

Phone: 020 8496 2201

E.Mail: [email protected]

Action required: For Decision

Wards affected: Leyton, Cathall and Grove Green

Appendices: None

Status: Open 1. SUMMARY

1.1. This report asks Cabinet to agree in principle to enter into two related agreements that will establish a joint regulatory service between the four boroughs covering the Olympic Park site. An agreement between four host boroughs and the Olympic Delivery Authority (ODA) to provide joint regulatory services in the Olympic Park. A second inter-borough agreement is proposed between the Council and three other host boroughs regarding how the joint service will be provided by the authorities. It should be noted that no decision-making powers are being delegated to another authority under either agreement.

2. RECOMMENDATION 2.1. For Cabinet Decision

2.1.1. Cabinet is requested to agree in principle: (a) to enter into a service level agreement with the

Olympic Delivery Authority and the London Boroughs of Newham, Hackney and Tower Hamlets to provide joint regulatory services in the Olympic Park (the JLARS agreement) and, if agreed,

(b) to enter into an agreement between the Council and the London boroughs of Newham, Hackney and Tower Hamlets establishing the inter-borough

Agenda Item 7

Page 49

Page 55: Cabinet Papers - St James St Library

- 2 -

arrangements to provide the JLARS agreement (the Inter-borough agreement), and

(c) to delegate the final agreement of both agreements at (a) and (b) to the Director of Environment and Regeneration on advice from the Director of Governance and Law and Director of Strategic Finance.

3. REASON FOR DECISION 3.1. This is a key decision for Cabinet as the JLARS agreement has

a value of £5,000,000. 4. PROPOSAL

4.1. The Olympic Park geographically falls within the five host boroughs but is under the sole remit of the Olympic Delivery Authority (a government executive agency). A significant number of regulatory issues will impact on the Olympic Park and the 2012 Games themselves but under current arrangements would be subject to the different regulatory services of the five boroughs.

4.2. As part of the Section 106 agreement with the ODA dated 28 September 2007, the boroughs agreed to enter into a service level agreement which defines the Regulatory Services to be provided by each of the Host Boroughs, the quality of service to be provided and the service level benchmarks. In consideration, the ODA would make a financial contribution of £5,000,000. This would have benefits for the boroughs and the ODA, but most importantly for local residents and users of the Olympic Park by providing a joined up service for regulatory matters covered by the agreement.

4.3. Consequently, the four host boroughs north of the Thames entered into joint negotiations with the ODA to provide a joint regulatory service that would provide a consistent and efficient service until 31 December 2014. This report is the culmination of these negotiations and proposes an agreement in principle to enter into two interrelated agreement.

The JLARS agreement 4.4. The joint regulatory agreement or JLARS between the ODA and

the four boroughs. This provides for a service level agreement between the boroughs and the ODA for consideration of £5,000,000 for the provision of the services. The purpose of the decision is to ensure that a consistent service is provided throughout the Olympic Park site. The services covered by the agreement are described in the Schedules to the agreement and are:

o environmental health, including: o pollution control;

Page 50

Page 56: Cabinet Papers - St James St Library

- 3 -

o food safety and standards; o health and safety enforcement; o pest control; and o public health; o highways and traffic management; o street naming and numbering; o licensing; o safety at sports grounds; o street scene enforcement; o parking; and o waste management.

4.5. It is important to note that the agreement only relates to the provision of support for operational regulatory activities. It does not involve the delegation of any decision making powers to the joint service or another borough. All decision making powers in respect of each regulatory power remain with the individual borough, e.g. on a licensing decisions. Moreover, the agreement contains safeguards to ensure that each borough’s decision-making is not fettered by this agreement.

The 4 borough agreement. 4.6. To support the delivery of JLARS an agreement between the

four boroughs as to how the service has been reached; this is the inter-borough agreement. The lead authority will be Hackney, who will be the accountable body for the receipt and distribution of funds from the ODA and will host the JLARS team. Each authority will provide officers to support the team, either by formal secondment or otherwise. Each authority is required to provide a suitable lead officer for each area covered by the agreement. A project management board with members from all boroughs will ensure the good governance of the joint working and the provision of the service level agreement with the ODA.

4.7. On a broader scale, joint working in this area in relation to the Olympics may provide foundations for future, longer term joint working as envisaged by the Olympics legacy and the Multi Area Agreement that will help deliver the Council’s aims under the Sustainable Community Strategy.

5. ALTERNATIVES CONSIDERED 5.1. The Council does not have to enter into this agreement and can

operate its regulatory services separately. However, it is likely that the three other boroughs will go ahead with the agreement in the absence of Waltham Forest. There is little benefit to

Page 51

Page 57: Cabinet Papers - St James St Library

- 4 -

seeking to undertake regulatory work independently as in practice due to the cross borough nature of the Olympic Park, the Council will have to work with its neighbours.

6. CONSULTATION 6.1. The agreement has been prepared in negotiation with the

partner boroughs, the ODA and internally with Legal Services. 7. IMPLICATIONS

7.1. Financial 7.1.1. The service provision will be funded by the contribution

from the ODA and distributed between the authorities based on their contribution to the joint service. Waltham Forest’s proportion of the ODA’s £5,000,000 contribution has yet to be quantified.

7.1.2. The agreement addresses insurance issues, requiring each authority to indemnify each other for their activities in performance of the agreement.

7.2. Legal 7.2.1. These agreements are in performance of the section 106

agreement with the ODA and have been jointly agreed by the legal teams in the four boroughs. Clause 2 and Schedule 2 of the JLARS agreement specify the Council’s primary regulatory powers. The Council has power to enter in these agreements to provide joint services under the following legislation:

7.2.1.1. Section 2 of the Local Government Act 2000 as an arrangement / agreement between the Council and any person. The purpose of the agreement is likely to provide a well being purpose through the delivery of improved regulatory services for the benefit of residents and businesses inside and outside the borough. As such, it is compatible with the Council’s Sustainable Community Strategy.

7.2.1.2. Under section 111 of the LGA 1972 in that the provision of a joint service is likely to facilitate the better provision of the regulatory services specified in schedule 2 of the JLARS agreement.

7.2.1.3. Under s.1 of the Local Authorities (Contracts) Act 1997, the Council has power to enter into an agreement with any person for the discharge of its functions.

Page 52

Page 58: Cabinet Papers - St James St Library

- 5 -

7.2.1.4. Under the Local Government (Contracts for Goods and Services) Act 1970, at the least for the provision of services to the other boroughs.

7.2.2. The Council may use its powers under section 2 LGA 2000 or section 112 of the Local Government Act 1972 to use its employees to undertake work for the other 3 boroughs.

7.2.3. The JLARS agreement does not delegate any decision-making powers, nor does the SLA fetter the Council’s discretion to make independent decisions on regulatory matters. The agreement provides that the Council and individual staff must enter into a confidentiality agreement with the ODA to work on JLARS. This agreement does not override the Council’s statutory duties, e.g. under the Freedom of Information Act 2000, but will be taken into account when responding to any requests for information. For example, legally confidential information need not be disclosed.

7.3. Human Resources The provision of the service can be made within existing resources. The JLARS team will be based in Hackney but Waltham Forest Service Coordinators will be appointed. Secondments will be advertised in accordance with normal Waltham Forest secondment processes. The Council provides a warranty as to the quality of staff provided but the Council can be confident that this will be met. Individual employees who wish to work on the team will have to enter into confidentiality agreements with the ODA, and an offer of employment will not be made without entering into this confidentiality agreement. The need for confidentiality arises for the security concerns in respect of the Olympic site.

7.4. Health Impact Assessment 7.4.1 The coordination of public health functions is one of joint

services. 7.5 Equality Impact Assessment

7.5.1 There is no adverse impact of this proposal. It will allow for a joined up service for the provision of regulatory services between the 4 boroughs, which will improve services for all groups. All of the boroughs are subject to the same equalities duties and will ensure that duties are met during the provision of the services during the course of the agreement.

Page 53

Page 59: Cabinet Papers - St James St Library

- 6 -

7.6 Climate Change Impact Assessment 7.6.1 The main climate change impacts relate to travel by staff.

Officers seconded use their cars to undertake inspections and visit sites. In undertaking inspections it may be necessary to carry heavy equipment, and limits how much can be carried. Officers are encouraged however to use alternative means of transport such as bicycles, buses and trains wherever possible. The council’s electric vehicles are available for staff to use.

7.6.2 Officers enforcing the law that relates to Pollution control are likely to have a positive impact on climate change in preventing unnecessary adverse effects during and after construction is complete.

8. CONCLUSION 8.1. Cabinet’s agreement is sought to enter into these agreements,

which will ensure that a joined up and value for money service is provided. The agreements are almost finalised and so it is requested that the power to finalise the agreement is delegated to the Executive Director in consultation with the portfolio holder and upon advice from the statutory officers. The agreements have not been appended due to their length but are available on request.

Background Information JLARS draft agreement Inter borough draft agreement Section 106 Agreement with the ODA dated 28 September 2007 Approval by the Portfolio-Holder (before inclusion on the Cabinet agenda) I have cleared this report for inclusion on the Cabinet agenda.

Signed . Date: 7/1/09 Councillor Afzal Akram Portfolio Member for Community Safety, Enforcement and Protection

Page 54

Page 60: Cabinet Papers - St James St Library

1

LONDON BOROUGH OF WALTHAM FOREST

Committee/Date: Cabinet: 20 January 2009

Title: Annual Review and Star Rating of Adults Social Care Performance 2007/08

Council Priority: Support and empower our most vulnerable residents to live independent, active and enjoyable lives.

Directorate: Adults and Community Services

Report of: Jim Crook, Interim Executive Director, Adults and Community Services

Contact: Peter Boon

Phone: X 3263

E.Mail: [email protected]

Action required: For Information

Wards affected: All wards

Appendices: Appendix 1. CSCI’s 2007/08 Performance Assessment Notebook

Status: Open 1. SUMMARY

1.1. This report informs Cabinet of the Commission for Social Care Inspection’s (CSCI) annual review of Waltham Forest’s adult social care performance in 2007/08.

1.2. The Council’s published adults social care star rating for 2008 is good with promising prospects for further improvement. This equates to a 2 star service and is reflected in a 2008 CPA score of 3 out of 4.

1.3. The adults social care performance assessment framework is based on delivering better service outcomes to service users and carers. For the seven service delivery outcomes the results we have achieved are set out in Table 1 below. Full details of our strengths and areas for improvement are in the final published 2008 Performance Summary Report published by CSCI on 27 November 2008 at Appendix 1.

Agenda Item 8

Page 55

Page 61: Cabinet Papers - St James St Library

2

Table 1.

Areas for judgement Grade awarded

Delivering Outcomes Good Improved health and emotional well–being Good Improved quality of life Good Making a positive contribution Good Increased choice and control Good Freedom from discrimination or harassment Excellent Economic well-being Excellent Maintaining personal dignity and respect Good

Capacity to Improve (Combined judgement) Leadership Commissioning and use of resources

Promising

Star Rating 2 stars

Scoring for the seven outcomes are Excellent, Good, Adequate, Poor. Scoring for the combined capacity to improve judgement is Excellent, Promising, Uncertain, Poor. For full details see Annex 2 on the CSCI “Professional” web site at: http://www.csci.org.uk/professional/councils/performance_assessment_handboo.aspx

1.4 The Council has improved its performance from 2007 with two outcomes

up-rated from good to excellent. However despite formal written representations we were unable to convince CSCI to improve the ratings of other outcomes and thus achieve an overall excellent 3 star rating for our adult social care services in 2008.

1.5 We are pleased with our excellent rating for the outcome “Freedom from discrimination or harassment”. We believe this demonstrates we are meeting our statutory duties to eliminate harassment in respect of race, gender and disability equality.

1.6 2008 is the last year of the CPA. The new CAA framework will report on Council activity and achievements for 2008-09 and will incorporate organisational assessments that comment directly on key Council services such as adult social care which in turn will draw on evidence provided by CSCI and, in future, the Care Quality Commission.

2. RECOMMENDATION

2.1. For Cabinet Decision 2.1.1 Cabinet is requested to note the adult social care Performance

Summary Report and areas for improvement at Appendix 1 following the annual review meeting with CSCI on 13 August 2008.

2.1.2 To note that a formal adult social care improvement plan, based on the areas for improvement in CSCI’s 2007-08 performance Review Summary at Appendix 1, will be submitted to Cabinet in March 2009.

Page 56

Page 62: Cabinet Papers - St James St Library

3

3. REASON FOR DECISION

3.1. This report is appropriate for monitoring by Cabinet. Adult social care is a level 1 service within the CPA and is therefore critical in the final overall Council CPA rating. Key services are provided to vulnerable residents and their carers throughout the borough in order to enable them to live independently and promote their health and well-being.

4. PROPOSAL

4.1. The annual review of adult social care performance is a year long process and incorporates a range of information which CSCI use to make their final judgment about how well Councils are delivering social care services to vulnerable adults and older people. A formal meeting to discuss Waltham Forest’s performance was held with CSCI on Wednesday 13 August 2008. This included the Portfolio lead for adult social care and health, senior partners from WFPCT and representatives from the voluntary sector. Following the meeting there were negotiations over the final contents of the formal Performance Report letter.

4.2. The information that informs the Performance report includes: (1) the 2007/08 out-turn figures for all the statutory adults social care

performance indicators, including BVPIs in the national performance assessment framework;

(2) detailed information on strategies, achievements and plans for improvement for all adult social care services set out in the Spring 2008 Self-Assessment Survey (SAS) which all local authorities had to submit to CSCI by 30 May 2008.

(3) the outcome of any service inspections undertaken by CSCI from 1 April 2007 to 31 March 2008. The Independence, Well-Being and Choice inspection in October 2007, where our adult safeguarding services were rated as good, counts towards our 2008 star rating.

4.3 The 2008 Performance report continues our record of service improvement. Waltham Forest has the key strategies in place, a range of modern, appropriate social care services, the business support and IT infrastructure and a motivated and well-trained workforce to drive further improvements and help us to achieve our ambition to be an excellent Council.

4.4 The 2008 CSCI Performance report at Appendix 1 sets out both our strengths and areas for improvement and Adults Social Care managers will be drawing the latter together in an overall service improvement plan which will set out targets, outcomes and timetables for delivering the areas for improvement. This plan will be presented to Cabinet for their approval at their March 2009 meeting.

5 ALTERNATIVES CONSIDERED

5.1 Not applicable for this report

Page 57

Page 63: Cabinet Papers - St James St Library

4

6 CONSULTATION 6.1 Not applicable for this report.

7 IMPLICATIONS 7.1 Financial

7.1.1 This report covers the full set of national performance indicators for adult social care services. The gross 2007-08 budget for these services is £ 77.049 million.

7.1.2 The continued improvement in adults social care services will need to be delivered within the Council’s overall financial priorities and budget setting framework. This means a sustained drive and commitment to ensure cost–effective commissioning that delivers value for money across all services. It further means services have to focus on preventative support for people of all ages with disabilities to help them achieve or maintain their independence before they require high intensity and high cost care services at a later stage in their dependency cycle.

7.2 Legal 7.2.1 The Commission for Social Care Inspection was created by the

Health & Social Care (Community Health & Standards) Act 2003. 7.2.2 The Annual Performance Review reports for adult social care are a

CSCI statutory responsibility for all English social care authorities. All Council’s reports are public documents and are published on CSCI’s web site.

7.2.3 There is an expectation that the Performance Review Report will be

presented to the executive members to endorse the proposed recommendations made by CSCI.

7.3 Human Resources

7.3.1 There are no direct Human Resources issues for staff, although

issues of training, recruitment and retention will continue to be high priorities for continuous improvement.

7.4 Health Impact Assessment

7.4.1 The Performance Review report and our plans for improvement are central to our agenda to support vulnerable and disabled older adults to enable them to live independently and meet their aspirations for appropriate housing, relevant training or employment, using leisure and sporting facilities and enjoying social activities. Living an independent life where a disabled person has choice and control are major determinants of their overall health and well-being.

7.5 Equality Impact Assessment

7.5.1 The Performance Review report and its improvement tasks support the Council's disability equality priority of enabling disabled people to

Page 58

Page 64: Cabinet Papers - St James St Library

5

live independently, including people with HIV and mental health issues. The action plans and targets that will flow from the report will be subject to continuous equalities monitoring through established project reporting arrangements and framed to maximize equality of opportunity for all users of adult social care and their carers. There are also key national indicators and performance descriptors in the annual self-assessment survey that measure outcomes on improving freedom from discrimination and harassment. The process of developing the plans and targets will enable any further opportunities to better promote, race, gender and faith-based equality and equality for LGBT people to be identified, prioritised and implemented.

7.5.2 Action to increase the number of people supported to live at home independently and to increase the take up of direct payments will support the delivery of the priorities set out in the Council’s disability equality scheme.

7.6 Climate Change Impact Assessment 7.6.1 The personalization agenda for adult social care is the key national

driver for radical change in these services. Under this new system service users and carers will manage budgets to choose, arrange and control their own care and support. Over time this will mean much reduced reliance on traditional Council facilities and buildings and this could have a positive impact on reducing the Council’s overall footprint in relation to energy use and transport.

8 CONCLUSION 8.1 Waltham Forest adult social care services have achieved a 2 stars

promising prospects rating for 2008. Over the last 4 years we have demonstrated to CSCI a sustained record of service improvement. We will continue to drive improvements forward and these will be embedded in plans and appraisals with clear objectives and targets, rigorously monitored and appraised.

Background Information

• CSCI’s 2007-08 Performance Assessment Handbook at http://www.csci.org.uk/professional/councils/performance_assessment_handboo.aspx

Approval by the Portfolio- Holder (before inclusion on the Cabinet agenda) I have cleared this report for inclusion on the Cabinet agenda. Signed Date 8 January 2009 Councillor Liz Phillips Portfolio Member for Health, Adults and Older People

Page 59

Page 65: Cabinet Papers - St James St Library

6

Appendix 1

Ms Mimi Konigsberg Executive Director Adult and Community Services London Borough of Waltham Forest Silver Birch House Uplands Business Park Blackhorse Lane London E17 5SD

27 October 2008

Dear Ms Konigsberg, Performance Summary Report of 2007-08

Annual Performance Assessment of Social Care Services for Adults Services

London Borough of Waltham Forest

Introduction This performance summary report summarises the findings of the 2008 annual performance assessment (APA) process for your council. Thank you for the information you provided to support this process, and for the time made available by yourself and your colleagues to discuss relevant issues. Attached is the final copy of the performance assessment notebook (PAN), which provides a record of the process of consideration by CSCI and from which this summary report is derived. You will have had a previous opportunity to comment on the factual accuracy of the PAN following the Annual Review Meeting.

The judgments outlined in this report support the performance rating notified in the performance rating letter. The judgments are

• Delivering outcomes using the LSIF rating scale And • Capacity for Improvement (a combined judgement from the Leadership and

the Commissioning & Use of Resources evidence domains)

CSCI Regional OfficeCaledonia House 223 Pentonville Road London N1 9NG

Tel: 020 7239 0330Fax: 020 7239 0318 Email: [email protected] Web: www.csci.org.uk

Page 60

Page 66: Cabinet Papers - St James St Library

7

The judgment on Delivering Outcomes will contribute to the Audit Commission’s CPA rating for the council. The council is expected to take this report to a meeting of the council within two months of the publication of the ratings (i.e. by 31st January 2009) and to make available to the public, preferably with an easy read format available. Adult Social Care Performance Judgments for 2007/08

Areas for Judgment

Grade awarded

Delivering Outcomes Good

Improved health and emotional well–being Good

Improved quality of life Good

Making a positive contribution Good

Increased choice and control Good

Freedom from discrimination and harassment Excellent

Economic well-being Excellent

Maintaining personal dignity and respect Good

Capacity to Improve (Combined judgment) Promising

Leadership Promising

Commissioning and use of resources Promising

Performance Rating Two Stars The report sets out the high level messages about areas of good performance, areas of improvement over the last year, areas which are priorities for improvement and where appropriate identifies any follow up action CSCI will take.

Page 61

Page 67: Cabinet Papers - St James St Library

- 8 -

Key Strengths and Areas for Improvement by People Using Services

Key strengths

Key areas for improvement

All people using services • People have access to a good range

of health promotion information, available in community languages.

• People benefited from improved quality of services including a well managed closure of one of the council’s own homes for older people.

• People had prompt and effective care management systems.

• Improvements were made to the complaints and out of hours services.

• People had access to a wider range of advocacy services.

• The council achieved Level 4 of the Equality Standard for Local Government, this was reflected in improved services for diverse communities.

• Good partnership work with health, including analysis of strategy and gaps in services.

• People had a wide range of employment and volunteering opportunities.

• People are actively engaged in developing and improving services

• People made good use of benefits advice services.

• Safeguarding services were inspected and rated “good with promising capacity to improve” by CSCI.

• Good performance management systems.

• Improved commissioning services. • Good budget management.

• More people need to be supported to live at home independently.

• Increase the take up of Direct Payments.

• Continue to develop Individual Budgets.

• Increase the completion rate for safeguarding investigations.

• Continue to improve the number of people undertaking safeguarding training, especially from the voluntary and independent sector and effectively record it.

• Reduce staff turnover and recruit to vacant posts.

• Continue to develop and launch Local Improvement Networks and demonstrate its impact and effectiveness.

• Continue to implement further levels of Equality Standard for Local Government.

• Continue to develop safeguarding services and consolidate the safeguarding quality assurance system.

Older people • Increased Intermediate Care

provision. • People had access to more Extra

• Continue to reduce the numbers of people who have delayed discharges from hospital

Page 62

Page 68: Cabinet Papers - St James St Library

- 9 -

Care Sheltered Housing schemes, with the opening of two new schemes.

• Expand the provision of Telecare services.

• Reduce the dependency on residential care.

• Increase the provision of intensive home care, and those receiving it via a Direct Payment.

People with learning disabilities • Some people had support to move

from residential care into the community.

• The service was inspected and rated “satisfactory” by CSCI.

• Some people had the choice of Individual Budgets.

• People are engaged in shaping future services and improving them.

• Good support services to help people find paid and voluntary work.

• Good strategic planning of the service, with health colleagues.

• Continue to review and improve the short breaks service.

People with mental health problems • People with drug and alcohol

problems experienced an improved range of services, which better meet the needs of diverse communities.

• Continued success of the “Coping Through Football” scheme.

• Some people used Direct Payments to buy their care.

• Continue to promote independent living for people with mental health problems.

People with physical and sensory disabilities • More people were supported to live

independently. • People had minor adaptations

delivered on time, and were happy with the improvements it made.

• People waited less time for Major Adaptations, and waiting lists reduced.

• People who are deaf or blind had braille training and some used telecare services.

Carers • Services for carers services

developed a wider range, including training and employment support.

Page 63

Page 69: Cabinet Papers - St James St Library

- 10 -

Improved Health and Emotional Well–Being

The contribution that the council makes to this outcome is good.

People have access to an increasing range of health promotion information and activities, including some new initiatives with Age Concern, which are becoming more effective in reaching black and minority ethnic communities. Leaflets are available in community languages.

The Mental Health Trust achieved Independent Foundation status, increasing its independence and capacity. Work took place to encourage people with mental health issues to take up Direct Payments, with some success. The innovative

“Coping Through Football” programme continued to support over 50 people with mental health issues, and helped to reduce isolation. People with drug and alcohol problems experienced an improved range of services, which better met the needs of diverse communities

There was substantial growth in intermediate care services, and the launch of an integrated “Inter Care Team”, which was established at the end of the 2007/08. The council anticipate the full benefits of this service will be more evident in 08/09.

There was robust monitoring of delayed hospital transfers, which continued to reduce, but there is need for further improvements to bring Waltham Forest in line with comparator councils. The council anticipate further reductions in 08/09. New monitoring systems are in place to identify any delays and resolve the causes.

An increasing number of people had reviews of their care packages.

Key Strengths • Good range of health promotion information, available in community

languages. • Successful “Coping through Football” scheme supports 50 people. • Improved drug and alcohol services. • More intermediate care services and new initiatives were launched to

reduce hospital delays. Key areas for improvement • Continue to reduce the numbers of people who have delayed discharges

from hospital.

Page 64

Page 70: Cabinet Papers - St James St Library

- 11 -

Improved Quality of Life

The contribution that the council makes to this outcome is good.

More older people were supported to live independently than in 06/07, as were people with physical disabilities. Work needs to continue to support people with mental health issues to live independently. People who are deaf or blind had braille training and some used telecare services. People waited less time for minor and major adaptations, and the waiting lists reduced. Fewer people had intensive packages of home care and no-one received it via Direct Payments. This needs to increase.

Telecare services were launched, with a show flat, and much work focussed on developing the capacity for this service. The numbers of people using this service were quite small and this needs to improve in the coming year. There were substantial improvements in extra care sheltered housing, with 71 new places available.

The quality of residential care improved, with better commissioning and a well-managed closure programme of a council run service for older people. There is still a high level of dependency on residential care for older people, with an increasing number of older people going into residential care, one of the highest in London. The council say there was an increased demand from people with dementia, and anticipate reductions in the coming year, with the expansion of community services for people with dementia.

Services for people with learning disabilities were part of the service inspection and rated “satisfactory”. The number of people who had short breaks reduced and the council are reviewing this service to make improvements that better meet people’s needs.

Carers benefited from an increasing range of support services, including a carer’s handbook, better assessments of their needs, “pampering” days, and initiatives that engaged carers in developing better services, using local carers networks.

There were continued initiatives to help people to feel safer in their homes.

Key Strengths • Better quality of care services and improved commissioning. • More older people helped to live at home. • Improved aids and adaptations, shorter waiting times. • Expansion of Extra Care Sheltered Housing schemes. • Satisfactory services for people with learning disabilities. • Improved services for carers. Key areas for improvement • Continue to promote independent living.

Page 65

Page 71: Cabinet Papers - St James St Library

- 12 -

• Expand the provision of Telecare services. • Reduce dependency on residential care for older people. • Continue to review and improve the short breaks service for people with

learning disabilities. • Increase the provision of intensive home care.

Page 66

Page 72: Cabinet Papers - St James St Library

- 13 -

Making a Positive Contribution

The outcomes in this area are good.

The recent CSCI Service Inspection judged learning disability services to be “satisfactory” and found good examples of how people using learning disability services were involved in planning their own care and developing services to better meet their needs. This included some people using Individual Budgets. People using services praised learning disability staff for their respectful and person centred approach.

There were a wide range of new and pre-existing initiatives to support people to have the confidence and opportunity to participate in service development. Groups of people were active in promoting and developing the voices of people using services.

Examples include people using services receiving training to create and produce a leaflet promoting sexual health services, and a redesign of application and assessment procedures for disability benefits was completed following advice and feedback from people who used the service. Following the participation of people using services in consultation, a day centre was replaced with a local resource centre.

An Older People’s Forum was established, developing a range of ways in which older people contributed to future services. This included promoting the community toilet scheme, improved awareness of Direct Payments, and better use of leisure services.

Plans were in place to develop Local Involvement Networks, LINKs, with an independent group appointed to facilitate this work. The effectiveness and impact of new initiatives set up during 07/08 is still to be demonstrated.

There continue to be a variety of effective volunteering opportunities.

Key Strengths • Older People’s forum set up. • People actively engaged in developing and improving services. • People with learning disabilities are engaged in shaping future services. • Training and support to develop confidence to participate. • Appointment of independent chair for the Local Involvement Networks. Key areas for improvement • Continue to develop and launch Local Improvement Networks. • Demonstrate the impact and effectiveness of new arrangements and

support in enabling people to further contribute to service developments.

Page 67

Page 73: Cabinet Papers - St James St Library

- 14 -

Increased Choice and Control

The outcomes in this area are good.

Care Management services continued to improve, with prompt and efficient services. Assessments included a growing number of carers, especially carers of people with learning disabilities. There was evidence of a substantial increase in the use of advocacy to help people express more choice and control over the care they needed. For example, Age Concern delivered a range of individual and groups advocacy, using people feedback to review the service.

For people with learning disabilities, the “Dynamite” project continued to help them exercise choice about the services they wanted.

People are well informed about services and understand how to complain. The number of complaints reduced, and there was evidence that improvements were made as a result of complaint investigations. The out of hours services were reviewed, with plans for a more effective system in the future.

There was an improvement in the quality of residential and domiciliary care services, with improved commissioning. Work is in progress on a reprovision programme for the future and new provision is still several years off.

