Multi-Family Fourplex Apartment
By: Brian Toomer
ET-494 Senior DesignDr. Cris KoutsougerasAdvisor: Mr. Rode’
Purpose
This project will exercise the skills and abilities learned from the Construction Engineering Technology program.
The apartment is a theoretical build, but all activities and documents will be done as if it were actually being built.
Pre-Design and Design Phase(First Semester Fall 2014)
Preliminary Drawings Rough Estimate Site Assessment and Selection Economic Feasibility Assessment Decision on Building Layout Investigation of Building Codes
The Building
Wood Framed Concrete Foundation
Estimated 3,826 sq. ft.
Estimated 957 sq. ft. for each unit.
Preliminary Drawings
Each building will have 4 units.▪ Three bedrooms▪ Two Bathrooms ▪ Kitchen▪ Utility ▪ Living and Dining Room
Two story layout.
A rough estimate was done to give an idea of the cost.
3,826 sq. ft. @ $80 sq. ft. = $306,080
Site Selection
5.7 Acres on Whiskey Lane 4.4 miles from campus Price: $79,500
Lot Dimensions 1400’ x 177’
Electricity Provided by: Entergy Water Type: Public
Land Use: Agricultural, Commercial/Residential, Multifamily
Pre-Construction Documents(Second Semester Deliverables )
The construction documents will include:
Final Drawings (using AutoCad):▪ Site Plan ▪ Parking ▪ Location of building▪ Access road▪ Utilities
▪ Floor plan▪ 1st and 2nd floor layout
▪ Foundation Plan
Pre-Construction Documents Cont.
Final Drawings Cont. ▪ Electrical▪ Elevations▪ Exterior materials▪ Roof design
▪ Schedules and Details of Construction ▪ Opening schedule
Windows Door openings
▪ Door schedule Shows complete details of doors
▪ Room finishing schedule Walls, Ceilings, and Floors
Pre-Construction Documents Cont.
Final Drawings Cont. Structural Detail Plan Floor Framing Plan▪ Floor and Ceiling joist layout ▪ Rafter plan
Pre-Construction Documents Cont.
Building specifications (spec sheet) Brand, Type, Color and Size of materials
used.
Project budget and financing
A complete estimation of labor, costs, and materials Detailed materials and equipment list
that are needed to complete the job
Pre-Construction Documents Cont.
Planning and scheduling of the project using Primavera Project Planner. Project duration When the construction phase will be
completed.
Conclusions
The completion of the pre-design and design phase last semester will allow me to fully complete the pre-construction documents that will be done this semester.
Timeline (Second Semester)
Jan 20 – Jan 23 Construction Documents: Floor plan/ Electrical/ Plumbing/ Elevations/ Overall site plans/ Schedules and Construction Details
Jan 26 – Jan 30 Cont.
Feb 2 – Feb 6 Cont.
Feb 9 - Feb 13 Cont.
Feb 16 - Feb 20 Cont.
Feb 23 - Feb 27 Present Proposal
Mar 2 – Mar 6 Building Specifications
Mar 9 – Mar 13 Project Budget and Financing
Timeline cont. (Second Semester)
Mar 16- Mar 20 Estimation of materials, costs, and labor
Mar 23 – Mar 27 Cont.
Mar 30 - Apr 3 Cont.
Apr 6 – Apr 10 Planning and scheduling using Primavera
Apr 13 - Apr 17 Cont.
Apr 20 – Apr 24 Cont.
Apr 27- May 1 Prepare for final presentations
May 4 – May 8 Present Final Project