bruce bare

21
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014

Upload: aviv

Post on 15-Feb-2016

181 views

Category:

Documents


0 download

DESCRIPTION

NETC Authoring Instruction Materials (AIM) Roadmap February 2014. Bruce Bare. Agenda. Agenda Authoring Instructional Materials (AIM I / AIM II) Content Planning Module (CPM) AIM Learning Object Module ( LOM) AIM- CeTARS CIN/CDP Comparison Numbers AIM and CeTARS Data Exchanges - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Bruce Bare

1

Bruce Bare

NETCAuthoring Instruction Materials (AIM)

Roadmap

February 2014

Page 2: Bruce Bare

2

Agenda

Agenda Authoring Instructional Materials (AIM I / AIM II) Content Planning Module (CPM) AIM Learning Object Module (LOM) AIM-CeTARS CIN/CDP Comparison Numbers AIM and CeTARS Data Exchanges AIM and CPM Database Topology Future Workgroups ETMF Integration between AIM-CPM and CeTARS Questions

Page 3: Bruce Bare

3

Authoring Instructional Materials (AIM) Overview

AIM is a government-owned & managed system used by Navy Training Learning Centers, Learning Sites and Navy acquisition community commands to design, develop, update, manage, and integrate training content such as the TPP, TCCD, CMS, RRL, Lesson Plan (LP), Trainee Guide (TG), and test items.

AIM works to Implement different Instructional Design Standards the Navy has in place by providing automated conformance to NAVEDTRA standards:

AIM I - Supports NAVEDTRA 131B – Personnel Performance Profile (PPP) based curriculum development AIM II - Supports NAVEDTRA 130B – Tasked-Based and ILE curriculum development AIM LO Module - Accepts design output from web-based CPM to produce ILE and ILT content objects and assessment items

A web version of AIM LOM is in development that will combine with CPM to create one integrated web application supporting the entire E2E Content Development process.

Learning Centers access AIM I, II and LO Module through Citrix; an interim step that centralized all AIM LC content from NAWCTSD’s R&D Network (DREN) to central site currently hosted by NETPDTC.

AIM PC-client standalone version is still used by some NETC and non-NETC commands, as well as extensive use by contractors supporting both. Many non-NETC commands using standalone AIM desire to transition to Central site AIM.

Page 4: Bruce Bare

Content Planning Module (CPM)

4

Content Planning Module (CPM) of AIM is web-based and CAC-Enabled, linking Navy Job Duty Task Analysis (JDTA) data to Learning Objectives and the Curriculum Outline of Instruction for development/maintenance of ILT and assessment items and for design/maintenance of IMI in the LO Module.

This linkage provides for a direct connection between tasks performed on the job and Learning

Objectives taught and assessed in the classroom and via e-learning.

CPM - Supports NAVEDTRA 136 and 137 and 138 – JDTA Based curriculum development.

AIM CPM was deployed in Jul 2009. Recent NETC Instructions provided guidance to Learning Centers/Learning Sites and recommendation to acquisition communities to transition their content development process to use CPM and AIM LO Module:

NETC INST 1500.10 - (10 Aug 12) defining policy: • Any new content development within the NETC domain, for revision of 50 percent or greater of existing content, shall be performed using AIM, CPM , and

LOM . Learning Centers (LCs) should strive to convert all course material using AIM, CPM, and LOM as workload permits

• A Job Duty Task Analysis (JDTA) is required to be developed in the CPM for all revisions that add new work to a course (tasks ) , new developments, and base-lining of an existing course, regardless of the development tool

NETC INST 1500.10A - (19 Sep 13) defining policy:• Any new content development, revision, or maintenance within the NETC domain shall be performed using AIM, CPM , and LOM . Additionally,

Learning Centers (LCs) shall convert all course material into AIM, CPM, and LOM no later than 1 October 2016

Page 5: Bruce Bare

Learning Object (LO) Module

5

Current version (5.0) is desktop client application integrated into both AIM I and AIM II hosted on NETPDTC Citrix Central Site Imports data from / exports data to web-based

CPM Continuing to evolve functionality based on user

community AIM Change Requests (ACRs) as prioritized by FRB and funded by NETC N7

ongoing functional enhancements tasked/funded through FY14

Page 6: Bruce Bare

AIM Database Topology graphic

6

Page 7: Bruce Bare

LO Module Webification

7

Long-term plan is to integrate LO Module functions into CPM as a fully web-based application

Phase 1 (approx. 50% of full desktop client LO Module functionality) Funded and accepted by govt in Jan 14

Phase 2 (approx. 20% additional increment of desktop client functionality) Funded - delivery scheduled Nov 14

Phase 3 (100% of desktop client functionality and operational replacement for AIM I/AIM II/ LO Module desktop client) Unfunded - schedule and required funding are TBD based on several factors, including freeze of desktop client enhancements that will need to be incorporated into the Phase 3 version of webified LO Module

Page 8: Bruce Bare

8

AIM and CeTARS

Page 9: Bruce Bare

AIM and CeTARS Data Exchanges

9

The Course Master Schedule (CMS) provides a detailed sequential period-by-period course structure outlining learning topics for each course of instruction (COI). Two methods are currently in place for input of the CMS into CeTARS:

Manual Input by the Learning Center or Learning Site using user input forms in JCERS A direct one-way AIM I/II to CeTARS web service

CeTARS maintains the CMS in JCERS at the CIN and CDP levels. AIM I/II maintain the CMS also at the CIN and CDP level within the AIM database.

NETCINST 1510.1A (18 Feb 2010) identifies CeTARS as the Authoritative Source for course information.