The numbers of people using Direct Payments increased, with a much better number of people from black and minority ethnic communities taking up this option. However, take up of Direct Payments needs to increase in the coming year, as part of the plans to deliver more Personalised Budgets. Some people with learning disabilities used Individual Budgets to make substantial improvements to the quality of their lives.

An analysis was done to look at the key features of improvements made in social care. This work will be used as a building block to develop work on personalised budgets in the future. This is in the early stages of development.

Key Strengths • People had prompt and effective care management systems. • Complaints and out of hours services improved. • Expansion of advocacy services. • Some Individual Budgets being used. • Some increase in take up of Direct Payments, especially from black and

minority ethnic communities. Key areas for improvement • Increase the take up of Direct Payments. • Continue to develop Individual Budgets.

Page 68

Page 74: Cabinet Papers - St James St Library

- 15 -

Freedom from Discrimination and Harassment

The outcomes in this area are excellent.

Eligibility criteria are clear and easy to understand. They are available in different formats and community languages. There is universal access to initial assessments.

The council achieved Level 4 of the Equality Standard for Local Government, and plans to achieve level 5 in the coming year. There is evidence that services are responding better to the needs of black and ethnic minority communities, such as the link with the Asian Resource Centre to support carers.

Senior managers play an important and strategic role to promote equality work across the council and retain its high service profile. A growing variety of services are developing to meet the needs of community groups that were “hard to reach”.

Service developments reflect the needs of black and minority ethnic communities, for example, work to develop effective safeguarding, and in the “Coping Through Football” scheme.

Key Strengths • Improvements to services to better meet the needs of a diverse

community. • Level 4 of the Equality Standard for Local Government was achieved, with

expectations that Level 5 will be reached in 08/09. Key areas for improvement • Continue to implement further levels of Equality Standard for Local

Government.

Page 69

Page 75: Cabinet Papers - St James St Library

- 16 -

Economic Well-being

The outcomes in this area are excellent. There is a clear protocol to cover continuing care and disputes effectively managed. There is well-established joint work, with a new integrated Intermediate Care Team of health and social care professionals. The Learning Disability Partnership was a “pilot site” to support people with high needs into employment, developing a variety of employment training and initiatives. This included an employment project that provides meals for a large day centre as well as placements within the council itself. The voluntary sector offer skills and workshops, with NVQ training, to support disabled people into work. People with mental health needs had a range of employment services, and 58 people were helped into work, 50% were from black and ethnic minority communities. Carers were supported to return to work or take up new employment, with home based respite and a ‘sitting service’, so they could attend interviews. There were also training courses and grants to help encourage people to take up opportunities. The number of people with learning disabilities supported in paid and voluntary work was amongst some of the highest in London. There are very effective partnerships and benefits advice that help people to maximise income and avoid financial difficulty. There is evidence that the councils own joint visiting scheme is effective, with £2,000,000 successfully claimed in benefit entitlements. Key Strengths • Good support services to help people with learning disabilities find paid and

voluntary work. • A wide range of training and support services to help people into

employment and volunteering opportunities. • Range of services to support carers to take up work. • People made good use of benefits advice services. Key Areas for Improvement • None identified.

Page 70

Page 76: Cabinet Papers - St James St Library

- 17 -

Maintaining Personal Dignity and Respect

The outcomes in this area are good. In the recent Service Inspection by CSCI, Safeguarding services were rated as “good with promising prospects”. The report praised leadership from senior managers, the effective Safeguarding Board, and effective policies and procedures. All staff doing investigations were qualified social workers, and case practice was sound. The council developed an action plan to continue improvements to safeguarding services, including for self–funders, and to implement the recommendations made by the inspection team. There was concern about the high number subsequent of abuse allegations in care homes. Close attention was given to this, with an improvement in the quality of care homes. The volume of safeguarding alerts increased, a reflection of the extensive outreach and training work done to improve awareness. Although the referrals increased, the number of investigations completed during the year dropped significantly to below 50%. This may be a reflection of more complex investigations, but improvement is needed. Training for front line staff was effective with a high volume of staff trained, more awareness of safeguarding issues and how to use the procedures. The same was not evident in the independent sector, where only 10% had similar training. The council report this figure was an early, inaccurate estimate that belies the large volume of training undertaken in the independent sector. They gave the example of 256 voluntary and independent care staff who attended the “good practice” workshops. More accurate monitoring of safeguarding training is needed in the coming year. There is a well-developed Multi Agency Safeguarding Board, with effective partnership working and a clear plan of action to continue to develop safeguarding services. Privacy and dignity are embedded into policies and procedures. Key Strengths • Safeguarding services were rated as “good with promising

prospects” • Good Action plan to continue improvements. • Effective training programme for council staff. • Well developed Safeguarding Board, with clear direction. Key areas for improvement • Continue to develop safeguarding services and consolidate the

safeguarding quality assurance system.

Page 71

Page 77: Cabinet Papers - St James St Library

- 18 -

• Increase the completions of safeguarding investigations. • Continue to increase safeguarding training, especially in the voluntary and

independent sector and effectively record it. • Complete implementation of the action plan following inspection. Capacity to Improve

The council’s capacity to improve services further is promising.

There is effective and ambitious leadership, that responds to peoples social care needs, and develops targets and priorities for improvement. A careful balance is needed between the efficiency initiative and the growth in need of the local population. Strategic plans are developing and aim to continue improvement in services. There is evidence of good engagement with external partnerships, especially with health partners, which have improved services.

There is forward planning of the workforce, with investment in staff training and a variety of secondment and apprenticeships. Staff turnover and the vacancy factor are currently high, due to the Efficiency Review and restructuring. Although interim appointments were made to ensure leadership capacity at senior level, vacant posts need to be filled and the turnover rate of staff reduced.

Following the 2007 CSCI Service Inspection that returned a ‘promising’ capacity judgement, action plans were implemented to improve services in a number of areas highlighted for improvement. These plans need to be fully realised in order to continue the improvement of services and outcomes for people who use them.

Performance management systems improved, with Business Objectives reporting available to managers. An Improvement Board was set up and signalled the importance of continued improvements to services. There was overall progress, with significant improvements on all areas identified in last year’s performance report. This brings the council more in line with that of comparator councils in some areas but also highlights areas where further improvement is required.

Commissioning improved during the year, with improvement to the quality of care services purchased. Some of this was achieved by the closure of one of the council’s own homes. Joint work with health developed a number of strategic plans to address gaps or inequalities in services, such as the pressing need for more dementia services. The Joint strategic Needs Assessment is still in the early stages of development, with the draft due in the autumn of 2008. Budget pressures due to growth in demand, and the council’s own Efficiency initiative led to close and effective budget monitoring. There is a 3-year financial plan, with sufficient resources to meet the growth in demand.

Page 72

Page 78: Cabinet Papers - St James St Library

- 19 -

There is increasingly effective use made of regulatory data to understand and manage the social care market. A concerted drive to improve quality was achieved this year and needs to be sustained in the coming year.

Key Strengths

Leadership o Ambitious and determined leadership o Good performance management systems. o Good budget management.

Commissioning and use of resources o Improved commissioning services. o Good use of regulatory information.

Key areas for improvement

Leadership o Reduce staff turnover and recruit to vacant posts. o Further develop the Joint Strategic Needs Assessment. o Plans to extend Self Directed Support and Personalisation need to be fully

realised and show positive benefits for people. o Complete implementation of the action plans developed in response to the

CSCI Service Inspection.

Commissioning and use of resources o Continue to sustain improvements to quality of regulated services.

Yours sincerely,

Colin Hough, Regional Director Commission for Social Care Inspection

Page 73

Page 79: Cabinet Papers - St James St Library

- 1 -

LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Cabinet: Tuesday 20th January 2009

Title: Delegation of Cabinet Powers to the Chief Executive for Council Restructuring arising from the Efficiency Review

Council Priority: Achieving Excellence

Directorate: People, Policy and Performance

Report of: Martin Esom Deputy Chief Executive

Contact: Martin Esom

Phone: 020 8496 6826

E.Mail: [email protected]

Action required: For Decision

Wards affected: None

Appendices: None

Status: Open 1. SUMMARY

1.1. This report seeks Cabinet approval to delegate its formal powers to agree the restructuring of officer management structures to the Chief Executive. This will allow the Council’s Efficiency Review to progress more quickly and to be more easily linked to other mandatory processes, such as the requirements to consult with staff and their union representatives. The delegation would only be for the period of the Efficiency Review.

2. RECOMMENDATION 2.1 For Cabinet decision:

2.1.1 Subject to 2.1.2, Cabinet is requested to agree to the delegation of the following powers to the Chief Executive: 2.1.1.1 The power to agree the Council’s Senior

Management Structure under paragraph 11 of the Cabinet’s Terms of Reference of Cabinet (Part 7, Council’s Constitution).

2.1.1.2 The power to agree Council wide restructuring under rule 9.3 of the Officer Employment Procedure Rules.

2.1.2 The delegation shall only apply to decisions falling within the scope of the Efficiency Review and the Chief Executive shall exercise these powers following consultation with:

Agenda Item 9

Page 74

Page 80: Cabinet Papers - St James St Library

- 2 -

2.1.2.1 The Leader and Deputy Leader in their Business Management Meeting; and

2.1.2.2 Relevant portfolio holders and Strategic or Executive Director(s) and the Director of Finance.

2.1.3 Cabinet is asked to note that: 2.1.3.1 The delegated powers would remain subject to

overview and scrutiny; and 2.1.3.2 Cabinet retains the power to make the

delegated decisions should this be considered appropriate in individual cases.

3. REASON FOR DECISION 3.1. The Cabinet only can agree to delegate its powers.

4. PROPOSAL 4.1. As Waves 1 and 2 of the Efficiency Review are about to be fully

implemented, it is appropriate to review the governance arrangements in place and how well they worked. A key issue that arose from this process is the need to align decision-making processes as far as possible but without compromising effective oversight of decision-making.

4.2. It took approximately nine months to go through the process of implementing Waves 1 and 2. A lot of this time was unavoidable and desirable, such as the need to consult with staff on the proposals following which amendments to structures were made. Moreover, the scrutiny process needs to be built into the timeframe.

4.3. Unnecessary delay, however, reduces the potential savings available to the Council and so it is important to consider how the process can be streamlined. It is considered that one area where decision-making could be streamlined is Cabinet decision-making. The forward plan requirement (i.e. that it must be published 14 days before the month in which a decision is made) makes it difficult to make quick decisions following the closure of consultation. For example, the consultation on Wave 1 ended on 28th July 2008 but the Cabinet decision to implement the new structure did not take place until 9 September 2008, the date of a special Cabinet meeting. The next scheduled meeting was on 30 September 2008.

4.4. It is proposed that Cabinet for decisions falling with the scope of the Efficiency Review delegate the following powers to the Chief Executive: 4.4.1. Its power to agree Council wide restructuring

(Constitution, Part 8, Officer Employment Procedure Rules, rule 9).

Page 75

Page 81: Cabinet Papers - St James St Library

- 3 -

4.4.2. Its power to agree the senior management structure of the Council.

4.5. It is expected that the Efficiency Review (to be known as the Smarter Spending Programme) will continue until March 2010. For good governance, the delegation would be conditional upon the following: 4.5.1. Consultation with the Leader, Deputy Leader and relevant

portfolio holders and the Director of Finance. 4.5.2. Any decisions (proposed or made) would be subject to

scrutiny in accordance with the Constitution. 4.6. Should there be a significant disagreement (e.g. a consensus on

the decision cannot be reached) on a proposed decision by the Chief Executive, it could simply be referred to the next Cabinet meeting for decision.

4.7. It is anticipated that this would bring significant time savings to the Efficiency Review, which in turn will materialise into financial savings. This can be implemented with the current wave of consultation in respect of Finance, Performance and Information and Customer Services.

4.8. All other processes involved with a restructure will continue unchanged. Decisions will be made on the basis of reports taking into account the outcome of consultation with staff and Unions and with the necessary financial, legal, equalities and other implications.

4.9. It should be noted that where the Chief Executive will be making a key decision, as defined in the Constitution, similar access to information requirements will apply to the decision. In addition, it is a legal requirement that the chair of the relevant Overview and Scrutiny Committee is provided with a copy of the report.

5. ALTERNATIVES CONSIDERED 5.1. The main alternatives are:

5.1.1. Retain the current arrangements and seek to align timetables as best as possible.

5.1.2. Delegate decisions to an individual Cabinet member or committee of the Cabinet.

5.1.3. Use urgency provisions to allow the Leader to make decisions, where the Constitution allows this.

5.2. Each option has its merits, although 5.1.3 would have limited application as we should be able to anticipate when decisions are needed. It is considered that the proposals achieve an effective balance between the need to make quick, effective decisions and transparency and member scrutiny of the process.

Page 76

Page 82: Cabinet Papers - St James St Library

- 4 -

6. CONSULTATION 6.1. The following have been consulted in preparing this report and

their input taken into account: Leader and Deputy Leader, Chief Executive, Directors of Governance and Law and Finance and the Chair of Overview and Scrutiny Management Committee.

7. IMPLICATIONS 7.1. Financial

The delegation of powers to approve restructures developed as part of the Efficiency Review would result in their earlier implementation. This earlier implementation would mean that the Council would realise earlier and greater savings from restructures. The amount realised would depend upon the size and scope of the restructure in question.

7.2. Legal

7.2.1. Under Part 2 of the Local Government Act 2000, the Leader and Cabinet as the Council’s executive may delegate its powers to an officer. Where the delegated decision is a key decision, specific access to information requirements still apply so that, amongst other things, the forward plan must be used and a report published and made available at least 5 working days before the meeting. The Chief Executive already has delegated powers under the Constitution and 2001 Local Authorities (Standing Orders) Regulations for overall management of the Council’s workforce. The Chief Executive may also currently agree restructuring where it impacts on one or more directorates but is not council wide.

7.2.2. Where the executive has delegated its powers, Part 2 LGA 2000 provides that it still retains the powers to make the delegated decision. This therefore provides a safeguard where a proposed decision of the Chief Executive is considered appropriate for Cabinet decision.

7.2.3. Nothing in this report has any implications on the Council’s obligations to consult with affected employees or treat employees fairly and without unlawful discrimination. Equalities impact assessments will continue to be carried out.

7.3. Human Resources

7.3.1. Human resource implications of any restructure will continue to be assessed.

7.4. Health Impact Assessment

7.4.1. There are no health implications in this report.

Page 77

Page 83: Cabinet Papers - St James St Library

- 5 -

7.5 Equality Impact Assessment 7.5.1 There are no direct equalities impacts of this report – as

stated in paragraph 7.2.3 above, Equality Impact Assessments will continue to be undertaken on specific proposals.

7.6 Climate Change Impact Assessment 7.6.1 There are no climate change impact assessments.

8. CONCLUSION 8.1. Cabinet is requested to consider and agreement the delegation

of its powers in respect of restructuring for the period of the Efficiency Review.

Background Information None Approval by the Portfolio-Holder (before inclusion on the Cabinet agenda)

I have cleared this report for inclusion on the Cabinet agenda.

Signed Date 07/01/09 Portfolio Member for Service Modernisation

Page 78

Page 84: Cabinet Papers - St James St Library

LONDON BOROUGH OF WALTHAM FOREST

Committee/Date: Cabinet - 20th January 2009

Title: FINANCIAL MONITORING: MONTH 9 (DECEMBER)

Council Priority: Achieve Excellence - Ensuring Value for Money

Directorate: Finance Department

Report of: Director of Finance

Contact: Lin Burton

Phone: 0208 496 4392

E.Mail: [email protected]

Action required: For Decision

Wards affected: Not Ward Specific

Appendices: A - Summary of revenue budget monitoring projections B - Sundry debtors by type and month C - Capital Budget Changes D - Net borrowing summary E - Creditors % invoices paid on time F - Agency spend G - Progress on Policy Review (2007/08 year two) H - Action Plan for Savings 2008/09 I - Provisions and Reserves 2008/09

Status: Open SUMMARY

This report covers the budget monitoring for the ninth month of 2008/09, December, including the position on capital, debtors, creditors, the net borrowing summary, the cumulative spend on agency and consultants and the progress on year two of the 2007/08 Policy Review, along with the action plans for all savings required in 2008/09 to offset potential overspends. The in-year savings requirement has been actioned in SAP and is incorporated in the projections.

RECOMMENDATIONS Cabinet is requested to:-

note the financial monitoring for month 9; and agree the capital programme budget reallocation of £647,000 (appendix C). agree to release the Directorate reserves and provisions totalling £966,000 as

detailed in paragraph 4.10, to support the 2008/09 budget REASON FOR DECISION

It is best practice for Members to monitor the Council’s budget, focusing on high-risk areas on an exception basis.

Agenda Item 11

Page 79

Page 85: Cabinet Papers - St James St Library

ANALYSIS

REVENUE BUDGET MONITORING 2008/09

Directorate

Month 9 Variance

£’000

Year end Projection

£’000

Action plan

savings £’000

Use of Directorate balances

£’000

Possible Corp.

Funding £’000

Net Year-end Project’n

£’000 Adult and Community

1,316 811 (811) 0 0 0

Chief Executive 0 0 0 0 0 0 Children and Young People Services

(29) 2,724

(2,103) (103) 0 518

- Asylum Seekers (346) 461 0 0 (461) 0 Environment and Regeneration

1,722 2,160 (415) (509) 0 1,236

Finance 369 716 (716) 0 0 0 Governance and Law

624 810

(130) (148) 0 532

People, Policy, Performance

(231) 244 (74) (170) 0 0

TOTAL 3,425 7,926 (4,249) (930) (461) 2,286 HRA (1,732) 0 0 0 0 0

Summary

4.1 In overall terms, there is a projected net overspending of £2.286 million at the year-end. This represents an increase of £268,000 since month 8, with the overspending on Environment and Regeneration and Governance and Law remaining the same, but Children and Young People an increase of £268,000 on the savings still to be found due to additional placements in December. As with last month’s report, the forecast takes account of the in-year savings target of £4.5 million. Appendix H shows action plans to offset overspendings identified by the Directorates. In some cases, Directorate balances are being used to meet the in-year savings targets and/or budget pressures. As approved at Special Cabinet on 9th September, the Efficiency Review Workstreams 1 and 2 will produce a base budget reduction of £6.2 million in a full financial year. The shortfall of £3 million on the original target for 2008/09 will be met from a planned contribution from balances. Adult and Community Services

4.2 Adult and Community Services net projection for the year-end is a spend to budget

position. The projected over spend of £811,000 represents an improvement of £262,000 on last month’s projection of £1.073 million, and will be funded through a management recovery action plan. This projection includes the in-year savings requirement of £1.31million. Adult Social Care is projecting spending pressures of £1.76 million, inclusive of recovery action, which is £5,000 more than month 8. The overspend is mainly on placements, income generation on in-house care homes and agency staff. Culture and Leisure Services is projecting a net overspend of £147,000, a £33,000 increase from last month, primarily on Libraries staffing and income. The overspends are offset by savings in the Executive Director and Resources services of £1.04 million, inclusive of recovery action, an increase of £126,000 on month 8, and the reduction in the number of void rents and additional rent income in Housing temporary accommodation of £871,000, a reduction of £38,000 from last month, plus some staff vacancy reductions.

Page 80

Page 86: Cabinet Papers - St James St Library

Chief Executive

4.3 The spend in this area will be to budget. Children and Young People Services

4.4 The month 9 position now reflects the directorate’s in-year saving target of

£1,176,000. Excluding asylum services, Children & Young People Services’ net projection for the year-end remains a spend to budget position, but this includes significant risks; successful claims against the PCT for joint placements of £500,000 and further successful management action to identify £518,000 savings. Of this amount, £250,000 represents savings still to be identified as reported last month, but there is an additional £268,000 resulting from a number of placements in December, including one remand placement. The projected overspend on Children and Families, excluding the £518,000, is being funded through a combination of management actions, grant reattribution, £103,000 use of the Transformation reserve and other compensatory savings. The overspend is primarily due to the continuing trend for looked after children having increasingly complex needs resulting in higher unit costs. The figure now reflects the one off costs relating to the in -sourcing of EduAction, Connexions and Career Management services. Asylum services is currently predicted to overspend by £461,000, which will be funded from the corporate Loss of Grants reserve. This figure now excludes the special circumstances grant following the Home Office setting new criteria for this grant in the summer. The service is working to ensure it meets the new requirements. It can now be reported that £327,000 additional income has been secured in respect of the UASC Leaving Care Costs 2007/08 Special Circumstances Bid from the Home Office subject to audit. This will be used to reimburse the corporate Loss of Grants reserve, which is used to fund shortfalls in the Asylum Seekers funding. Environment and Regeneration Services

4.5 The forecast outturn position for the Directorate is an overspending of £1.236

million having incorporated the £924,000 in-year savings target. The overall position has improved this month and the proposed allocation from provisions and reserves has been reduced by £156,200 to £508,800, (the Hoppa Bus reserve and the Yellow Box provision), which is being used to partially offset the in-year savings target. The £1.236 million overspending is attributable to IT and is one-off but there is a potential base budget shortfall ongoing of £200,000 per annum. There are some areas of concern within the Public Realm Service; in particular, these are Transport, Non-Domestic Refuse, Recycling Income and the Public Realm Unit Head. However, it is anticipated that these will be managed and contained within the Service.

Strategic Directorates

Finance Department

4.6 The Finance Department is forecast to spend in line with the budget. Revenues

and Benefits are taking action to contain its expenditure as Benefits Administration subsidy has reduced from 2007/08. This will continue to be monitored closely. The forecast takes account of the in-year savings target of £716,000.

Page 81

Page 87: Cabinet Papers - St James St Library

Governance and Law

4.7 Governance and Law is forecast to overspend by £532,000, no change since last month. The problem has been held to £532,000 by using a £148,000 reserve created for fluctuating income and by restricting expenditure within the Directorate. The slowdown in the Housing market, combined with the trend towards requesting basic searches instead of full searches, has caused a projected income shortfall in Land Charges. The forecast takes account of the in-year savings target of £130,000 for which action plans have been identified. People, Policy and Performance

4.8 People, Policy and Performance is forecast to spend in line with the budget. The

forecast includes expenditure of £326,000 within Human Resources being the cost of implementing Single Status. This is contained by underspends within the directorate and options to contain the remaining overspend will be explored. The forecast takes account of the in-year savings target of £244,000, of which £170,000 is being offset by the use of the Strategic Initiatives reserve. Housing Revenue Account (HRA)

4.9 The Housing Revenue Account is currently forecast to spend to budget, but there

are a number of issues that will affect the forecast. There is an underspend due to the recalculation of debt management expenses for Housing Subsidy for the 2007/08 final claim of £621,000. The figures are now more or less finalised, and the cash has been received. An exercise was undertaken to investigate the impact of the unpooling of tenant service charges, following concerns having been raised by residents. This has now been concluded and there will be an in-year cost of some £392,000, due to issues around allocation of costs. Extensive work has been done with colleagues from Ascham Homes, and in a full year, the corrected position, using current figures would be a full year increase of some £90,000 income. The additional costs will be fully offset against benefits gained as part of the subsidy recalculation. There is also an issue about leaseholder contributions to the Decent Homes programme, raised as an implication of the Leaseholder Valuation Tribunal.

Provisions and Reserves

The table below sets out the Provisions and Reserves identified by the Directorates to be used to support the 2008/09 budget;

Description Balance as at 31/3/08

Proposed Release for

08/09 budget Reserves; £’000 £’000 Children - Transformation Fund 103 (103) Environment - Bywaters 226 (36) - Hoppa Bus 817 (259) Governance & Law - Fluctuating Income 148 (148) PPP - Strategic Initiatives 317 (170) Provisions; Environment - Yellow Box Junction 259 (250) TOTAL 1,584 (966)

Page 82

Page 88: Cabinet Papers - St James St Library

Members need to agree the use of £966,000 of these reserves and provisions to support the 2008/09 revenue budget that, with the exception of the Fluctuation Income reserve, was not the intended use for which the reserves and provisions were being held. Council Tax Collection, Net Borrowing and Cash Flow

The Council Tax collection rate is above the monthly profiled target level and also above

that achieved at month nine last year. The NNDR collection rate is below the monthly profiled target level and also below last year’s actual at month nine. The Council’s net borrowing is higher than last year’s figure but below the year-end target figure. The year-end target for 2007/08 for the Council’s net borrowing was revised upwards from £214 million to £257 million last year and has been increased for 2008/09 to £289.8 million. This was originally due to two main factors; the first was the allocation of borrowing approval of £10 million for decent homes, which was spent in 2007/08. The second was due to the change of fund managers for the pension fund needing liquid assets since the market is not viable for the sale of pension fund property assets, which were acquired under the previous fund managers. The loan to the pension fund has now been repaid. However, the current economic climate is likely to cause other pressures and, although the year-end target is being reviewed, it is unlikely to be reduced. The chart at Appendix D shows the comparison of the last three financial years and the first nine months of this financial year. The sundry debtors’ position has improved considerably from last month and will reduce substantially in January due to a partial payment of £2,614 million by EduAction in respect of the invoice for £3.614 million in respect of the shortfall on the Pension Fund. However, due to the sums still outstanding from EduAction as at the end of December, it is still higher than last year’s figure and slightly above the target. A further breakdown of the figure is given in Appendix B. The percentage of invoices paid on time, shown in Appendix E has been distorted this month due to the introduction of e-invoicing. It is anticipated that it will be a couple of months before the normal level is regained.

Contingency and Balances

4.12 There has been no movement in the working balance, which as planned was increased to 2.3% of net revenue expenditure, although there is a potential call against this of up to £3 million to offset estimated slippage on the Efficiency Review savings. This sum will be repaid over the Efficiency Review programme period. There have been no allocations from the general contingency this month.

Actual December

2007

Actual December

2008

Target for December

2008

Target forYear-end 2008/09

C.Tax collection rate 82.30% 82.84% 82.14% 94.81% NNDR collection rate 86.67% 85.02% 86.14% 96.84% Council’s net borrowing £221.0 m £226.2 m N/A £289.8 m Sundry debtors £8.695 m £11.978 m £10 m £10 m

Page 83

Page 89: Cabinet Papers - St James St Library

CAPITAL BUDGET MONITORING 2008/09

Directorate

Month 9 Variance

£000

2008/09 Budget at Month 8

£000

New Adjusted Budget

£000

Budget Change

£000

Predicted Outturn

£000

Variance £000

Adults and Community (575) 45,233 45,417 184 44,001 (1,416)

Children and Young People (688) 30,866 30,866 0 28,332 (2,534)

Strategic Directorates (493) 3,390 3,377 (13) 3,264 (113)

Environment and Regeneration (1,461) 11,532 11,994 462 10,639 (1,355)

Total (3,217) 91,021 91,654 633 86,236 (5,418)

See appendix C for explanations of requested budget reallocation. Adult and Community Services

4.13 The total expenditure on Adults and Community to the end of month 9 is £29.885

million against a profiled budget of £30.46 million. The estimate for the end of the year is an underspend of £1.416 million. This is predominantly attributable to the Leyton Library project. Plans are still being finalised and consultation is being undertaken. This project will slip into the new year resulting in an underspend of £1.006 million. The Month 9 variance on the other HRA programme is £181,000 under budget which is mainly on the Willow House regeneration project. Major refurbishment works have commenced and the project is anticipated to complete by the end of January 2009.

Children and Young People Services

Overall, the Children and Young People capital programme is set to underspend by £2.534 million in this financial year. The Education programme is showing a small forecast overspend of £172,000. On the Building Schools for the Future Programme, the 2008/09 budget assumes that the bulk of expenditure on the Whitefield project will take place in 2008/09. This is no longer the case as works are not set to commence until January 2009 at the earliest. Therefore this scheme is expected to spend £2.511 million less than the budget in this year. The £500,000 budget for contingency costs on BSF is likely to be exceeded this year by approximately £179,000 and work is continuing to identify funding for these additional costs. Phase 3 of the Childrens Centre project is set to underspend in 2008/09 because of delays in scoping the works. The programme is forecast to meet expenditure targets over its three year duration.

Strategic Directorates

4.15 The Strategic Directorates have spent £1.871 million to the end of month 9, against a profiled budget of £2.364 million. This includes expenditure of £686,000 on Higham Hill JSC Phase 2 and £717,000 on Waltham Forest Direct Shops. The projected outturn is £3.264 million against a budget for the year of £3.377 million. This represents an underspend of £113,000, which is a slight increase on the £98,000 reported at the end of November. This includes £75,000 projected underspend on the e-invoicing project, which is now to be utilised towards the Merchant Services project. There is also a £76,000 projected underspend on

Page 84

Page 90: Cabinet Papers - St James St Library

Waltham Forest Direct Shops and an £111,000 overspend on the final account for Juniper House.

