bureau veritas marine & offshore · pdf filepsc inspection checklist for bureau veritas...

79
BUREAU VERITAS MARINE & OFFSHORE DIVISION CHECK LISTS TO PREPARE FOR PSC INSPECTIONS

Upload: lethuan

Post on 06-Feb-2018

279 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

BUREAU VERITAS MARINE & OFFSHORE DIVISION

CHECK LISTS TO PREPARE FOR

PSC INSPECTIONS

Page 2: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive
Page 3: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

3

BUREAU VERITAS MARINE & OFFSHORE DIVISION

Preventive Inspection Preparation Questionnaire

This Check list is issued to assist surveyors and help the responsible crew on board to check preventively the apparent condition of maintenance of the ship prior to the potential, expected or consecutive Port State Control inspection.

It does not in any way replace or cover the scope of class and/or statutory surveys carried out by Bureau Veritas, the Flag state or by Bureau Veritas on behalf of the Flag state.

It is not exhaustive and contains items which are recorded as of elevated attention by the PSC in different areas. The questionnaire is based also on similar checklists created and distributed recently by Flag Administrations, marine consultants and organizations. It is reflecting as well the recent data from statistics available apparently to Bureau Veritas from its own classed fleet and various external sources.

It is worth to underline that as per Bureau Veritas Rules, latest edition, Pt.A, Ch.1, Sec.1, under the par. “Duties of the Interested Parties” :

“The classification of a ship is based on the understanding that the ship is loaded and operated in a proper manner by competent and qualified crew or operating personnel according to the environmental, loading, operating and other criteria on which classification is based. In particular, it will be assumed that the draught of the ship in operating conditions will not exceed that corresponding to the freeboard assigned or the maximum approved for the classification, that the ship will be properly loaded taking into account both its stability and the stresses imposed on its structures and that cargoes will be properly stowed and suitably secured and that the speed and course of the ship are adapted to the prevailing sea and weather conditions according to the normal prudent seamanship. …… Ships are to be maintained at all times, at the diligence of the Owners, in proper condition complying with international safety and pollution prevention regulations.” Present document is not in any way designed, even as guidance only, to replace or prevent the use of any applicable regulatory document in the field of Port State Control Inspection Regime, such as IMO Res.A.1052(27) as amended or specific PSC Administrations requirements, Concentrated Inspection Campaign announcements or any other Administration imposed additional regulations and/or specific port, country or regional regimes as published.

If your ship is detained, or appears to be in the process of being detained, you should contact the nearest BV office immediately for assistance. The BV surveyor will facilitate rectification of deficiencies, verify compliance with the applicable requirements and expedite release of the ship. Refer to BV Rules Pt A, Ch1, sec1, § 3.4.1.

Page 4: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive
Page 5: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

5

Preventing Detentions

� By regular maintenance � By periodic inspections of the vessel in a similar way to the PSC's “more detailed” inspection :

�By a third party

� Training of staff

�By own staff

� Use of checklist

� Periodicity of vessel's inspection :

� Monthly

� After crew changes

� Approaching a port of PSC inspection

Page 6: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive
Page 7: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

7

Boarding the vessel

0 Arrangements for safe boarding (*)

0.1 Load line marks clearly marked on shell plating on each side and correspond with ILLC

0.2 Pilot ladders/hoist and arrangement for safe boarding, e.g. accommodation ladders, safety net and lights in good condition.

0.3 Gangway watch and security checks in place as required.

0.4 Deck cleanliness, doors and corridors free of obstacles and clean.

Documentation and Records

1 Documentation and Records (*)

1.1 All original copies of trading certificates available and valid.

1.2 CSR documents (incl. Form 1, 2 & 3) available for review.

1.3 All seafarers’ National Certificates of Competency, GMDSS Operator’s Certificates, Flag Licenses for Officers, Certificate of Receipt of Application, Dangerous Cargo Endorsements and Medical Fitness Certificates available and valid.

1.4 Verification that the “Letter of receipt of application for a COE” is available on board for officers sailing under the ships flag but who have not yet received endorsement.

1.5 Records of hours of work/rest for each crew member comply with STCW requirements and tally with vessel’s operation logs (Note: very detailed examination will be carried out by PSCO in ports of Australia).

1.6 All approved and required manuals/documents (e.g. stability, cargo securing, SOPEP, grain loading, garbage management, LRIT conformance test report, diesel engine technical files, VOC Management Plan, etc.) available for inspection and all contents updated.

1.7 All inspection/service records of LSA, FFA, navigation equipment and GMDSS radio equipment, and survice records available and valid.

1.8 Plans (Fire Control, Damage Control, etc.) and instructions (muster list, life-jackets donning, etc.) available.

1.9 All drill records (abandon ship, fire, steering gear, SOPEP, security, etc.) available as evidences of emergency preparedness.

1.10 ISSP and ship-company exchange on alerts and level of security.

1.11 Last PSC report, Shore-based Radio equipment maintenance agreement, Survey Report files

1.12 For MLC – see the dedicated list

Do not underestimate the importance of the first

impression made on the PSC officer.

Provide polite, cooperative and correct attitude by the crew

to the PSC officer duties during the inspection.

Page 8: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 9: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

9

Bridge area

2 Bridge Area – Navigation Safety and Means of Communication (*)

2.1 Up-to-date and corrected nautical publications and charts available for the intended voyages; latest IMO and flag State required publications available. (Res.A.1052(27),Ap.2/3.11; Ap.7/11.3)

2.2 Berth to berth voyage plan prepared and approved by ship’s Master (SOLAS V/34)

2.3 Voyage charts corrected as necessary (SOLAS V/19.2.1; V/27)

2.4

Magnetic compass is easily readable and correctly adjusted (deviation card clearly exposed). (SOLAS V/12 ; V/19.2.1 ; V/19.2.2.1)

Confirmation that a table or curves of residual deviations for the magnetic compass is available on board. (Res.A.1053(27)/EA.1.2.1.25)

Verification that the magnetic compass deviation book is properly maintained (Res.A.1053(27)/EA.1.2.1.25)

2.5

All navigation equipment (e.g. radars, ARPA, magnetic/gyro compass, echo sounding device, speed log, bridge indicators, daylight signalling lamp, AIS, VDR, ECDIS, LRIT, etc.) are in good working condition; no overdue of annual servicing or expiry of batteries; inspection and testing records available (SOLAS V/16 ; Res.A.1053(27)/EA.1.2.1.26)

2.6 Navigational lights, shapes and sound signaling equipment (daylight signaling lamp, whistles, forecastle bell, gong, alarms) in good working condition (SOLAS II-1/43.2; COLREG/An.I)

2.7

GMDSS installations (e.g. VHF & MF/HF radio installations, NAVTEX receiver, INMARSAT-C, EPIRB, SART, etc.) in good working condition; no overdue of annual servicing or expiry of batteries; inspection and testing records (monthly, weekly and daily) available; GMDSS installation reverse power fully charged and tested weekly. (SOLAS IV/14,15; MSC/Circ.955; Res.A.1052(27)/Ap.9/3.3.2)

2.8 EPIRB in working order; updated maintenance records available. EPIRB located in a float free position which can also be accessed by ships staff without the need to climb a vertical ladder. (SOLAS IV/7.1.6; IV/15.9)

2.9 Fire detection alarms panel on bridge in working order including sensors, call points and fault alarms (Res.A.1052(27)/Ap.2/3.6; Ap.7/6.1 & 8.1.6.1)

2.1 Verification that pyrotechnics, line throwers, immersion suits and life jackets on bridge are in place and in date (SOLAS III/7; Res.A.1052(27)/Ap.6/5.2)

2.11 Engine telegraph, engine room and steering gear room communication operational (Res.A.1052(27),Ap.2/3.9; SOLAS II-1/29)

2.12

Pilot ladders condition careful check (condition of ropes, steps abd their seizing, non-slip surfaces, spreaders, securing to deck). Hoist arrangement for safe boarding, e.g. accommodation ladders, safety net and lights in good condition.

Pay Attention please:

60% of all maritime claims over €1m in 2014 are caused by grounding, collision

and hull damage [Global Claims Review 2014, AGCS].

Safety of Navigation and relevant equipment are in the focus of the PSC initial

inspections. See the MoU statistics for this area in 2015 on next page.

Page 10: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 11: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

11

PARIS MoU, 2015, Safety of Navigation:

TOKYO MoU, 2014:

Page 12: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 13: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

13

Life Saving Appliances (LSA)

3 Life-Saving Appliances (*)

3.1

Emergency lighting and batteries - verification of the lighting of the muster and embarkation stations, alleyways, stairways and exits giving access to the muster and embarkation stations, including the emergency source of power (all ships).