The Resource Requirements List (RRL) is maintained in AIM I/II as part of the TCCD and other training elements identified and required by NAVEDTRA series. Course RRL data is maintained in AIM and can be provided to LC via a PDF file.

LC manually input RRL data, with the exception of Publications, into CeTARS using AIM PDF file. CNATT used ATEM for RRL minus Pub data. This produced an ERL – Equipment Requirements List. CNATT ERL is manually downloaded via a flat file from CeTARS and uploaded into AIM for RRL updates.

Page 10: Bruce Bare

10

AIM and CeTARS Data Exchange Graphic

Page 11: Bruce Bare

11

Page 12: Bruce Bare

AIM - CPM Database Topology

12

AIM Database consists of Learning Center specific database folders and a file share resource database for ILT Computer Aided Instruction (CAI) content.

The Learning Object Module (LOM) also uses the AIM database structure User input for training material, LO, and file sharing is through five (5) load balanced Citrix servers Total current data density for AIM database is: 385gb with a current capacity of 500gb

With the development of CPM and LO Module web version, all LC database folders will be consolidated into one CPM database.

LC initiated input into CPM. Target completion date of 1 Oct 2016 (NETC INST 1500.10A) Existing AIM I and II data elements will be migrated to CPM-LO Module format Efficacy of conversion testing is currently in-work

As data density in CPM increases, so will the requirement for new web services:

CMS – Change existing AIM I/II Web Service to CPM Web Service RRL – New Web Service with CeTARS to use the CeTARS equipment inventory Assessments (Questions) – New Web Service with CeTARS Assessments (Test Item Analysis) – New Web Service with LAS Content Outline - New Web Service with LMS

Page 13: Bruce Bare

Potential Workgroups

13

Form working groups to determine future web service requirements within ETMF.

CeTARS Web Services:

CMS Working Group: Database differences between CPM and CeTARS indicate a deep dive into the requirements of CeTARS for CPM Course Master Schedule (CMS). As the data density of CPM increases, a milestone will identify the switch from current AIM I/II CMS web service to a new CPM CMS web service.

RRL Working Group: Currently, CNATT has exclusive equipment data sharing with AIM I/II via a downloadable Equipment Resource List (ERL). However, the ERL does not contain all data elements of the RRL: specifically, Publications and IETMS. Identify RRL data elements required by CeTARS eTEM Module Define the process for update of RRL through CeTARS and CPM Determine the RRL authoritative source location

CSM and LAS Assessment: Determine process and structure to use AIM assessment data for Test Item Analysis processes, tools, and structure.

Recognized: Training Data Originates in AIM and CPM We need to build Interfaces to capture this data and distribute where needed Convert AIM to CPM databases structure Determine context of Data Authority

Page 14: Bruce Bare

14

ETMF Integration Between AIM-CPM and CeTARS Graphic

Page 15: Bruce Bare

Summary

.15

AIM CPM-LO is progressing in both usage and content. With the recent distribution of NETCINST 1500.10A to all Learning Centers and Learning Sites, data density within CPM is expected to increase exponentially as the 1 Oct 2016 deadline for course conversion from AIM I/II to CPM-LO is reached. We need to work together to: Identify Bottlenecks Monitor quarterly progress by LC/LS Provide assistance

Manual process are still in use by within LC and LS to input equipment inventory, publications, Course Master Schedules (CMS) and other training related activities. Both AIM and CeTARS have recently introduced modules within their applications to assisting users in automating manual processes. Workgroups need to be established between all ETMF partners to: Identify specific web-services that will be required Conduct In-depth review of data elements requirements Determine Level of Effort (LOE), cost, and development schedule for each web-service.

Page 16: Bruce Bare

16

Questions

Page 17: Bruce Bare

Backup Slides

17

Page 18: Bruce Bare

List of AcronymsAcronym Full NameAIM Authoring Instruction Materials

Altiris Asset Management Suite

CPM Content Planning Module

eTEM Enterprise Training Equipment Management

LOM Learning Object Module

NOID

CeTARS Corporate enterprise Training Activity Resource System

JDTA Job, Duty, Task Analysis

OCCSTDS Occupational Standards

LAS Learning Assessment system

LMS Learning Management System

TRS Training Resource Scheduler

CMS Course master Schedule

RRL Resource Requirements List

NORDAC

NJAM

PES Personnel Equipment Space

18

Page 19: Bruce Bare

Authoritative NJA Data

Job Duty Task Analysis

(JDTA) Data

Learning Objectives / COI Data

NJAM DM Data

NETC LAS Survey Data

QMP Application v6 (Super Matrix Modification

incorporated)

Content Planning Module (CPM) Applications

NJAM Data Mgmt

Application

Restore NJAM Capabilities QMP Incorporates Super Matrix into v6 NETC LAS Upgrades to QMP v6 NPRST Completes NJAM DM Application NETC Incorporated NJAM DM into AIM / CPM NETC links LAS QMP Survey Data to CPM NAVMAC transfers task data & discontinues NOID task management function

NJAM Architecture Final Architecture - Full Capabilities

19

NETC / AIM

NETC / LAS Web Portal

NavySailor

Page 20: Bruce Bare

20

Page 21: Bruce Bare

LO Module Webification – Terminology

21

Migration: largely manual re-development of current AIM I/II (NAVEDTRA 131/130 ISD model) into CPM/LO Module (NAVEDTRA 136/137/138 ISD model) driven by the NETC INST 1500.10A

Conversion: largely automated update of LO Module desktop client curricula into Web-based LO Module format