Environment and Regeneration Services

4.16 Environment and Regeneration have spent £5.648 million to the end of December against a profiled budget of £7.109 million. The year end predicted outturn is now at £1.355 million less than the budget. Transport Schemes will underspend by £160,000 as a result of previously reported problems on the Bakers Arms diagonal crossing and the Bus Priority Scheme at Chingford Road. The EPCS capital works are predicted to underspend by £968,000. This is predominantly the result of the document management system not being fully implemented in this financial year. A request will be made to transfer this funding forward into the 2009/10 year. Growth Area Fund Schemes are expected to spend £201,000 less than budgeted. It is proposed that these resources will be used on regeneration projects in the next financial year.

5 ALTERNATIVES CONSIDERED

5.1 Not applicable. 6 CONSULTATION

6.1 Executive Directors have consulted with Portfolio Holders and the Chief Finance Officer has consulted with Directorate Heads of Finance in preparing this report.

7 IMPLICATIONS

Financial The whole report is of a financial nature.

Legal

There are no direct legal implications.

Human Resources There are no direct human resource implications.

Health Impact Assessment

A stable financial position means that the Council is more able to fund urgent health priorities as they arise. Services to older people are currently experiencing pressures, needing careful management.

Equality Impact Assessment

7.5 There are several areas of budget pressure such as Asylum Seekers, Social Care placements for Adults and Children’s placements, all of which affect vulnerable people. These areas will be closely monitored.

Climate Change Impact Assessment

7.6 There are no direct climate change implications.

Page 85

Page 91: Cabinet Papers - St James St Library

8 CONCLUSION 8.1 The table in Section 4 of this report indicates that although there is a projected net

overspending of £2.286 million at the year-end, this requires the successful delivery of savings totalling £4.249 million, of which £2,103 million relates to the Children and Young People Services Directorate. It is also dependent on the delivery of Policy Review savings of £3,492. For Policy Review items, it should be noted that where one-off savings have been used as alternatives in 2008/09, permanent on-going savings will need to be identified. Some of the proposed additional savings in the Action Plans are deemed to be of moderate risk, pending further investigation, and as such the delivery of these savings will need to be closely monitored. There are proposals to use Directorate reserves and provisions of £966,000, and these have been taken into account for the month 9 forecast. However, in order to satisfy the External Auditor, Members need to approve the alternative use of these balances. Two directorates are currently forecasting a net overspending; Environment and Regeneration Services are projecting a £1.236 million overspend due to IT and Governance and Law where there is a projected £532,000 overspend due to an income shortfall in Land Charges. In addition, a £518,000 overspend for Children and Young People is forecast, an increase of £268,000 from last month following additional placements including one remand placement during December. It is essential that the service pressures within the directorates are closely monitored along with the compensatory savings identified. There is specific funding available from corporately established reserves to finance the projected overspending of £461,000 in respect of Asylum Seekers services.

______________________________

Background Information: Returns from Directorate Resources Units

Approval by the Portfolio-Holder (before inclusion on the Cabinet agenda) I have cleared this report for inclusion on the Cabinet agenda.

Signed Date 9th January 2009 Cabinet Member for Finance, Risk and Governance

Page 86

Page 92: Cabinet Papers - St James St Library

LBW

F: S

UM

MA

RY

OF

BU

DG

ET M

ON

ITO

RIN

G Y

EAR

EN

D P

RO

JEC

TIO

NS

2008

/09

FOR

ECA

ST O

UTT

UR

NS

vs B

UD

GET

: Ove

r and

(Und

ersp

endi

ngs)

by

Maj

or A

reas

Year

Mon

th12

36

910

11Fi

nal

23

45

67

89

Serv

ice

£'00

0£'

000

£'00

0£'

000

£'00

0£'

000

£'00

0£'

000

£'00

0£'

000

£'00

0£'

000

£'00

0£'

000

£'00

0C

ultu

ral S

ervi

ces

135

950

187

226

238

283

043

058

123

126

113

147

Eld

erly

0Y

oung

er A

dults

2O

ther

Soc

ial S

ervi

ces

199

Adu

lt S

ocia

l Car

e - O

P/P

D1,

035

1,22

91,

513

1,85

91,

874

2,00

60

413

433

318

135

366

429

465

Adu

lt S

ocia

l Car

e - M

enta

l Hea

lth0

414

439

373

350

314

012

916

654

030

042

071

775

6A

dult

Soc

ial C

are

- Lea

rnin

g D

isab

.83

51,

336

1,50

31,

764

1,76

41,

729

2,03

10

376

501

845

514

684

922

663

Res

ourc

es/E

xec.

Dire

ctor

(1)

(68)

(844

)(8

50)

(831

)(1

71)

(82)

0(2

41)

(257

)(2

42)

(413

)(1

,080

)(3

29)

(312

)C

once

ssio

nary

Far

es0

332

332

332

354

354

355

0(3

7)(3

7)(3

7)(3

7)(3

7)(3

7)(3

7)H

omel

essn

ess/

HS

A

(1,2

87)

(23)

(169

)(5

78)

(599

)(7

03)

(1,1

29)

0(4

98)

(507

)(1

22)

(622

)(6

22)

(742

)(8

71)

In-y

ear s

avin

gs ta

rget

1,31

01,

310

00

abso

rbed

in M

8 fig

sD

irect

orat

e sa

ving

s/us

e of

rese

rves

0(1

,499

)(2

,465

)(2

,807

)(2

,875

)(3

,671

)(3

,657

)0

(185

)(2

99)

(1,3

60)

(1,3

10)

(1,1

67)

(1,0

73)

(811

)A

dult

and

Com

mun

ity S

ervi

ces

(117

)1,

208

00

271

012

10

00

00

00

0C

hief

Exe

cutiv

e(1

39)

00

00

00

00

00

00

00

Chi

ldre

n &

You

ng P

eopl

e1,

267

990

1,86

93,

172

3,00

43,

000

2,53

61,

436

1,43

61,

436

1,53

61,

824

1,82

81,

828

1,85

4A

sylu

m S

eeke

rs55

071

471

464

864

864

866

955

854

152

546

646

146

146

146

1Lo

ss o

f Gra

nts

rese

rve

00

(714

)(6

48)

(648

)(6

48)

(669

)(5

58)

(541

)(5

25)

(466

)(4

61)

(461

)(4

61)

(461

)O

ther

Life

long

Lea

rnin

g ar

eas

0-

--

--

--

--

227

317

352

916

870

In-y

ear s

avin

gs ta

rget

1,17

61,

176

1,17

60

abor

bed

in M

9 fig

sD

irect

orat

e sa

ving

s/us

e of

rese

rves

(1,8

19)

(990

)(1

,869

)(3

,172

)(3

,004

)(3

,000

)(2

,539

)(1

,436

)(1

,436

)(1

,436

)(1

,148

)(3

,017

)(3

,356

)(3

,670

)(2

,206

)C

hild

ren

Serv

ices

(2)

714

00

00

(3)

00

061

530

00

250

518

Loca

l Lan

d C

harg

es20

210

0-

--

--

--

--

--

--

now

Gov

& L

awH

alls

Ser

vice

6514

212

3-

--

--

--

--

--

-no

w A

dults

& C

omm

Com

mer

cial

Ren

ts(1

38)

(100

)0

--

--

--

--

--

--

now

Fin

ance

Dep

t.IC

T45

638

528

4-

--

--

--

--

--

-no

w E

nviro

nmen

tC

usto

mer

Ser

vice

s8

(256

)(1

58)

--

--

--

--

--

--

now

Env

ironm

ent

Cou

ncil

Tax

& B

enef

its80

169

20-

--

--

--

--

--

-no

w F

inan

ce D

ept.

Cat

erin

g in

com

e(1

2)35

0-

--

--

--

--

--

-no

w C

hild

ren

Dire

ctor

ate

savi

ngs/

use

of re

serv

es(6

61)

(475

)(2

69)

--

--

--

--

--

--

Cor

pora

te S

ervi

ces

00

00

00

(12)

00

00

00

00

Pub

lic R

ealm

867

1,46

61,

344

1,52

91,

573

1,48

927

027

554

153

438

454

145

144

138

7w

as S

treet

Srv

sS

usta

inab

le C

omm

uniti

es41

618

620

915

712

612

227

77

(112

)(1

23)

(2)

215

4(4

2)(1

39)

Dev

elop

men

t Uni

tG

reen

spac

e30

(16)

(19)

(66)

(73)

(123

)(1

50)

1519

0(2

)(2

4)(2

5)(4

4)(4

6)C

onsu

mer

Pro

tect

ion

(18)

(21)

(124

)(3

3)(4

5)(1

00)

(107

)(2

1)(1

4)0

(31)

(22)

57(5

1)(4

)R

esou

rces

(413

)0

(13)

(17)

(93)

(84)

(552

)(1

24)

(62)

(93)

(60)

(60)

(500

)(1

33)

(118

)S

afer

& S

trong

er C

omm

uniti

es(1

1)(8

)(2

1)(1

31)

5522

(17)

(106

)(8

2)(3

8)(6

2)(1

30)

Bui

ldin

g S

ervi

ces

832

00

00

016

00

00

00

00

ICT

93C

usto

mer

Ser

vice

s(9

3)In

-yea

r sav

ings

targ

et92

492

492

492

450

9D

irect

orat

e sa

ving

s/us

e of

rese

rves

(1,7

37)

(1,6

15)

(1,3

97)

(1,5

59)

(1,5

74)

(1,5

01)

(85)

(91)

(1,1

22)

(1,2

93)

(1,2

15)

(1,0

80)

(509

)En

viro

nmen

t & R

egen

erat

ion

(23)

00

00

0(1

86)

00

01,

146

1,23

61,

236

1,23

61,

236

Rev

enue

s &

Ben

efits

320

123

(1)

070

7271

3649

4948

Pro

perty

(62)

00

(1)

0(2

0)(4

4)(7

2)(7

1)(1

10)

(110

)(1

26)

Oth

er fi

nanc

e se

ctio

ns30

0(1

23)

00

(50)

(28)

135

6161

78Fi

nanc

e D

epar

tmen

t(2

8)0

00

00

(2)

00

00

00

00

Gov

erna

nce

and

Law

135

130

8015

99

028

635

841

752

051

653

253

2Pe

ople

, Pol

icy

& P

erfo

rman

ce(1

35)

(130

)(8

0)(1

80)

(87)

00

00

00

00

Cor

pora

te E

xpen

ditu

re0

00

00

0(1

9)0

00

00

00

0

TOTA

L LB

WF

(281

)1,

922

00

271

(21)

(179

)0

286

358

2,17

82,

056

1,75

22,

018

2,28

6

2006

/07

was

incl

uded

in C

orpo

rate

Ser

v94

2007

/08

218

(207

)

2008

/09

(210

)1,

161

1,28

31,

250

APPENDIX A

recategorised

was

incl

uded

in C

orpo

rate

Ser

v(3

09)

was

incl

uded

in C

orpo

rate

Ser

v

191

1,28

6

was

incl

uded

in C

orpo

rate

Ser

vw

as in

clud

ed in

Cor

pora

te S

erv

1,42

8

Page 87

Page 93: Cabinet Papers - St James St Library

APPENDIX B

As at 31st December 2008

Unsecured Debts 0 - 30 31 - 60 61 - 90 91 - 180 > 181 Total£ £ £ £ £ £

People, Policy & PerformancePerformance 17,373 13,060 5,292 376 10,366 46,467Human Resources 4,693 765 871 4,352 56,232 66,914

113,381Children & Young PeopleChildren and Families 3,660 0 0 15,477 1,720 20,857Resources 433,203 47,282 962,646 350,960 56,906 1,850,996Education for Communities 21,074 2,482 1,296 1,085 1,344 27,281Catering Services 15,658 4,036 1,890 229,583 64,015 315,181

2,214,315Adult and Community ServicesAdult Social Care 272,034 55,307 54,675 119,903 877,984 1,379,903Housing and Neighbourhoods 4,461 478 744 668 48,997 55,348Cultural and Leisure 18,080 0 524 234 2,271 21,109Resources (6,675) 29,807 143,055 84,445 46,782 297,414

1,753,773Governance and LawLegal and Democratic 0 0 0 0 30,984 30,984

30,984Environment and RegenerationParking 2,126 3,135 280 1,815 0 7,356Consumer Protection 18,620 8,985 36,755 5,824 62,720 132,903Resources 6,889 611,614 0 0 708 619,211Public Realm 312,645 110,259 38,257 127,322 184,584 773,067Building Services 0 0 0 0 49,998 49,998Greenspace 23,063 0 395 3,996 27,498 54,953Sustainable Communities 2,274 930 12,000 31,573 10,664 57,440ICT 166 0 24,179 169 106,776 131,289

1,826,217

Finance DepartmentStrategic Finance 11,024 197,482 2,237 3,614,200 29,918 3,854,861Procurement 1,808 0 0 0 119 1,927Property Services 685,820 102,177 17,223 78,304 406,473 1,289,996Revenues & Benefits 0 4,030 540 0 20,899 25,469

5,172,253

Unallocated credits (31,513) 10,497 (1,536) (5,485) (19,008) (47,044) Transfers/Reversals 180 0 809 (352) 11,676 12,313 Customer payment (274,475) (7,631) (9,700) (13,379) (36,212) (341,397) Write offs (2,474) (28,426) 0 (12,750) (124,458) (168,108)

(544,236)

1,539,713 1,166,268 1,292,431 4,638,319 1,929,957 10,566,688Fully Secured DebtsHousing and Neighbourhoods 174,139 178,340 9,251 113,644 241,398 716,772Adult Social Care 0 41,612 64,811 62,895 449,194 618,513Land Charges 0 0 0 0 9,112 9,112Environment 0 0 0 0 66,793 66,793

174,139 219,952 74,062 176,539 766,497 1,411,190

TOTAL DEBT 1,713,852 1,386,221 1,366,493 4,814,858 2,696,454 11,977,877

Debtor Analysis 2008/09

Number of Days

Page 88

Page 94: Cabinet Papers - St James St Library

As

at 3

1st D

ecem

ber 2

008

Uns

ecur

ed D

ebts

Dec

embe

rJa

nuar

yFe

brua

ryM

arch

May

Jun

July

Aug

ust

Sep

Oct

Nov

Dec

2007

2008

2008

2008

2008

2008

2008

2008

2008

2008

2008

2008

Tota

lTo

tal

Tota

lTo

tal

Tota

lTo

tal

Tota

lTo

tal

Tota

lTo

tal

Tota

lTo

tal

££

££

££

££

££

££

Chi

ef E

xecu

tive

00

00

00

00

00

00

Peop

le, P

olic

y an

d Pe

rfor

man

ce10

7,87

010

4,08

511

3,57

213

5,00

015

5,55

813

6,16

513

3,77

613

8,37

810

5,12

193

,741

109,

548

113,

381

Chi

ldre

n an

d Yo

ung

Peop

le1,

556,

621

1,48

8,19

684

7,68

81,

448,

872

720,

921

615,

059

1,79

5,80

92,

459,

570

3,88

5,69

74,

098,

705

2,38

4,50

72,

214,

315

Adu

lt an

d C

omm

unity

Ser

vice

s2,

343,

471

1,81

6,78

61,

873,

897

2,49

4,62

91,

634,

883

1,80

7,95

41,

853,

302

1,76

4,19

73,

162,

408

2,73

6,11

51,

772,

297

1,75

3,77

3

Gov

erna

nce

and

Law

43,9

1043

,910

99,6

6037

,510

37,5

1037

,510

37,5

1039

,449

38,4

5031

,924

31,9

2430

,984

Envi

ronm

ent a

nd R

egen

erat

ion

1,78

3,97

02,

081,

351

1,69

4,45

32,

565,

436

1,23

8,18

798

8,98

71,

292,

055

899,

650

1,43

6,87

71,

719,

452

2,12

3,32

91,

910,

649

Fina

nce

Dep

artm

ent

2,09

4,92

11,

454,

011

1,41

2,92

61,

728,

000

1,11

8,03

51,

630,

914

1,24

5,50

91,

188,

416

5,39

1,44

25,

094,

757

5,26

8,19

55,

172,

253

Writ

e-O

ffs

(37,

024)

(55,

663)

(35,

018)

(4,5

71)

(312

,677

)(1

33,9

71)

(137

,719

)(1

37,0

06)

(145

,103

)(1

37,2

08)

(250

,066

)(2

52,5

40)

Oth

er D

ocum

ents

& P

aym

ents

(394

,619

)(9

6,21

8)(2

54,1

46)

(143

,055

)(1

75,8

59)

(252

,402

)(1

68,3

83)

(164

,977

)(3

,889

,379

)(1

27,5

03)

(233

,736

)(3

76,1

28)

7,49

9,11

86,

836,

458

5,75

3,03

28,

261,

821

4,41

6,55

74,

830,

216

6,05

1,85

86,

187,

676

9,98

5,51

213

,509

,984

11,2

05,9

9710

,566

,688

Fully

Sec

ured

Deb

ts1,

196,

127

1,27

3,75

31,

117,

997

1,39

8,35

01,

410,

650

1,45

7,27

61,

334,

613

1,37

4,68

81,

537,

998

1,39

1,83

41,

502,

390

1,41

1,19

0

Page 89

Page 95: Cabinet Papers - St James St Library

APPENDIX B(i)

Page 90

Page 96: Cabinet Papers - St James St Library

Sep'

07O

ct'0

7N

ov'0

7D

ec'0

7Ja

n'08

Feb'

08M

ar'0

8M

ay'0

8Ju

n'08

Jul'0

8A

ug'0

8Se

p'08

Oct

'08

Nov

'08

Dec

'08

£(00

0)£(

000)

£(00

0)£(

000)

£(00

0)£(

000)

£(00

0)£(

000)

£(00

0)£(

000)

£(00

0)£(

000)

£(00

0)£(

000)

£(00

0)

Loca

l Par

tner

ship

s1,

532

3,

107

1,

645

1,

462

1,

379

87

6

1,

773

61

884

470

380

42,

108

6,

304

5,

387

5,

278

S

choo

ls58

828

328

362

248

838

586

837

521

561

388

52,

246

1,

108

1,

787

1,

086

O

ther

Loc

al A

utho

ritie

s1,

701

60

4

69

234

133

424

4529

7875

41,

019

1,

196

1,

553

24

9

26

Sub

-tota

l-Par

tner

s3,

821

3,99

4

3,99

4

2,42

5

2,

201

1,28

5

2,

686

1,02

2

1,

137

2,

070

2,70

8

5,

550

8,96

5

7,

423

6,39

0

Oth

er E

xter

nal D

ebto

rs4,

119

4,13

32,

513

5,07

44,

635

4,46

85,

576

3,62

13,

693

3,98

23,

480

4,43

64,

545

3,78

23,

782

Tota

l7,

940

8,

127

6,

507

7,

499

6,

836

5,

753

8,

262

4,

643

4,

830

6,

052

6,

188

9,

986

13

,510

11,2

05

10

,567

0 - 3

031

-60

61 -9

091

- 18

0>

181

Tota

££

££

£

Tota

ls33

7

1,

230

2,

426

16

,329

23,7

41

44

,064

04/1

2/20

08 b

ase

rate

cha

nged

to 3

.00%

Ann

ual i

nter

est l

ost d

ue

to n

on-c

olle

ctio

n

APPENDIX B(ii)

Num

ber o

f Day

s

Sund

ry D

ebto

rs b

y m

ajor

gro

upin

gs (U

nsec

ured

)

Page 91

Page 97: Cabinet Papers - St James St Library

Mov

emen

t on

Bad

Deb

t Pro

visi

ons

Bal

ance

as

atR

ecov

erie

sR

estr

uctu

ring

Add

ition

sW

ritte

n of

fB

alan

ce a

s at

Prov

isio

n

Serv

ice

Blo

cks

26th

Nov

embe

rto

Pro

visi

onTr

ansf

ers

to P

rovi

sion

in m

onth

31st

Dec

embe

r%

££

££

££

Peo

ple,

Pol

icy

and

Per

form

ance

(59,

819)

(59,

819)

66,5

9890

%

Adu

lt an

d C

omm

unity

Ser

vice

s (7

63,8

78)

2,47

4(7

61,4

04)

976,

035

78%

Gov

erna

nce

and

Law

(39,

336)

(39,

336)

30,9

8412

7%

Env

ironm

ent a

nd R

egen

erat

ion

(394

,030

)(3

94,0

30)

442,

949

89%

Chi

ldre

n an

d Y

oung

Peo

ple

(132

,071

)(1

32,0

71)

123,

985

107%

Fina

nce

Dep

artm

ent

(397

,759

)(3

97,7

59)

457,

409

87%

Tota

ls(1

,786

,893

)0

00

2,47

4(1

,784

,419

)2,

097,

959

85%

Deb

tor B

alan

ces

over

6 m

onth

s ol

d at

31

st D

ecem

ber

APPENDIX B(iii)

Page 92

Page 98: Cabinet Papers - St James St Library

SUN

DR

Y D

EBTO

RS

BY

MA

JOR

GR

OU

PIN

GS

(UN

SEC

UR

ED)

-

2,00

0

4,00

0

6,00

0

8,00

0

10,0

00

12,0

00

14,0

00

16,0

00

18,0

00

AP

RM

AY

JUN

JUL

AU

GS

EP

OC

TN

OV

DE

CJA

NFE

BM

AR

MO

NTH

S

SUNDRY DEBTORS (£'000)

TAR

GE

T20

05-0

620

06-0

720

07-0

820

08-0

9 APPENDIX B(iv)

Page 93

Page 99: Cabinet Papers - St James St Library

Appendix C Capital Budget Changes during December

Month 9 represents the last point in the financial year at which capital budgets may be adjusted to reflect changing grant allocations and the transfer of budgets between schemes. After this point budgets remain unaltered until year end to allow the accurate reporting of outturn positions. The budget changes during month 9 are explained in detail, and by directorate, below. Adults and Community Services Expenditure Changes

Capital Scheme Budget

Increase/(Decrease)£000

Pelly Court Project (69)Void Conversions 12Chingdale Centre 16Disabled Facilities Grant 225Total 184

1. Pelly Court Project

The budget at Pelly Court was intended to be used to convert a three bedroom warden flat into two self contained one bedroom flats. However, planning permission was refused on the basis that the resulting housing units would be of insufficient size. The options for conversion are being reconsidered and therefore the budget is removed at this stage.

2. Void Conversions

Works on restoring void properties are funded by grant funding from the Housing Sub Regional Funding body. The budget for this scheme is increased by £12,000 to correctly match the resources which are available during 2008/09.

3. Chingdale Centre In order to free up land for Housing Development the offices of the Friday Hill Tenant Management Organisation are moving from 56 Friday Hill to the Chingdale Centre. A budget of £16,000 is therefore required to provide suitable office accommodation at the Chingdale Centre.

Page 94

Page 100: Cabinet Papers - St James St Library

4. Disabled Facilities Grant An overspend of £87,000 is currently being predicted on the Disabled Facilities Grant (DGF). Also, a number of backdated claims, which are currently being looked into with Legal Services, may have an impact on the current budget. To mitigate any over-spending, an increase of £225,000 on the current budget has been facilitated by drawing funds from an existing DFG reserve. Resourcing Changes

Capital Scheme Budget

Increase/(Decrease)£000

Sub Regional Decent Homes (224)Capital Reserve 225Total 1

In addition to the increase in resources of £225,000 relating to the DFG reserve (Expenditure Change No.4), there has been a decrease in the resources shown from the Sub Regional Grant for Decent Homes. This is because this amount of £224,000 was also included in Adults and Community monitoring under “Sub Regional carried forward resources” and is therefore removed to prevent any possible double counting, Children and Young People There have been no further budget changes for this directorate. Environment and Regeneration Expenditure Changes

Capital Scheme Budget

Increase/(Decrease)£000

Drug Services Refurbishment 307Blades Sports Ground Refurbishment 140Station Gateway Phase 2 (170)Sutherland South Access Scheme 1- Land Assembly 170Bridge Assessment and Strengthening 15Total 462

Page 95

Page 101: Cabinet Papers - St James St Library

Resourcing Changes

Capital Resource Budget

Increase/(Decrease)£000

PCT Contribution 307“Goals” Contribution 140TfL Funding 15Total 462

1. Drug Services Refurbishment

In 2004, £600,000 from Waltham Forest Primary Care Trust was set aside for the Drug Action Team to utilise public sector properties earmarked for disposal, to house drug treatment provision. In addition to this a further £67,000 has been received from the Primary Care Trust in 2008/09. This scheme comprises three projects. The first project concerns the refurbishment of the Larkswood Centre on the Thorpe Coombe Hospital site in Walthamstow. Works on this site have already been completed. The costs are expected to total £250,000, which will be paid when a schedule of works is received. The second project concerns the refurbishment of accommodation on Beulah road and the Alpha Business Centre. Works are currently underway and should be completed by March 2009. Estimated costs total £42,000. The third project concerns the refurbishment of a site in Coppermill Lane, which formerly accommodated the St. James’s St. Library. The aim is to provide enough capacity to house the borough’s open access service hub. Preliminary works will be carried out in 2008/09. The majority of the work, costing an estimated £350,000, is expected to take place in 2009/10 and therefore this amount will form part of next year’s capital budget.

2. Blades Sports Ground Refurbishment This project is funded by a contribution from ‘Goals’ (sport centre organisation) following lease of the Blades Sports Ground. The money has been provided to the Council in order to fund works that were part of the planning process. At present the proposal is to develop Blades playing fields to provide facilities for mini soccer. Greenspace is working with two local football clubs (Ryan FC and Ridgeway Rovers FC) to develop the site. This will involve installing toilets and storage containers as well as improvement works to the grass pitches, car park and the security of the site. Confirmation has only recently been received from Sport England that they are happy for the money be spent on the Blade Sports Ground. Therefore no quotes for the above work have been requested yet. Profiles of the spend will be agreed after confirmation of the costs. This project will continue into 2009/10.

Page 96

Page 102: Cabinet Papers - St James St Library

3. Growth Area Fund Schemes Schemes It is expected that no further expenditure will be required during 2008/09 for Phase 2 of the Blackhorse Lane Traffic Management Scheme. Therefore £170,000 of the 2008/09 budget has been transferred to help fund the costs of land assembly on the Sutherland South Access Scheme.

4. Bridge Assessment and Strengthening Transport for London provide funding for assessment and strengthening of bridges within the borough. An additional £15,000 has been awarded for this scheme and the budget is therefore increased accordingly. Finance Expenditure Changes

Capital Resource Budget

Increase/(Decrease)£000

Higham Hill Phase 2 (13) Resourcing Change

Capital Resource Budget

Increase/(Decrease)£000

ERDF Grant (9)Corporate Resources (4)Total (13)

The second phase of works at the Higham Hill JSC (313 Billet Road) is funded by a grant from the European Regional Development Fund (ERDF). The grant to be received has recently been confirmed as £221,000, a reduction of £9,000 from the original estimate. Also, the contribution required from Corporate Resources is £4,000 less than anticipated. The budget for the schemes has therefore been reduced accordingly.

Page 97

Page 103: Cabinet Papers - St James St Library

NET

BO

RR

OW

ING

OU

TSTA

ND

ING

150,

000

160,

000

170,

000

180,

000

190,

000

200,

000

210,

000

220,

000

230,

000

240,

000

250,

000

260,

000

270,

000

AP

RM

AY

JUN

JUL

AU

GS

EP

OC

TN

OV

DE

CJA

NFE

BM

AR

MO

NTH

S

NET BORROWING (£'000)

2005

/06

2006

/07

2007

/08

2008

/09 APPENDIX D

Page 98

Page 104: Cabinet Papers - St James St Library

NB

. Dec

embe

r 200

8 %

low

due

to th

e in

trodu

ctio

n of

e-in

voic

ing

CR

EDIT

OR

S - %

INVO

ICES

PA

ID O

N T

IME

65707580859095100

AP

RM

AY

JUN

JUL

AU

GS

EP

OC

TN

OV

DE

CJA

NFE

BM

AR

MO

NTH

S

INVOICES PAID ON TIME (%)

2007

/08

2008

/09

Targ

et

APPENDIX E

Page 99

Page 105: Cabinet Papers - St James St Library

AG

ENC

Y C

UM

ULA

TIVE

SPE

ND

ING

EXC

LUD

ING

CO

MM

ITM

ENTS

01234567891011121314151617

AP

RM

AY

JUN

JUL

AU

GS

EP

OC

TN

OV

DE

CJA

NFE

BM

AR

MO

NTH

S

CUMULATIVE SPENDING £m

2007

/08

2008

/09 APPENDIX F

Page 100

Page 106: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

: C

omm

ents

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

C15

Red

uce

Fixt

ures

and

Fitt

ings

and

E

quip

men

t bud

gets

1.5

Red

uctio

ns in

thes

e bu

dget

s ar

e po

ssib

le to

refle

ct p

ast

spen

ding

leve

ls a

nd th

e cu

rren

t inv

estm

ent b

eing

mad

e in

the

Cou

ncil's

adm

inis

trativ

e bu

ildin

gs th

roug

h th

e B

IG

Pro

ject

. Th

ere

are

no E

qual

ity Im

pact

impl

icat

ions

as

ther

e w

ill b

e su

ffici

ent b

udge

t to

mee

t prio

rity

heal

th a

nd

safe

ty a

nd o

ther

bus

ines

s cr

itica

l req

uire

men

ts.