Verification of low level lighting (passenger ships)

3.2

Lifeboats - Lifeboats and rescue boat are structurally sound and properly stowed.

Inventory and ration adequate and in good condition.

Confirmation of the compulsory markings of each lifeboat.

Check of the lifting hooks, keel attachment.

Engines start without difficulty (with primary & secondary means of starting in normal working condition).

Davits (incl. wire falls) well maintained, marked for inspection, log book entries.

On-load release mechanisms and hydrostatic locks (where fitted) in working order and in correct position. Date of servicing or replacement.

Retro-reflective tapes provided.

Annual & 5-year thorough examinations done.

Verification of the condition and operation of water spray and air supply systems where provided in totally enclosed lifeboats which have self-contained air support systems.

Confirmation that the record indicating that the lifeboat equipment was examined and found to be complete has been entered in the log book.

Verification that the engine of each lifeboat, if so fitted satisfactorily starts and operates both ahead and astern and fuel tank contents are maintained at acceptable level.

3.3 Liferafts and hydrostatic release units serviced, liferafts properly stowed, hydrostatic releases properly connected, launching arrangement (if fitted) in good working condition.

3.4 Sufficient lifebuoys provided and marked, smoke/lights and lifelines are in good working condition, quick release mechanisms are working properly

3.5 Sufficient lifejackets and immersion suits are provided and marked, lights and whistles are attached and in working condition, retro-reflective tapes provided

3.6

Means of embarkation for lifeboats and liferafts readily available, emergency lights at survival stations are working, overside lights in good working condition

Length of all embarkation ladders for liferaft is appropriate to reach the waterline in the lightest seagoing condition under unfavorable conditions of trim of up to 10° and a list of up to 20°.

Each portable light, when used for illumination of liferaft stowage area and the area of water into which it is to be launched, have brackets to permit their positioning and are supplied from the emergency source of power.

3.7 Donning instructions, launching instructions and IMO symbols are suitably posted

3.8 LSA manufacturer’s maintenance instructions and SOLAS training manuals available

Though being on 3rd

and 4th

place in the 2015 Paris MoU LSA deficiencies chart

LIFEBOATS and RESCUE BOATS are the reason for highest number of detentions.

For Tokyo MoU in 2014 they are on the top. (see next page)

Page 14: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 15: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

15

PARIS MoU, 2015, LSAs:

TOKYO MoU, 2014:

Page 16: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 17: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

17

Fire-Fighting Appliances (FFA)

4 Fire-Fighting Appliances (*)

4.1 Fire detectors and alarm panels (Bridge, E/R & Fire Control Station) in good working condition

4.2 Fire lines (incl. hydrants) no leakage or temporary repair; E/R isolating valves in operating condition and clearly marked; fire-fighting gears (e.g. hoses, nozzles, spanners and tools) in good condition, international shore connection available

4.3 Main and emergency fire pumps are easily started, in good operating condition, have sufficient suction and discharge pressures (with 2 hoses at remote/highest locations), legible operating instructions for emergency fire pump posted

4.4

Fixed gas/foam/dry powder /water spray firefighting installations in good working condition; visual and audible alarms tested; CO2 bottles, foam or dry powder reservoirs, etc. room ventilation and fire/thermal insulations in order; servicing not overdue and records available; legible operating instructions posted

4.5 Portable/moveable fire extinguishers in good working condition, sufficient number and readily available; servicing not overdue and records available; sufficient spare charges and additional fire extinguishers available

4.6

Fire doors in good working condition and not latched; fire dampers/ventilators not seized and clearly marked; skylights in good condition. FO/LO quick closing valves not latched and in good condition, E/R ventilation and FO pump remote stops tested and in good condition; fire insulations/resistant penetration in good condition

4.7 EEBDs, BA sets and fireman’s outfits in good working condition, readily available, servicing not overdue and records available; escape routes properly lighted (emergency lights), clearly marked and unobstructed

4.8 Fire drill training schedule and records available

4.9

Fire hoses length to be complient with SOLAS II-2,reg.10.2.3.1.1, e.g. not more than:

- 15 m in machinery spaces

- 20 m in other spaces and open decks

- 25 m for open decks on ships with max breadth above 30 m

Paris MoU, 2015, Fire Safety

Page 18: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 19: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

19

Accommodation – 1/2

5.A. Accommodation-1/2 (*)

5.a.1

Fire doors - Examination of manual and automatic fire doors and verification of their working condition and able to close tight.

Verification that fire doors are self-closing and self-latching, ensure self-closing doors have no hold back arrangements fitted other than those that can be remotely released.

5.a.2

FireFighting equipment - Examination of the fire-fighting appliances, with working test as far as necessary and practicable.

Examination of the hydrants, hoses, spanners and nozzles and confirmation that they are at their respective locations.

Examination of the international shore connection and confirmation that it is located as shown on the Fire Control Plan.

Verification that the connection bolts dimensions is as per regulation and must be stored next to the connection. The correct joint must also be available at the location as should correct size spanner.

Confirmation that the fire fighter's outfits are complete (correct number of suits are available) and in satisfactory condition.

Confirmation that the cylinders, including the spare cylinders, of any self-contained breathing apparatus are suitably charged.

5.a.3

Fire control plan - Confirmation that the fire-control plans are permanently exhibited, or, alternatively, that emergency booklets containing information dealing with firefighting are available on board.

Confirmation that a duplicate copy of the fire-control plans (or booklet) is available in a prominently marked enclosure, external to the ship's deckhouse.

5.a.4 Signs, indications (weather tight doors, fire detectors, fire dampers, ventilation)

All in place and as required.

5.a.5

Emergency lighting and batteries - Tests of emergency lighting, transitional emergency lighting and supplementary emergency lighting.

Verification that batteries are fully charged.

5.a.6 Alarms and PA Systems - Tests of general emergency alarms & signals, operational alarms and public address systems functioning and clearly audible in all areas.

Paris MoU, 2015, emergency systems

Page 20: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 21: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

21

Accommodation – 2/2

5.B. Accommodation and ILO Requirements -2/2 (*)

5.b.1 Accommodation kept in clean and habitable condition and are free from any infestation; cabin and staircase doors can properly close and lock; no stores, equipment stores or cargoes are stowed in these places

5.b.2 Galleys, pantries and food preparation areas are clean and free of any infestation with no blocked drain, flooring or tiling in good condition; range hood grease traps are cleaned; fridges kept in operating order, clean and regularly defrosted

5.b.3

Hospital and sick bay are clean and free of any infestation;equipment and instruments are

clean and orderly; adequate medical equipment is available and that proper medicines are available and within validity dates; medical chest is stored in the medical locker and that instructions for use of medicines and equipment are available; hospital is not used as an extra cabin/store room

5.b.4 Sanitary places are neat and clean; flushes and drainage are working and not leaking; floor tiles are in good condition; doors can properly close and lock; cold and hot water is ready available

5.b.5 Accommodation spaces, working spaces and corridors are properly lit; ventilation and heating systems are in satisfactory operating order

5.b.6 Adequate food and fresh water provided for the intended voyage, free of any infestation and insects; provision store and refrigerated store rooms conditions at a suitable temperature

5.b.7 Electrical features are in satisfactory order; electrical cable connectors are maintained duly isolated to avoid risks of electrical shocks; no loose wiring

Paris MoU, 2015, Living & Working Conditions, Labour Conditions - Accomodation

Page 22: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 23: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

23

Deck Area 1/2

6 Deck Area – including Load Line & Structures - 1/2 (*)

6.1 Deck corrosion - Weather decks, side shell above waterline and accessible parts of the rudder well maintained, not corroded, holed or wasted.

6.2 Railings, cat walks - Guardrails, gangways, walkways, ladders and any other means provided for the protection of the crew and means for safe passage for crew well maintained, not corroded, holed or wasted.

6.3

Cargo and other hatchways - Examination of the means of securing the weather tightness of machinery-space hatchways and of other hatchways on decks.

Verification of the satisfactory condition of hatch covers.

Verification of the satisfactory condition of hatch coamings and stiffeners.

Verification of the satisfactory condition of clamping devices, retaining bars and cleats.

Verification of the satisfactory condition and operation of hydraulic and power components, wires, chains and link drives essential to closing and securing (mechanically operated hatch covers).

Verification of the satisfactory condition of wooden covers and portable beams, carriers or sockets for the portable beams, and their securing devices (pontoon hatch covers).

6.4 Weather tight doors and rubber sealing - Examination of the means of closing and securing the weather tightness of all openings in freeboard, superstructure and exposed decks.

6.5

Ventilators, air pipes, casings, manually operated valves - Examination of ventilators, including their coamings and closing appliances.

Examination of air pipes and overflow pipes, including their coamings and closing appliances.

