  • BY ORDER OF THE COMMANDER

    OF THE 2D BOMB WING

    BARKSDALE AIR FORCE BASE

    INSTRUCTION 11-250

    11 MAY 2018

    FLYING OPERATIONS INSTRUCTION

    AIRFIELD OPERATIONS AND BASE

    FLYING PROCEDURES

    COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

    ACCESSIBILITY: Publications and forms are available on the e-Publishing web site at

    www.e-Publishing.af.mil for downloading or ordering.

    RELEASABILITY: There are no releasability restrictions on this publication.

    OPR: 2 OSS/OSA

    Supersedes: BARKSDALEAFBI11-250,

    23 November 2013

    Certified by: 2 OSS/CC

    (Lt Col David Leaumont)

    Pages: 70

    This instruction prescribes airport operations, air traffic control policies and flying procedures

    established by the Barksdale Air Force Base (AFB) Airfield Operations Board and applies to all

    units involved in flying operations or flying support activities at Barksdale AFB. Ensure that all

    records created as a result of processes prescribed in this publication are maintained in accordance

    with Air Force Manual (AFMAN) 33-363, Management of Records, and disposed of in accordance

    with Records Disposition Schedule (RDS) located in the Air Force Records Information

    Management System (AFRIMS) located at https://www.my.af.mil/gcss-af61a/afrims/afrims.

    Contact supporting records managers as required for approval. Refer recommended changes and

    questions about this publication to the Office of Primary Responsibility (OPR) using the Air Force

    Information Management Tool (AF Form) 847, Recommendation for Change of Publication; route

    AF Form 847s from the field through the appropriate functionals chain of command.

    SUMMARY OF CHANGES

    This document has been substantially revised and needs to be completely reviewed. Major changes

    include: rewording hung ordance, weapons, and flare procedures; added Barrier Arresting Kit-12

    (BAK-12) recurring maintenance time; hot pit refueling verbiage; updated critical area maps;

    updated reduced same runway separation table; Airfield Management evacuation location; flight

    planning procedures; and the airfield diagram.

    http://www.e-publishing.af.mil/https://www.my.af.mil/gcss-af61a/afrims/afrims

  • 2 BARKSDALEAFBI11-250 11 MAY 2018

    Chapter 1 INTRODUCTION 6

    1.1. Overview. ............................................................................................................... 6

    1.2. Temporary Duty (TDY) Operations. ...................................................................... 6

    1.3. Policies. ................................................................................................................... 6

    1.4. Recommended Changes. ......................................................................................... 6

    Chapter 2 GENERAL INFORMATION 7

    2.1. Runways and Taxiways. ......................................................................................... 7

    2.2. Runway Selection Procedures................................................................................. 7

    2.3. Control of Ground Traffic in the Controlled Movement Area (CMA). .................. 7

    2.4. Airfield Lighting Systems. ...................................................................................... 8

    2.5. Aircraft Arresting Systems (AAS). ......................................................................... 9

    2.6. Parking Plan/Restrictions. ....................................................................................... 10

    2.7. Operating Hours and Designated Airspace. ............................................................ 11

    Figure 2.1. Airspace Designations. ........................................................................................... 12

    2.8. Local ....................................................................................................................... 13

    Figure 2.2. Local Frequencies and Channels. ........................................................................... 13

    2.9. 2 BW Command Post (2 BW/CP)/ATCT Coordination. ........................................ 13

    2.10. Air Traffic Control and Landing Systems (ATCALS)/ Preventative Maintenance

    Inspection (PMI) Schedule. ..................................................................................... 14

    2.11. Transient Alert (TA). ............................................................................................ 15

    2.12. Automatic Terminal Information Service (ATIS) Procedures. ............................... 15

    2.13. Aircraft Special Operations Areas/Ramps. ............................................................. 15

    2.14. Aircraft Towing Procedures .................................................................................... 16

    2.15. Aircraft Taxiing Requirements/Routes. ................................................................ 16

    Figure 2.3. Flightline Road Traffic Flow Plan. ......................................................................... 17

    2.16. Airfield Maintenance. ........................................................................................... 17

    2.17. Runway Surface Condition (RSC) and Runway Condition Reading (RCR)

    Values. .................................................................................................................... 18

    2.18. Procedures/Requirements for Conducting Runway Checks. .................................. 18

  • BARKSDALEAFBI11-250 11 MAY 2018 3

    2.19. Procedures for Opening and Closing the Runway. ................................................. 19

    2.20. Procedures for Suspending Runway Operations. ................................................... 19

    2.21. Engine Test/Run-up Procedures. ............................................................................ 20

    2.22. Noise Abatement. ................................................................................................... 20

    2.23. Procedures for Protecting Precision Approach Critical Areas. ............................... 22

    Figure 2.4. Critical Areas .......................................................................................................... 23

    2.24. Restricted/Classified Areas on the Airfield. ........................................................... 23

    2.25. Aircraft Jacking. ...................................................................................................... 26

    Chapter 3 FLYING AREAS 28

    3.1. Local Flying Area/Designation of Airspace. .......................................................... 28

    Figure 3.1. Standard Runway 33 VFR Traffic Pattern and Local Avoidance Areas. ............... 29

    Figure 3.2. Standard Runway 15 VFR Traffic Pattern and Local Avoidance Areas. .............. 30

    3.2. Military Operations Areas (MOAs). ....................................................................... 31

    Figure 3.3. Local Military Operations Areas (MOAs). ............................................................. 31

    3.3. Use of Shreveport Regional Airport. ..................................................................... 31

    Chapter 4 VFR PROCEDURES 32

    4.1. VFR Weather Minimums. ....................................................................................... 32

    4.2. VFR Traffic Patterns. .............................................................................................. 32

    Figure 4.1. VFR Overhead Traffic Pattern. ............................................................................... 34

    4.3. Special Procedures. ................................................................................................. 34

    4.4. Reduced Same Runway Separation (RSRS) Procedures. ....................................... 35

    Table 4.1. RSRS for Similar Fighter Type Aircraft. ................................................................ 36

    Table 4.2. RSRS for Dissimilar Fighter Type Aircraft. ........................................................... 36

    Chapter 5 IFR PROCEDURES 38

    5.1. Radar Traffic Patterns. .......................................................................................... 38

    5.2. Availability/Restrictions of Surveillance and Precision Approaches. .................... 38

    5.3. Local Departure Procedures. ................................................................................... 38

    Figure 5.1. Cypress/Bistineau Departure Routes. ..................................................................... 39

  • 4 BARKSDALEAFBI11-250 11 MAY 2018

    5.4. Revised Visibility Minima With Approach Lights Out or Runway Markings

    Obscured. ............................................................................................................... 39

    5.5. Radar Vector to Initial Procedures. ......................................................................... 40

    Chapter 6 EMERGENCY PROCEDURES 41

    6.1. Operation of the Primary Crash Alarm System (PCAS) and Secondary Crash Net

    (SCN). ...................................................................................................................... 41

    6.2. Emergency Response Procedures. .......................................................................... 41

    6.3. External Stores Jettison Area Procedures. .............................................................. 43

    6.4. Fu