This

will

in

clud

e an

y sp

ecia

list e

quip

men

t, et

c. re

quire

d by

di

sabl

ed s

taff.

1.1

1.5

Ach

ieve

dG

reen

A6

Clo

sure

of 2

hom

es -

in-h

ouse

O

lder

Per

sons

Res

iden

tial

706

This

ass

umes

the

clos

ure

of h

omes

ove

r a tw

o ye

ar

perio

d co

nsis

tent

with

the

care

hom

es re

plac

emen

t pr

ojec

t. Th

ese

are

the

cont

rolla

ble

budg

ets

with

in th

ese

hom

es.

The

full

impa

ct o

n us

ers

will

be

cons

ider

ed a

s pa

rt of

the

Car

e H

omes

Pro

ject

as

repo

rted

to C

abin

et

on 1

7th

Oct

ober

200

6.

530

706

Edi

th P

ears

on L

odge

(EP

L) c

lose

d in

May

20

08, a

nd c

onsu

ltatio

n is

und

er w

ay fo

r the

cl

osur

e of

a s

econ

d ho

me.

Wor

k is

pr

ogre

ssin

g on

this

pro

ject

.

Gre

en

A14

Sav

ings

from

Con

tract

s re

view

100

Ther

e is

a re

view

of c

ontra

cts

for s

uppo

rt at

hom

e sp

ot

cont

ract

s £3

mill

ion

and

volu

ntar

y se

ctor

pro

vide

rs £

3.8

mill

ion

in th

e ne

xt 3

yea

rs.

This

repr

esen

ts s

avin

gs o

f 4.

5%

00

The

tend

erin

g pr

oces

s st

alle

d in

200

7/08

, an

d no

sav

ings

wer

e ac

hiev

ed. A

co

nsul

tant

has

bee

n em

ploy

ed to

revi

ew

the

use

of s

pot c

ontra

cts

and

exte

nd th

e pr

ovis

ions

of b

lock

con

tract

s, b

ut it

is

unlik

ely

that

any

sig

nific

ant s

avin

gs w

ill b

e ac

hiev

ed in

200

8/09

.

Red

Alte

rnat

ive

savi

ng fo

r A14

Com

pens

ator

y sa

ving

s fro

m fo

reca

st u

nder

spen

ding

in

gran

t fun

ding

will

be

used

to a

chie

ve th

e sa

ving

s.75

100

Ach

ieve

dG

reen

A16

Rev

iew

of R

eten

tion

Bon

us

Sch

eme

for A

dult

Soc

ial C

are

Soc

ial W

orke

rs.

50To

revi

ew th

e re

tent

ion

bonu

s sc

hem

e w

ith th

e in

tent

ion

of p

hasi

ng it

out

and

repl

acin

g w

ith a

sch

eme

base

d on

pe

rform

ance

pay

able

as

incr

emen

ts.

3750

Ach

ieve

dG

reen

Prog

ress

on

Polic

y R

evie

w S

avin

gs -

Dec

embe

r 200

8

Estim

ated

Sa

ving

AD

ULT

AN

D C

OM

MU

NIT

Y SE

RVI

CES

DIR

ECTO

RA

TE

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar

end

savi

ngTr

affic

Lig

ht

Page 101

Page 107: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

: C

omm

ents

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

Estim

ated

Sa

ving

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar

end

savi

ngTr

affic

Lig

ht

A17

Bus

ines

s S

uppo

rt re

-stru

ctur

e30

Fina

nce

and

proc

urem

ent f

unct

iona

lity

are

sepa

rate

d to

pr

ovid

e gr

eate

r foc

us o

n ea

ch a

ctiv

ity a

nd to

giv

e sp

ecifi

c le

ads

for e

ach

area

. Th

e m

anag

er w

orki

ng in

th

e pr

ocur

emen

t fun

ctio

n w

ould

hav

e an

act

ive

role

and

th

eref

ore

one

of th

e S

AP

Pro

cure

men

t Offi

cer p

osts

co

uld

be d

elet

ed a

ccor

ding

ly.

2330

Ach

ieve

dG

reen

APPENDIX G

A29

Red

uce

core

fund

ing

of M

enca

p -

Lear

ning

Dis

abili

ty16

The

Loca

l Aut

horit

y cu

rren

tly fu

nds

arou

nd 3

5% o

f M

enca

p’s

core

cos

ts.

Cor

e co

sts

enab

le M

enca

p to

ra

ise

fund

s fro

m o

ther

sou

rces

to fu

nd a

rang

e of

ad

voca

cy, s

uppo

rt an

d le

isur

e se

rvic

es fo

r adu

lts w

ith a

le

arni

ng d

isab

ility

, and

thei

r fam

ily c

arer

s. T

his

wou

ld fa

ll ba

ck o

n Lo

cal A

utho

rity

team

s.

1216

Ach

ieve

dG

reen

A67

Dis

posa

l of

Wal

tham

For

est

thea

tre20

The

clos

ure

optio

n as

sum

es a

sav

ing

aris

ing

from

cl

osur

e in

200

8/09

. Th

is is

on

the

assu

mpt

ion

that

lo

ttery

app

licat

ions

cur

rent

ly b

eing

pur

sued

for t

he

rede

velo

pmen

t of t

he p

ark

will

be

succ

essf

ul. T

he s

avin

g be

ing

achi

eved

in y

ear 2

is s

ubje

ct to

the

Lloy

d P

ark

timet

able

.

1520

Ach

ieve

dG

reen

A73

CLa

SS

– R

evie

w o

f Dire

ct S

ubsi

dy76

To re

mov

e th

e di

rect

sub

sidy

to C

LaS

S. T

he s

avin

gs

iden

tifie

d ar

e cu

rren

t exp

endi

ture

that

is n

ot fu

nded

from

ou

r LS

C g

rant

mon

ies.

The

y ha

ve b

een

iden

tifie

d to

re

mov

e W

alth

am F

ores

t Cou

ncil’

s co

ntrib

utio

n to

the

cont

rolla

ble

cost

s of

CLa

SS

. Red

uctio

n of

two

0.5

FTE

po

sts

for W

ork

Bas

ed L

earn

ing,

1.5

FTE

in c

rèch

e w

orke

rs p

ositi

ons,

rem

ove

the

subs

idy

on c

ours

e fe

es fo

r ov

er 6

0s, r

emov

e th

e lin

k be

twee

n ac

adem

ic s

taff

pay

incr

ease

s an

d A

PTC

incr

ease

s an

d th

e ba

lanc

e of

cos

ts

follo

win

g th

e cl

osur

e of

Lou

isa

Oak

es p

rem

ises

.

5776

Ach

ieve

dG

reen

Tota

l Pol

icy

Rev

iew

999.

575

0.1

999.

5

Page 102

Page 108: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

:

Com

men

ts

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

CH

S4

Bro

oks

Farm

20

Ref

ocus

ser

vice

to p

rovi

de a

cur

ricul

um o

ffer a

nd

gene

rate

inco

me.

Pro

posa

ls m

ay in

clud

e ch

argi

ng

scho

ols

for v

isits

, cor

pora

te s

pons

orsh

ip e

vent

s,

spon

sors

from

bus

ines

ses,

pub

lic s

pons

ors

- spo

nsor

an

anim

al s

chem

e, a

nd s

eeki

ng o

ther

ext

erna

l inc

ome.

2020

Bro

oks

farm

has

em

bark

ed o

n a

mar

ketin

g st

rate

gy to

attr

act m

ore

visi

tors

, sav

ings

will

be

ach

ieve

d.G

reen

CH

S8

Red

uce

Pla

cem

ents

cos

ts 1

%13

0

The

Chi

ldre

n an

d Fa

mili

es p

lace

men

ts b

udge

t is

som

e £1

3 m

illio

n. T

here

sho

uld

be s

cope

for m

odes

t re

duct

ions

in th

e un

derly

ing

cost

bas

e of

0.5

% in

20

07/0

8 an

d 1%

in e

ach

of n

ext t

wo

year

s. A

chie

ved

by

join

ing

com

mis

sion

ing

cons

ortia

and

oth

er in

itiat

ives

.

130

130

The

budg

et h

as b

een

cut t

o re

flect

ann

ual

com

mis

sion

ing

effic

ienc

ies,

how

ever

ad

ditio

nal c

lient

s w

ith h

igh

cost

s ne

eds

cont

inue

to p

lace

dem

ands

on

the

serv

ice.

S

avin

gs m

ay b

e ac

hiev

ed th

roug

h va

rious

m

anag

emen

t act

ions

Gre

en

CH

S9

Incr

ease

ado

ptio

n an

d in

-hou

se

fost

erin

g50

Ado

ptio

n an

d in

-hou

se fo

ster

ing

are

muc

h le

ss

expe

nsiv

e so

lutio

ns th

an p

lace

men

ts in

priv

ate,

vol

unta

ry

or in

depe

nden

t set

tings

. 'In

vest

to s

ave'

initi

ativ

es a

re

bein

g dr

awn

up th

at s

houl

d pr

oduc

e lo

nger

-term

sav

ings

. Th

ese

may

incl

ude

incr

easi

ng fo

ster

ing

allo

wan

ces

to

attra

ct m

ore

care

rs a

nd in

crea

sing

the

capa

city

of t

he

fost

erin

g an

d ad

optio

n te

am. E

qual

ity Im

pact

impl

icat

ions

ha

ve b

een

anal

ysed

. D

isab

led

child

ren

with

com

plex

ne

eds

are

the

mos

t lik

ely

to b

e pl

aced

far a

way

from

ho

me,

so

any

impr

ovem

ent i

n av

aila

bilit

y of

loca

l pl

acem

ents

is li

kely

to b

enef

it th

is m

ost v

ulne

rabl

e gr

oup.

Fo

r BM

E c

hild

ren

ther

e is

a h

ighe

r pro

porti

on o

f in-

hous

e ca

rers

that

are

BM

E a

nd th

at a

re a

goo

d m

atch

, tha

n th

ose

out b

orou

gh.

BM

E c

hild

ren

that

are

pla

ced

far

from

hom

e ar

e m

ore

likel

y to

be

plac

ed in

less

div

erse

co

mm

uniti

es.

Ther

e ar

e no

sig

nific

ant i

mpl

icat

ions

on

the

basi

s of

gen

der a

lone

.

5050

The

serv

ice

is fo

cusi

ng a

ttent

ion

in th

is

area

, sav

ing

will

be

achi

eved

thro

ugh

vario

us m

anag

emen

t act

ions

.G

reen

CH

S10

Del

ete

post

s in

bus

ines

s su

ppor

t un

it an

d tra

nsfe

r rem

aini

ng

func

tions

and

sta

ff to

oth

er te

ams

with

in C

hild

ren

Ser

vice

s

30

2007

/08:

del

ete

post

of H

ead

of B

usin

ess

Sup

port

unit

(red

unda

ncy

impl

icat

ions

, bei

ng d

ealt

with

thro

ugh

HR

pr

oced

ures

) and

one

adm

in a

ssis

tant

(no

redu

ndan

cy

impl

icat

ions

- va

cant

pos

t). 2

008/

09: d

elet

e on

e fu

rther

ad

min

pos

t fol

low

ing

the

end

of th

e E

duA

ctio

n co

ntra

ct

(pot

entia

l red

unda

ncy

impl

icat

ion,

to b

e de

alt w

ith

thro

ugh

HR

pro

cedu

res)

.

3030

Sav

ings

met

from

LE

A c

ontin

genc

yG

reen

Prog

ress

on

Polic

y R

evie

w S

avin

gs -

Dec

embe

r 200

8

Proj

ecte

d ye

ar

end

savi

ngSa

ving

s to

M

onth

9Tr

affic

Lig

ht

CH

ILD

REN

AN

D Y

OU

NG

PEO

PLE

SER

VIC

ES D

IREC

TOR

ATE

Estim

ated

Sa

ving

Page 103

Page 109: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

:

Com

men

ts

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

Prog

ress

on

Polic

y R

evie

w S

avin

gs -

Dec

embe

r 200

8

Proj

ecte

d ye

ar

end

savi

ngSa

ving

s to

M

onth

9Tr

affic

Lig

ht

CH

ILD

REN

AN

D Y

OU

NG

PEO

PLE

SER

VIC

ES D

IREC

TOR

ATE

Estim

ated

Sa

ving

CH

S11

Sun

trap:

Del

ete

post

s, in

crea

se

inco

me

thro

ugh

fees

and

cha

rges

an

d br

oade

n us

e du

ring

sum

mer

ho

liday

s

60

Rep

lace

teac

hing

pos

ts w

ith te

achi

ng s

uppo

rt st

aff s

o th

at c

entre

may

ope

n in

sch

ool h

olid

ays,

lotte

ry b

id to

pr

ovid

e ad

ditio

nal v

isits

(at n

o ex

tra c

ost),

pro

vide

out

of

hour

s an

d ho

liday

act

iviti

es.

No

redu

ndan

cy im

plic

atio

ns

as p

osts

will

nat

ural

ly b

e va

cate

d.

6060

Ach

ieve

d - n

ew s

taffi

ng s

truct

ure

impl

emen

ted

from

Sep

tem

ber 2

007

to

achi

eve

savi

ngs.

G

reen

CH

S12

Mus

ic s

ervi

ce: t

o co

ver d

irect

co

sts

and

then

to m

ove

to in

com

e ge

nera

tion

60R

atio

nalis

e m

anag

emen

t stru

ctur

e; s

eek

alte

rnat

ive

prem

ises

; rat

iona

lise

char

ging

arr

ange

men

ts w

ith

scho

ols

and

fees

for i

nstru

men

t rep

airs

.60

60S

avin

gs w

ill b

e ac

hiev

ed

Gre

en

CH

S13

Sch

ool a

nd p

upil

supp

ort s

ervi

ces

500

Effi

cien

cies

to b

e ga

ined

afte

r ter

min

atio

n of

Edu

Act

ion

cont

ract

. Lik

ely

to in

clud

e re

dund

anci

es a

s du

plic

atio

n of

ef

fort

is re

mov

ed a

nd ra

tiona

lisat

ion

into

inte

grat

ed

serv

ices

bec

omes

pos

sibl

e.

500

500

The

budg

et h

as b

een

cut a

nd s

avin

gs w

ill

be a

chie

ved.

How

ever

the

inso

urci

ng c

osts

su

ch a

s IC

T ar

e hi

gher

than

ant

icip

ated

, sa

ving

s w

ill b

e fu

lly a

chie

ved

thro

ugh

a co

mbi

natio

n of

man

agem

ent a

ctio

ns.

Gre

en

CH

S15

You

th s

ervi

ce re

-alig

nmen

t12

0

Con

nexi

ons

inco

me

is g

rant

ed to

cou

ncil

from

200

8/09

an

d its

dep

loym

ent b

ecom

es d

irect

ed b

y W

alth

am

Fore

st.

Ser

vice

s pr

ovid

ed b

y yo

uth

wor

kers

will

bec

ome

elig

ible

for s

uppo

rt by

Con

nexi

ons

fund

ing.

120

120

This

will

be

achi

eved

G

reen

CH

S16

You

th s

ervi

ce in

com

e40

Dev

olut

ion

of y

outh

ser

vice

s to

are

a pa

rtner

ship

s an

d fo

cus

of w

ork

on p

rovi

ding

mor

e ac

tiviti

es s

houl

d pr

ovid

e op

portu

nitie

s fo

r mod

est c

harg

es.

4040

This

will

be

achi

eved

Gre

en

Tota

l Pol

icy

Rev

iew

1,01

01,

010

1,01

0

Page 104

Page 110: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

:

Com

men

ts

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

C1

Am

alga

mat

e cu

rren

t Ser

vice

H

elpd

esks

96.0

Ther

e ar

e a

num

ber o

f sep

arat

e se

rvic

e he

lpde

sks

oper

atin

g ac

ross

the

Dire

ctor

ate

invo

lvin

g so

me

20 o

r so

staf

f and

pro

vidi

ng s

uppo

rt to

inte

rnal

sta

ff, in

clud

ing

thos

e in

WFD

, Fac

ilitie

s M

anag

emen

t, IC

T an

d th

e S

hare

d S

ervi

ce C

entre

. The

con

solid

atio

n of

team

s an

d m

anag

emen

t fun

ctio

ns w

ill e

nabl

e re

duct

ions

in s

taffi

ng

and

softw

are

cost

s. T

here

are

no

redu

ndan

cy

impl

icat

ions

.

72.0

96.0

Spe

nd is

cur

rent

ly w

ithin

the

redu

ced

2008

/09

budg

et

and

is e

xpec

ted

to s

tay

with

in.

Gre

en

C13

a12

.5

12.5

Sav

ings

wer

e im

pact

ed d

ue to

a p

aym

ent m

ade

to

Sun

guar

d of

£37

.5k

unde

r adv

ice

from

lega

l. £3

7.5k

sh

ortfa

ll in

sav

ings

to b

e m

et th

roug

h re

duce

d ex

pend

iture

with

in th

e sa

me

cost

cen

tre (r

efer

to C

13b)

.

Red

C13

b28

.1

37.5

S

hortf

all o

f C13

a £3

7.5k

sav

ings

hav

e be

en id

entif

ied

from

with

in th

e sa

me

cost

cen

tre b

y en

surin

g ex

pend

iture

is c

onta

ined

with

in th

e 20

08/0

9 bu

dget

.G

reen

C15

Red

uce

Fixt

ures

and

Fitt

ings

and

E

quip

men

t bud

gets

3.1

Red

uctio

ns in

thes

e bu

dget

s ar

e po

ssib

le to

refle

ct p

ast

spen

ding

leve

ls a

nd th

e cu

rren

t inv

estm

ent b

eing

mad

e in

the

Cou

ncil's

adm

inis

trativ

e bu

ildin

gs th

roug

h th

e B

IG

Pro

ject

. Th

ere

are

no E

qual

ity Im

pact

impl

icat

ions

as

ther

e w

ill b

e su

ffici

ent b

udge

t to

mee

t prio

rity

heal

th a

nd

safe

ty a

nd o

ther

bus

ines

s cr

itica

l req

uire

men

ts.

This

will

in

clud

e an

y sp

ecia

list e

quip

men

t, et

c. re

quire

d by

di

sabl

ed s

taff.

3.1

3.1

Spe

nd is

cur

rent

ly w

ithin

the

redu

ced

2008

/09

budg

et

and

is e

xpec

ted

to s

tay

with

in.

Gre

en

C22

a16

.016

.0O

nly

£16.

0k o

f £30

.0k

savi

ngs

had

been

iden

tifie

d fro

m

ICT.

Ref

er to

C22

b.R

ed

C22

b10

.5

14.0

R

emai

ning

£14

.0k

savi

ngs

have

bee

n id

entif

ied

from

C

usto

mer

Ser

vice

s an

d bu

ilt in

to th

e fo

reca

st S

ervi

ce

unde

rspe

ndin

g.G

reen

X20

Com

mun

ity S

afet

y V

olun

tary

Sec

tor

Com

mis

sion

ing

freez

e on

infla

tion

4.0

In li

ne w

ith th

e pr

inci

ples

of G

ersh

on w

e ar

e ex

pect

ing

volu

ntar

y gr

oups

to a

chie

ve e

ffici

ency

sav

ings

and

ab

sorb

infla

tiona

ry im

pact

of 2

.25%

per

ann

um.

4.0

4.0

Spe

nd fo

reca

st to

be

with

in b

udge

t. Fu

lly m

et.

Gre

en

Red

uce

num

ber o

f man

agem

ent

post

s30

.0 Th

e ef

fect

s of

pre

viou

s an

d pl

anne

d re

orga

nisa

tions

, the

ra

tiona

lisat

ion

of a

num

ber o

f ser

vice

are

a st

ruct

ures

an

d re

cent

resi

gnat

ions

will

ena

ble

the

dele

tion

of 7

m

anag

eria

l pos

ts o

ver t

he n

ext t

hree

-yea

r per

iod

with

out

loss

of s

ervi

ce.

Ther

e is

one

pot

entia

l red

unda

ncy

whi

ch

will

be

man

aged

thro

ugh

HR

pro

cedu

res

with

an

aim

to

re-d

eplo

y.

Est

ablis

h si

ngle

Dat

a C

entre

with

ex

tern

al p

artn

er50

.0 Th

e co

nsol

idat

ion

of th

e C

ounc

il's e

xist

ing

2 D

ata

Cen

tres

(Tow

n H

all a

nd S

ilver

Birc

h H

ouse

) ar

rang

emen

ts th

roug

h in

tegr

atio

n of

suc

h se

rvic

es

acro

ss N

orth

or N

orth

Eas

t Lon

don

boro

ughs

will

offe

r th

e op

portu

nity

for s

ome

econ

omie

s of

sca

le a

nd lo

wer

co

st a

t the

sam

e tim

e as

impr

ovin

g di

sast

er re

cove

ry

arra

ngem

ents

and

mor

e re

silie

nt s

ervi

ce p

rovi

sion

. The

sa

ving

s w

ill b

e re

alis

ed th

roug

h ce

asin

g th

e us

e of

ex

istin

g so

ftwar

e.

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar e

nd

savi

ng

Traf

fic L

ight

Prog

ress

on

Polic

y R

evie

w S

avin

gs -

Dec

embe

r 200

8

ENVI

RO

NM

ENT

AN

D R

EGEN

ERA

TIO

N S

ERVI

CES

DIR

ECTO

RA

TE

Estim

ated

Sa

ving

Page 105

Page 111: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

:

Com

men

ts

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar e

nd

savi

ng

Traf

fic L

ight

Estim

ated

Sa

ving

E2

Clo

sure

to a

ll pu

blic

con

veni

ence

s w

ithin

the

boro

ugh

with

the

exce

ptio

n of

Aut

omat

ic P

ublic

Con

veni

ence

s (A

PC

s)

130.

0

This

pro

posa

l con

side

rs c

losi

ng th

e C

ounc

il's re

mai

ning

tra

ditio

nal p

ublic

toile

ts a

nd c

ompl

emen

ts th

e re

venu

e gr

owth

bid

and

the

capi

tal b

id fo

r the

laun

ch o

f the

co

mm

unity

toile

t sch

eme.

The

con

tract

for t

he p

rovi

sion

of

Aut

omat

ic P

ublic

Con

veni

ence

s do

es n

ot a

llow

for

thes

e to

be

incl

uded

in th

is s

avin

gs p

ropo

sal a

t thi

s tim

e.

The

prop

osal

s fo

r thi

s sc

hem

e ar

e lin

ked

to th

e re

venu

e gr

owth

bid

for t

he c

omm

unity

toile

t sch

eme

(EG

16) a

nd

the

capi

tal b

id (E

C6)

, whi

ch w

ill b

e us

ed to

fund

the

prov

isio

n of

dis

able

d to

ilets

at a

ppro

pria

te

esta

blis

hmen

ts.

The

rem

aini

ng to

ilets

will

not

be

clos

ed

until

the

com

mun

ity to

ilet s

chem

e is

ope

ratio

nal.

A

mee

ting

has

take

n pl

ace

with

Bui

ldin

g C

lean

ing

and

it ha

s be

en id

entif

ied

that

four

per

man

ent c

lean

ing

staf

f w

ill b

e af

fect

ed b

y th

ese

prop

osed

clo

sure

s. C

losu

res

are

plan

ned

for 2

008/

09, s

o th

is w

ill a

llow

the

serv

ice

to

rele

ase

staf

f on

casu

al c

ontra

cts

thus

min

imis

ing

the

effe

ct o

n pe

rman

ent s

taff

thou

gh it

may

not

be

poss

ible

to

ens

ure

that

ther

e w

ill b

e no

redu

ndan

cies

as

a re

sult

of th

ese

prop

osed

clo

sure

s.

69.5

13

0.0

Cle

anin

g co

sts

have

resu

lted

in s

pend

gre

ater

than

bu

dget

set

. Will

look

to m

itiga

te a

ny o

vers

pend

ing

with

in

Ser

vice

.A

mbe

r

E10

Pla

nnin

g ad

vice

: pre

-app

licat

ion

char

ging

30.0

Pre

-app

licat

ion

advi

ce in

trodu

ced

follo

win

g so

me

dela

ys

on 2

5/02

/08.

The

fees

due

are

dep

enda

nt o

n th

e si

ze o

f th

e de

velo

pmen

t and

inte

rest

has

alre

ady

been

rece

ived

by

the

Ser

vice

for t

his

advi

se b

y ex

tern

al c

lient

s. W

ork

is

also

bei

ng u

nder

take

n to

allo

w fo

r pay

men

t of t

he fe

e vi

a th

e in

tern

et.

30.0

30

.0

Inte

rest

in p

re-a

pplic

atio

n ad

vice

has

bee

n be

tter t

han

fore

cast

con

side

ring

curr

ent l

evel

of i

ncom

e ag

ains

t pr

ofile

bud

get.

Exp

ecte

d to

be

fully

met

and

mor

e th

an

likel

y ex

ceed

ed.

Gre

en

E12

Inte

grat

ed w

aste

col

lect

ion

serv

ice

- do

mes

tic a

nd re

cycl

ing

400.

0

With

the

oppo

rtuni

ty to

tend

er b

oth

the

refu

se a

nd

recy

clin

g se

rvic

e in

the

curr

ent f

inan

cial

yea

r, it

is

expe

cted

that

an

inte

grat

ed s

ervi

ce w

ill y

ield

sig

nific

ant

savi

ngs

over

and

abo

ve th

e ex

istin

g m

etho

d of

ser

vice

de

liver

y.

400.

0 40

0.0

Des

pite

issu

es id

entif

ied

in th

e V

erda

nt c

ontra

ct

mea

sure

s ha

ve b

een

take

n to

con

tain

with

in o

vera

ll w

aste

man

agem

ent b

udge

t. S

avin

g ha

s be

en fu

lly m

et.

Gre

en

E13

Stre

et c

lean

sing

ser

vice

revi

ew20

0.0

The

curr

ent s

treet

cle

anin

g se

rvic

e is

to b

e re

view

ed a

s pa

rt of

sin

gle

stat

us n

egot

iatio

ns to

ens

ure

that

the

serv

ice

prov

ided

is c

onsi

sten

t in

its d

eliv

ery,

and

is

supe

rvis

ed th

roug

hout

the

boro

ugh

usin

g th

e C

omm

unity

C

ounc

il bo

unda

ries.

It w

ould

then

be

able

to

dem

onst

rate

an

annu

al im

prov

emen

t rec

ord

that

is

mea

sura

ble

both

in q

uant

ifiab

le te

rms

(EnC

amm

s su

rvey

) and

vis

ual t

erm

s (r

esid

ents

' pan

el).

150.

0 20

0.0

New

cle

ansi

ng c

ontra

ct h

as b

een

mob

ilise

d, s

avin

gs

expe

cted

to b

e fu

lly m

et.

Gre

en

Tota

l Pol

icy

Rev

iew

94

3.1

795.

7 94

3.1

Page 106

Page 112: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

: C

omm

ents

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

C1

Am

alga

mat

e cu

rren

t Ser

vice

H

elpd

esks

32

Ther

e ar

e a

num

ber o

f sep

arat

e se

rvic

e he

lpde

sks

oper

atin

g ac

ross

the

Dire

ctor

ate

invo

lvin

g so

me

20 o

r so

staf

f and

pro

vidi

ng s

uppo

rt to

inte

rnal

sta

ff, in

clud

ing

thos

e in

WFD

, Fac

ilitie

s M

anag

emen

t, IC

T an

d th

e S

hare

d S

ervi

ce C

entre

. The

con

solid

atio

n of

team

s an

d m

anag

emen

t fun

ctio

ns w

ill e

nabl

e re

duct

ions

in s

taffi

ng

and

softw

are

cost

s. T

here

are

no

redu

ndan

cy

impl

icat

ions

.