Remote operation of scuppers, inlets, discharges are satisfactorily and that non-return valves and manual closures are in satisfactory condition.

6.6 Winches and capstans - Examination of anchoring and mooring equipment, as far as practicable, clearly markings and in good working condition.

6.7

Fixed fire extinguishing installation - Bottles/tanks serviced, level checked and dated; release mechanisms & applicators in good condition and in place.

Examination of the fixed fire-fighting system for the cargo spaces and confirmation that its operation mode is clearly indicated.

Confirmation of the operational readiness and maintenance.

Examination of the controls, piping, instructions and markings; search for evidence of proper servicing, including date of last system tests.

Verification that the test of alarms for inert gas flooding and test of remote fan/pump stops are performed and recorded.

6.8

Firefighting equipment - Examination of the fire-fighting appliances, with working test as far as practicable.

Examination of the hydrants, hoses, spanners and nozzles and confirmation that they are at their respective locations.

Confirmation that the fire fighter's outfits are complete and in satisfactory condition.

Confirmation that the cylinders, including the spare cylinders, of any self-contained breathing apparatus are suitably charged.

Page 24: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 25: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

25

Deck Area 2/2

6 Deck Area – including Load Line & Structures - 2/2 (*)

6.9

Fire dampers, quick closing devices and means of control - Examination of fire divisions, fire doors, dampers in ventilation ducts, means of closure of skylights and other openings.

(TOKYO MOU) – Maintenance and operational condition of upper funnel flaps, manually or from a distance as applicable.

6.1 Lighting - Tests of main lights, emergency lighting, transitional emergency lighting and supplementary emergency lighting.

6.11

Signs, indications (weather tight doors, fire detectors, fire dampers, ventilation, CO2 room, Muster station instructions) -

All in place and as required

6.12 Alarms and PA Systems - Tests of general emergency alarms & signals, operational alarms and public address systems functioning and clearly audible in all areas

Paris MoU, 2015, Structural Conditions, Water/Weathertight Conditions

Page 26: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 27: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

27

Machinery & Electrical - General

7 Machinery and Electrical (*)

7.1

Main and auxiliary engines in good working condition; clean and free from leakage; hot surfaces insulated; instrumentation (e.g. safety valves and pressure gauges) in good working condition; remote and emergency starting system working properly.

Load transfer between generators tested satisfactorily.

Auto start-up on black-out.

7.2

Jacketed piping system for high pressure fuel lines - Confirmation that all external high-pressure fuel oil delivery lines between the high-pressure fuel oil pump and fuel oil injectors are protected with a jacketed piping system capable of containing fuel from a fuel line failure.

Verification that a fuel oil leakage alarm is given in the event of a pipe failure.

7.3 Fuel oil and lubricating oil systems (including pumps, purifiers, filters, heaters and piping) maintained in satisfactory condition and free of any leakage.

7.4

Boilers (including valves, water, steam and fuel systems, gauge glass mountings) kept working properly; boiler and piping insulated; local and remote control of safety devices, automatic and manual control system, visual alarms/indicators in good condition; securing arrangements in position.

7.5 Bilge pumping system (auto start/stop), piping and valves together with high level alarms in operational condition.

7.6 Engine control room equipment and switchboards (incl. safety protections, protection against electrical shocks, conditions of indicator lights and instruments) maintained satisfactory.

7.7

Emergency generator in both manual and automatic modes tested and testing records maintained; fuel oil tank for emergency generator topped-up; starting batteries are charged; no irregularities on the emergency generator switchboard; all emergency lights (by battery or by e-generator) in good order.

7.8

Engine room clean and tidy; no oily bilge, oil residual and rags; all movable parts suitably protected/guarded; no flying electrical cables or junction boxes; dangerous of electrical shocks clear out; personal protection warnings posted and protective equipment (e.g. helmets, ear-plugs, goggles, gloves, etc.) are readily available.

7.9 Retention of oil onboard - Tanks correctly identified and any disposals documented.

Visual examination of records of various oil-discharge monitoring and control systems.

7.1

Steering gear - Examination and working test of the main steering arrangements, including their associated equipment and control systems.

Confirmation that the emergency instructions are posted.

Confirmation of the arrangements to relay instructions from bridge to emergency steering position is clear and audible, confirmation that visual indication exists at emergency steering position for rudder angle.

7.11 Alarms and PA Systems - Tests of general emergency alarms and signals, operational alarms and public address systems functioning and clearly audible in all areas.

7.12

Firefighting equipment - Examination of the fixed fire-fighting arrangements and their sensors. Test carried out as far as necessary and practicable.

Examination of the hydrants, hoses, spanners and nozzles and confirmation that they are at their respective locations in ready-to-use condition.

Fire fighter's outfits complete and in satisfactory condition stored at designated places.

Breathing apparatus bottles charged including spares.

Page 28: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 29: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

29

PARIS MoU, 2015, Propulsion & Auxiliary Machinery, Alarms:

TOKYO MoU, 2014,Most Frequent detainable deficiencies (Mach & ER in red):

Page 30: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 31: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

31

Pollution Prevention

8 Pollution Prevention (*)

8.1

The general condition and functionality of the oily water separator in satisfactory condition; the oil discharge monitoring and control system and 15 ppm alarm (if fitted) tested; oil content meter calibrated; operating instructions of the installation permanently posted; no illegal by-pass piping; warning placards against prohibited discharges posted

8.2 Bilge & sludge pumps operational; the volume of the bilge holding tank and sludge tank remains sufficient for the intended voyage; sludge discharge piping leading to deck for discharge ashore is not blocked

8.3 Standard discharge connection is readily available, including the required number of bolts in the required dimensions

8.4 Garbage reception facilities adequate and categorised; warning placards against prohibited discharges posted

8.5 Oil record book, garbage record book, ODS record book, record book of engine parameters, bunker delivery note, etc. correctly entered and available for inspection

PARIS MoU, 2015, Pollution prevention, MARPOL All Annexes:

PARIS MoU, 2015, Pollution prevention, MARPOL Annexes I, IV & V:

Page 32: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 33: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

33

System Requirements (ISMS - Safety Management)

9.A Safety Management System (ISMS) (*)

9.A.1 Safety Management Manual with updated version available at all relevant locations; company’s safety & environmental policy displayed at prominent locations, e.g. Bridge, Mess Room, Engine Room, etc.

9.A.2 All documents properly controlled in accordance with SMS; obsolete documents removed. DoC, SMC ISSC and CSR certificates available and data checked for consistency.

9.A.3 Minimum Safety Manning Doc matches personnel on board. Crew List updated. Medical Fitness Certificates for all crew in place.

9.A.4 Working language established for communication (including manuals, instructions, etc.); all crew members communicate effectively in execution of their duties

9.A.5 DPA/Shore contact details readily available; Master, officers and ratings aware of the DPA

9.A.6 Master familiar with his responsibilities and authority under SMS including over-riding authority; officers and ratings familiar with their responsibilities, specific duties, ship arrangements, installation, equipment and procedures

9.A.7 Engine room and deck equipment maintenance records available; planned maintenance system established. Emergency escape routes are clean and free.

9.A.8 Records/plans/evidence of key shipboard operations available. Muster List and Fire Control Plans copies updated to SOLAS. Emergency Contact Lists for the company and the port of inspection available.

9.A.9

Records of crew familiarization of SMS available including job familiarisation, onboard training, instruction prior to sailing, familiarization with their specific duties, ship arrangements, installations, equipment and procedures; records of drills and training available including individual crew’s performance evaluation and training

9.A.10 Emergency situations identified and drills/training programme established; drills records (scenarios covered & frequency) available and review/record for each drill done

9.A.11 Procedures of reporting accident, incident, non-conformity established; Records (incl. responses by the company with corrective actions) showing the procedures implemented effectively available; Evidence of risk assessments available

9.A.12 Master’s review, internal and external audits conducted on time and records available; NC follow-up and corrective action taken/closed on time

PARIS MoU, 2015, ISM :

Attention please !! ISM deficiencies are the reason for the biggest number of detentions in 2015

Page 34: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 35: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

35

System Requirements (ISPS - Ship Security)

9.B Ship SecuritySystem (ISPS) (*)

9.B.1 Ship Security Plan is available and properly protected from unauthorized access or disclosure

9.B.2 Evidences showing Master’s understanding of his responsibility and overriding authority to make decisions with respect to the safety and security of the ship available

9.B.3

Certificate of Proficiency for Ship Security Officer is available;

Evidence of SSO’s understanding of his security duties and responsibilities in accordance with SSP;

Contact details with CSO available.

