Broadband Developments Road Map Release AJ 16 th September 2013 Release AK 18 th November 2013 CP action needed N o C P a c t i o n n e e d e d CP Changes recommende d FTTP: Product Withdrawal (BB940- 13) WBC: Abortive Visit Charges (BB955-13) IPS, WBC & FTTx: Visibility of Openreach KCI notes via B2B & Portal (BB940-13) I can be found at www.btwholesale.com IPS, WBC FTTC: Amend order to earlier date /Preponement (BB940- 13) FTTC: Self Install GEA service test (BB940-13) FTTC: Select OR or CP modem in FTTC PCP only Self Serve Trial (BB832-13) FTTC: Self Install Standard or Flexible Appt for PCP only (BB941-13) FTTP On Demand: New Dialogue Service for Distance Based Charging (BB832- 13) FTTP On Demand: Out of Term EUA charges (BB832-13) IPS, WBC & FTTC: SiM2 (BB1059-13) WBC: LLU migration to BTW broadband (BB1059-13) FTTX: Automated expedite process (BB1059-13) FTTC: Consume Openreach TRC charges T2R (BB1059- 13) IPS, WBC FTTX: KCI enhancements (BB1062-13) FTTC: Consume EMLC speed ranges (BB1062-13) FTTC: Improving the transfer and winback process (BB1062-13) IPS, WBC & FTTX: Visibility of KCI’s via xml & portal (BB1062-13) FTTC: Self Install Openreach to install modem (BB1062-13) FTTC: Self Install ability to select flexible or standard appt (BB1062-13) FTTP: Product withdrawal (BB1062- 13) FTTC: Self Install consume CPE enablement parameter (BB1062-13) FTTP On Demand: New dialogue service for Distance Based Charging (BB1062-13) FTTP On Demand: L2C journey change for Radial Based Charging (BB1062-13)

Upload: xavier-booker

Post on 02-Jan-2016

21 views

Category:

Documents


2 download

DESCRIPTION

I can be found at www.btwholesale.com. Broadband Developments Road Map. Release AJ 16 th September 2013. Release AK 18 th November 2013. IPS, WBC FTTC: Amend order to earlier date / Preponement (BB940-13). IPS, WBC & FTTC: SiM2 (BB1059-13). FTTP: Product Withdrawal (BB940-13). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Broadband Developments Road Map

Broadband Developments Road MapRelease AJ

16th September 2013Release AK

18th November 2013

CP

act

ion

ne

ed

ed

N o C P a c ti o n n e e d e d

CP

Ch

an

ge

s re

com

me

nd

ed

FTTP: Product Withdrawal (BB940-13)

WBC: Abortive Visit Charges (BB955-13)

IPS, WBC & FTTx: Visibility of Openreach KCI notes via

B2B & Portal (BB940-13)

I can be found at www.btwholesale.com

IPS, WBC FTTC: Amend order to earlier date

/Preponement (BB940-13)

FTTC: Self Install GEA service test (BB940-13)

FTTC: Select OR or CP modem in FTTC PCP only

Self Serve Trial (BB832-13)

FTTC: Self Install Standard or Flexible Appt for PCP only

(BB941-13)

FTTP On Demand: New Dialogue Service for

Distance Based Charging (BB832-13)

FTTP On Demand: Out of Term EUA charges

(BB832-13)

IPS, WBC & FTTC: SiM2 (BB1059-13)

WBC: LLU migration to BTW broadband (BB1059-

13)

FTTX: Automated expedite process (BB1059-13)

FTTC: Consume Openreach TRC charges

T2R (BB1059-13)

IPS, WBC FTTX: KCI enhancements (BB1062-

13)

FTTC: Consume EMLC speed ranges (BB1062-

13)

FTTC: Improving the transfer and winback process (BB1062-13)

IPS, WBC & FTTX: Visibility of KCI’s via xml

& portal (BB1062-13)

FTTC: Self Install Openreach to install modem (BB1062-13)

FTTC: Self Install ability to select flexible or standard

appt (BB1062-13)

FTTP: Product withdrawal (BB1062-13)

FTTC: Self Install consume CPE enablement

parameter (BB1062-13)

FTTP On Demand: New dialogue service for

Distance Based Charging (BB1062-13)

FTTP On Demand: L2C journey change for Radial Based Charging (BB1062-

13)

Page 2: Broadband Developments Road Map

Broadband Release Schedule 2012/13

Release Date

Release AJ 16th September 2013

Release AK 18th November 2013

Release AL 20th January 2014

The above dates are not confirmed until 90 day legal notification has been published

I can be found at www.btwholesale.com