2432

Sav

ings

iden

tifie

d in

FM

Adm

inG

reen

C4

Rev

iew

leve

ls o

f deb

t20

As

the

Dire

ctor

ate

begi

ns to

take

a m

ore

pro-

activ

e ap

proa

ch to

redu

cing

deb

t, th

e le

vel o

f ann

ual b

udge

t co

ntrib

utio

n to

the

prov

isio

n fo

r bad

deb

t can

be

redu

ced.

The

sav

ing

will

, of c

ours

e, c

ontin

ue in

to fu

ture

ye

ars

and

the

poss

ibili

ty o

f red

ucin

g th

e co

ntrib

utio

n to

th

e D

irect

orat

e's

bad

debt

pro

visi

on s

till f

urth

er w

ill b

e ke

pt u

nder

regu

lar r

evie

w.

020

Fina

l dec

isio

n on

bad

deb

t pro

visi

on w

ill b

e ta

ken

at y

ear e

nd b

ut c

urre

nt le

vel o

f deb

t su

gges

ts th

is w

ill b

e ac

hiev

edG

reen

C8

Red

uce

prin

ting

cost

s in

Rev

enue

s an

d B

enef

its37

Use

of a

diff

eren

t pos

tal c

arrie

r to

Roy

al M

ail f

or b

ulk

mai

lings

(£13

,000

); m

atch

ing

diffe

rent

bill

s se

nt to

the

sam

e pe

rson

at t

he s

ame

addr

ess,

com

bini

ng H

B a

nd

CTB

lette

rs a

nd re

vise

d bi

lls s

ent i

n-ye

ar (£

15,0

00);

the

new

car

rier w

ill e

nabl

e us

e of

sec

ond

rath

er th

an fi

rst

clas

s po

stag

e fo

r sum

mon

s ru

ns (£

3,00

0); u

se o

f P

aypo

int a

llow

s fo

r bar

-cod

ed le

tters

rath

er th

an

paym

ent s

lips

lead

ing

to s

mal

ler e

nvel

opes

and

low

er

post

al c

harg

es (£

6,00

0).

2837

Bud

gets

redu

ced.

Gre

en

C10

C

11

C14

Rev

iew

of F

acili

ties

Man

agem

ent

(Pre

mis

es),

Est

ate

Man

agem

ent

(Com

mer

cial

Por

tfolio

) and

P

rope

rty a

nd L

itiga

tion

Lega

l S

ervi

ces

60

Rev

iew

the

way

in w

hich

the

Faci

litie

s M

anag

emen

t (P

rem

ises

), E

stat

e M

anag

emen

t (C

omm

erci

al P

ortfo

lio)

and

Pro

perty

and

Liti

gatio

n Le

gal S

ervi

ces

are

curr

ently

de

liver

ed a

nd e

xplo

re a

ltern

ativ

e w

ays

of p

rovi

sion

, in

clud

ing

the

use

of p

artn

ersh

ips

and

mar

ket t

estin

g.

The

prop

osal

s as

sum

e th

at s

avin

gs o

f bet

wee

n 2.

5%

and

5% o

f exi

stin

g co

sts

can

be a

chie

ved.

4560

Bud

gets

redu

ced.

Gre

en

FIN

AN

CE

DEP

AR

TMEN

T

Estim

ated

Sa

ving

Prog

ress

on

Polic

y R

evie

w S

avin

gs -

Dec

embe

r 200

8

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar

end

savi

ngTr

affic

Lig

ht

Page 107

Page 113: Cabinet Papers - St James St Library

C15

Red

uce

Fixt

ures

and

Fitt

ings

and

E

quip

men

t bud

gets

7

Red

uctio

ns in

thes

e bu

dget

s ar

e po

ssib

le to

refle

ct p

ast

spen

ding

leve

ls a

nd th

e cu

rren

t inv

estm

ent b

eing

mad

e in

the

Cou

ncil's

adm

inis

trativ

e bu

ildin

gs th

roug

h th

e B

IG

Pro

ject

. Th

ere

are

no E

qual

ity Im

pact

impl

icat

ions

as

ther

e w

ill b

e su

ffici

ent b

udge

t to

mee

t prio

rity

heal

th a

nd

safe

ty a

nd o

ther

bus

ines

s cr

itica

l req

uire

men

ts.

This

will

in

clud

e an

y sp

ecia

list e

quip

men

t, et

c. re

quire

d by

di

sabl

ed s

taff.

77

Ach

ieve

d ac

ross

ICT(

EN

) £3,

100,

Pro

perty

S

ervi

ces

£3,8

00(F

I), R

evs

& B

ens(

FI)

£3,8

00, G

over

nanc

e &

Law

£2,

000,

Hum

an

Res

ourc

es(P

PP

) £40

0, S

uppo

rt S

ervi

ces

£900

.

Gre

en

C21

Red

uce

num

ber o

f adm

in./s

uppo

rt po

sts

24

The

sign

ifica

nt in

vest

men

t mad

e by

the

Cou

ncil

in IC

T an

d ot

her s

yste

ms

in re

cent

yea

rs h

as le

d to

impr

oved

bu

sine

ss p

roce

sses

and

furth

er in

vest

men

t is

plan

ned

with

the

impl

emen

tatio

n of

an

enha

nced

HR

mod

ule

with

in S

AP

ena

blin

g se

lf-se

rvic

e ac

cess

to s

taff

and

man

ager

s. E

lect

roni

c in

voic

ing

will

ena

ble

an

auto

mat

ed p

roce

ss fo

r pay

men

t of i

nvoi

ces

thro

ugh

the

syst

em ra

ther

than

thro

ugh

man

ual p

roce

dure

s. T

his

wou

ld fu

rther

impr

ove

paym

ent o

f inv

oice

s pe

rform

ance

an

d w

ill e

nabl

e su

pplie

rs to

pro

vide

ele

ctro

nic

invo

ices

, fu

rther

redu

cing

thei

r cos

ts.

Toge

ther

with

the

ratio

nalis

atio

n of

exi

stin

g ad

min

istra

tive

supp

ort

arra

ngem

ents

acr

oss

the

Dire

ctor

ate,

it is

pos

sibl

e to

de

lete

12.

5 ad

min

istra

tive

post

s ov

er th

e ne

xt th

ree-

year

pe

riod

with

out l

oss

of s

ervi

ce.

Ther

e ar

e tw

o po

tent

ial

redu

ndan

cies

(bot

h pa

rt tim

e) e

quiv

alen

t to

one

full

time

post

, whi

ch w

ill b

e m

anag

ed th

roug

h H

R p

roce

dure

s w

ith a

n ai

m to

re-d

eplo

y.

1824

Sav

ings

iden

tifie

d in

FM

Adm

inG

reen

C24

Red

uce

Rep

airs

and

Mai

nten

ance

B

udge

t17

A 2

.5%

sav

ing

in th

e R

epai

rs a

nd M

aint

enan

ce B

udge

t is

pro

pose

d as

a c

onse

quen

ce o

f the

rece

nt/p

lann

ed

refu

rbis

hmen

ts o

f the

Cou

ncil's

mai

n ad

min

istra

tive

build

ings

e.g

. Tow

n H

all,

Silv

er B

irch

Hou

se, R

owan

H

ouse

and

Syc

amor

e H

ouse

. Th

ese

build

ings

hav

e be

en b

roug

ht u

p to

sta

ndar

d an

d fu

ture

regu

lar

mai

nten

ance

will

not

requ

ire in

vest

men

t at p

revi

ous

leve

ls.

1317

Tota

l bud

get a

djus

ted.

Man

aged

by

Pro

perty

Ser

vice

s. 2

007/

08 o

vers

pent

due

to

Hea

lth a

nd S

afet

y w

orks

. E

xpec

ted

to

achi

eve

in 2

008/

09.

Am

ber

C25

Rep

lant

ing

of F

low

er B

eds

at th

e To

wn

Hal

l10

Spo

nsor

ship

fund

ing

will

be

soug

ht fo

r pla

ntin

g up

the

flow

er b

eds

in th

e To

wn

Hal

l, le

adin

g to

a s

avin

g of

£1

0,00

0 in

the

reve

nue

budg

et c

urre

ntly

use

d to

un

derta

ke 3

diff

eren

t pla

ntin

g ex

erci

ses

ever

y ye

ar.

00

No

long

er b

eing

pur

sued

. Alte

rnat

ive

savi

ngac

hiev

ed th

roug

h ou

tsou

rcin

g co

ntra

ct (s

ee

belo

w)

Red

Alte

rnat

ive

savi

ng fo

r C25

0C

ost o

f mai

nten

ance

of f

low

er b

eds

has

been

redu

ced

in

the

new

con

tract

.7

10A

chie

ved.

Gre

en

Tota

l Pol

icy

Rev

iew

20

714

220

7

Page 108

Page 114: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

: Sa

ving

s to

M

onth

9C

omm

ents

Traf

fic L

ight

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

C10

C

11

C14

Rev

iew

of F

acili

ties

Man

agem

ent

(Pre

mis

es),

Est

ate

Man

agem

ent

(Com

mer

cial

Por

tfolio

) and

P

rope

rty a

nd L

itiga

tion

Lega

l S

ervi

ces

7

Rev

iew

the

way

in w

hich

the

Faci

litie

s M

anag

emen

t (P

rem

ises

), E

stat

e M

anag

emen

t (C

omm

erci

al P

ortfo

lio)

and

Pro

perty

and

Liti

gatio

n Le

gal S

ervi

ces

are

curr

ently

de

liver

ed a

nd e

xplo

re a

ltern

ativ

e w

ays

of p

rovi

sion

, in

clud

ing

the

use

of p

artn

ersh

ips

and

mar

ket t

estin

g.

The

prop

osal

s as

sum

e th

at s

avin

gs o

f bet

wee

n 2.

5%

and

5% o

f exi

stin

g co

sts

can

be a

chie

ved.

57

Bud

gets

redu

ced.

Gre

en

C15

Red

uce

Fixt

ures

and

Fitt

ings

and

E

quip

men

t bud

gets

2

Red

uctio

ns in

thes

e bu

dget

s ar

e po

ssib

le to

refle

ct p

ast

spen

ding

leve

ls a

nd th

e cu

rren

t inv

estm

ent b

eing

mad

e in

the

Cou

ncil's

adm

inis

trativ

e bu

ildin

gs th

roug

h th

e B

IG

Pro

ject

. Th

ere

are

no E

qual

ity Im

pact

impl

icat

ions

as

ther

e w

ill b

e su

ffici

ent b

udge

t to

mee

t prio

rity

heal

th a

nd

safe

ty a

nd o

ther

bus

ines

s cr

itica

l req

uire

men

ts.

This

will

in

clud

e an

y sp

ecia

list e

quip

men

t, et

c. re

quire

d by

di

sabl

ed s

taff.

22

Ach

ieve

d ac

ross

ICT(

EN

) £3,

100,

Pro

perty

S

ervi

ces

£3,8

00(F

I), R

evs

& B

ens(

FI)

£3,8

00, G

over

nanc

e &

Law

£2,

000,

Hum

an

Res

ourc

es(P

PP

) £40

0, S

uppo

rt S

ervi

ces

£900

.

Gre

en

C20

Cea

se p

aym

ent o

f Leg

al P

ract

ice

Cer

tific

ates

9

The

Dire

ctor

ate

curr

ently

pay

s fo

r the

cos

ts o

f the

Leg

al

Pra

ctic

e C

ertif

icat

es h

eld

by a

ll of

the

Cou

ncil's

sol

icito

rs

and

barr

iste

rs (a

ppro

x. £

800

per p

erso

n). I

t is

inte

nded

to

pha

se th

is a

rran

gem

ent o

ut o

ver a

per

iod

of tw

o ye

ars

as n

o su

ch p

aym

ent i

s m

ade

to o

ther

pro

fess

iona

ls

with

in th

e D

irect

orat

e, e

.g. a

ccou

ntan

ts, s

urve

yors

or H

R

man

ager

s.

99

Ach

ieve

d.G

reen

Proj

ecte

d ye

ar

end

savi

ng

Prog

ress

on

Polic

y R

evie

w S

avin

gs -

Dec

embe

r 200

8

GO

VER

NA

NC

E A

ND

LA

W

Estim

ated

Sa

ving

Page 109

Page 115: Cabinet Papers - St James St Library

Ref

No

Shor

t Des

crip

tion

Det

ails

: Sa

ving

s to

M

onth

9C

omm

ents

Traf

fic L

ight

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

Proj

ecte

d ye

ar

end

savi

ngEs

timat

ed

Savi

ng

C21

Red

uce

num

ber o

f adm

in/s

uppo

rt po

sts

24

The

sign

ifica

nt in

vest

men

t mad

e by

the

Cou

ncil

in IC

T an

d ot

her s

yste

ms

in re

cent

yea

rs h

as le

d to

impr

oved

bu

sine

ss p

roce

sses

and

furth

er in

vest

men

t is

plan

ned

with

the

impl

emen

tatio

n of

an

enha

nced

HR

mod

ule

with

in S

AP

ena

blin

g se

lf-se

rvic

e ac

cess

to s

taff

and

man

ager

s. E

lect

roni

c in

voic

ing

will

ena

ble

an a

utom

ated

pr

oces

s fo

r pay

men

t of i

nvoi

ces

thro

ugh

the

syst

em

rath

er th

an th

roug

h m

anua

l pro

cedu

res.

Thi

s w

ould

fu

rther

impr

ove

paym

ent o

f inv

oice

s pe

rform

ance

and

w

ill e

nabl

e su

pplie

rs to

pro

vide

ele

ctro

nic

invo

ices

, fu

rther

redu

cing

thei

r cos

ts.

Toge

ther

with

the

ratio

nalis

atio

n of

exi

stin

g ad

min

istra

tive

supp

ort

arra

ngem

ents

acr

oss

the

Dire

ctor

ate,

it is

pos

sibl

e to

de

lete

12.

5 ad

min

istra

tive

post

s ov

er th

e ne

xt th

ree-

year

pe

riod

with

out l

oss

of s

ervi

ce.

Ther

e ar

e tw

o po

tent

ial

redu

ndan

cies

(bot

h pa

rt tim

e) e

quiv

alen

t to

one

full

time

post

, whi

ch w

ill b

e m

anag

ed th

roug

h H

R p

roce

dure

s w

ith a

n ai

m to

re-d

eplo

y.

1824

Pos

ts d

elet

ed a

nd b

udge

ts re

duce

dG

reen

Tota

l Pol

icy

Rev

iew

42

3442

Page 110

Page 116: Cabinet Papers - St James St Library

Prog

ress

on

Polic

y R

evie

w S

avin

gs -

Dec

embe

r 200

8

PEO

PLE,

PO

LIC

Y A

ND

PER

FOR

MA

NC

E

Ref

No

Shor

t Des

crip

tion

Estim

ated

Sa

ving

Det

ails

:

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar

end

savi

ngC

omm

ents

Traf

fic L

ight

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

C1

Am

alga

mat

e cu

rren

t Ser

vice

H

elpd

esks

32

Ther

e ar

e a

num

ber o

f sep

arat

e se

rvic

e he

lpde

sks

oper

atin

g ac

ross

the

Dire

ctor

ate

invo

lvin

g so

me

20 o

r so

staf

f and

pro

vidi

ng s

uppo

rt to

inte

rnal

sta

ff, in

clud

ing

thos

e in

WFD

, Fac

ilitie

s M

anag

emen

t, IC

T an

d th

e S

hare

d S

ervi

ce C

entre

. The

con

solid

atio

n of

team

s an

d m

anag

emen

t fun

ctio

ns w

ill e

nabl

e re

duct

ions

in s

taffi

ng

and

softw

are

cost

s. T

here

are

no

redu

ndan

cy

impl

icat

ions

.

2432

Bud

get r

educ

ed. S

avin

gs m

et fr

om w

ithin

ov

eral

l HR

stru

ctur

eG

reen

C2+

3Im

plem

enta

tion

of S

AP

Hum

an

Cap

ital M

anag

emen

t Mod

ule

128

The

impl

emen

tatio

n of

the

SA

P H

uman

Cap

ital

Man

agem

ent a

nd E

-Invo

icin

g m

odul

es w

ill e

nabl

e re

stru

ctur

ing

of th

e S

hare

d S

ervi

ce C

entre

lead

ing

to th

e re

duct

ion

in th

e nu

mbe

r of a

dmin

istra

tive

and

supe

rvis

ory

post

s (n

o re

dund

ancy

impl

icat

ions

) and

the

redu

ctio

n in

the

prin

ting

and

adm

inis

trativ

e co

sts

of

dist

ribut

ing

pay

slip

s. C

urre

nt p

roce

ss fo

r dis

tribu

ting

pays

lips

will

con

tinue

for s

taff

who

are

non

-PC

use

rs a

nd

thos

e w

ho d

o no

t hav

e ac

cess

to P

Cs.

No

chan

ge is

en

visa

ged

in th

e di

strib

utio

n of

P45

s an

d P

60s.

9612

8R

e-st

ruct

ure

impl

emen

ted

2007

/08

Gre

en

C15

Red

uce

Fixt

ures

and

Fitt

ings

and

E

quip

men

t bud

gets

0.4

Red

uctio

ns in

thes

e bu

dget

s ar

e po

ssib

le to

refle

ct p

ast

spen

ding

leve

ls a

nd th

e cu

rren

t inv

estm

ent b

eing

mad

e in

the

Cou

ncil's

adm

inis

trativ

e bu

ildin

gs th

roug

h th

e B

IG

Pro

ject

. Th

ere

are

no E

qual

ity Im

pact

impl

icat

ions

as

ther

e w

ill b

e su

ffici

ent b

udge

t to

mee

t prio

rity

heal

th a

nd

safe

ty a

nd o

ther

bus

ines

s cr

itica

l req

uire

men

ts.

This

will

in

clud

e an

y sp

ecia

list e

quip

men

t, et

c. re

quire

d by

di

sabl

ed s

taff.

0.4

0.4

Ach

ieve

d in

Hum

an R

esou

rces

.G

reen

X10

Com

mun

icat

ions

Out

door

ad

verti

sing

55

It is

pro

pose

d to

pro

mot

e ou

tdoo

r stre

et a

dver

tisin

g w

hich

will

incl

ude

look

ing

at n

ew m

edia

suc

h as

la

mpp

ost b

ased

vid

eo s

cree

ns.

Bas

ed o

n re

sear

ch

unde

rtake

n on

the

expe

rienc

e of

oth

er lo

cal a

utho

ritie

s, it

is

pre

dict

ed th

at s

igni

fican

t inc

ome

can

begi

n to

be

gene

rate

d in

yea

r tw

o (2

008/

09).

00

Due

to th

is in

volv

ing

a co

ntra

ct th

at m

ay

inte

rfere

with

pro

posa

ls fo

r 201

2 O

lym

pics

, th

is h

as n

ot b

een

prog

ress

ed.

Red

Alte

rnat

ive

savi

ngs

to b

e id

entif

ied

(X10

)0

It is

pro

pose

d to

trea

t thi

s as

par

t of o

vera

ll ol

ympi

cs

spon

sors

hip

targ

et0

55G

reen

Page 111

Page 117: Cabinet Papers - St James St Library

PEO

PLE,

PO

LIC

Y A

ND

PER

FOR

MA

NC

E

Ref

No

Shor

t Des

crip

tion

Estim

ated

Sa

ving

Det

ails

:

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar

end

savi

ngC

omm

ents

Traf

fic L

ight

Ris

ks Is

sues

2008

/09

£'00

0£'

000

£'00

0

X13

Pol

icv

and

Par

tner

ship

s M

ulti

Ling

ual A

dvic

e C

entre

10

As

part

of a

larg

er re

view

of v

olun

tary

sec

tor

com

mis

sion

ing

it is

pro

pose

d th

at th

e C

ounc

il w

ill

cons

olid

ate

supp

ort f

or a

mul

ti-lin

gual

adv

ice

cent

re

rath

er th

an g

ivin

g su

ppor

t to

vario

us s

ingl

e gr

oups

. Th

is

will

resu

lt in

a s

ervi

ce th

at is

mor

e re

spon

sive

to

chan

ging

com

mun

ity n

eeds

. W

hils

t com

mis

sion

ing

is

com

ing

into

pla

y in

yea

r one

, it w

ould

be

inad

visa

ble

to

seek

sav

ings

unt

il th

e se

rvic

e ha

s be

en fu

lly e

stab

lishe

d as

ther

e ar

e lik

ely

to b

e se

t-up

cost

s at

the

front

end

.

Sav

ings

ther

efor

e w

ill c

ome

into

pla

y fro

m y

ear t

wo.

1010

Gra

nt s

uppo

rt ad

just

edG

reen

X14

Pol

icy

and

Par

tner

ship

s G

rant

s to

V

olun

tary

Sec

tor

28

Cab

inet

agr

eed

a fre

eze

in S

epte

mbe

r 200

6 on

in

flatio

nary

incr

ease

s fo

r vol

unta

ry s

ecto

r com

mis

sion

ing

from

200

7/08

to 2

009/

10.

The

ove

rall

savi

ngs

are

base

d up

on a

n an

nual

sav

ing

on in

flatio

n of

2.2

5% w

hich

is

in li

ne w

ith th

e ef

ficie

ncie

s ex

pect

ed b

y ce

ntra

l go

vern

men

t of t

he p

ublic

sec

tor t

hrou

gh G

ersh

on

prin

cipl

es

2828

Ach

ieve

d. B

udge

ts re

duce

d.G

reen

X15

Pol

icy

and

Par

tner

ship

s - d

elet

ion

of p

ost

37

It is

exp

ecte

d th

at th

e re

sour

ces

of th

is te

am w

ill

incr

ease

ove

r the

nex

t yea

r or s

o th

roug

h th

e tra

nsfe

r of

staf

f fro

m e

lsew

here

in th

e or

gani

satio

n. G

iven

the

over

all i

ncre

ase

in s

ize

of th

e te

am it

is c

onsi

dere

d th

at

the

wor

k w

ill b

e ab

le to

be

orga

nise

d in

suc

h a

way

as

to

mak

e th

e re

duct

ion

of o

ne p

ost i

n ye

ar tw

o po

ssib

le

whi

lst s

till m

aint

aini

ng c

urre

nt p

rodu

ctiv

ity.

It is

exp

ecte

d th

at o

ver t

he c

ours

e of

the

next

18

mon

ths

a va

canc

y w

ill

occu

r nat

ural

ly a

nd th

ere

will

be

no n

eed

to m

anag

e a

redu

ndan

cy s

ituat

ion.

2737

Ach

ieve

d. P

ost d

elet

ed.

Gre

en

Tota

l Pol

icy

Rev

iew

290.

418

5.4

290.

4

Page 112

Page 118: Cabinet Papers - St James St Library

Cos

t C

entr

eSe

rvic

e A

rea

Act

ions

requ

ired

/ Des

crip

tion

Com

men

ts

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

Cro

ss D

irect

orat

e - H

sg /

MH

84S

uppo

rting

Peo

ple

sche

mes

fund

ing

re-

allo

catio

n50

84

A fu

ndin

g bi

d ha

s be

en a

gree

d pr

ovis

iona

lly, s

ubje

ct to

the

cost

s be

ing

in re

latio

n to

sup

port,

not

pr

ovis

ion

of te

mpo

rary

ac

com

mod

atio

n. W

ork

is b

eing

ca

rrie

d ou

t on

this

by

Ser

vice

m

anag

ers

Gre

en

Cro

ss D

irect

orat

e72

7A

dditi

onal

fund

ing

from

the

Prim

ary

Car

e Tr

ust (

PC

T) &

Sup

porti

ng P

eopl

e G

rant

072

7

Add

ition

al fu

ndin

g ha

s be

en a

gree

d to

unde

rtake

a n

umbe

r of p

roje

cts

of

mut

ual b

enef

it. S

ome

spen

d w

ill b

e fo

r new

pro

ject

s, w

ith th

e re

sidu

al

amou

nt h

avin

g a

bene

ficia

l effe

ct o

n th

e bu

dget

ary

posi

tion.

Am

ber

Tota

l In-

Year

Sav

ings

811

5081

1

APPENDIX HA

ctio

n Pl

an fo

r Sav

ings

200

8/09

- D

ecem

ber 2

008

Estim

ated

Sa

ving

AD

ULT

AN

D C

OM

MU

NIT

Y SE

RVI

CES

DIR

ECTO

RA

TE

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar e

nd

savi

ng

Traf

fic

Ligh

t

Page 113

Page 119: Cabinet Papers - St James St Library

Adv

ance

d ne

gotia

tions

with

the

PCT

in N

ovem

ber h

as s

ince

reve

aled

that

the

£1,0

52,0

00 p

oten

tially

reco

vera

ble

from

PC

T an

d pr

ojec

ted

will

no

t be

real

ised

. It

is n

ow e

vide

nt th

at d

ue to

cos

ts p

ress

ures

with

in th

e PC

T th

at th

ey w

ill b

e re

leas

ing

less

mon

ies

for c

ontr

ibut

ions

to jo

int

care

pla

cem

ents

cos

ts.

This

sch

edul

e ha

s th

eref

ore

been

am

ende

d to

refle

ct th

is lo

ss a

nd a

ltern

ativ

e sa

ving

s re

prof

iled.

Cos

t Cen

tre

Serv

ice

Are

aA

ctio

ns re

quire

d / D

escr

iptio

nC

omm

ents

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

1127

C&

F0

Neg

otia

ting

with

PC

T to

incr

ease

thei

r inc

ome

cont

ribut

ion

tow

ards

the

join

t pla

cem

ent c

osts

. Thi

s el

emen

t tha

t was

sho

wn

to b

e £5

26k

in p

rior m

onth

s is

no

long

er a

chei

veab

le fo

llow

ing

disc

ussi

ons

with

the

PC

T.

See

Sup

porti

ng p

eopl

e w

hich

is n

ow re

plac

ing

a la

rge

prop

ortio

n of

this

.

00

Rec

ent d

iscu

ssio

n w

ith P

CT

have

reve

aled

that

we

will

not

re

ceiv

e th

is e

lem

ent

1127

C&

F50

0N

egot

iatin

g w

ith P

CT

to in

crea

se th

eir i

ncom

e co

ntrib

utio

n to

war

ds th

e co

st o

f joi

nt p

lace

men

ts. T

his

man

y no

t be

real

ised

050

0P

CT

have

not

giv

en a

de

finiti

ve fi

gure

Am

ber

2165

C&

F30

4

Rea

ttrib

utio

n of

cos

ts o

f sem

i ind

epen

dent

acc

omad

atio

n to

sup

porti

ng p

eopl

e gr

ant .

Thi

s sa

ving

is n

ow b

eing

sh

own

agai

nst t

he p

lace

men

t ove

rspe

nd a

nd re

plac

es a

pr

opor

tion

of th

e P

CT

cont

ribut

ion

now

dee

med

not

ac

heiv

eabl

e.

304

304

A b

id w

as m

ade

to th

e S

uppo

rting

Peo

ple

Com

mis

sion

ing

Boa

rd a

nd

agre

ed o

n 3r

d N

ovem

ber

2008

Gre

en

1108

Rea

ttrib

utio

n of

CA

MH

S g

rant

100

Dur

ing

the

final

qua

rter o

f the

yea

r elig

ible

cos

ts w

ithin

C

&F

will

be

reat

tribu

ted

agai

nst t

his

gran

t.75

100

Man

ager

nee

ds to

con

firm

by

sign

ing

off

Gre

en

vario

us c

ost

cent

res

in

Edu

catio

n fo

r C

omm

uniti

es

Rea

ttrib

utio

n of

sur

e st

art g

rant

315

Cos

ts in

C&

F re

latin

g to

und

er 5

pro

visi

on w

ill b

e re

attri

bute

d to

sur

e st

art g

rant

23

631

5N

one

Gre

en

vario

us C

&F

cost

cen

tres

C&

F 57

6

A n

umbe

r of s

peci

fic u

nder

spen

ds in

sta

ff co

sts,

sec

tion

17 p

rovi

sion

s an

d sl

ippa

ge fr

om fa

mily

cen

tre p

roje

cts

and

othe

r spe

nd h

ave

been

iden

tifie

d to

sup

port

the

plac

emen

t ove

rspe

nd.