9.B.4

Programs & records for training, drills and exercises available; various types of security exercises with shore-based personnel conducted; specific security duties and responsibilities assigned to crew members;

Evidences showing crew members understand their ship security responsibilities and sufficient knowledge available.

9.B.5

Main power source and alternative power for the SSAS are properly maintained;

SSAS operational and maintenance manuals available; activation of SSAS from the bridge and one other location working properly;

Ship Security Alert Message can be addressed to the Administration;

SSAS operational test conducted satisfactory.

9.B.6

Control of access to ship (incl. control of visitors and their belongings) implemented in an appropriate manner;

Access to restricted areas are monitored; upper deck, f’cle deck, poop deck and surrounding of the ship are monitored;

Handling of cargo and ship’s stores are supervised;

Security communication is readily available;

Safety requirements are ensured even the security measures are in place;

Thoroughly searched for stowaways and established measures to prevent stowaways secreting on board.

9.B.7

Records of security activities maintained on board (e.g. :

training, drill and exercise;

Security threats and security incidents;

Beaches of security;

Changes in security level;

Communication relating to the direct security of the ship such as specific threats to the ship or to port facilities the ship;

Internal audits and reviews of security assessment;

Periodical review of the SSP;

Implementation of any amendments to the SSP;

Maintenance, calibration and testing of any security equipment;

External audits; audit or review of findings closed out, etc.)

Though ISPS deficiencies in Paris MoU have not been up to this date the reason

for detentions in 2015, they are 30% in number of the ISM ones and more than

the ones for the Lifeboats, the Fire dampers or the Em.generator.

Page 36: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 37: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

37

MLC most frequent deficiencies

10 MLC Requirements (by frequency of detainable deficiencies data) (*)

10.1

Area 14 Payment of wages

Labour conditions - Conditions of employment

- wage slip delivered on monthly basis

- seafarers receiving wages as per SEA (Serious Deficiency)

- wage calculated as required (i.e. holidays not included, overtime)

- wage or calculation included in SEA (Serious Deficiency)

- transfer of wage effective

10.2

Area 6 Hours of Work or Rest

Certificate & Documentation – Documents

- work and rest hours divided properly

- working schedule posted onboard

- sefarers receive copies of work and rest hours record

- work and rest hours record and shipboard working schedule on approved format

- work and rest hours record endorsed by master and/or seafarer

Labour conditions - Conditions of employment

10.3 Area 11 Health and safety and accident prevention

Labour conditions - Accommodation, recreational facilities, food and catering

10.4

Area 4 Seafarers’ employment agreements

Certificate & Documentation - Crew Certificates

Certificate & Documentation – Documents

Labour conditions - Conditions of employment

10.5 Area 7 Manning levels for the ship

Certificate & Documentation - Crew Certificates

10.6

Area 8 Accommodation

Certificate & Documentation – Documents

Labour conditions - Accommodation, recreational facilities, food and catering

10.7 Area 10 Food and catering

Labour conditions - Accommodation, recreational facilities, food and catering

10.8

Area 12 on-board medical care

Labour conditions - Accommodation, recreational facilities, food and catering

Labour conditions - Health protection, medical care, social security

10.9 Area 13 On-board complaint procedure

Certificate & Documentation - Documents

10.1

MLC,2006 Ship’s certificates and documents

Certificate & Documentation - Ship Certificates

Certificate & Documentation - Documents

10.11

Area 2 Medical certification of seafarers

Certificate & Documentation - Crew Certificates

Labour conditions - Minimum requirements for seafarers

10.12

Area 3 Qualifications of seafarers

Certificate & Documentation - Crew Certificates

Labour conditions - Minimum requirements for seafarers

Page 38: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 39: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

39

SOLAS Operational Requirements - Drills

11 SOLAS Operational Requirements - Drills (*)

11.1 Abandon Ship Drills: operational effectiveness of the drills for the officers and ratings in accordance with the muster list

11.2 Fire Drills: operational effectiveness of the drills for the officers and ratings in accordance with the muster list; the officers and ratings familiar with the using of fireman outfits, BA sets, stretcher, etc.

11.3

Enclosed Space Entry and Rescue Drills: - enclosed spaces identification lists; - required personal protective equipment; - communication equipment in order and ready for use; - enclosed space entry procedures available for check; - instruments for measuring the atmosphere in enclosed spaces; - rescue equipment and rescue procedures in place; - instructions for first aid and resuscitation techniques; - relevant crew training records available.

11.4 Effective communication among the officers and ratings during the drills

PARIS MoU, 2015, Emergency Systems, Drills.

The ratio of detentions vs inspections in the area of Ship Operations &

Drills is one of the biggest values in Paris Mou for 2015.

Paris, Tokyo, Indian MoU & AMSA have launched a dedicated

Concentrated Inspection Campaign (CIC) on Enclosed Space Entry and

Rescue which started on 1st

Sep 2015.

Page 40: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 41: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

41

Specific for Bulk Carriers – 1/2

12 Additional Specific for Bulk Carriers - 1/2 (*)

12.1

Documentation and certificates for bulk carrier are available, e.g.:

Bulk Carrier Booklet per SOLAS Reg.VI/7,

Cargo Information per SOLAS Reg.VI/2,

Stability information per SOLAS Reg.VI/6,

BLU Code,

Damage Control Plan & Booklet (for Bulk Carrier constructed on or after 1 Feb 1992),

Document of Authorization required by the Intern. Grain Code, Grain Loading Manual,

Enhanced Survey Records & associated documents,

Cargo Record Book,

DOC with the Special Requirements for Ship Carrying Dangerous Goods (SOLAS Reg. II-2/19.4),

Exemption Certificate for Fixed CO2 System for Cargo Holds,

Emergency Towing Procedures for ships constructed on or after 1 Jan 2010 or not later than 1 Jan 2012 for ships constructed before 1 Jan 2010, etc.

12.2

Carriage of solid bulk cargoes, grains and cargo operation in compliance with the relevant requirements of IMO, flag States, classification society and port authorities, e,g, SOLAS (Ch.VI: Carriage of Cargoes, etc.), IMSBC Code; BLU Code, International Grain Code, Operation Manual, etc.

12.3

Carriage of dangerous goods in solid form in bulk and cargo operation in compliance with the relevant additional requirements of IMO, flag State, classification society and port authorities:, e.g. :

Documents per SOLAS Reg.VII/7-2;

Stowage and segregation requirements per SOLAS Reg.VII/7-3;

Reporting of incidents involving dangerous goods per SOLAS Reg.VII/7-4;

IMSBC Code, IMDG Code, BLU Code, Operation Manual, etc.

12.4

Hull construction and piping on deck maintained in good condition, e.g. :

Cargo hold (bulkheads, frames, tank top plating) maintained in good condition without heavy corrosion, wastage, holes or cracks;

Cargo hold hatch covers and coaming structure including cleats & bolts maintained in good condition;

Cargo hold gas sampling points properly maintained;

Hydraulic system including hydraulic cylinders and pipes for hatch cover operation properly maintained without oil leakage;

Deck plating including main deck, cross deck, f’cle deck & poop decks maintained in good condition;

All piping & valves on deck maintained in good condition;

Electric cable conduits maintained in good condition;

Water ballast tanks maintained in good condition without leakage;

Air pipes maintained in good condition without heavy corrosion and leakage.

Page 42: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 43: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

43

Specific for Bulk Carriers – 2/2

12 Additional Specific for Bulk Carriers - 2/2 (*)

12.5

Water ingress alarm system properly maintained and operates satisfactorily.

Water level detector: level alarms (audible and visual) in each cargo hold, in any ballast tank located forward of collision bulkhead, in each dry or void space in any part of which is extending forward of the forward most hold maintained in good condition; Dewatering arrangement: forepeak tank, Bosun’s store and f’cle space able to be drained by pumps or eductors that can be operated from navigation bridge or engine control room without traversing exposed decks.

12.6

Additional safety measures for carriage of solid dangerous goods in bulk required by SOLAS Reg. II-2/19 complied with and maintained in good condition, e.g. :

Immediate availability of a supply of water from the fire main by remote control fire pumps;

Electrical equipment and wiring are not fitted in enclosed cargo spaces unless it is certified safe type;

Adequate power ventilation provided in enclosed cargo spaces (at least 6 air changes per hour), the fans unable to ignite flammable gas air mixture & suitable wire mesh guards fitted over inlet and outlet ventilation openings, or natural ventilation provided in enclosed cargo spaces;

Personnel protection including 4 sets of full protective clothing resistant to chemical attack with 2 sets of SCBA;

Bulkhead forming boundaries between cargo spaces and machinery spaces of category A shall be insulated to “A-60” class standard, unless the dangerous goods are stowed at least 3 m horizontally away from such bulkheads.

12.7 Means of closing all ventilators and other openings leading to the cargo spaces maintained in good condition as required by SOLAS Reg.II-2/10.7.1.4 for exemption from the requirements of fixed gas-extinguishing systems for dangerous goods

12.8 Loading instrument properly maintained and operates satisfactorily (SOLAS Reg. XII/11); calibration & inspection carried out and records properly maintained

12.9

Oxygen analysis and gas detection equipment per SOLAS Reg.VI/3 with detailed instruction for use available and maintained in good condition when transporting a solid bulk cargo which is liable to emit a toxic or flammable gas, or cause oxygen depletion in the cargo space;

Crews of the ship are trained in the use of the instruments;

Calibration & inspection of the equipment carried out and records properly maintained.

PARIS MoU, 2015, Bulkers, All areas

Page 44: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 45: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

45

Specific for Oil Tankers – 1/2

13 Additional Specific for Oil Tankers - 1/2 (*)

13.1

Documentation and certificates for oil tankers available, e.g. :

Damage Stability Plan,

Operation Manual,

ODM Manual & Records,

COW Manual,

Oil Discharge Manual & Records,

Shipboard Oil Pollution Emergency Plan,

STS Operation Plan,

Oil Record Book Part I & II,

VOC Record Book,

Enhanced Survey Records & associate documents,

Exemption Certificates, etc.

13.2 Cargo carriage and operation in compliance with the relevant requirements of IMO, flag State, classification society, port authorities, e.g. SOLAS, MARPOL, Operation Manual, etc.

13.3 Officers and Ratings national certificates,

Flag licenses and dangerous cargo endorsements for oil tankers available and valid

13.4

Hull construction, cargo tanks and piping on weather decks maintained in good condition.

Cargo tanks without leakage and damage.

Piping and associated fittings for cargo transfer, fuel oil, ballast, air pipes, inert gas and all other piping on weather decks and in cargo pump room maintained in good condition without heavy corrosion or leakage, etc.;

Type approved hoses properly maintained;

Water ballast tanks maintained in good condition without leakage;

Air pipes maintained in good condition without heavy corrosion and leakage

13.5

Protection of cargo pump room maintained in good condition, e.g. :

Lighting/Ventilation inter-lock system, continuous hydrocarbon monitoring system and alarms,

Pump shaft gland monitoring and alarm system,

Bilge level monitoring and alarm system,

Temperature sensors, etc.;

Inspection carried out and records properly maintained.

13.6

Inert gas system including inert gas generator and inert gas blower,

Scrubber room ventilation system,

Deck water seal,

Remote and automatic control valves,

Interlocking system between soot blower and shut-off valve on gas supply line, Measuring system, alarm system and safety device properly maintained,

Satisfactory operation of alarm indicators and alarms’ control panel.

Page 46: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 47: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

47

Specific for Oil Tankers – 2/2

13 Additional Specific for Oil Tankers - 2/2 (*)

13.7

Oil Detection Monitor (ODM) properly maintained and manual & auto means of discharge working satisfactorily;

Records of ODM operation properly maintained;

Oil/Water Interface Detector properly maintained and the unit is operating satisfactorily;

Calibration & inspection of the equipment carried out and records properly maintained

13.8

Tank cleaning system, e.g. :

COW system, including piping, pumps, valves and deck machines properly maintained and free of leaks,

The system arranged and operates satisfactorily as outlined in Operations and Equipment Manual.

13.9

Cargo tank level indicators, high liquid level alarms and overflow control, etc. properly maintained and operates satisfactorily;

Indicators/gauges/meters and alarms at cargo control station or in cargo control room function properly;

Calibration & inspection of the instrument carried out and records properly maintained.

13.1 Electrical and mechanical remote operating and shut-off device for cargo pumps, bilge pumps, ballast pumps and stripping pumps properly maintained

13.11

Fixed and portable gas detecting instruments and associated alarms, and gauging devices for oxygen density properly maintained and operate satisfactorily;

Calibration & inspection of the instruments carried out and records properly maintained.

13.12 Earthing between hull structures and cargo tanks properly maintained.

13.13 Electrical installations in hazardous areas properly maintained, e.g. interlocking device, explosion-proof lights, etc.

13.14

Fixed fire extinguishing arrangements for cargo area on weather decks and pump room properly maintained;

Testing of audible alarm for release of CO2 in pump room carried out and found satisfactory;

Additional fireman’s outfits (at least 4 sets of fireman’s outfit with 200% spare air cylinders provided for each unit) properly maintained;

Inspection of the arrangement & equipment carried out and records properly maintained.

13.15

Emergency towing arrangements for tankers DWT > 20000, properly maintained;

For tankers constructed on or after 1 July 2002, both ends of the tanker capable of rapid deployment without main power on vessel.

PARIS MoU, 2015, Oil Tankers, All areas

Page 48: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 49: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

49

Specific for Chemical Tankers – 1/3

14 Additional Specific for Chemical Tankers - 1/3 (*)

14.1

Documentation and certificates for chemical tankers available, e.g. :

Damage Stability Plan,

Operation Manual, ODM Manual,

COW Manual,

P&A Manual,

Shipboard Marine Pollution Emergency Plan,

Cargo Record Book,

Oil Record Book Parts I & II,

Enhanced Survey Records & associated documents,

Cert for Carriage of Dangerous Chemicals in Bulk (BCH or IBC Code),

Cert for Carriage of Noxious Liquid Substances in Bulk (NLS),

Exemption Certificates,

IBC Code or BCH Code, etc.

14.2 Cargo carriage and operation comply with the relevant requirements of IMO, flag States, classification society, port authorities, e,g, SOLAS, MARPOL , IBC Code /BCH Code, Operation Manual, etc.

14.3 Officers and Ratings national certificates, Flag licenses and dangerous cargo endorsements for chemical tankers (watch keeping, chemical tanker familiazation and chemical tanker special training) are available and valid.

14.4

Hull construction, cargo tanks and piping on weather decks maintained in good conditions.

Cargo tanks without leakage and damage.

Piping & associated fittings for cargo transfer, fuel oil, ballast, air pipes, inert gas and all other piping in cargo pump room and on weather decks maintained in good condition without heavy corrosion or leakage, etc.;

Type approved cargo hoses properly maintained;

Identification marks of pipe lines including pumps and valves;

Air pipes and high velocity pressure-vacuum relief valves properly maintained and operate satisfactory;

Fixed or portable trays or insulation for deck protection against cargo leakage properly maintained;

Pump discharge pressure gauges provided outside pump rooms properly maintained; Water ballast tanks maintained in good condition without leakage;

Air pipes maintained in good condition without heavy corrosion and leakage.

14.5 Closing devices of windows, door and other openings of wheelhouse and of those on exposed bulkheads of superstructures and deckhouse as required maintained in good condition.

Page 50: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 51: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

51

Specific for Chemical Tankers – 2/3

14 Additional Specific for Chemical Tankers - 2/3 (*)

14.6

Emergency towing arrangements for tankers DWT > 20000 maintenance;

For tankers constructed on or after 1 July 2002, both ends of the tanker capable of rapid deployment without main power on vessel.

15.7 Equipment for inerting/padding/drying maintained and operated satisfactorily

14.8

Properly maintained in good condition :

Protection of cargo pump room

Bilge alarm,

Gas monitoring system,

Temperature sensor,

Inter-lock system, etc.;

Ventilation system for compartments and enclosed spaces in cargo areas.

15.9

Prewashing system for noxious liquid substances properly maintained and operated satisfactorily, e.g. :

Prewashing machines,

Tank washing pipelines and wash water heaters;

Stripping system maintained and operated satisfactorily.

14.1

Cargo tank level indicators, high liquid level alarms and overflow control, etc. properly maintained and operates satisfactorily;

Indicators/gauges/meters and alarms at cargo control station or in cargo control room function properly;

Calibration & inspection of the instrument carried out and records kept.

14.11 Electrical and mechanical remote operating and shut down device for cargo pumps and bilge system in pump room maintained and operated satisfactorily.

14.12

Fixed and portable gas detecting instruments and associated alarms, and oxygen content meters properly maintained and operate satisfactorily;

Calibration & inspection of the instruments carried out and records kept.

14.13 Electrical bonding between hull structures and cargo piping properly maintained.

14.14

Electrical installations in hazardous areas in satisfactory condition, e.g. :

Cargo pump motors,

Explosion-proof lights,

Interlock devices;

Others.

Page 52: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 53: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

53

Specific for Chemical Tankers – 3/3

14 Additional Specific for Chemical Tankers - 3/3 (*)

14.15

Proper maintenance of :

Fixed fire extinguishing arrangements for cargo area on weather deck and pump room;

Foam applicator;

Fixed dry powder system, etc.;

Satisfactory test of audible alarm for release of CO2 in pump room ;

Additional fireman’s outfits for flammable cargoes properly maintained (at least 4 sets of fireman’s outfit with 200% spare air cylinders provided for each unit);

Inspection of the arrangements & equipment carried out and records kept.