234

576

Low

risk

G

reen

CH

ILD

REN

AN

D Y

OU

NG

PEO

PLE

SER

VIC

ES D

IREC

TOR

ATE

Act

ion

Plan

for S

avin

gs 2

008/

09 -

Dec

embe

r 200

8

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar

end

savi

ngTr

affic

Lig

ht

Estim

ated

In-

Year

Sav

ing

Page 114

Page 120: Cabinet Papers - St James St Library

Cos

t Cen

tre

Serv

ice

Are

aA

ctio

ns re

quire

d / D

escr

iptio

nC

omm

ents

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar

end

savi

ngTr

affic

Lig

ht

Estim

ated

In-

Year

Sav

ing

Var

ious

se

rvic

es

Sav

ings

iden

tifie

d fro

m

man

agem

ent a

ctio

n up

to

mon

th 6

-non

sal

ary

308

Thes

e sa

ving

s ha

ve a

risen

follo

win

g m

anag

emen

t act

ion

to h

old

unde

rspe

nds

with

in s

ervi

ce a

reas

aga

inst

the

plac

emen

ts o

ver s

pend

. 0

308

Man

ager

s ar

e in

the

proc

ess

of s

igni

ng o

ff sa

ving

s (s

avin

gs c

onfir

med

sho

wn

agai

nst E

R ta

rget

)

Gre

en

Sub

Tota

l2,

103

849

2,10

3

Var

ious

cod

es w

ithin

CY

PS

250

Man

ager

s co

ntin

ue to

see

k sa

ving

s ag

ains

t the

ER

targ

et

.In e

arly

Nov

embe

r gra

nt o

f £30

4k w

as id

entif

ied

agai

nst

supp

ortin

g co

sts

of y

oung

peo

ple

,this

was

sho

wn

as

savi

ng a

gain

st th

e E

R ta

rget

, how

ever

it is

now

dee

med

th

at it

is s

how

n ag

ains

t the

pla

cem

ent o

vers

pend

. M

anag

ers

are

bein

g as

ked

to lo

ok fo

r fur

ther

sav

ings

025

0

Man

ager

s ar

e no

w b

eing

as

ked

to fi

nd s

avin

gs to

re

plac

e th

ose

no lo

nger

ac

heiv

able

by

the

PC

T

Red

268

Ext

ra s

avin

gs to

be

foun

d to

offs

et c

osts

of n

ew

plac

emen

ts d

urin

g D

ecem

ber,

incl

udin

g on

e re

man

d pl

acem

ent

026

8R

ed

Tota

l2,

621

849

2,62

1

Page 115

Page 121: Cabinet Papers - St James St Library

Cos

t C

entr

eSe

rvic

e A

rea

Act

ions

requ

ired

/ Des

crip

tion

Com

men

ts

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

var

Con

sum

er P

rote

ctio

n68

.0A

com

bina

tion

of re

crui

tmen

t del

ays

and

hold

ing

unde

rspe

nds

on ru

nnin

g co

st a

ctiv

ity s

ee d

etai

led

tem

plat

e fo

r mor

e in

form

atio

n68

.068

.0G

reen

1622

Dev

elop

men

t12

3.0

Del

ay in

spe

ndin

g gr

owth

mon

ey in

Reg

ener

atio

n an

d S

patia

l pla

nnin

g12

3.0

123.

0G

reen

1622

Dev

elop

men

t50

.0A

furth

er d

elay

on

the

new

Reg

ener

atio

n po

st50

.050

.0G

reen

2238

ICT

6.0

WFD

Chi

ngfo

rd S

hop

- Gro

wth

item

- sl

ippa

ge in

op

enin

g th

e S

hop

6.0

6.0

Gre

en

2083

ICT

65.4

Vac

ancy

fact

or fo

r SA

P s

taff

in th

e ea

rly p

art o

f the

yea

r65

.465

.4G

reen

var

Pub

lic R

ealm

508.

8H

oppa

Bus

& P

arki

ng A

ccou

nt P

rovi

sion

508.

850

8.8

Gre

en18

18R

esou

rces

30.6

Sal

ary

scal

e 6

offic

er p

ost h

eld

vaca

nt.

30.6

30.6

Gre

en20

99S

afe

& S

trong

36.8

Del

ay in

recr

uitin

g to

Stre

et W

arde

n M

anag

er36

.836

.8G

reen

2099

Saf

e &

Stro

ng25

.4D

elay

in re

crui

ting

to 2

Stre

et W

arde

n P

osts

25.4

25.4

Gre

en20

99S

afe

& S

trong

10.0

Red

uctio

n in

Stre

et W

arde

n A

ctiv

ity C

osts

10.0

10.0

Gre

enTo

tal I

n-Ye

ar S

avin

gs92

4.0

924.

092

4.0

Traf

fic L

ight

ENVI

RO

NM

ENT

AN

D R

EGEN

ERA

TIO

N S

ERVI

CES

DIR

ECTO

RA

TE

Estim

ated

Sa

ving

Act

ion

Plan

for S

avin

gs 2

008/

09 -

Dec

embe

r 200

8

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar e

nd

savi

ng

Page 116

Page 122: Cabinet Papers - St James St Library

Cos

t C

entr

eSe

rvic

e A

rea

Act

ions

requ

ired

/ Des

crip

tion

Com

men

ts

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

1309

Pro

perty

Ser

vice

s16

6C

omm

erci

al R

ent I

ncom

e - B

udge

t und

erst

ates

re

nt ro

ll12

516

6R

ent c

olle

cted

qua

rterly

Gre

en

2292

Pro

perty

Ser

vice

s29

7C

omm

erci

al R

ent I

ncom

e - S

elbo

urne

Wal

k ar

rear

s27

429

7A

rrea

rs n

ow in

voic

ed. F

inal

sav

ing

to

com

e in

last

qua

rter

Gre

en

1052

Rev

enue

s &

Ben

efits

253

Add

ition

al s

ubsi

dy -

hous

ing

bene

fits

025

3

This

dep

ends

on

achi

evem

ent o

f a

good

sta

ndar

d of

ove

rpay

men

t re

duct

ion

- fin

al re

sult

will

not

be

know

n un

til e

nd o

f yea

r (th

ough

it is

cu

rren

tly o

n co

urse

to a

chie

ve)

Gre

en

Tota

l In-

Year

Sav

ings

716

399

716

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar e

nd

savi

ng

Traf

fic L

ight

FIN

AN

CE

DEP

AR

TMEN

T

Estim

ated

Sa

ving

Act

ion

Plan

for S

avin

gs 2

008/

09 -

Dec

embe

r 200

8

Page 117

Page 123: Cabinet Papers - St James St Library

Cos

t Cen

tre

Serv

ice

Are

aA

ctio

ns re

quire

d / D

escr

iptio

nSa

ving

s to

M

onth

9C

omm

ents

Traf

fic L

ight

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

1304

Ele

ctor

al S

ervi

ces

17E

lect

ion

Acc

ount

Sav

ings

1717

Targ

et s

avin

gs c

urre

ntly

on

track

to b

e ac

hiev

ed.

Gre

en

1293

Cor

pora

te L

aw14

Mon

itorin

g O

ffice

r Acc

ount

(129

3)10

14G

reen

1296

Mem

bers

' Sup

port

15S

taff

Cos

ts S

avin

gs -

Mem

bers

' Sup

port

Ser

vice

s11

15S

ervi

ce is

cur

rent

ly u

nder

spen

ding

Gre

en13

0030

Res

olut

ion

of O

utst

andi

ng L

itiga

tion

2525

Cas

e no

w re

solv

edG

reen

1304

Ele

ctor

al S

ervi

ces

5S

taff

Cos

ts S

avin

gs -

Ele

ctor

al S

ervi

ces

35

Cur

rent

ly o

n ta

rget

due

to v

acan

t pos

tG

reen

1008

Scr

utin

y17

Sta

ff C

osts

Sav

ings

- S

crut

iny

1317

Cur

rent

ly o

n ta

rget

due

to v

acan

t pos

tG

reen

1293

Cor

pora

te L

aw5

Sta

ff C

osts

Sav

ings

- C

orpo

rate

Info

rmat

ion

Offi

cer

710

Look

ing

to c

over

from

vac

ant p

ost

Gre

en

1008

, 128

7,

1304

, 130

63

Trai

ning

Bud

get s

avin

gs2

3P

lann

ed u

nder

spen

d in

the

area

s id

entif

ied.

Gre

en

1304

Ele

ctor

al S

ervi

ces

15S

taff

Cos

ts S

avin

gs -

Hea

d of

Ele

ctor

al &

R

egis

tratio

n S

ervi

ces

(Ten

tativ

ely

plac

ed a

gain

st C

C

1304

)11

15Th

is p

ost i

s cu

rren

tly v

acan

t und

er th

e ne

w s

truct

ure

Gre

en

1306

Reg

istra

rs10

Add

ition

al In

com

e fro

m R

egis

tratio

n S

ervi

ces

710

Bas

ed o

n cu

rren

t tre

nd in

the

issu

ing

of

Birt

h &

Mar

riage

cer

tific

ates

Gre

en

Tota

l In-

Year

Sav

ings

130

106

130

Proj

ecte

d ye

ar e

nd

savi

ng

Act

ion

Plan

for S

avin

gs 2

008/

09 -

Dec

embe

r 200

8

GO

VER

NA

NC

E A

ND

LA

W D

EPA

RTM

ENT

Estim

ated

Sa

ving

Page 118

Page 124: Cabinet Papers - St James St Library

PEO

PLE,

PO

LIC

Y A

ND

PER

FOR

MA

NC

E

Cos

t C

entr

eSe

rvic

e A

rea

Act

ions

requ

ired

/ Des

crip

tion

Savi

ngs

to

Mon

th 9

Proj

ecte

d ye

ar e

nd

savi

ng

Com

men

tsTr

affic

Lig

ht

Ris

ks Is

sues

08/0

9£'

000

£'00

0£'

000

3200

41P

PP

170

Del

ete

rese

rves

set

asi

de fo

r stra

tegi

c in

itiat

ives

and

und

ersp

end

from

pro

gram

mes

170

170

Res

erve

adj

uste

dG

reen

1285

Per

form

ance

& S

ervi

ce

Impr

ovem

ent

70U

se o

f und

ersp

end

in C

entre

of E

xcel

lenc

e bu

dget

due

to v

acan

cies

5270

Gre

en

1578

Per

form

ance

Man

agem

ent

4U

se o

f und

ersp

end

in S

trate

gic

Dire

ctor

ates

' P

erfo

rman

ce T

eam

bud

get d

ue to

vac

anci

es4

4G

reen

Tota

l In-

Year

Sav

ings

244

226

244

Act

ion

Plan

for S

avin

gs 2

008/

09 -

Dec

embe

r 200

8

Estim

ated

Sa

ving

Page 119

Page 125: Cabinet Papers - St James St Library

PROVISIONS, RESERVES AND BALANCES

Actual Actual Actual Estimated EstimatedEARMARKED RESERVES 1st April 2007/08 31st March 2008/09 31st March

2007 Movement 2008 Movement 2009£'000 £'000 £'000 £'000 £'000

Adult and Community Services Learning Disabilities Reserve 1,000 (1,000) 0 0 0

ISIS Phase 3 Development Costs 139 0 139 0 139

Other Social Services Reserves 60 (50) 10 0 10

Homelessness Reserve 1,200 (1,200) 0 0 0

HSA Disabled Facilities Reserve 308 0 308 (225) 83

Willow / Cedar Wood House Reserve 290 (62) 228 (228) 0

Adult Education Reserve 200 0 200 0 200

Other Culture & Leisure Reserves 117 (117) 0 0 0

Children and Young People ServicesBSF and Schools Reserves 159 2,241 2,400 (17) 2,383

School Budget Reserve - SEN 934 65 999 (999) 0

Lammas School PFI Reserve 222 (82) 140 0 140

Grouped Schools PFI Reserve 9,017 (2,203) 6,814 (2,000) 4,814

Transformation Reserve 255 (152) 103 (103) 0

Remand Placements Reserve 220 (220) 0 0 0

Other Reserves 200 (1) 199 (155) 44

Environment and Regeneration ServicesStreet Trading Reserve 83 0 83 (39) 44

Hoppa Bus Reserve 817 0 817 (250) 567

Regeneration Reserve 909 (186) 723 (664) 59

Playground Improvements Reserve 120 (120) 0 0 0

Bywaters Reserve 176 50 226 (50) 176

Building Consultancy Reserve 150 (150) 0 0 0

Building Safer Communities Reserve 0 295 295 (35) 260

Community Safety Issues Reserve 0 219 219 0 219

Sustainable Communities Restructuring 0 440 440 1,002 1,442

Planning Delivery Grant Reserve 0 602 602 147 749

S38 & S278 Agreements Reserve 0 123 123 (55) 68

Other Reserves 353 713 1,066 (341) 725

Governance and LawMunicipal Elections Reserve 104 100 204 100 304

Fluctuating Income Reserve 208 (59) 149 (149) 0

Other Reserves 8 0 8 0 8

People, Policy and PerformancePPP Corporate Initiatives Reserve 109 208 317 (259) 58

Other Reserves 99 (89) 10 (10) 0

Finance DepartmentSilver Birch House Accomm cost Reserve 157 (99) 58 (58) 0

Systems Development Reserve 36 157 193 (160) 33

SAP SRM Upgrade Reserve 0 110 110 0 110

Procurement Restructuring Reserve 0 112 112 135 247

Other Reserves 291 193 484 (266) 218

Insurance Reserve 856 1,165 2,021 N/A N/A

APPENDIX I

11AppIProvisionsReservesDecember080.xls

Page 120

Page 126: Cabinet Papers - St James St Library

Actual Actual Actual Estimated EstimatedEARMARKED RESERVES 1st April 2007/08 31st March 2008/09 31st March

2007 Movement 2008 Movement 2009£'000 £'000 £'000 £'000 £'000

Corporate/Cross CuttingFluctuating NNDR Reserve 254 342 596 N/A N/A

Ill Health/Corporate Redundancies 1,411 4,382 5,793 (200) 5,593

Loss of Grant & Partnership Income 1,478 (352) 1,126 (461) 665

Repairs & Maintenance Reserve 79 1,142 1,221 (465) 756

Loss of Rent Income Reserve 167 170 337 0 337

Revenues & Benefits Subsidy Reserve 617 3,550 4,167 0 4,167

Collection Fund Deficit Reserve 4,033 (1,676) 2,357 (1,955) 402

Invest to Save Fund Reserve 395 (15) 380 60 440

Efficiency Review Reserve 650 1,582 2,232 (2,232) 0

Social Services-Back to Base Issues Reserve 500 (500) 0 0 0

Equal Pay Reserve 2,759 (904) 1,855 (1,579) 276

Waste Disposal Reserve 946 0 946 0 946

Financial Instrument Reserve 0 1,518 1,518 0 1,518

Staff Benefits Reserve & Energy Costs Reserve 73 406 479 (400) 79

Revenue Financing Reserve 4,556 (2,104) 2,452 (2,452) 0

Total General Fund Reserves 36,715 8,544 45,259 (14,364) 28,278

HRA Reserves 8,241 2,003 10,244 (1,550) 8,694

Schools Revenue Reserves 6,577 1,019 7,596 (1,500) 6,096

TOTAL EARMARKED RESERVES 51,533 11,566 63,099 (17,414) 43,068

Actual Actual Actual Estimated EstimatedPROVISIONS 1st April 2007/08 31st March 2008/09 31st March

2007 Movement 2008 Movement 2009£'000 £'000 £'000 £'000 £'000

GENERAL FUNDChildren and Young People 560 (550) 10 10 20

Environment and Regeneration 550 698 1,248 (1,247) 1

People, Policy and Performance 2 (2) 0 0 0

Finance Department 54 (54) 0 0 0

Insurance Provision 5,940 99 6,039 N/A N/A

Corporate/Cross - Cutting 900 178 1,078 (1,078) 0

8,006 369 8,375 (2,315) 21

HOUSING REVENUE ACCOUNTHRA Interest on Purchase Money 48 0 48 0 48

48 0 48 0 48

TOTAL PROVISIONS 8,054 369 8,423 (2,315) 69

Actual Actual Actual Estimated EstimatedWORKING BALANCES 1st April 2007/08 31st March 2008/09 31st March

2007 Movement 2008 Movement 2009£'000 £'000 £'000 £'000 £'000

GENERAL FUND 7,069 838 7,907 (3,300) 4,607

HOUSING REVENUE ACCOUNT 1,407 1,367 2,774 401 3,175

11AppIProvisionsReservesDecember080.xls

Page 121

Page 127: Cabinet Papers - St James St Library

- 1 -

LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Cabinet: 20 January 2009

Title: Decent Homes: Quarter Two and Quarter Three Performance Report July – December 2008

1. Manage population growth and change 2. Improve housing quality and choice with the

right kind of homes in the right places 3. Respond effectively to the threat of climate

change in a practical and effective way

Directorate: Adult and Community Services

Report of: Interim Executive Director, Adult & Community Services

Contact: Head of Housing

Phone: 020 8496 5401

E.Mail: [email protected]

Action required: For Information

Wards affected: All

Appendices: Appendix 1-Decent Homes Performance Appendix 2 -Ward Information Appendix 3 -Tenant Satisfaction Appendix 4 -Details of Delays Appendix 5 -Leasehold Valuation Tribunal Update

Status: Open 1. SUMMARY

1.1. This report summarises the performance data for quarters two and three (July to December 2008) of the Decent Homes Programme to tenants.

1.2. A total of 298 properties were made decent in the second quarter

against a provisional target of 370. The details of the delays to works on properties scheduled for Quarter Two are contained in Appendix 4 to this report.

1.3. At the Cabinet Meeting on the 21 October 08, Quarter One

performance was discussed and it was requested that the shortfall of 84 properties be addressed in Quarter Two.

1.4. The shortfall has been addressed in Quarter Three performance

where the target of 400 properties due to be completed was exceeded and Ascham Homes have confirmed that 467 properties were completed. This means that out of 926 properties due for completion by the end of Quarter Three, Ascham Homes have completed 914, which is 12 short of the target which has almost

Agenda Item 12

Page 122

Page 128: Cabinet Papers - St James St Library

- 2 -

addressed the majority of the shortfall identified in Quarter One, albeit still short. The target for Quarter Four is 641, which, if achieved, will exceed the overall target of 1500 by 55 properties.

1.5. The remaining properties in Quarter Four have been reprofiled to

lessen the impact from the Leasehold Valuation decision (refer to Appendix 5). Properties where access issues have prevented works being started are due to be completed in Quarter Four.

1.6. 42 leaseholder dwellings have been completed in the second quarter and 34 leaseholder dwellings in Quarter three.

1.7. The cumulative year to date capital expenditure up to the third

quarter was £27.389m against a profile budget of £27.250m. 2. RECOMMENDATIONS

2.1. Cabinet is requested to note the second and third quarter performance in the delivery of the Decent Homes Programme.

2.2. Cabinet is requested to note that the decent homes programme has been reprofiled and some leaseholder properties have been programmed to be completed in quarters three and four.

3. PROPOSALS

3.1. Appendix 1 sets out the overall number of properties across the borough made decent during quarters two and three, 298 and 467 respectively.

3.2. Appendix 2 sets out the number of properties completed in each

Ward and the total spend by Contract Area from July to December 08.

3.3. Appendix 3 sets out tenants’ satisfaction and complaints monitoring

for the second quarter. Quarter three complaints data was not available. Out of 216 questionnaires returned, 97% were satisfied with the works completed. Appendix 3A and B shows a consistently high level of resident satisfaction across quarters two and three of 97-98% with Decent Homes works.

3.4. Appendix 4 sets out the reasons for the delays in achieving the

Quarter Two target.

3.5. Appendix 5 sets out the Leasehold Valuation Tribunal update.

3.6. Quality assurance measures are in place for the Decent Homes programme through quarterly monitoring of quality (right first time completions). Benchmarking data is collected for:

Cost Predictability Time Predictability

Page 123

Page 129: Cabinet Papers - St James St Library

- 3 -

Defects (right first time) Numbers of residents satisfied Reported incidents

A revised figure of 898 dwellings will fall out of decency in 2008 and

these properties have been included in this programme as these works will prevent them becoming non decent in 2008/9 which would increase the overall number of non-decent dwellings. Works on 303 properties have been completed to date.

Properties are recorded as having met the Decent Homes standard

when the works identified for that particular property have been completed. The National Indicator 158, Percentage of Non-Decent Homes, is one of Housing’s priority indicators and as such, will be subject to an audit of performance in 2008/9.

The range of works will vary between properties and will broadly fit

into one or more of the following categories which meets the Decent Homes standard:

Roofing repairs / replacement Structural works Installation of new windows and doors Mechanical and electrical improvements and updating External decorations and general repair Thermal efficiency Internal upgrades Security and Sustainable communities

Leasehold Valuation Tribunal (LVT) Update

3.7. See Appendix 5 for LVT update.

4. ALTERNATIVES CONSIDERED 4.1 There is no alternative to deliver decent homes work through

another organisation as Ascham Homes are the preferred delivery agent and were created specifically for this purpose.

5. CONSULTATION

5.1 Consultation on delivery issues is regularly discussed at Contract Panels, which are representative groups of residents in specific geographical areas.

5.2 Extensive resident and leaseholder consultation has continued to take place with the majority of schemes, involving either one-to-one visits or group meetings.

Page 124

Page 130: Cabinet Papers - St James St Library

- 4 -

6. IMPLICATIONS 6.1 Financial

The spend by Ascham Homes up to the third quarter was £27.389m against a budget profile of £27.250m. Spend to budget will be achieved in this financial year. The issues around the outcome of the LVT mean that there is a possibility of a large potential gap in the overall Decent Homes programme. In the short term this is being mitigated by amending the programme to concentrate on blocks or estates where the number of leaseholders is relatively low. Should the appeal prove unsuccessful, the contribution from leaseholders, which underpins the completion of the programme, will not meet the target level. In that eventuality, alternative potential sources of funding would need to be found.

6.2 Legal Ascham Homes is an arms length management organisation (ALMO) providing housing management services to the Council under section 2 of the Local Government Act 2000 and an agreement under section 27 of the Housing Act 1985, as amended. Ascham Homes is a wholly owned Council company but has a separate legal identity to the Council. Decent Homes funding is only provided to ALMOs and not to the Council. Consequently, the Council’s legal powers to determine the use of the funding are, in practice, limited to its influence through its 4 appointed directors on the Executive Board where duties as Directors are in any event owed to the ALMO.

6.3 Human Resources

There are no Human Resources issues arising from this report.

6.4 Health Impact Assessment It is a known fact that living conditions significantly impact on health and well-being. The components of decent homes work will enable tenants and leaseholders to live in better quality housing.

6.5 Equalities impact assessment 6.5.1 It is envisaged that improving the condition and standard of the

council housing stock will have a beneficial impact on all tenants. There are ongoing surveys to check satisfaction with the quality of services received as well as the impact of the new improvements. It is a requirement of the decent homes standard that accessibility of the property will not be reduced and Ascham Homes will monitor this and also look for opportunities for improving the access. The impact on tenants of decent homes work will be continually monitored for any potential adverse impacts on any particular group.

6.5.2 The profile information collated from the Housing database indicates that 25% of LBWF tenants are aged 65 and over, 65% are female and 23% have a disability. It is evident from this information that if the Decent Homes programme is not delivered on target, then there will be a negative impact on older people, women and those with special needs. The Decent Homes Programme will lead to

Page 125

Page 131: Cabinet Papers - St James St Library

- 5 -

improved Housing quality and choice, thus there will be a positive impact on these equality groups, once the programme is completed.

6.5.3 In March 2008 Ascham Homes conducted a survey of homes made decent between 2001 and 2008. This indicated that BME tenants were fairly represented across all categories of Decent Homes works.

6.5.4 Ascham Homes has arrangements in place to test the equality aspects of the delivery of the Decent Homes programme. Diversity data is available on approximately 80% of tenants. Ascham Homes intend to provide a comprehensive report by the end of January 2009, which will be reported to Cabinet.

6.6 Climate Change Impact Assessment 6.6.1 Sustainable results and long term benefits have arisen from the

Affordable Warmth project, which addresses the needs of homeowners, private tenants and council tenants for information and advice on home energy checks.

6.6.2 The average SAP rating of the Council stock is 76, which is the second best in London, and is also above the CPA upper threshold of 65. Ascham Homes, has contributed to this as part of the Decent Homes programme, and has carried out a high number of cavity insulations through grants, compared to other London boroughs.

6.6.3 Recycling statistics for the second quarter confirm that Bywaters exchanged or collected 290 skips across all sites. The total amount of mixed waste collected during this period was 766 tonnes, an increase of nearly 50% on the first quarter (391 tonnes). Bywaters recycle the following materials: wood, metal, hardcore, plastic and slates. Information for quarter three is not yet available.

7 CONCLUSION 7.1 This report presents information about the delivery of the Decent

Homes Programme, for the second and third quarters of 2008/9.