14.16

Personnel protection equipment maintained appropriately, e.g. :

Decontamination shower and eye wash,

Stretcher and medical first-aid equipment,

Respiratory protection for emergency escape purpose, etc.;

Inspection of the equipment carried out and records kept.

PARIS MoU, 2015, Chemical Tankers, All areas

Page 54: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 55: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

55

Specific for Gas Carriers – 1/3

15 Additional for Gas Carriers - 1/3 (*)

15.1

Documentation and certificates for gas carrier available, e.g. :

Operation Manual & records related to cargo containment system and cargo handling system,

Cargo Plant Operating Manual (Re-liquefaction/Refrigeration System, Gas combustion Units, Re-gasification Units),

Cargo Record Book,

Shipboard Marine Pollution Emergency Plan,

Oil Record Book Parts I & II,

Certificate for Carriage of Liquefied Gas in Bulk,

Exemption Certificates,

GC Code/IGC Code, etc.

15.2 Cargo carriage and operation comply with the relevant requirements of IMO, flag States, classification society, port authorities, e.g. SOLAS, IGC Code, Operation Manual, etc.

15.3 Officers and Ratings national certificates, Flag licenses and dangerous cargo endorsements for gas carriers are available and valid.

15.4

Hull construction, cargo tanks and piping on weather decks maintained in good condition.

Cargo tanks without leakage and damage; piping and associated fittings for cargo transfer, fuel oil, ballast, air pipes, inert gas and all other piping in cargo pump room and on weather decks maintained in good condition without heavy corrosion or leakage, etc.;

Type approved cargo hoses properly maintained;

Identification marks of pipe lines including pumps and valves properly maintained; Water ballast tanks maintained in good condition without leakage;

Air pipes without heavy corrosion and leakage.

15.5

Venting system of cargo containment system properly maintained and operates satisfactorily, e.g. :

Pressure/vacuum relief valves for cargo tanks, pressure/vacuum relief devices and associated safety systems for inter barrier/hold spaces;

Venting systems including their spare fans or impellers for enclosed spaces and compartment in cargo area maintained and operated satisfactorily;

Inspection carried out and records kept.

Page 56: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 57: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

57

Specific for Gas Carriers – 2/3

15 Additional for Gas Carriers - 2/3 (*)

15.6

Cargo handling systems properly maintained and inspection of safety devices carried out, e.g. :

Emergency shut-off devices;

Cargo heat exchangers, pressure vessels;

Cargo pumps, cargo gas compressors, cargo gas blowers and their prime movers;

Piping and their insulations;

Automatic & manual stopping devices for cargo pumps and compressors;

Equipment relating to refrigerant (pump & compressors, condensers, receiver, inter-coolers, oil separators & relief valves, etc.);

Drainage system for leaked cargo in inter-barrier spaces and hold spaces.

15.7

Gauging devices and associated alarms properly maintained and operate satisfactorily, e.g. :

Liquid level gauges, high level alarms and valves related to emergency shutdown system;

Temperature indication equipment and associated alarms;

Pressure gauges and associated alarms for cargo tanks,

Interbarrier spaces/hold spaces;

Safety devices related to use of cargo boil-off gas as fuel;

Calibration & inspection of the instruments carried out and records kept.

15.8

Fixed and portable gas detecting instruments and associated alarms, and oxygen content meters maintained and operated satisfactorily;

Calibration & inspection of the instruments carried out and records properly maintained.

15.9

Inert gas system properly maintained, e.g.

Inert gas generating system;

Inert gas storage system;

Dry air installation;

Gases for compensating normal losses and drying agent, etc.

Gas free and purging systems and gas collecting devices for cargo tanks properly maintained.

15.10

Fixed fire extinguishing arrangements for cargo area on weather deck and pump room properly maintained, e.g. :

Foam applicator, fixed dry powder system, water spray system for deck house, cargo domes & manifolds, etc.;

Firefighting system for gas dangerous closed spaces and alarming devices for emergency escape properly maintained;

Additional fireman’s outfits for flammable cargoes properly maintained (at least 4 sets of fireman’s outfit with 200% spare air cylinders provided for each unit);

Inspection of the arrangements and equipment carried out and kept.

Page 58: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 59: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

59

Specific for Gas Carriers – 3/3

15 Additional for Gas Carriers - 3/3 (*)

15.11 Electrical installations in gas dangerous spaces or areas properly maintained, e.g. cargo pump motors, explosion-proof lights, interlocking devices, etc.;

15.12 Closing devices of windows, door and other openings of wheelhouse and of those on exposed bulkheads of superstructures and deckhouse as required maintained in good condition.

15.13 Gas-tight bulkhead penetrations including gas-tight shaft sealing properly maintained.

15.14 Electrical bonding between independent cargo tanks and hull structure properly maintained;

Electrical bonding between hull structures and piping, and between pipe flanges.

15.15

Emergency towing arrangements for tankers DWT > 20000 maintenance;

For tankers constructed on or after 1 July 2002, both ends of the tanker capable of rapid deployment without main power on vessel.

15.16

Personnel protection equipment properly maintained, e.g. :

Decontamination shower and eye wash (if required to be installed), stretcher, medical first-aid equipment, respiratory protection for emergency escape purpose, and shelter in emergency, air compressor (if provided for safety equipment), etc.;

Inspection of the equipment satisfactory and records kept.

PARIS MoU, 2015, Gas Carrier, All areas

Page 60: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 61: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

61

Specific for Passenger Ships – 1/8

16 Passenger Ships - 1/8 (*)

16.1

Safe Manning Document:

SOLAS 74/78 V/13, SOLAS 2004 V/14, IMO Res. A.481 (XII)

Manning in accordance with document, review copy of crew list

15.2

Officers’ certificates:

Master and Chief Engineer licenses current (STCW 95 I/2)

Navigating and engineering officers’ licenses current (STCW 95 I/10)

Medical certificates

16.3

Crew Documents

Documents valid (STCW 95 VI/1)

Medical certificates

16.4 Rest periods

Review watch schedules (STCW 95 VII/1)

16.5

Lifesaving equipment maintenance record (SOLAS 74/78 III/19, SOLAS 2004 III/20)

Periodic checks

Visual inspection

Operation of lifeboat / rescue boat engines

Lifesaving appliances, including lifeboat equipment examined

16.6

Emergency training and drills (SOLAS 74/78 III/18, SOLAS 2004 III/19)

Onboard training in use of lifesaving equipment

SOLAS training manual

Logbook records (SOLAS 74/78 III/18.5, SOLAS 2004 III/19.5)

Weekly and lifeboat drills (SOLAS 74/78 III/25, SOLAS 2004 III/19 3.2)

16.7 Instructions, on-board training and drills (Training Manuals) (SOLAS 2004 II-2/15 & 16)

16.8

Crew able to perform necessary safety and pollution prevention duties (STCW 95 VI/1)

Personal survival techniques

Firefighting emergencies

Elementary first aid

16.9

Accident prevention and occupational health

Rails, guards, protective clothing and equipment, warning signs posted in

crew work areas

16.1

Lifeboats – 1/3

Number required (SOLAS 74/78 III/8, 20, 27, SOLAS 2004 III/21)

Specifications (SOLAS 74/78 III/9, 10, 41, 46, LSA code IV/4.4)

Equipment (SOLAS 70 III/ 11, 12, SOLAS 74/78 III/41, LSA code IV/4.4.8)

Radiotelephone (SOLAS 74/78 III/6.2, SOLAS 2004 III/6.2)

Operating instructions (SOLAS 74/78 III/9, SOLAS 2004 III/9)

Manning (SOLAS 74/78 III/10, SOLAS 2004 III/10)

Marking (SOLAS 74/78 III/20, 41, LSA code IV/4.4.9)

Retro-reflective tape (SOLAS 74/78 III/30, LSA code I/1.2)

Embarkation (SOLAS 74/78 III/11,19, 22, 28, LSA code IV/4.4.3, VI/6.1)

Falls renewed / end-for-end (SOLAS 74/78 III/19, SOLAS 2004 III/20.4)

Page 62: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 63: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

63

Specific for Passenger Ships – 2/8

16 Passenger Ships - 2/8 (*)

16.11

Lifeboats – 2/3

Availability (SOLAS 74 III/4, SOLAS 2004 III/20)

Hull and fittings (SOLAS 74 III/5 & 10, LSA code IV/4.4)

Capacity (SOLAS 74 III/6 & 7, SOLAS 2004 III/21)

Searchlights (SOLAS 74 III/14, LSA code IV/4.4.8)

Davits, falls, winches and stowage (SOLAS 74 III/28, 29, SOLAS 2004 III/23)

16.12

Lifeboats – 3/3

Stowage (SOLAS 74/78 III/11 & 13, SOLAS 2004 III/13, 24,LSA code VI/6.1)

Launching stations (SOLAS 74/78 III/12, SOLAS 2004 III/12)

Launching and recovery procedures (SOLAS 74/78 III/15 & 48, SOLAS 2004 III/16, LSA code VI/6.1)

16.13

Life rafts – 1/2

Number required (SOLAS 74 III/27, SOLAS 74/78 III/20, SOLAS 2004 III/21,32)

Availability (SOLAS 74 III/4, SOLAS 2004 III/16, 20)

Specifications (SOLAS 74 III/ 15 & 16, SOLAS 74/78 III/38 & 40, LSA code IV/4.1)

Equipment (SOLAS 74 III/ 17, SOLAS 74/78 III/38, LSA code IV/4.1.5)

Embarkation (SOLAS 74/78 III/11 & 22, LSA code VI/6.1.5)

Marking (SOLAS 74 III/20, SOLAS 74/78 III/39 & 40, LSA code IV/4.2.7)

Operating instructions (SOLAS 74/78 III/9, SOLAS 2004 III/9)

Manning (SOLAS 74/78 III/10, SOLAS 2004 III/10)

Retro-reflective tape (SOLAS 74/78 III/30, LSA code I/1.2)

Stowage (SOLAS 74 III/29, SOLAS 74/78 III/13,23, SOLAS 2004 III/13,24, LSA VI/6.1)

Servicing (SOLAS 74/78 III/19, SOLAS 2004 III/20)

16.14

Life rafts – 2/2

Launching stations (SOLAS 74/78 III/12, SOLAS 2004 III/12)

Launching and recovery procedures (SOLAS 74/78 III/15 & 48, SOLAS 2004 III/16)

Falls renewed / end-for-end (SOLAS 74/78 III/19, SOLAS 2004 III/20.4)

16.15

Rescue boats

Number required (SOLAS 74/78 III/20, SOLAS 2004 III/21, 32)

Construction and equipment (SOLAS 74/78 III/47, LSA code V/5.1)

Embarkation, launching and recovery (SOLAS 74/78 III/16,22,48, LSA VI/6.1.5)

Stowage (SOLAS 74/78 III/14, SOLAS 2004 III/13, 24, LSA code VI/6.1)

Retro-reflective tape (SOLAS 74/78 III/30, LSA code I/1.2)

16.16

Lifebuoys

Number required (SOLAS 74 III/34, SOLAS 74/78 III/21, SOLAS 2004 III/7)

Specifications (SOLAS 74 III/21, SOLAS 74/78 III/30, 31, LSA code II/2.1)

Retro-reflective tape (SOLAS 74/78 III/30, LSA code I/1.2)

16.17

Additional lifebuoy requirements

Distribution (SOLAS 74/78 III/7, SOLAS 2004 III/7)

Lifeline

Water lights

Markings

Smoke signals

Page 64: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 65: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

65

Specific for Passenger Ships – 3/8

16 Passenger Ships - 3/8 (*)

16.18

Life jackets

Adult ___________, Children ____________

Infant:________________________ (retroactive: 01.07.10) SOLAS 2004 III/22

Specifications (SOLAS 74 III/22, SOLAS 74/78 III/32, LSA code II/2.2)

Retro-reflective tape (SOLAS 74/78 III/30, LSA code I/1.2)

Lights (SOLAS 74/78 III/21, LSA code II/2.2.3, SOLAS 2004 III/22)

Whistles (SOLAS 74/78 III/32, LSA code II/2.2.1.8)

16.19 Stowage of life jackets (SOLAS 74/78 III/7, SOLAS 2001 III/22.2, SOLAS 2004 III/22.2, 26.5)

16.2 Immersion suits and thermal protective aids

SOLAS 74/78 III/21, SOLAS 2004 III/22.4 (region of navigation to be considered)

16.21

Additional immersion suit requirements

Specifications (SOLAS 74/78 III/33, SOLAS 2004 III/7.3, 22.4 LSA code II/2.3)

Retro-reflective tape (SOLAS 74/78 III/30, LSA code I/1.2)

16.22

Line throwing apparatus

Specifications (SOLAS 74 III/23, SOLAS 74/78 III/49, SOLAS 2004 III/18, LSA code VII/7.1)

16.23

Additional line-throwing apparatus requirements

Number required (SOLAS 74/78 III/33, SOLAS 2004 III/18)

Stowage (SOLAS 74/78 III/49, LSA code VII/7.1)

16.24

Distress signals

12 red rocket parachute flares (SOLAS 74 III/24, SOLAS 74/78 III/16, 35, SOLAS 2004 III/6.3, LSA code III/3.1)

16.25

Additional emergency communication equipment (SOLAS 74/78 III/6, SOLAS 2004 III/6)

Two-way radio

Portable radio for survival craft (SOLAS 74/78 III/50, LSA code IV/4.4.7.8)

Emergency alarm system

Emergency communications (SOLAS 2004 III/6.4)

16.26

Muster stations

Marking

Location (SOLAS 74/78 III/24, SOLAS 2004 III/25)

Size (SOLAS 74/78 III/24, SOLAS 2004 III/25)

Emergency lighting (SOLAS 74/78 III/11, SOLAS 2004 III/11)

16.27 Adequate lighting for decks, lifeboats, etc

Emergency lighting (SOLAS 74/78 III/30, SOLAS 2004 II-1/42)

16.28

Fire control plans (SOLAS 74/78 II-2/20, SOLAS 2004 II-2/15.2.4)

Properly displayed (SOLAS 74/78 II-2/41, 2.1.1)

Correct notations and information

Weathertight enclosure outside deckhouse

Page 66: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 67: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

67

Specific for Passenger Ships – 4/8

16 Passenger Ships - 4/8 (*)

16.29

Construction details

Restricted use of combustible materials: (SOLAS 74 II-2/27, SOLAS 74/78 II-2/34, SOLAS 2004 II-2/9)

Draught stops (SOLAS 74 II-2/28, SOLAS 74/78 II-2/35, SOLAS 2004 II-2/8)

Penetration of A and B class bulkheads: (SOLAS 74 II-2/23, 24 SOLAS 74/78 II-2/18, SOLAS 2004 II-2/9.3)

16.3

Main vertical and horizontal zones

(SOLAS 74 II-2/18, 36, SOLAS 2004 II-2/3, 9.2.2)

Conforms to plans (SOLAS 74/78 II-2/24, SOLAS 2004 II-2/9.2.2)

A-class bulkheads

Bulkheads within main vertical zones: (SOLAS 74 II-2/19, SOLAS 74/78 II-2/25, SOLAS 2004 II-2/9.2.2.2)

Fire integrity values (SOLAS 74 II-2/20, SOLAS 2004 II-2/9.2.2.3)

16.31 Additional main vertical zone requirements: SOLAS 74/78 II-2/24, 25

Bulkheads deck to deck or equivalent (SOLAS 2004 II-2/9.2.2.2)

16.32

Fire doors: (SOLAS 74 II-2/23, 24, 37)

A-Class in following areas: (SOLAS 74/78 II-2/30, 31)

- Main vertical zones

- Stairway enclosures

- Control stations

- Bridge control / indicator lighting

- Galley enclosures

Control station and local release

Proper closure

Free of hold-back hooks (SOLAS 74/78 II-2/41, 2.4.2, SOLAS 2004 II-2/9.4.1.2)

Tested

16.33

Protection of stairways and lifts: SOLAS 74 II-2/22, 42, SOLAS 2004 II-2/9.2.2.5

A-class enclosures (SOLAS 74/78 II-2/29, SOLAS 2004 II-2/9.2.2.5)

Fire dampers(SOLAS 74/78 II-2/42, SOLAS 2004 II-2/9.7.3)

No direct access to spaces containing combustibles

16.34

Windows and side scuttles: (SOLAS 74 II-2/26 MSC circ. 847, II-2/33)

Proper framing (SOLAS 74/78 II-2/33)

Glass meets bulkhead integrity requirements

Special attention in way of embarkation areas

16.35 Paint lockers: (SOLAS 74/78 II-2/18, SOLAS 2004 II-2/10.6.3)

Fire extinguishing system

Page 68: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 69: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

69

Specific for Passenger Ships – 5/8

16 Passenger Ships - 5/8 (*)

16.36

Ventilation systems: (SOLAS 74/78 II-2/32, SOLAS 2004 II-2/9.7)