8. Background Information: - Report to Cabinet, 19 June 2007 – Decent Homes Delivery Plan Quarter One Decent Homes Report – Cabinet 21 October 2008

This report has been cleared after discussion with the Portfolio

Member

Signed: Date: 7.1.2009 Portfolio Member for Communities and Housing

Page 126

Page 132: Cabinet Papers - St James St Library

Page 127

Page 133: Cabinet Papers - St James St Library

- 7 -

App

endi

x 1

D

ecen

t Hom

es Q

uart

er T

wo

and

Qua

rter

Thr

ee P

erfo

rman

ce

A

scha

m H

omes

Dec

ent H

omes

CLG

Mon

itorin

g Fo

rm

2008

/9

Qua

rter

One

R

etur

n A

pril-

June

2008

/9

Qua

rter

Tw

o R

etur

n Ju

ly-

Sept

embe

r

2008

/9

Qua

rter

Thr

ee

Ret

urn

Oct

ober

- N

ovem

ber

Num

ber o

f pro

pert

ies

at s

tart

of q

uart

er

1052

4 10

522

1052

2 N

umbe

r of D

ecen

t pro

pert

ies

at s

tart

of q

uart

er

4942

50

91

5389

Po

sitio

n at

st

art o

f re

port

ing

perio

d N

umbe

r of N

on-D

ecen

t pro

pert

ies

at s

tart

of q

uart

er

5582

54

31

5133

H

omes

mad

e D

ecen

t in

quar

ter

149

298

467

Hom

es b

ecom

ing

Non

-Dec

ent i

n qu

arte

r 0

0 0

Stoc

k re

duct

ion

cons

istin

g of

Rig

ht to

Buy

s 2

0 0

Cha

nge

with

in

repo

rtin

g qu

arte

r To

tal S

tock

redu

ctio

ns

2 0

0 N

umbe

r of D

ecen

t pro

pert

ies

at e

nd o

f qua

rter

50

91

5389

58

56

Num

ber o

f Non

-Dec

ent p

rope

rtie

s at

end

of q

uart

er

5431

51

33

4666

Po

sitio

n at

en

d of

re

port

ing

perio

d N

umbe

r of p

rope

rtie

s at

end

of q

uart

er

1052

2 10

522

1052

2

Page 128

Page 134: Cabinet Papers - St James St Library

- 8 -

App

endi

x 2A

W

ard

Info

rmat

ion:

Jul

y to

Sep

tem

ber 2

008

Oct

ober

to D

ecem

ber 2

008

To

tal N

umbe

r of C

ompl

eted

Pro

pert

ies

C

ount

of P

rope

rties

Ju

ly-S

ept 0

8

Cou

nt o

f Pro

perti

es

Oct

- Dec

08

WA

RD

To

tal

W

AR

D

Tota

l C

ATH

L 13

BIL

LE

5 C

HA

LL

32

C

ATH

L 39

C

HA

PL

2

CH

ALL

118

CH

ING

12

CH

AP

L 0

EN

DLE

52

CH

ING

11

E

PP

NG

0

E

ND

LE

44

HAE

ND

4

EP

PN

G

0 H

ATC

H

9

HAE

ND

20

H

HIL

L 42

HA

TCH

6

HIG

H

40

H

HIL

L 82

H

OE

ST

2

HIG

H

38

LAR

KS

26

HO

ES

T 28

LE

YB

R

2

LAR

KS

4

MAR

K 0

LE

YBR

3

VA

LLY

31

M

AR

K

1 W

FOR

D

0

VA

LLY

3 W

ILLM

13

WFO

RD

0

WO

OD

18

WIL

LM

0 G

rand

Tot

al

298

W

OO

D

65

G

rand

Tot

al

467

Page 129

Page 135: Cabinet Papers - St James St Library

- 9 -

Appendix 2B Total Spend by Contract Area July to September 2008

EXPENDITURE AREA Budget Total Total Spend at

July to Sept Decent Homes

July to Sept CONTRACT AREA 1 £ 1,096,510 £ 59,209 CONTRACT AREA 1 A £ 4,137,609 £ 1,665,408 134 CONTRACT AREA 2 £ 1,705,188 £ 257,519 CONTRACT AREA 2 A £ 9,791,761 £ 1,914,888 21 CONTRACT AREA 3 £ 921,260 £ 630,920 CONTRACT AREA 3 A £ 3,394,480 £ 1,462,319 55 CONTRACT AREA 4 £ 944,210 £ 583,774 CONTRACT AREA 4 A £ 3,490,025 £ 813,875 42 CONTRACT AREA 5 £ 6,780 £ - CONTRACT AREA 5 A £ 29,725 £ - CONTRACT AREA 6 £ 1,039,658 £ 411,714 CONTRACT AREA 6 A £ 838,116 £ 50,287 45 CONTRACT AREA 7 £ 226,394 £ 32,522 CONTRACT AREA 7 A £ 668,033 £ 27,937 MRA AREA 1 £ 1,018,988 £ 74,585 MRA AREA 2 £ 471,516 £ 30,058 MRA AREA 3 £ 196,600 £ 14,681 MRA AREA 4 £ 202,628 £ 15,132 MRA AREA 5 £ 1,781 £ 133 MRA AREA 6 £ 424,185 £ 42,630 MRA AREA 7 £ 34,251 £ 2,557 MRA CENTRAL HEATING £ 1,000,000 £ 437,741 MRA HEAT RECOVERY £ 250,000 £ 120,183 MRA ELECTRICAL WORKS £ 250,000 £ 154,594 MRA TANK WORKS £ 300,000 £ 51,720 MRA CROSS BOROUGH INSULATION £ 100,000 £ 36,537 MRA ENERGY WORKS £ 90,000 £ 15,632 MRA TANK WORKS JW/FW £ 1,000,000 £ 111,102 MRA ENVIRONMENTAL / PLANNED £ 1,000,000 £ 247,994 MRA BUILDING WORKS £ 119,050 £ - MRA HOSTELS £ 100,000 £ 19,179 MRA VOIDS £ 1,200,000 £ 250,372 VOIDS DH £ 740,000 £ 269,310 1 CONVERSIONS VOIDS £ 141,000 £ 44,917 ST ANDREWS CT £ 450,000 £ - PRIVATE SECTOR HEATING £ 20,000 £ 11,167 HOMES FOR LIFE £ 534,000 £ 148,035 PEACOCK CLOSE £ - £ - CHP £ 96,000 £ - Grand Total £38,029,749.00 £ 10,008,630.83 298

Page 130

Page 136: Cabinet Papers - St James St Library

- 10 -

Appendix 2C Total Spend by Contract Area Oct to December 2008

EXPENDITURE AREA Budget Total Estimated Spend at Oct to December

Decent Homes Oct to December

CONTRACT AREA 1 £ 1,096,510 £ 46,137 CONTRACT AREA 1 A £ 4,137,609 £ 1,314,713 87 CONTRACT AREA 2 £ 1,705,188 £ 47,204 CONTRACT AREA 2 A £ 9,791,761 £ 2,620,369 89 CONTRACT AREA 3 £ 921,260 £ 46,137 CONTRACT AREA 3 A £ 3,394,480 £ 1,660,289 78 CONTRACT AREA 4 £ 944,210 £ 218,752 CONTRACT AREA 4 A £ 3,490,025 £ 1,336,839 37 CONTRACT AREA 5 £ 6,780 £ - CONTRACT AREA 5 A £ 29,725 £ - CONTRACT AREA 6 £ 1,039,658 £ 408,799 CONTRACT AREA 6 A £ 838,116 £ 50,529 156 CONTRACT AREA 7 £ 226,394 £ 121,504 CONTRACT AREA 7 A £ 668,033 £ 77,014 5 MRA AREA 1 £ 1,018,988 £ 293,577 MRA AREA 2 £ 471,516 £ 121,247 MRA AREA 3 £ 196,600 £ 108,898 MRA AREA 4 £ 202,628 £ 15,131 MRA AREA 5 £ 1,781 £ 133 MRA AREA 6 £ 424,185 £ 84,841 MRA AREA 7 £ 34,251 £ 14,559 MRA CENTRAL HEATING £ 1,000,000 £ 236,182 MRA HEAT RECOVERY £ 250,000 £ 50,744 MRA ELECTRICAL WORKS £ 250,000 £ 73,546 MRA TANK WORKS £ 300,000 £ 42,737 MRA CROSS BOROUGH INSULATION £ 100,000 £ 16,164 MRA ENERGY WORKS £ 90,000 £ 18,792 MRA TANK WORKS JW/FW £ 1,000,000 £ 382,960 MRA ENVIRONMENTAL / PLANNED £ 1,000,000 £ 363,918 MRA BUILDING WORKS £ 119,050 £ 4,002 MRA HOSTELS £ 100,000 £ 80,045 MRA VOIDS £ 1,200,000 £ 533,780 VOIDS DH £ 740,000 £ 204,813 15 CONVERSIONS VOIDS £ 224,000 £ 32,663 ST ANDREWS CT £ 450,000 £ - PRIVATE SECTOR HEATING £ 20,000 £ 2,962 HOMES FOR LIFE £ 534,000 £ 121,442 PEACOCK CLOSE £ - CHP £ 96,000 £ 55,084 Grand Total £ 38,112,749 £ 10,806,505 467

Page 131

Page 137: Cabinet Papers - St James St Library

- 11 -

Appendix 3 Tenant Satisfaction in Quarter Two with Decent Homes Programme

Quarter 2 2008/9 Tenant Satisfaction 1. Number and % of

refusals Zero

2. Number of returned satisfaction questionnaires

216 Residents returned questionnaires out of 528 distributed

3. % of satisfaction awarded 97% Satisfaction awarded 4. Number of complaints

received 20 Reported by Contract Partners

5. Number of complaints answered in time (within 28 working days)

All initially responded to in time. 16 out of the 20 complaints resolved within 28 working days. The 4 outside the timeframe required further investigation or are awaiting response from residents.

6. Top five areas of complaint

1) A resident at Holmes Avenue complained about Workmanship, a missing torch pen .

Outcome: The RLO left numerous voice messages with the resident to arrange works to be looked at again. RLO also advised resident to give us a receipt for the torch and the Contract Partner would reimburse them. The resident has not got back to the Contract Partner to date, despite 3 letters being sent to them.

2) A resident at Western Road reported a broken Lawn edging on 25th

September 08, as detailed in the relevant QA2 and QA3. White Gravel replaced on 13th October 08 by Apollo Roofing.

Outcome: Resident reimbursed £25 on 27th October 08. 3) A resident at Titley Close complained on 8th August 08 that 1day

electrical upgrade turned into a 3day re-wire. Resident also claims that operatives damaged fridge/freezer and grill handle.

Outcome: All operatives have been interviewed but no blame attributable. Signed off as resolved on 7th October 08.

4) In September, a resident at Chingford Lane complained that as

part of the Area 1 electrical works, a faulty freezer socket was installed and the contents of the freezer were spoiled.

Outcome: The situation was resolved by Birchcroft who gave the resident £50 as compensation to cover the cost of food items.

5) Complaint at Chingford Lane on 8th September 08 that minor works

outstanding. Outcome: All snagging items completed by end of play 8th

September 08 and photos taken by RLO.

Information for quarter three is not yet available

Page 132

Page 138: Cabinet Papers - St James St Library

- 12 -

Appendix 3A Resident Satisfaction for Quarter 2 - 2008/2009

Number of answers 'satisfied'

Number of answers

'dissatisfied' Number 2393 92

Percentage 96.30% 3.70%

Page 133

Page 139: Cabinet Papers - St James St Library

- 13 -

Appendix 3B Resident Satisfaction for Quarter 3 - 2008

Number of answers 'satisfied'

Number of answers

'dissatisfied' Number 3798 79

Percentage 97.96% 2.04%

Page 134

Page 140: Cabinet Papers - St James St Library

- 14 -

Appendix 4 Detail of Delays to Works on Properties Scheduled for Quarter Two Attlee Terrace (28 properties) – Delays have occurred in the approval of Planning and Building Control for the scheme. NPS Ltd, failed to submit the applications. Applications have been made, but this has delayed manufacture of balustrades and these will not start to be installed until November. As previously reported, the start of the scheme was delayed due to leaseholders requesting an independent survey of the roof covering before works could commence. 2 Kimm House (1 property) - Requested by LBWF to decant tenant due to structural issues. Millfield Avenue (24 properties) – during course of work DPC failure was identified, this resulted in a new DPC membrane to be installed extending the contract period. Canons & Southfield Crt (19 Properties) – Identified for electrical test only, during inspection additional works were required to achieve decent homes criteria.

Page 135

Page 141: Cabinet Papers - St James St Library

- 15 -

Appendix 5 Leasehold Valuation Tribunal (LVT) Update

1. As previously reported in the Quarter One report, Ascham Homes, when undertaking works on properties where leaseholders have exercised their right to buy, have a legal duty to consult about the works with those leaseholders. This is the basis for recovering some of the costs from those leaseholders. Consultation did not take place in accordance with the statutory procedure. Ascham Homes was therefore required to apply to the Leasehold Valuation Tribunal (LVT) – an independent body – for a dispensation waiving the consultation requirements. The LVT did not grant the dispensation to appeal therefore Ascham Homes would now need to repeat the same process with the Lands Tribunal.

2. The appeal has been lodged but could take up to a year to be heard.

3. The Leasehold Valuation Tribunal suggested Ascham Homes could provide detailed

costs to leaseholders at the time tenders were received. The Decent Homes programme was dependent on the Council’s 10% survey of the stock, which was extrapolated to achieve cross borough costs. It was for this reason that accurate costs could not be given. To provide accurate costs, it would therefore be necessary to survey each property and then construct the programme.

4. Ascham Homes have provided detailed plans to the Council of how to address the

problems caused by the LVT decision and will ensure that the Council’s lawyers, leaseholders and tenants are kept informed of the appeal process.

5. In light of the LVT decision and the changes necessary to mitigate financial loss to the

Council, the programme must be re-profiled, meaning that the order of works to leaseholders will have to change. This will impact on Council tenants as it is not possible to isolate specific blocks as leaseholders are dispersed among the housing stock.

6. For tenants, there is no obligation to pay any contribution to works but works may be

delayed. For leaseholders, there is still a duty to make a contribution but the size of that contribution cannot be determined until after the appeal process has been completed.

Page 136

Page 142: Cabinet Papers - St James St Library

- 1 -

LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Cabinet: 20 January 2009

Title: Annual Performance Assessment of Services for Children and Young People in the London Borough of Waltham Forest: 2008

Council Priority: Create wealth and opportunity for residents

Directorate: Children and Young People Services

Report of: Chris Kiernan, Executive Director, Children and Young People Services

Contact: Jonathan Daniels

Phone: x3551

E.Mail: [email protected]

Action required: For Information

Wards affected: All

Appendices: Appendix 1: Ofsted APA 2008 assessment letter

Status: Open 1. SUMMARY

1.1. This report is to inform the cabinet of the outcome of the 2008 annual performance assessment (APA) by Ofsted of children and young people services in Waltham Forest.

1.2. The APA judgment find services in all 5 every child matters outcome areas to be good (3 out of 4), it also finds that the service’s capacity to improve is also good.

1.3. 2008 is the final year of the APA. From 2008-09 this will be replaced by the comprehensive area assessment (CAA). This will include will include identification of the strengths and weaknesses in outcomes and services for children and young people. CAA assessments will be made based on a national range of indicators (the National Indicator Set), findings from inspection and regulation, and a review of the progress that has been made against targets in Local and Muliti-Area Agreements.

2. RECOMMENDATION 2.1. For Cabinet Decision

2.1.1. Cabinet is requested to note the APA judgements and the areas of strength and areas for development identified in the letter from Ofsted.

Agenda Item 13

Page 137

Page 143: Cabinet Papers - St James St Library

- 2 -

3. REASON FOR DECISION 3.1. The outcome of the APA is important and appropriate for cabinet

to monitor. Children and young people services are a level 1 service within the comprehensive performance assessment (CPA) and is therefore critical in the council’s overall CPA rating. This council’s performance in this area relates to all education and social care services provided to children and young people.

4. PROPOSAL 4.1. The 2008 annual performance assessment was undertaken in a

more low key way and without a separate site visit as the authority was regarded as “low risk” following the positive outcome of the joint area review (JAR) held in May and June 2008.

4.2. Although the rating in each outcome area remains the same as in the last two inspection years there are more strengths, and notably fewer areas for development. In 2007, there were 17 areas for development, against ten this year. In particular, enjoying and achieving, positive contribution and economic wellbeing have only a single area for development, against three, two and three in 2007. There are also stronger statements about strengths – particularly notable in the three areas noted above.

4.3. Our inspectors state in the report that the council has made progress in responding to the recommendations made in 2007; that we consistently delivers good services; and that we are well managed. To quote from the overall judgement:

‘… services have good capacity to improve further and are well managed. Through strong leadership and management, good strategic planning, productive inter-agency partnerships and effective safeguarding arrangements, the needs of children and young people are being addressed well.

4.4. It is particularly pleasing that, for the first time, there is considerable praise for pupils’ attainment, with ‘outstanding progress between key stage 2 and 4, accompanied by ‘successful focus on equalities and diversity … closing gaps in outcomes. The praise for our engagement with children and young people reflects really good practice by many staff in the directorate and our partners.

4.5. The vast majority of those areas for development set out in the judgment had already been identified by the authority as part of our review of progress against our 2007-08 action plan. As a result we are already taking forward actions to address these areas. These areas will also be central focus in the refreshed 2009-10 children and young people plan which we are in the process of developing.

4.6. We will continue to review our progress in addressing the areas for development over the course of the coming year through our existing partnership performance management meetings.

Page 138

Page 144: Cabinet Papers - St James St Library

- 3 -

4.7. We can be confident of the judgment of the inspectors in spite of the recent concerns about the quality of APA judgments by Ofsted following the Haringey “baby P” case. This is because this assessment has coincided with the major inspection of children services though the JAR. Unlike Haringey’s JAR inspection, the one in Waltham Forest followed the new methodology which place particularly focus on the council and its partner’s abilities in relation to safeguarding vulnerable children and young people.

5. ALTERNATIVES CONSIDERED 5.1. Not applicable to this report.

6. CONSULTATION 6.1. Not applicable to this report.

7. IMPLICATIONS 7.1. Financial

7.1.1. The APA judgment covers the whole of children and young people services, which including the schools budget amounts to around half of all council expenditure.

7.1.2. Actions in response to the recommendations in the areas for development are in most cases underway and are expected to be met within existing budgets.

7.2. Legal 7.2.1. There are no specific legal implications arising from this

report.

7.3. Human Resources 7.3.1. The APA report includes a recommendation relating to

need to ensure that all workforce needs are met. We are currently in the process of developing a comprehensive children and young people’s workforce strategy, which will address the weaknesses identified in this area.

7.4. Health Impact Assessment

7.4.1. The APA report finds our performance in relation to the “be healthy” outcome area to be good for the third consecutive year. Whilst there has been good progress against many health outcomes, the rate of teenage pregnancies and number of obese children remain significant cause for concerns. Both of these areas will be prioritised and monitored closely over the coming year.

7.5 Equality Impact Assessment 7.5.1. The report recognises the strong performance of the local

authority in focusing on equalities and diversity which is proving successful in narrowing the gap between lower attaining ethnic groups and those in poverty and the average performance.

Page 139

Page 145: Cabinet Papers - St James St Library

- 4 -

7.5.2. The report also highlights a number of areas for development which have a direct relationship to the council’s wider equalities duties. These include:

• Reducing teenage pregnancy rates is a gender equality issue and action to further reduce this and the social and economic disadvantage associated with it will support the delivery of the Council in meeting its duty to promote gender equality

• Increasing the participation of young offenders in education, training or employment. Given the group’s profile this is a race equality issue and action taken to improve participation will support the council in meeting its duty to promote race equality

• Increasing the range of post 16 learning options for young people with learning difficulties/disabilities. This will directly support the Council’s duty to promote disability equality and meet the Disability Equality Scheme priority of enabling disabled to live independently. Action to address this issue is also an opportunity to build on the research done with learning disabled young people on their post 16 aspirations which was completed as part of the Disability Equality Scheme action plan.

7.5.3. We will continue our focus on improving performance in all the above areas by ensuring that they are priorities in the 2010-13 children and young people plan which we are currently developing.

7.6 Climate Change Impact Assessment 7.6.1. There are no specific climate change implications arising

from this report. 8. CONCLUSION

8.1. The good performance by Children and Young People services in 2008 consolidates the good performance in the last two APA reports and in the JAR that took place earlier this year. The text of the judgment shows a stronger performance overall than in the last two years and places the directorate and its partners in a strong position to improve performance further when assessed under the new CAA regime.

Background Information Approval by the Portfolio-Holder (before inclusion on the Cabinet agenda) I have cleared this report for inclusion on the Cabinet agenda.

Signed Date 5/01/2009 Portfolio Member for Children and Young People

Page 140

Page 146: Cabinet Papers - St James St Library

Page 1 of 5

17 December 2008

Mr Chris Kiernan Director of Children’s Services London Borough of Waltham Forest Silver Birch House Uplands Business Park Blackhorse Lane London E17 5SD

Dear Mr Kiernan

Annual performance assessment of services for children and young people in the London Borough of Waltham Forest 2008

This letter summarises the findings of the 2008 annual performance assessment

(APA) for your council. The evaluations and judgements in the letter draw on a range

of data and information which covers the period 1 April 2007 to 31 March 2008. As

you know, the APA is not based on an inspection of your services and, therefore, can

only provide a snapshot based on the evidence considered. As such, I am grateful to

you for assuring the quality of the data provided.

Performance is judged on a four point scale as detailed in the handbook.

I should emphasise that the grades awarded are based on an overall ‘best fit’ model.

For instance, an outstanding judgement of Grade 4 reflects that overall most

aspects, but not necessarily all, of the services in the area are working very well. We

know that one of the features of outstanding provision is the drive for greater

improvement and no council would suggest, and nor would Ofsted, that a judgement

of outstanding indicates that everything is perfect. Similarly within a judgement of

inadequate overall, Grade 1, there could be some aspects of the overall service that

are adequate or even good. Judgements are made in a rounded way, balancing all of

the evidence and giving due consideration to outcomes, local and national contexts,

priorities and decision-making.

Alexandra House 33 Kingsway London WC2B 6SE

T 08456 40 40 40 [email protected]

Direct T 0117 945 6293 Direct F 0117 945 6554 [email protected]

Page 141

Page 147: Cabinet Papers - St James St Library

Page 2 of 5

The following table sets out the grades awarded for performance in 2008.

Assessment judgement area APA grade

Overall effectiveness of children’s services 3

Being healthy 3

Staying safe 3

Enjoying and achieving 3

Making a positive contribution 3

Achieving economic well-being 3

Capacity to improve, including the management of services for children and young people

3

Inspectors make judgements based on the following scale4: outstanding/excellent; 3: good; 2: adequate; 1: inadequate

Page 142

Page 148: Cabinet Papers - St James St Library

Page 3 of 5

Overall effectiveness of children’s services Grade 3

The London Borough of Waltham Forest consistently delivers good services. It has sustained good performance in each of the five Every Child Matters outcomes for children, in service management and in capacity to improve.

The council has made progress in responding to the recommendations made in the 2007 APA. The access to second tier child and adolescent mental health services is now good, hard-to-reach groups are more involved in decision making and data is used more reliably in a range of areas to drive improvement. For looked after children, care planning processes are now good, the proportion made subject to adoption or special guardianship orders has increased greatly and attainment has risen. However, there are no discernible improvements in reducing the rate of teenage pregnancy or the timely completion of initial social care assessments.

Children’s services have good capacity to improve further and are well managed. Through strong leadership and management, good strategic planning, productive inter-agency partnerships and effective safeguarding arrangements, the needs of children and young people are being addressed well. A good track record of improvement has delivered clear benefits. Children start school with much lower than expected levels of attainment and make outstanding progress between Key Stages 2 and 4, although the standards they reach at each key stage remain below national averages. The successful focus on equalities and diversity is closing gaps in outcomes. Very good engagement with children and young people contributes greatly to the improvements. Nevertheless, there are some weaknesses in communication with schools. The council’s analysis of its strengths and areas for development is consistent with the evidence. There are no additional recommendations to make as a result of the APA.

The children's services grade is the performance rating for the purpose of section 138 of the Education and Inspections Act 2006. It will also provide the score for the children and young people service block in the comprehensive performance assessment to be published by the Audit Commission.

We are grateful for the information you provided as part of this process and for the time given by you and your colleagues in preparing for the assessment.

Yours sincerely

Juliet Winstanley Divisional Manager, Local Services Inspection

Page 143

Page 149: Cabinet Papers - St James St Library

Page 4 of 5

Major strengths and important weaknesses

Major strengths Important weaknesses and areas for development

Being healthy

Very good multi-agency partnerships that promote healthy lifestyles.

Good and improved access to second tier child and adolescent mental health services.

Continued very good performance on health checks for looked after children.

Being healthy

Links between healthy schools initiatives and measures to tackle the very high incidence of childhood obesity are underdeveloped.

The teenage pregnancy rate has not diminished in the last two recorded years and remains above the national average.

Staying safe

Strong innovative work with children and families on safeguarding and community safety.

Highly effective multi-agency child protection case planning and reviewing

Good support and positive outcomes for looked after children.

Staying safe

The proportions of timely initial and core assessments are below figures nationally and in similar areas.

The quality of assessment varies across the partnership.

Enjoying and achieving

Continued outstanding progress between Key Stages 2 and 4, and rising standards at Key Stage 4.

Secondary school attendance well above, and improved more than, figures nationally and for similar areas.

Narrowing attainment gap between most vulnerable groups and their peers.

Enjoying and achieving

Outcomes for childcare and attainment at all key stages are below national averages.

Making a positive contribution

Very good involvement in strategic decision making of children and young people, including those who are hard to reach.

Low and decreasing proportions of young people re-offending and entering the youth justice system for the first time.

Making a positive contribution

Limited participation in education, employment or training by young offenders.

Page 144

Page 150: Cabinet Papers - St James St Library

Page 5 of 5

Achieving economic well-being

Very high proportion of young people aged 17 in education and training.

Low proportion of young people aged 16 to 18 from minority ethnic groups not in education, employment or training.

Higher percentage of young people gaining Level 3 qualifications than nationally and in similar areas.

Achieving economic well-being

There is an insufficient range of learning options post-16 for young people with learning difficulties and/or disabilities.

Capacity to improve including the management of children’s services

Strong leadership and management that has ensured continued improvement.

Good strategic planning.

Very good engagement with children and young people to improve planning.

Productive inter-agency partnerships contributing effectively to improving outcomes.

Successful focus on equalities and diversity helping to close the gap.

Capacity to improve including the management of children’s services

Not all services have their workforce needs fully met.

Communication and engagement with schools and some smaller partners are limited.

Gaps in the measurable outcomes in some plans restrict performance monitoring.

Page 145

Page 151: Cabinet Papers - St James St Library

Portfolio Holder Report 20 January Cabinet Council Leader IDeA Beacon Council Presentation On Thursday 8 January we made a formal presentation to the IDeA on our Beacon Status application for building resilient and cohesive communities. This presentation followed on from a successful site visit. As a Council and Local Strategic Partnership we are at the forefront of local action in this area. Our Sustainable Community Strategy and Community Cohesion Strategy both underpin this work - breaking down the local approach into 4 strands covering support and advice for newly arrived communities, trust and contact, citizenship, tension monitoring and Preventing Violent Extremism. We are one of the few areas to have independently evaluated our work and to have measured, concrete outcomes such as can be seen from the Swapping Cultures and Young Muslim Leaders Programmes. This is a vital policy area for our borough and I would like to thank Portfolio Leads, Members and Officers for their excellent work. Most Improved Council visit On Thursday 15 January we hosted a visit from the LGC Most Improved Council Panel. The visit included a Google Earth presentation, information on our key achievements and focus groups with residents and frontline staff. Over the last year we became the first Council to go from 0 to 4 stars. Moreover we also continued to drive service improvement whilst developing and delivering a unique vision for the area - based on unlocking the talents of residents, by tackling worklessness, low skills, educational disadvantage and child poverty, and unlocking the potential of our borough, by securing a sustainable economic, environmental and social legacy from the 2012 Olympics and East London’s regeneration. Budget 2009 / 10 We are continuing to make progress with this year’s Budget. Of course our 2009 / 10 Budget needs to be set in the context of our 3 year Budget settlement which included £12.8 million investment growth with £2.6 million earmarked for 2009 / 10. In addition this year’s budget makes £1.046 million available to support Council priorities. Child Poverty, Housing, Worklessness and Economic development The period just before Christmas saw the culmination of work on both the Child Poverty and Housing strategy. Moreover our WorkNet Scheme, which provides Single Points of Access to employment and skills support, and our Multi-Area Agreement, which will sharpen economic legacy from the 2012 Games, are both taking shape. Finally in the latter part of 2009 we put forward 2 planning proposals to restrict the opening of fast-food outlets near schools, youth centres and parks and to prevent HMO conversions eroding our base of family homes. These are practical steps towards achieving our SCS ambitions and responding to the concerns raised by residents during our consultations.

Agenda Item 14a

Page 146

Page 152: Cabinet Papers - St James St Library

Internal Meetings - Regular Meetings with Cabinet Members, the Chief Executive, Executive Directors,

the Head of Strategic Finance and the Head of Corporate Communications. - Council - Corporate Projects Board External Meetings - Capital Ambition - London Remade - IDeA - Beacon Council presentation - Chairing Waste and Regeneration in Upper Lee Valley - Leytonstone Community Council - Alan Whitehead MP - Harry Cohen MP - LGC Judges - Most Improved Council

Page 147

Page 153: Cabinet Papers - St James St Library

January Cabinet

SERVICE MODERNISATION PORTFOLIO HOLDER REPORT Councillor John Macklin

ACCESS 2 SERVICES

The Out of Hours is provided at a charge to WFD and includes expenses such as personnel, office

space and stationary. The true expense should be covered by individual directorates. Report to be

edited to focus on directorate payments then submitted to Leadership Team.

EFFICIENCY REVIEW

I will be working to ensure that the Councils business structure is realigned in delivering the

commitments made in the Sustainable Communities Strategy.

5.0 MEETINGS AND ACTIVITIES 02/12/08 Visited to Hackney regarding regeneration

03/12/08 Meeting with Max Carter

03/12/08 Meeting with Roy Morgan

03/12/08 Corporate Projects Board

03/12/08 BMM

03/12/08 Met with the Leader

04/12/08 Meeting with the Chief Executive

05/12/08 Meeting with Kat Myers

05/12/08 Access 2 Services meeting

10/12/08 Meeting with Chief Executive

12/12/08 Top Team

12/12/08 Tax Collection Challenge Session

16/12/08 Pre Cabinet

16/12/08 Cabinet

18/12/08 Pre Council

18/12/08 Council

07/01/08 BMM

Agenda Item 14b

Page 148

Page 154: Cabinet Papers - St James St Library

January

Portfolio Holder Report - Councillor Afzal Akram Community Safety, Enforcement & Protection Community Safety Winter Crime Prevention Activities A series of crime prevention activities took place during the period 3rd to 18th December. Locations included B&Q, Fulbourne Rd, Morrison’s, St John’s Church E11, Walthamstow Town Square and Chingford Assembly Hall. This year’s theme was focused on reducing domestic burglary through advice, information and target hardening with products such as timer switches, property marking products and UV torches. The events were supported by Council officers (including a dedicated ASB officer at every event), Street Wardens, Police and partners, including Age Concern, Haven, Turning Point, CBHA and the Fire Brigade. The events were also used as an opportunity to consult widely with residents on their crime priorities, with over 600 surveys completed. Update on Turning Point’s community based drug treatment service Turning Point (TP) was awarded a contract in June to provide community-based drug treatment services (winning the contract from three previous providers) and to develop service user and carer involvement across the sector. The contract got off to a difficult start, with threats of a judicial review of the commissioning process by one decommissioned provider. This threat was effectively neutralised by the Council. Since beginning operations in the borough, TP has experienced a number of challenges with underperformance by TUPE'd staff, which they are working to resolve. A substantive manager was recruited in October, since which time we have seen an improvement in performance. TP is unlikely to meet its targets for getting drug users into treatment in this first year of operation as a consequence of the transition. However, risks to the partnership have been mitigated as follows:

• A programme of outreach work has been agreed in order to maximise numbers coming into treatment

• Performance is monitored monthly • The contract is performance based and financial penalties will be applied for

failure to meet targets thereby protecting the Council's investment (Waltham Forest is one of very few boroughs to have introduced this form of risk-share with providers).