Main inlets and outlets can be closed from outside ventilated spaces (SOLAS 74 II-2/23, SOLAS 2004 II-2/9.5)

Construction (SOLAS 74 II-2/25, SOLAS 2004 II-2/9.7)

Two remote shutdowns

Fire damper with their remote closing control (SOLAS 74/78 II-2/32, SOLAS 2004 II-2/9.5):

- Overall condition

- Operation

- Marking

Smoke damper:

- Overall condition

- Operation

- Marking

Conforms to plans

Separate for enclosed stairways

Machinery ventilation shut-down (SOLAS 74 II-2/45, SOLAS 2004 II-2/9.5)

Machinery ventilation fire damper (SOLAS 74 II-2/34, SOLAS 2004 II-2/9.5)

16.37

Galley range ducts: (SOLAS 74/78 II-2/41, 2.4.3, SOLAS 2004 II-2/9.7.5)

- A-class

- Grease traps

- Fixed fire extinguishing system

- Shutdown

- Fire damper

16.38

Laundry room ventilation:

System clean and clear of potential fire hazards

Adequate cleaning and maintenance program NOTE: For vessels operating in U.S. Waters extra filters on exh. Air ducting

16.39

Smoke detection and alarm system: (SOLAS 74/78 II-2/41,2.2 SOLAS 2004 II-2/7)

Accommodation spaces

Service spaces

Stairway enclosures

Corridors

16.4

Smoke detection and alarm system fitted above ceilings: (SOLAS 74/78 II-2/41, 2.3, FSS code Ch. 9)

In stairways and corridors (if ceilings are made of combustible material) NOTE: This system is no longer accepted for use after 10/2010

16.41

Fixed fire detection and alarm systems: (SOLAS 74 II-2/12, SOLAS 2004 II-2/7, FSS code Ch. 9)

Indicate fire and its location (SOLAS 74 II-2/32)

2 sources of power (SOLAS 74/78 II-2/13)

Spare parts (SOLAS 74/78 II-2/36)

Alarms

Page 70: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 71: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

71

Specific for Passenger Ships – 6/8

16 Passenger Ships - 6/8 (*)

16.42

Additional fixed fire detection and alarm system requirements:

Fault indicators (SOLAS 74/78 II-2/13, FSS code Ch. 9)

Control panel indicators (SOLAS 74/78 II-2/36, SOLAS 2004 II-2/7.5.3)

Instructions

Call point indicators

Smoke extraction system (vessels built after 02.92)

Required in machinery spaces if manning is reduced

16.43

Fire extinguishers: (SOLAS 74 II-2/15, SOLAS 2004 II-2/10.3)

Spares (SOLAS 74/78 II-2/21, SOLAS 2004 II-2/10.3.3.3)

Serviced (SOLAS 74/78 II-2/6)

Location and number as per the Fire Control Plan (SOLAS 74 II-2/7,32)

16.44

Fire pumps, fire mains, hydrants hoses: (SOLAS 74 II-2/15, SOLAS 2004 II-2/10.2)

Number of pumps required (SOLAS 74/78 II-2/21)

Adequate number and position of hydrants (SOLAS 74 II-2/5, SOLAS 2004 II-2/10.2.1.5)

(SOLAS 74 II-2/5, SOLAS 2004 II-2/10.2.1.5)

Adequate pressure (SOLAS 74/78 II-2/4, SOLAS 2004 II-2/10.2.1.6)

Relief valves (SOLAS 74 II-2/32)

Fire hoses & spanners properly stored (SOLAS 2004 II-2/10.2.3.2)

Water fog applicators (SOLAS 74/78 II-2/41, 2.1.3, SOLAS 2004 II-2/10.5.5, III/20.6.2)

- 2 in each category A machinery space

- 1 for each SCBAs

- 3 for each special category space

Portable foam applicators (SOLAS 74/78 II-2/41, 2.1.4, SOLAS 2004 II-2/10.5)

- 1 unit in each boiler room

- 1 unit in each engine room

- 1 unit for each special category space

Fire hose nozzles (SOLAS 74/78 II-2/41, 2.1.5, FSS code Ch. 7)

- Jet / spray nozzles with a shutoff

16.45 Fire hoses made of non-combustible / perishable materials: ( SOLAS 74/78 II-2/4, 21, SOLAS 2004 II-2/10.2.3)

16.46 International shore connection: (SOLAS 74 II-2/32, SOLAS 74/78 II-2/19, SOLAS 2004 II-2/10.2.7)

16.47

Fixed gas systems: (SOLAS 74 II-2/8, SOLAS 74/78 II-2/5, SOLAS 2004 II-2/10.2.4)

Alarms

Piping

Controls

CO² storage rooms

16.48 Instructions and spare parts for fixed gas systems: (SOLAS 74/78 II-2/5)

Page 72: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 73: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

73

Specific for Passenger Ships – 7/8

16 Passenger Ships -7/8 (*)

16.49

Alternate fixed systems in machinery spaces: (SOLAS 74 II-2/10)

Fixed high expansion foam (SOLAS 74/78 II-2/9)

Fixed pressure water spray (SOLAS 74 II-2/11)

16.5 Fixed foam systems in machinery spaces: (SOLAS 74 II-2/9)

16.51 Fixed low expansion foam as supplement in machinery spaces:

(SOLAS 74/78 II-2/8)

16.52

Automatic sprinkler, fire alarm and fire detection systems: (SOLAS 74 II-2/12)

Isolation valves (SOLAS 74 II-2/29)

Pressure gauges (SOLAS 74/78 II-2/12)

Wet pipe (fully loaded)

Alarms (bridge panel)

Plan (zone plan)

Pump and tank

Test valve

Sprinkler heads are not recessed, not covered, nor shaded

Spare heads

16.53

General emergency alarm: (SOLAS 74 II-2/32, SOLAS 74/78 II-2/40)

Audible throughout accommodation spaces, crew working spaces, and open decks (SOLAS 74/78 II-2/41, 2.4.8)

Sounds continuously until MANUALLY shut off

Special crew alarm (SOLAS 74/78 II-2/40.4)

16.54

Public address system Installed: (SOLAS 74 II-2/32, SOLAS 74/78 II-2/40)

Audible throughout accommodation spaces, public spaces, service spaces, control stations and open decks (SOLAS 74/78 II-2/6.5 & 41, 2.4.9)

16.55

Adequate means of escape in accordance with fire control plans: (SOLAS 74 II-2/21, SOLAS 74/78 II-2/28)

Two means of escape

Dead-end corridors

Not blocked by furniture (SOLAS 74/78 II-2/41, 2.4.10)

Enclosed protected access to embarkation

Permanent signage displayed

16.56

Low-location lighting: (SOLAS 74/78 II-2/41, 2.4.7)

- No more than 1 foot above deck

- Signs and equipment marked

- Inspected and logged weekly

- Confirmation of 5 year testing for PL material effectiveness

Page 74: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 75: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

75

Specific for Passenger Ships – 8/8

16 Passenger Ships - 8/8 (*)

16.57

Additional requirements for vessels with Ro-Ro decks: (SOLAS 74 II-2/30, SOLAS 74/78 II-2/37)

Structural boundaries

Manual drencher system:

- Condition of heads and piping

- Testing

Fire patrol

Fire call boxes

Fixed fire extinguishing system

Additional fire equipment

Vent system requirements

Explosion-proof lighting

16.58

Additional requirements for vessels with cargo holds intended to carry motor vehicles with fuel tanks (SOLAS 74 II-2/31, SOLAS 74/78 II-2/38, 39)

Fixed fire detection and alarm (vessels built after 02.92 may substitute smoke extraction system)

Fixed fire extinguishing system

Special ventilation requirements

Explosion-proof fixtures + equipment

16.59

Watertight doors: SOLAS 74 II-1/13,15 (for vessels constructed 01.02.1992)

- Visual inspection

- Marking

- Local operation

- Remote operation from Bridge

- Operation from emergency station

Page 76: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

REMARKS / COMMENTS:

Page 77: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive

Date ….………….…….. Place .………………………… Ship Stamp: Name .…………….……. Signature ………………………….

(*) X = Checked (*) N = Not checked (*) D = Deficient (*) NA = Not applicable

PSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP

77

PARIS MoU, 2015, Passenger Ship, All areas

PARIS MoU, 2015, Ro-Ro Passenger Ship, All areas

PARIS MoU, 2015, High Speed Passenger Ship, All areas

Page 78: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive
Page 79: BUREAU VERITAS MARINE & OFFSHORE · PDF filePSC Inspection Checklist for BUREAU VERITAS classed vessels – rev. 04/2015 M&O/DO/FM/TPP 3 BUREAU VERITAS MARINE & OFFSHORE DIVISION Preventive