It should be noted that despite this difficulty, the treatment system in Waltham Forest is performing above the regional and national average in terms of retaining drug users in effective treatment. Additionally, the Health Care Commission rated the service’s performance in relation to access to residential treatment and meeting the needs of diverse communities as excellent. Community Protection and Enforcement Littering enforcement activities Planned enforcement activity continues regarding littering with a minimum of two locations being targeted each week. The enforcement programme for January is litter

Agenda Item 14c

Page 149

Page 155: Cabinet Papers - St James St Library

January

and hot spots such as high streets, transport hubs and takeaways at lunch time will be targeted. Fly tipping enforcement Investigations are ongoing into fly tipping offences and a number have been put forward for summons and they will be heard in January and February 2009. Legal papers have also been prepared for those who have not paid Fixed Penalty Notices and they are in the process of being completed and forwarded to legal for summonses to be issued. On 27th November one business, Shernhall Street News, appeared at Waltham Forest Magistrates Court and the owner admitted the offences of fly tipping and failing in his duty of care regarding the correct disposal of waste. He was fined £50 on each matter and costs were awarded of £300. Kingsway International Christian Church Festive Events Kingsway International Christian Centre (KICC) is a very large independent interdenominational Christian Church that operates throughout the UK. The Church now holds festive celebrations over the Christmas period that involve several thousand people. This year the venue was Walthamstow Dog Stadium, which is in Larkswood and on the boundary of Chapel End and Valley Wards.

KICC advised us of the following services: Christmas Day 25/12/08 10.00 - 13.00 expected attendance 4-5000 Sunday 28/12/08 10.00 - 13.00 expected attendance 4-5000 New Years Eve 31/12/08 20.00 - 04.00 (next day) expected attendance 8000 although advertising suggested that it may be 15,000 In response to this, council officers carried out a pro-active approach to integrated enforcement work to ensure that any potential problems were mitigated. Integration of services included Police, WFD, Fire Brigade, Parking enforcement, Building Control ,Environmental Health, Enforcement and Community Safety. The main concerns were ones of parking, noise and safety (both in terms of those attending and the wider community). Noise teams were on duty and a team of officers available on standby in case of additional need, and noise abatement notices were served. The Police were at the stadium to manage events. Building Control and Health and Safety ensured that the Marquee in use for celebrations was safe. All services were fully briefed of each others’ activities and the public were informed of our actions through WFD, media enquires and website information. The noise team acted as a lead for liaising with KICC and residents. Feedback from the three events: There were no major issues reported. There were 12 noise complainants with only one complaint on New Years Eve and no contraventions of noise. 141 parking notices were issued and 10 vehicles towed away. No crime and disorder or cleansing issues were reported. This represents a considerable success given the extent of public concern regarding these events and the fact that 15-20,000 people attended over the three days. Enforcement activities – Fixed Penalty Notices In order to keep Cabinet and the public up to date with our increased enforcement efforts, a table of how many Fixed Penalty Notices have been given over the course

Page 150

Page 156: Cabinet Papers - St James St Library

January

of the month is included below. Please note that these are the figures for the month of November. Correction – the figures in the report sent to December Cabinet were the figures for the month of October.

Fixed penalty notices issued in November* 53 issued Littering 41 Failing to comply with a requirement notice 2 Failing to comply with a waste receptacles notice

1

Fly-posting 9 45 penalty charges paid in November totalling £2,360

*Excluding Fixed Penalty Notices for parking offences Key dates and meetings 01/12/2008 Meeting Head Teacher Highams Park School 01/12/2008 Meeting Interlink College 01/12/2008 Meeting Maureen McDonald-Khan 01/12/2008 Meeting Mark Benbow Borough Commander 02/12/2008 Spoke at Preventing Violent Extremism Conference (Central London) 02/12/2008 Meeting Name Claim & Shame Campaign 03/12/2008 Meeting Labour Group 04/12/2008 Meeting Aquisitive Crime Project Board 04/12/2008 Meeting Andrew Kilburn 04/12/2008 Meeting Robin Tuddenham 05/12/2008 Meeting Joint Project Leaders Meeting 10/12/2008 Meeting Richard Squire Fire Service Borough Commander 11/12/2008 Meeting Youth Diversion Event 11/12/2008 Meeting Labour Front Benchers 11/12/2008 Attended Civic Carol Concert 12/12/2008 Meeting Joint Project Leaders Meeting 12/12/2008 Meeting Top Team 12/12/2008 Meeting HMO's and multi Lets enforcement 12/12/2008 Attended Leyton Orient Community Sports Programme's Xmas lunch 15/12/2008 Meeting Martin Esom and Chris Kiernan 15/12/2008 Meeting Assett Management workstream

Page 151

Page 157: Cabinet Papers - St James St Library

January

ENVIRONMENT PORTFOLIO HOLDER REPORT Councillor Bob Belam High Bridge replacement As part of the 2007/08 Policy Review Process, Members approved capital funding of £100k for the replacement of High Bridge (end of Coppermill Lane). Waltham Forest and Hackney jointly own this bridge; both boroughs have agreed to fund the replacement of the bridge, which is in a state of disrepair. I am pleased to inform residents that works are currently underway and are scheduled to be completed by the end of February 2009. Asset Management Plan development – funding bid Officers in the Highway Network Group have recently submitted a bid to the Department of Transport for £50K. This funding will support the ongoing development of our Asset Management Plan (highways assets). I will keep members updated on the outcome of this bid. Winter Maintenance Plan 2008/9 - update I am pleased to advise you that our Winter Maintenance Plan 2008/09 has been updated and has proved to be highly effective during the recent inclement conditions. The updated plan can be seen here: http://www.walthamforest.gov.uk/index/transport/parking-roads/road-highway/highway-maint/winter-maint.htm Parking Enforcement Services contract – retendering for 1st January 2010 In last month’s report, I mentioned that the Parking Enforcement Services Contract was up for retendering. Below is an update on progress with the retendering process. A project team has been established to oversee the tendering process and an OJEU Notice was published in September 2008. Four completed pre-qualification questionnaires were received by the published response date of 27 October 2008 from NCP Services, APCOA Parking, Mouchel Limited and Vinci Park Services. All applicants successfully passed the compliance and technical evaluations and as a result will be invited to participate in the next stage of the tendering process. The tender documentation, in particular the Enforcement and IT specifications, are currently being prepared by the Project Team with the intention to issue the tender documents to the four interested parties in March 2009. A report is scheduled to go to Cabinet in February as an update on the progress of the tendering exercise and to seek approval of the proposed evaluation methodology of the bids submitted. CPZ update The new Winns Avenue CPZ and the Lloyd Park CPZ extension were substantially completed on 19th December. There are still some outstanding works to be carried out, but these will be completed by mid-January, weather permitting. Once this work is completed, enforcement of the CPZ will commence. Although enforcement has yet

Agenda Item 14d

Page 152

Page 158: Cabinet Papers - St James St Library

January

to commence, I have received feedback from some residents that the presence of signs and markings in the CPZ area has reduced parking pressure already. Road maintenance - Rangers Rd E4 - Station Road to Borough Boundary Works to resurface the carriageway and overlay the footway were completed on Ranger Road to Boundary Rd. Works started on site on the 13th October and were completed by the 5th December ahead of programme and within budget. Dates for diaries Kingsway International Christian Centre Christmas and New Year Celebrations Briefing New Years Day Parade New Years Day Parade Concert West Walthamstow Community Council Council's financial grip - work planning meeting Ian O'Donnell Interview with Mayer Nissim student Lloyd and Aveling Park & William Morris Gallery Quarterly Programme Board meeting 1:1 with Chief Executive Name, Claim and Shame comms meeting with Katie Myers Verdant Performance Review Board meeting Green Fair meeting Lloyd & Aveling Park 1-1 with Cllr Loakes LGC Awards - Most Improved Council 1:1 with Keith Hanshaw COUNCIL Joint PLM with Cllr Akram Top Team Kier Performance Review Board meeting Climate change update Street Watchers meeting North London Waste Planning Members group LSCP Meeting

Page 153

Page 159: Cabinet Papers - St James St Library

December 2008

Page 1 of 1

Portfolio Holder Report to Cabinet: Councillor Liz Phillips Cabinet Member for Health, Adult & Older Peoples Services

1. Key issues Personalisation and Prevention Agenda in Social Care On the afternoon of the 4th December, I attended another meeting of the Older Peoples Forum and spoke about the ‘Personalisation and Prevention Agenda in Social Care’ and how the Council is working through it. I explained the concept of Personalisation, which means that every person who receives support, whether provided by statutory services or funded by themselves, will have choice and control over the shape of that support in all care settings. I also outlined some of the elements of the Personalisation vision, which comprise of direct payments, individual budgets, a resource allocation system (RAS), self assessments and self directed support, support brokerage and supporting carers. Some of the Prevention Agenda being undertaken by the Council are:

o Further development of the out of hospital services; o Re-ablement of home care; o Outcome focussed care planning, and o Provision of tele-care and tele-health.

2. Key Meetings and Activities – December 2008 01-12-08 1:1 with Aisha Begum, Executive Support Officer 01-12-08 Portfolio Lead Meeting 04-12-08 Older People’s Forum 2008 05-12-08 Quarterly Update on Commissioning 08-12-08 1:1 with Sandra Howard, Head of Adults Social Care 08-12-08 Joint Partnership Board 08-12-08 WF Joint Visiting Team Strategic Board Meeting 09-12-08 Interim Interviews for the post of Adult and Community Services

Executive Director 10-12-08 1:1 with Eileen Means, Interim Head of Strategic Commissioning 10-12-08 Cann Hall CPZ Meeting 11-12-08 1:1 with Sheenagh Burgess, Head of Learning Disabilities 12-12-08 1:1 with Stephen Gilson, Head of Finance 12-12-08 1:1 with Cllr Milton Martin 12-12-08 Monthly Communications Meeting 15-12-08 Transformation Board Meeting 16-12-08 Cabinet 18-12-08 Full Council

Agenda Item 14e

Page 154

Page 160: Cabinet Papers - St James St Library

December 2008

Page 2 of 2

Cllr Naheed Qureshi, Junior Cabinet Member for Health, Adults and Older Peoples Services Key Meetings and Activities – December 2008 16-12-08 Cabinet

Page 155

Page 161: Cabinet Papers - St James St Library

January 2009

1

Portfolio Holder Report – January 2009 Councillor Marie Pye, Cabinet Member for Communities and Housing Community Councils The Community Councils have completed their budgetary decision making and £161, 252 has been allocated to support over seventy local projects. Delivery started over the Christmas period and included events in a local park, a children’s party and a youth diversion and education programme. The Access 2 Services Mystery Shopping Project (comprising of over 100 face to face shops, 200 telephone shops, 50 e-mail or on-line shops and 20 letters shops across all major contact points) has completed and a presentation of findings will be conducted in February 2009. A study to measure perceptions around community cohesion has just been commissioned comprising of a face to face household borough-wide survey and follow-up qualitative work. The aim of the study is to inform the implementation of the Community Cohesion Strategy and monitor its impact. The interviews will take place throughout January and February and findings will be presented in April 2009. BNI Health Programme Our BNI health programme has been singled out for particular praise in a report published by the Kings Fund, focussing on how people can be supported to change health related bad behaviour. The BNI Household Health Improvement Programme is held a model of good practice on page 7 of the document and further details on this can be found in the Kings Fund Commissioning and behaviour change Kicking Bad Habits final report. New Forest Road development

I was delighted to have the opportunity to open the new Islington and Shoreditch Housing Association (ISHA) green housing development at 544 Forest Road. The scheme will provide 47 affordable homes on a prominent site overlooking the town hall. ISHA purchased the site in 2005, which had previously been a filling station, but had been vacant for several years. Wind turbines on the roof will power the communal electricity and lighting for the scheme. ISHA is pioneering the use of renewable energy in affordable housing schemes within the borough and elsewhere.

Agenda Item 14f

Page 156

Page 162: Cabinet Papers - St James St Library

January 2009

2

I was very pleased to be able to open this innovative scheme that makes use of renewable energy, and I hope to see many more housing developments focusing on energy efficiency in the future. Affordable housing is of the utmost importance to Waltham Forest Council. The issue is a key priority in the Council’s Sustainable Community Strategy, our 20 year plan for the borough, and it is vital that we continue to provide quality, affordable homes to our residents. Community Cohesion The Council’s work on community cohesion has been externally recognised with our shortlisting for Beacon status for Cohesive and Resilient communities. We had an extremely positive visit from the team who met with community organisations and stakeholders, and visited Frederick Bremer school where three Headteachers spoke about the impact of community cohesion work in schools in the borough. Our three-year cohesion strategy agreed earlier this year is now being delivered, with progress made across each of the four key priorities in relation to newly arrived communities, building trust and dialogue, citizenship and preventing extremism. We have commissioned research into current perceptions of cohesion and tolerance between communities in Waltham Forest, which will be lead by BMG. We have delivered inter-generational events, and are utilising arts and culture to generate understanding between communities. Our ‘women together’ project is increasing involvement of local women in public and civic life, and our citizenship training is about to commence. In relation to tackling conflict within our communities, our work on tension monitoring has been used as a model for our other boroughs, and we have detailed practice guidance and training which are subject to consultation. Our work on preventing extremism continues to attract national interest and media attention. I attended a recent meeting with young muslim leaders filmed by the BBC. It is also positive to note that our work with muslim women, led by Ashiana, is now fully operational and will lead to the development of a reference panel of local women in the new year. RADAR (The National Disability Network) Tipping Point Project Advisory Group I am very pleased to have been asked to become a member of the RADAR Tipping Point Project Advisory Group. This Group will be tasked with advising and making recommendations to the RADAR Tipping Point Project on a range of matters including - best practice for disabled people’s organisations on increasing user involvement across employment, services, internal and external policy and governance, particularly in relation to effective strategies for engaging groups of disabled people historically deemed ‘hardest to reach’ including BME disabled people; - options for collaboration and partnership with related networks and projects to maximise impact; - effective dissemination of learning from this project so that it has the widest spread and benefits.

Page 157

Page 163: Cabinet Papers - St James St Library

January Cabinet

Portfolio Holder Report - Councillor Keith Rayner Finance, Risk and Governance Legal Services Achievements

Legal Services recently had its annual Lexcel inspection, which is the Law Society's quality assurance standard. The Council passed without any non-compliance and the inspector said there were some good examples of best practice in place in Waltham Forest and that our achievement was particularly impressive given the number of vacancies we currently have. The results of the client survey have also been received. Over 60 clients responded and the results were very positive. There are still areas for improvement identified by the survey and the Lexcel inspector gave us some good ideas for improving our standards and processes. We will be working on these over the coming year. Well done to Daniel Fenwick and everyone in Legal services. Key portfolio meetings include:

9/12 Regular meeting with Director of Governance and Law 10/12 Attended Scrutiny re outsourcing of Audit. 11/12 Sustainable Procurement Event 11/12 Regular meeting with Director of Finance 12/12 E-invoicing event 12/12 Tax collection challenge session 12/12 Top Team Briefing 15/12 Meeting re Efficiency Review Asset Management workstream 16/12 Cabinet 18/12 Meeting re CAB accommodation 18/12 Meeting re Adults Services budget pressures 18/12 Council

Agenda Item 14g

Page 158

Page 164: Cabinet Papers - St James St Library

December Cabinet

Page 1 of 3

Portfolio Holder Report: Councillor Geraldine Reardon Cabinet Member for Leisure, Arts and Culture 1. Key Issues Sport and Leisure • The Sport England Progress Report for the first quarter of fit club has been submitted as

requested. • Training sessions for the Sports Hall Athletics have commenced. • As part of the ‘Active People Survey 2008’, there is an improved score for volunteering. • Work to repair the boom at Waltham Forest Pool and track has commenced. • Work is continuing on the Sport England Application for the urban beach sports venue. This

will be submitted on 6th January 2008. • The Online sports Directory is taking shape, and will be launched very soon once data is

uploaded onto the system. • Preparation for the London Youth Games have commenced, with the cricket scheduled for

February 2009. • Orders have been placed to map Lloyd Park, Marsh Lane and Ridgeway park with orienteering

courses. Arts and Events Chingford Christmas Lights Switch on The last of the Christmas Lights Switch went ahead on Saturday 6th December in Chingford. Music, a children’s entertainer and face painter kept the young audience occupied for two hours, much to the delight of Christmas shoppers. Older People’s Christmas Concert At Waltham Forest Theatre on Wednesday 9th December, we organized a free Older Peoples Christmas Concert. Tickets were available all over the borough in Waltham Forest Direct shops. Approximately 200 people attended this. The Mayor also came along, and comedian John Pope and a female singing duo called ‘Drop Dead Divas’ entertained everyone. Free tea, coffee and mince pies were available and a raffle was organised. Eid Celebration at Waltham Forest Town Hall On Saturday 13th December an Eid Celebration went ahead in Walthamstow Assembly Hall. Tickets were available in Waltham Forest Direct shops, which proved very popular. Numerous telephone calls were taken, requesting more. The stage show consisted of dancing, singing and music provided by SKI. Pantomime at Waltham Forest Theatre On Friday 18th Dec and over the weekend in partnership with Waltham Forest Youth Drama group, a pantomime, ‘Elves & The Shoemakers’ was held at Waltham Forest Theatre. Tickets proved a huge sell-out.

Agenda Item 14h

Page 159

Page 165: Cabinet Papers - St James St Library

December Cabinet

Page 2 of 3

Children’s Disco at Chingford Assembly Hall On Saturday 20th December at Score Centre Leyton, a Christmas children’s disco went ahead and on Sunday 21st December at Chingford Assembly Hall the show was repeated. Mrs Bubbles and her friends Father Christmas, and Mr Teddy entertained the children and danced away the afternoon with a very appreciative audience of children and adults. Libraries, Museum and Gallery Skilled for Health Grant A ‘Skilled for Health’ grant of £1,730 has been awarded to Waltham Forest Libraries to develop a Skilled for Health project. This is part of an initiative developed in partnership between a number of partners, including the Community Learning and Skills Service (CLaSS) and the Waltham Forest PCT. Police Surgeries North Chingford Library held a Police Surgery on 4th December, 3-4pm and these will continue on the first Wednesday of each month. Chatter Book Reading Group A Chatter Book Reading Group has started at Walthamstow Library. It takes place every third Friday of the month between 12-2pm with children from Hillyfield Primary School. North Chingford Activities The Baby Rhyme time had a Christmas special on 17th December 2008. It was attended by 20 mums with their babies. The adult reading group is in great demand with a waiting list of people wanting to attend, and numbers are increasing for the under 5s story time. Lea Bridge Library Contracts have now been agreed for the refurbishment of Lea Bridge Library. Work is expected to start on site in February 2009. There will be a temporary library in the garden behind the Library for the duration of the works. The refurbished Library is expected to open in the Autumn of 2009. We will continue to work closely with the staff team to develop the internal details of the design to maximise the benefits of the refurbishment to customers. Green Spaces The Council has applied for and been awarded around £1 million under the DCFS's Wave 2 Playbuilder programme. Over the next two years officers in Green Spaces will work in conjunction with colleagues in Children's Services to develop and implement improvements to at least 21 playground sites across the Borough. Further work will be done to decide which sites are to receive funding and the residents will be consulted so that they can have a say in how the playgrounds are transformed. The Council has also been successful in securing a grant of £85,000 from the London Marathon Trust towards the new Walthamstow Borough Bowling Club pavilion in Lloyd & Aveling Park. This is a significant development as it closes the funding gap needed for the Council to relocate

Page 160

Page 166: Cabinet Papers - St James St Library

December Cabinet

Page 3 of 3

the club house and artificial green from near the William Morris Gallery in Lloyd Park to its new site in Aveling Park. This relocation is necessary as part of the Council's proposed Parks for People Lottery project. More information on the Lottery project is available at www.walthamforest.gov.uk/parks-for-people 2. Key Meetings and Activities – December 2008 01-12-08 Launch of London Tree and Woodland Awards 05-12-08 Tour of HLF Parks in Southwark 09-12-08 London Councils meeting 09-12-08 Churches and community cohesion meeting 09-12-08 Interviews for the post of Interim Adult and Community Services Executive Director 10-12-08 Meeting with Cllr Wheeler and UCKG on the EMD Cinema 10-12-08 Lloyd and Aveling Park Project Board meeting 10-12-08 Arts, Culture and Strategy Pre-meeting 11-12-08 HLF Event 12-12-08 Top Team 16-12-08 Quarterly Performance and Budget Review Meeting – Libraries 18-12-08 Arts, Culture & Sport Strategy Project Board meeting 18-12-08 Wave 2 Play Areas discussion with Children’s Services

Page 161

Page 167: Cabinet Papers - St James St Library

January Cabinet

Children and Young People Portfolio Holder Report Councillor Chris Robbins BSF AWARD FOR KELMSCOTT SCHOOL Kelmscott School recently gained national recognition, beating off stiff competition to win the ‘Best design for a remodelled school’ at this month’s Partnerships for Schools (PfS) Awards. The annual awards celebrate the positive impact that the Building Schools for the Future (BSF) scheme has been having nationwide, transforming education provision and providing better facilities for pupils, parents and teachers alike. The refurbishment has led to the total transformation of Kelmscott School, vastly improving conditions and providing valuable facilities like a drama suite, assembly hall, improved dining area, themed garden areas and internet café. The school has also been aesthetically improved, with an eyecatching glass entrance lending the building a strong sense of identity.

EXTRA SERVICES IN SCHOOL An event was held recently to celebrate the fact that Waltham Forest schools are offering more and more services to pupils and parents. As part of the government’s ‘Every Child Matters’ initiative, all schools have been set targets to help ensure children are healthy, safe, happy and getting the most from their schooldays by providing services above and beyond regular lessons. Seventy per cent of the borough’s schools are now providing breakfast and teatime groups, holiday activities, study and sports clubs, mentoring programmes and parent support services. Teachers from across Waltham Forest attended the event, which featured displays from pupil and parent groups as well as lively performances and presentations from local schoolchildren. The event was a roaring success and highlighted the hard work of the borough’s teaching staff, pupils and parents. Access our Services Our Council provides free impartial information and support to families with children and young people aged 0-19. I would encourage families to contact us as they may be eligible for support. +Ask us about + Childminders + Day Nurseries + Children’s Centres + Creches + Pre-schools + Parent and Toddler groups + After School and Breakfast Clubs + Holiday Play schemes + Extended Services And…

Agenda Item 14i

Page 162

Page 168: Cabinet Papers - St James St Library

January Cabinet

Working Tax Credits and Child Tax Credit + Free part-time early education places for 3-4 year olds + Special needs inclusion Phone: 0208 496 3000 Email: [email protected] Website: www.walthamforest.gov.uk/csd Meetings and Activities of Cllr Robbins 02/12/08 Portfolio Lead Meeting 02/12/08 Meeting with the Chief Executive 03/12/08 Visit to Heathcote School 03/12/08 Meeting with Sherron Hoskins 04/12/08 Leyton High road and other issues 04/12/08 Visit to River Lea School 08/12/08 Visit to Henry Maynard School 08/12/08 Leyton High road and other issues 09/12/08 Briefing on BSF and Primary School education 11/12/08 Meeting with Keith Hanshaw and Martin Esom

12/12/08 Top Team 12/12/08 Site visit to George Mitchell School 16/12/08 Met with Youth Ambassadors 16/12/08 Visit to Davis Lane Primary School 17/12/08 Childrens centre booklet 17/12/08 Special PLM 18/12/08 Meeting with Andy Howells and the Leader

Councillor Angie Bean Junior Cabinet Member for Children and Young People Activities in December Tuesday 2nd Hosted Chapel End year six in the chamber Topic democracy Wednesday 3rd Met with Jo Olsen Chris Kiernan Cllr Robbins re the sen strategy Met with cllr Robbins and Sheron Hoskins the Manager responsible for Disabled children. Thursday 4th Hosted St. Marys catholic school year six in the Chamber Topic the Olympics Friday 5th Adoption panel all day Monday 8th Meeting with Jo Olsson Tuesday 9th Hosted chapel end year five topic democracy Thursday 11th Civic carol service Friday 12th Top team meeting Tuesday 16th Cabinet

Page 163

Page 169: Cabinet Papers - St James St Library

January 2009

Portfolio Holder Report to Cabinet – Cllr. Terry Wheeler Investment & Enterprise

Blackhorse Lane Regeneration Progressing well in the context of the current credit crunch. Need to identify school in the regeneration area is accepted. 3 options have been identified, with two of those examined further. We are continuing with site assembly on Sutherland Road and have already completed on one site. Paper Mill Place Phase III (Sutherland Road) is before the Planning Committee on 06 January 2009 with a recommendation for approval. We are continuing to assess the Banbury Park planning application (Billet Road) in view of largely favourable responses from CABE and the GLA. The Traffic Management Study is now nearing completion and the Waterfront Park feasibility study Stage 1 is also now complete. South Grove Regeneration Sainsbury’s have expressed an interest in moving forward a proposal to redevelop the South Grove site, and their existing store site, and Cabinet (16th Dec) authorised officers to explore this opportunity. Officers in Regeneration and Property will continue to work with Sainsbury’s and their advisors to bring forward a scheme that meets the IPPF vision. Lea Bridge Regeneration Urban Practitioners (appointed by the LBWF, Hackney, Lea Valley Regional Park Authority, North London Strategic Alliance & Design for London partnership) are taking the study forward with a focus on open space/leisure improvements and the regeneration of the area as a whole. The inception meeting having already taken place, a consultant update meeting was held just before Christmas 2008 to outline the base-line study work UP are now undertaking, with this part of the work still scheduled for completion at the end of March 2009. A steering group meeting for the Lea Bridge study will happen on 8 January 2009. Hall Farm Curve The results have now been received of the in depth economic study that we commissioned from tfl to demonstrate the benefits that would accrue from the reinstatement of the curve. The results are very encouraging and the BCR (Benefit Cost Ratio) for our preferred options both fall very much within the parameters set for projects to receive active consideration. Indeed the study supports the 4 trains (8 coaches) an hour option rather than two trains an hour as the better option. The cost aspects of the report are capable of improvement and more work is being done to strengthen the case. We are arranging to meet with Network Rail and the Department of Transport with a view to securing its inclusion early in the next Rail Capital Expenditure window of 2014-2019. This not an expensive project as rail projects go, and we now have the Business Case to make it happen. Northern Olympic Fringe Masterplan The masterplanners (Urban Practitioners) have recently completed their initial baselining analysis and are developing the draft spatial masterplan throughout December 2008 and January 2009.

Agenda Item 14j

Page 164

Page 170: Cabinet Papers - St James St Library

2

Lea Bridge/Middle Lea Complementary masterplanning work is underway linking the Northern Olympic Fringe and the Tottenham Hale Region - North London Waterpark regional plan. There are clearly very exciting opportunities in the Lea Bridge road area. Walthamstow Town Centre Work continues at a pace despite the recession to move the “Princes Foundation” Work forward as the two reports on the December agenda demonstrated (Arcade and South Grove) LDF Core Strategy Issues and Options Officers have completed analysis on consultation comments and will be reporting back soon. Section 106 SPD and Dwelling Conversions Policy Following successful public consultation exercise the policy is now approved, during Cabinet 25 November 2008, to be adopted as formal policy, pending the usual call-in deferral period. Hot Food Takeaway SPD This has been extended due to local, national and international media and public interest. An additional postal questionnaire will now be available make it easier for more local people to become involved and provide feedback comments, due to the level of interest in this topic. Meetings and Activities attended: 4.12.08 – Meeting with Symon Sentain 17.12.08 – Meeting with Gordon Glenday - Characterisation Study Meeting - Construction Training Centre Project Board 5.12.08 – Leaders and Mayors Meeting - Meeting with James McGlashen 8.12.08 – Meeting with London Buses - Waltham Forest Business Board 9.12.08 – ODA Planning Committee 18.12.08 – C.A.B. Premises Meeting 10.12.08 – EMD Cinema Meeting 7.1.09 – Meeting with Shifa Mustafa - Drapers Field Meeting - Meeting with Andrew Kilburn - Can Hall, Cathall CPZ - Meeting with Leader Consultation Meeting 11.12.08 – Worknet Board 12.12.08 – Top Team 16.12.08 – NSAfC Board Pre-meeting - Meeting with Shifa Mustafa - Meeting with John McGill - Cabinet